WESTERN SLOPE CIP AND TIM FEE UPDATE

Similar documents
Western Slope CIP and TIM Fee Update Workshop

Community Development Agency Capital Improvement Program TIM Fee Program Cash Proforma (by Revenue Grouping)

Fresno County Little Bear Solar Project EIR SCOPING MEETING Thursday, September 14, :30 pm - 7:30 pm

ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

1 Introduction. 1.1 Specific Plan Background

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

Long Range Transportation Plan

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT

Renewed Measure M2 Eligibility Requirements Workshop. Orange County Transportation Authority April 12, 2011

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP ("Applicant"),

Attachment B. Long Range Planning Annual Work Program

Appendix B Meeting Presentation. PowerPoint Presentation Informational Boards

Agenda Item D.2 PRESENTATION Meeting Date: June 17, 2014

METHODOLOGY - Scope of Work

APPENDIX B.3 SCOPING SUMMARY REPORT

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

PRESENTATION ITEMS. 1. Furniture, Fixtures and Equipment (FF&E) Program

REQUEST FOR CITY COUNCIL ACTION

Downtown Oakland Specific Plan Frequently Asked Questions

Public Scoping Meeting for the Environmental Impact Report

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

1.0 EXECUTIVE SUMMARY

IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

A RESOLUTION ADOPTING THE LADY S ISLAND CORRIDOR STUDY

2016 Measure B Program Areas

The goal of the program is to enable transit-oriented housing and employment growth in Santa Clara County s Priority Development Areas (PDAs).

Board of Supervisors' Agenda Items

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.

CITY COUNCIL File #

CITY OF MERCED Planning & Permitting Division

ORTEGA HIGHWAY: UNNECESSARY DELAYS HAVE COST US MILLIONS

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

PLACER COUNTY REGIONAL TRAFFIC CONGESTION AND AIR QUALITY MITIGATION FEE PROGRAM

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of March 14, 2018.

South Fulton Comprehensive Transportation Plan of Fulton County Transportation Coordinating Committee August 08, 2014

Metro. Board Report. File #: , File Type:Informational Report

ENVIRONMENTAL IMPACT REPORT

LAKE~SUMTER MPO 2035 TRANSPORTATION PLAN & LAND USE WORKSHOP

COUNTY OF SACRAMENTO CALIFORNIA

STAFF REPORT. MEETING DATE: August 21, 2008 AGENDA ITEM: 9

REQUEST FOR PROPOSALS EASTERN COACHELLA VALLEY S ACTION PLAN FOR CLIMATE RESILIENCE BACKGROUND AND GENERAL DESCRIPTION

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY

Board of Supervisors' Agenda Items

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT

MOBILITY PARTNERSHIP AGENDA

Presented by: James Moose Remy, Thomas, Moose and Manley, LLP. With: Stephen L. Jenkins, AICP Michael Brandman Associates

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT

ATTACHMENT A PDA PLANNING GRANT PROGRAM Information and Evaluation Criteria

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 10, 2018.

REQUEST FOR PROPOSALS

Memorandum CITY OF DALLAS. February 1, Honorable Mayor and Members of the City Council

COUNTY OF SACRAMENTO CALIFORNIA

TRAFFIC IMPACT ANALYSIS IMPLEMENTATION. Richard L. Caywood, P.E. Robert W. Hofrichter

Managing Access along Pennsylvania s Highways in the Delaware Valley

EL DORADO HILLS COMMUNITY SERVICES DISTRICT

CITY OF SPOKANE VALLEY Request for Council Action

Measure A Strategic Plan Update Citizens Advisory Committee July 1, 2014

REQUEST FOR PROPOSALS

Request for Proposals For General Plan Update

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park

Coolidge - Florence Regional Transportation Plan

Action / Decisions Pending / Follow up

City Council Report 915 I Street, 1 st Floor Sacramento, CA

GENERAL PLAN GENERAL PLAN ADVISORY COMMITTEE. General Plan 101 and Safety Element. Yucca Valley Community Center November 14, 2012

CITY OF SAN JOSE CHARCOT AVENUE EXTENSION PROJECT COMMUNITY STAKEHOLDER MEETING

County Executive Office/Legislative Affairs. County of Orange Report on Grant Applications/Awards

CAIS Trustee Head Conference 2014 Developing a Successful Project Entitlements Team & Strategy

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed

Contents. FY 2014 YEAR END REPORT Kalamazoo Area Transportation Study

VTP Highway Program. Semi-Annual Report April 2013

SACRAMENTO REGION, CALIFORNIA:

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding

2018 Regional Transportation Improvement Program

CITY OF PLACERVILLE Development Services Department ENGINEERING DIVISION

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

NAPA COUNTY GRAND JURY

Regional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

Tax Increment Financing Via Enhanced Infrastructure Financing Districts

FEDERAL LANDS ACCESS PROGRAM

Transportation Needs and Funding Role of Impact Fees. January 6, 2015 BoCC Workshop

INTRODUCTION. RTPO Model Program Guide February 27, 2007 Page 1

HB2 Update October, 2014

Planning Committee STAFF REPORT October 7, 2015 Page 2 of 6 Changes from Committee Background MTC began preparing its 2017 RTP Update earlier this yea

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of November 15, 2017.

CHAPTER House Bill No. 5013

The Council entered into an executive session at 5:10 p.m. Motion to adjourn R Eck, second D Johnson

DISCUSSION ITEM EXECUTIVE SUMMARY

H I G H WAY D I G I TA L S IGNS L AND D E V E L O M P E N T C O D E A M E N D M E N T A DDENDUM

Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended

Transcription:

WESTERN SLOPE CIP AND TIM FEE UPDATE 12/6/16 BOARD OF SUPERVISORS STUDY SESSION B O A R D S T U D Y S E S S I O N # 8 2015 14-0245 Revised 22M 1 of 53

AGENDA 1. Background 2. Programmatic EIR 3. General Plan Amendments 4. 2016 CIP Book 5. TIM Fee Program 6. Amendments to the County Ordinance Code 7. Next Steps 14-0245 Revised 22M 2 of 53 2

RECOMMEND BOARD APPROVE/ADOPT: Consistent with 10/27/16 Planning Commission Recommended Board Actions: Environmental Certification 1. Resolution Certifying the Environmental Impact Report (EIR) for the Major CIP and TIM Fee Update 2. Mitigation Monitoring and Reporting Plan (MMRP) General Plan Amendments 3. Resolution Amending the General Plan Transportation and Circulation Element 14-0245 Revised 22M 3 of 53 3

RECOMMEND BOARD TO APPROVE/ADOPT: 2016 CIP 4. 2016 Capital Improvement Program (CIP) Book TIM Fee Program 5. Resolution adopting the TIM Fee Program Nexus Study 6. Authorize Auditor-Controller to create new TIM Fee Accounts 7. Approve and authorize Chair to sign budget transfer for TIM Fee accounts 14-0245 Revised 22M 4 of 53 4

RECOMMEND BOARD TO APPROVE/ADOPT: Amendments to County Ordinance Code 8. Approve 1 st Reading of Frontage Improvement Ordinance 9. Approve 1 st Reading of TIM Fee Ordinance 10. Waive full reading, by title only and continue the adoption of the Ordinances to December 13, 2016 14-0245 Revised 22M 5 of 53 5

RECOMMEND BOARD TO RECEIVE & FILE: 11. Draft TIM Fee Administrative Manual 12. Final Outreach Summary Report 13. Responses to public comments 14-0245 Revised 22M 6 of 53 6

MEASURE E Measure E did not change: LOS standards as stated in General Plan policy TC-Xd General Plan Land Use map Projected growth based on legally defensible: Average historic growth rate Adopted General Plan Policies and Goals *Forecasted impacts to the County s road network have not changed, and therefore the proposed CIP project list as presented in April remains unchanged 14-0245 Revised 22M 7 of 53 7

1. COUNTY DEPARTMENTS INVOLVED IN THE UPDATE Community Development Agency Long Range Planning Division Transportation Division Development Services Administration & Finance Chief Administrative Office Economic Development County Counsel Auditor/Controller s Office 14-0245 Revised 22M 8 of 53

1. OTHER AGENCIES INVOLVED IN THE UPDATE SACOG Caltrans El Dorado County Transportation Commission El Dorado County Transit Authority City of Folsom City of Placerville City of Rancho Cordova Sacramento County 14-0245 Revised 22M 9 of 53

1. CONSULTANT TEAM Urban Economics 14-0245 Revised 22M 10 of 53 10

1. THE CONSULTANT TEAM 14-0245 Revised 22M 11 of 53

1. PUBLIC OUTREACH PROCESS 14-0245 Revised 22M 12 of 53 12

1. PROJECT WEBSITE & COMMUNICATION Launched Website in May 2015 5,600 individual site visits Over 1,300 active users 300+ online comments received Currently has 1,300 subscribers including all County news media Over 21 E-Blasts sent promoting meetings and documents 43% click-through rate 14-0245 Revised 22M 13 of 53 13

1. FOCUS GROUPS Recruited 65 people to participate in 5 focus groups: 2 Resident Groups Economic Development Development Interests Public Safety and Special Districts 14-0245 Revised 22M 14 of 53 14

1. FOCUS GROUPS Held two rounds of five 2-Hour Sessions (10 total) in May and August 90% of participants rated the TIM Fee & CIP development process as Good or Excellent 14-0245 Revised 22M 15 of 53 15

1. PUBLIC WORKSHOPS Five workshops in 2015 two in May, two in September, one in December Attended by 70+ people in-person Viewed by 155 people online 14-0245 Revised 22M 16 of 53 16

1. RECENT STEPS On September 20, 2016, the Board: Tentatively approved 2016 CIP Book Tentatively approved TIM Fee Project List & Nexus Report (Scenario 2) Conceptually approved and provided authorization to Amend the County Ordinance Code 14-0245 Revised 22M 17 of 53 17

2. ENVIRONMENTAL IMPACT REPORT California Environmental Quality Act (CEQA) Review Process Programmatic Environmental Impact Report (EIR) Consistent with 2005 TIM Fee Update Environmental Review 14-0245 Revised 22M 18 of 53 18

2. CEQA PROCESS FOR THE CIP & TIM FEE UPDATE CEQA PROCESS COUNTY CIRCULATES NOTICE OF PREPARATION COUNTY PREPARES DRAFT EIR COUNTY FILES NOTICE OF COMPLETION PUBLIC REVIEW PERIOD (45-DAY MINIMUM) COUNTY PREPARES FINAL EIR COUNTY PREPARES FINDINGS COUNTY SOLICITS INPUT ON CONTENT OF DRAFT EIR (i.e., Public Agencies and members of the Public provide comments) COUNTY SOLICITS COMMENTS ON THE DRAFT EIR (i.e., Public Agencies and members of the Public provide comments) COUNTY BOARD OF SUPERVISORS MAKES DECISION ON THE PROJECT YOU ARE HERE 14-0245 Revised 22M 19 of 53

2. ENVIRONMENTAL IMPACT REPORT Scoping Meeting held on 3/3/16 Comment Period for NOP closed on 3/7/16 Draft Programmatic EIR Released May 19 th Public Review Period: May 19 th July 5 th Response to Comments and Final EIR released on October 7, 2016 14-0245 Revised 22M 20 of 53 20

2. ISSUES ANALYZED IN THE EIR Aesthetics (Visual Resources) Agricultural and Forest Resources Air Quality Biological Resources Cultural Resources Geology/Soils Greenhouse Gas Emissions Hazards/Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services/Recreation Transportation/Traffic Utilities/Service Systems 14-0245 Revised 22M 21 of 53

2. ENVIRONMENTAL IMPACT REPORT Mitigation Monitoring and Reporting Program Findings of Environmental Impact Report Statement of Overriding Considerations 14-0245 Revised 22M 22 of 53 22

3. GENERAL PLAN AMENDMENT General Plan Amendment needed for: Circulation Map (Figure TC-1) Impact Fee Program Section Policy TC-1t Policy TC-1u and Measure TC-V(1) Policy TC-1y 14-0245 Revised 22M 23 of 53 23

3. GENERAL PLAN AMENDMENT The Major Update to the CIP and TIM Fee Programs has necessitated the following changes to the Transportation and Circulation Element: Changes to the size of the road needed by 2035 for nine roadway segments Addition of two roadway segments Changes to Figure TC-1 14-0245 Revised 22M 24 of 53 24

3. GENERAL PLAN AMENDMENT 14-0245 Revised 22M 25 of 53 25

4. ANNUAL CIP AND TIM FEE PROGRAM UPDATE CYCLE* Acronyms: CIP: Capital Improvement Program TIM: Traffic Impact Mitigation Step 1 Review current residential permit activity; research 10- Year housing trends Step 5 Update CIP Step 2 Develop 10-Year Permit Forecast for Board Adoption Step 4 Update TIM Fee Program Step 3 Board to provide roadway priorities for Current Year and 5-Year CIP * As required by General Plan Policy TC-Xb and Implementation Measures TC-A and TC-B 14-0245 Revised 22M 26 of 53 26

4. MAJOR 5-YEAR CIP AND TIM FEE PROGRAM CYCLE* Acronyms: CIP: Capital Improvement Program LOS: Level of Service TIM: Traffic Impact Mitigation Step 1 Update Baseline Information and 20- Year Growth Forecast Step 5 Develop/Update TIM Fee Program Step 2 Run Travel Demand Model * As required by General Plan Policy TC-Xb and Implementation Measure TC-B Step 4 Develop/Update CIP Step 3 Determine Necessary Infrastructure to achieve General Plan LOS Standards 14-0245 Revised 22M 27 of 53 27

4. THE 2016 CIP BOOK WILL INCLUDE: 14-0245 Revised 22M 28 of 53

4. WEST SLOPE ROAD/BRIDGE CIP PROJECT PRIORITIZATION Available Funding Economic Development Site Limitations Operational Deficiencies & Capacity Development Projects Conditions of Approval Regulatory Requirements General Plan Policies (e.g., TC-Xa) 14-0245 Revised 22M 29 of 53

4. 2016 INTERIM CIP BOOK Approved by the Board on June 7, 2016 Provides a work plan for the Transportation Division Proposed 2016 CIP book will replace the Interim Book 14-0245 Revised 22M 30 of 53 30

4. PROPOSED 2016 CIP BOOK Projects are identified in current year, 5, 10, and 20- Year timeline For West Slope Road & Bridge CIP: Project list includes TIM Fee and Non-TIM Fee Projects Addition of an Unfunded CIP Project List 14-0245 Revised 22M 31 of 53 31

4. UNFUNDED CIP PROJECT LIST Roadway Improvements Safety/ Operational Bridge Projects Bike & Ped Projects White Rock Rd Widening (2 to 4 lanes) Manchester Dr. to Sacramento Co. line U.S. 50/Camino Area Local Road Improvements EDC Share Bucks Bar Rd Bridge Replacement U.S. 50/El Dorado Hills Blvd. Interchange Pedestrian Overcrossing 14-0245 Revised 22M 32 of 53 32

4. UNFUNDED CIP PROJECT LIST Sources include: Projects in the current CIP or TIM Fee programs that are not proposed for funding under the updated TIM Fee program Public comments through the project website (www.edcwesternslopeupdate.com) 14-0245 Revised 22M 33 of 53 33

5. TIM FEE PROGRAM COMPONENTS Growth Forecast Project List Zones Land Use Categories 14-0245 Revised 22M 34 of 53 34

5. 2015 2035 GROWTH FORECAST Multi-Family Single Family Retail 14-0245 Revised 22M 35 of 53 35

5. TIM FEE PROJECT LIST Capacity Projects Local roadway widening Auxiliary lanes Interchange improvements Parallel capacity projects (e.g., Saratoga Way) Reimbursement Obligations Constructed projects (e.g., Silva Valley Parkway Interchange) Other Program Costs Bridge replacement grant match funds Intersection improvements Transit capital improvements Program administration 14-0245 Revised 22M 36 of 53 36

2. TIM FEE PROJECT LIST 14-0245 Revised 22M 37 of 53 37

5. EXISTING & PROPOSED TIM FEE BENEFIT ZONE GEOGRAPHY TIM OPTIONS FEE ZONES Option 2 8-Zone Structure Smoothed Legend Existing Zone 14-0245 Revised Proposed 22M 38 of 53 Zone 38

5. LAND USE CATEGORIES 14-0245 Revised 22M 39 of 53 39

5. LAND USE CATEGORIES 14-0245 Revised 22M 40 of 53 40

5. REDUCED TIM FEE PROGRAM COST TIM Fee 20-Year CIP $804 Million $800 $600 $396 Million $400 $200 $0 2012 TIM Fee Program Proposed TIM Fee Update TIM Fee 20-Year CIP 14-0245 Revised 22M 41 of 53 41

5. WHY DID TIM FEES GO DOWN? Decrease in growth rate assumptions 3% growth rate 1% growth rate Results in less infrastructure required Successful TIM Fee Program resulted in completed projects (Over $320 Million). 14-0245 Revised 22M 42 of 53 42

5. PROJECTS NOT INCLUDED THE PROPOSED CIP Projects were eliminated from the proposed CIP for the following reasons: Project has been constructed, i.e., US Highway 50 HOV lanes Project is no longer needed in the next 20 years, i.e., Bass Lake Road widening to four lanes from US Highway 50 to Silver Springs Parkway. Project scope change, i.e. Latrobe Connection new arterial now only an intersection fix on existing facility. For a complete list of the projects deleted, revised or added to the 2016 CIP see Attachment 9G. 14-0245 Revised 22M 43 of 53 43

5. TIM FEE COST CHANGES SINGLE FAMILY DWELLING - EXISTING VS PROPOSED $13,330 to $4,017 $14,640 to $3,190 $35,740 to $29,500 $28,140 to $19,885 $13,470 to $4,739 $23,420 to $5,830 $14,750 to $4,382 *For TIM Fee Zone Comparison For All Other Categories 14-0245 Revised See Attachment 22M 44 of 53 19M Table 23 Page 64 44

5. PROPOSED TIM FEE RELATIVE TO OTHER JURISDICTIONS $45,000 $40,000 $35,000 $30,000 Single Family Multi-Family ($ per unit) $25,000 $20,000 $15,000 $10,000 $5,000 $- 14-0245 Revised 22M 45 of 53 45

5. PROPOSED TIM FEE RELATIVE TO OTHER JURISDICTIONS $40 Commercial Office Industrial $35 $30 $25 $ per sqft $20 $15 $10 $5 $- 14-0245 Revised 22M 46 of 53 46

5. TIM FEE PROGRAM SUMMARY OF CHANGES MINOR UPDATES TO TIM FEE ZONE BOUNDARIES AND LAND USE CATEGORIES: Adjust zone boundaries to match model TAZs Combine and remove several nonresidential land use categories Add a Per Trip Fee rate for unusual land uses FEE REDUCTIONS ACROSS NEARLY ALL ZONES AND LAND USES: Single Family Homes reduced 17% - 78% General Commercial reduced 16% - 88% *TIM Administration Manual to be used for program to be administered consistently 14-0245 Revised 22M 47 of 53 47

6. AMENDMENT TO COUNTY ORDINANCE CODE TIM Fee Ordinance Establishes basic structure. Fee schedule will be adopted via Resolution Requires a 2 nd Reading by BOS prior to implementation Frontage Improvements Ordinance Requires development to construct frontage Improvements and dedicate right of way. Requires a 2 nd Reading by BOS prior to implementation 14-0245 Revised 22M 48 of 53 48

7. NEXT STEPS Staff will return to the Board December 13, 2016-2 nd Reading of the Frontage Improvement & TIM Fee Program Ordinance Staff will return to the Board January/February 2017 - Approval of the TIM Fee Program Administrative Manual Begin minor update to include revisions related to growth in Folsom, minor TIM Fee Zone boundary adjustments for 2017 TIM Fee Update Cameron Park Drive Interchange Design Alternatives 14-0245 Revised 22M 49 of 53 49

RECOMMEND BOS APPROVE/ADOPT: Consistent with 10/27/16 Planning Commission Recommended Board Actions: Environmental Certification 1. Resolution Certifying the Environmental Impact Report (EIR) for the Major CIP and TIM Fee Update 2. Mitigation Monitoring and Reporting Plan (MMRP) General Plan Amendments 3. Resolution Amending the General Plan 14-0245 Revised 22M 50 of 53 Transportation and Circulation Element 50

RECOMMEND BOS TO APPROVE/ADOPT: 2016 CIP 4. 2016 Capital Improvement Program (CIP) Book TIM Fee Program 5. Resolution adopting the TIM Fee Program Nexus Study 6. Authorize Auditor-Controller to create new TIM Fee Accounts 7. Approve and authorize Chair to sign budget transfer for TIM Fee accounts 14-0245 Revised 22M 51 of 53 51

RECOMMEND BOS TO APPROVE/ADOPT: Amendments to County Ordinance Code 8. Approve 1 st Reading of Frontage Improvement Ordinance 9. Approve 1 st Reading of TIM Fee Ordinance 10. Waive full reading, by title only and continue the adoption of the Ordinances to December 13, 2016/January 3, 2017 14-0245 Revised 22M 52 of 53 52

RECOMMEND BOS TO RECEIVE & FILE: 11. Draft TIM Fee Administrative Manual 12. Final Outreach Summary Report 13. Responses to public comments 14-0245 Revised 22M 53 of 53 53