Non-exempt employees that are paid monthly need to record all time worked and all leave taken.

Similar documents
Elementary School District office.

Additionally, the committee was opened to anyone who wanted to participate.

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

Facilities Services Weekly

UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA

Facilities. Guide M ANAGEMENT. Facilities Management Directory of Services

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program:

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION

CENTRAL IOWA HEALTHCARE Marshalltown, Iowa HEALTH & SAFETY POLICY EMERGENCY MANAGEMENT POLICY

HOME RENOVATION TAX CREDIT (HRTC)

SENIOR FOOD PRODUCTION UTILITY WORKER

CLASS TITLE: Bus driver/custodian/gardner Range 13

Bond Projects Update A. R. Rucker Middle

BCPS 2017 Bond Issue Frequently Asked Questions

EPISCOPAL CHURCH OF OUR SAVIOUR REQUEST FOR PROPOSAL FOR JANITORIAL AND CLEANING SERVICES FOR CHURCH SANTUARY, CHURCH OFFICE AND UNDERCROFT

C A M P A I G N NEYLAND STADIUM. Master Plan Update WINTER Preparing College Football s Greatest Stadium for Future Generations of Service

Business Façade Improvement Program Available

ROLLING RIVER SCHOOL DIVISION REGULATION

EXISTING CONDITIONS

COST SAVINGS AND EFFICIENCIES

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795

City Manager Briefing Report

Ballot Measures-J Section

University of Tennessee Athletics Department Overview

Welcome to the 31 ST Annual TENNESSEE

P rivate Duty! A g r e a t o p p o r t u n i t y t o f i n d o u t m o r e

STANDARD DRAWINGS INDEX

THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

New Hope-Solebury School District Facilities Committee Meeting Minutes April 19, 2017, 6:00 pm Upper Elementary School Room 105

Facilities/Activity Locations

-THE VIEW- 36 New York Avenue, Halesite, NY. Tenant newsletter Issue no. 1, August 2007 KMF PROPERTY GROUP, INC.

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Waterford School District 2003 Bond Update

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE

Frequently Asked Questions May 8, 2018 Sinking Fund Election

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

540/ Arena Renovations and Systems Improve 7,440,000 SUMMARY Early Design Shokouhi J

SAC FACILITIES MEETING MINUTES FEB 21, :30P.M. 3:00P.M.

CLUSTER UPDATE PLAN ACADEMIC YR

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012

JOB FAIRS. Walmart on North Side of town is hiring multiple positions. Apply within.

House of Order, House of Prayer. Chores & Charts

City of Waterbury Safety & Security Assessment

Owner s Meeting Minutes /03/08

School Safety Audit Checklist

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Trade Street. Building Handbook. UC San Diego Real Estate North Torrey Pines Road, Suite 340 La Jolla, California www-red.ucsd.

The University of Memphis-Emergency Action Plan FedEx Park

Bond Update to Bond Oversight Committee

St. Michael s Lutheran Church Church Custodian

MCKINSTRY INNOVATION CENTER

Student Organization Housing. Project Initiation Request (PIR)

THIS INFORMATION MUST BE READ BEFORE YOU LEAVE 2015 CLOSING NOTICE OHIO WESLEYAN UNIVERSITY

Job Postings for Lexington One Students Full and Part Time Job Opportunities

IMR Plan. IMR Funds available for 2017/2018 are as follows:

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305)

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP

Building Services Manager (BSM) then Bursar through to the Head. Assisting the BSM in managing the Cleaning Staff

TOWN OF GRAY POSITION DESCRIPTION

MINUTES OF THE SAANICH HERITAGE FOUNDATION MEETING HELD AT SAANICH MUNICIPAL HALL COMMITTEE ROOM #2 TUESDAY, APRIL 14, 2015 AT 5:30 P.M.

HR Forum. Connecting HR Serving the Duke Community. July 2014

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305)

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

Incident Planning Guide Tornado Page 1

HORRY COUNTY FIRE/RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING PROCEDURE SOP 202 SHIFT MANAGEMENT

Dallas County Community College District Bond Program. July 10, 2007

SOUTH DAKOTA BOARD OF REGENTS. Planning, Governance, and Resource Development

RETAIL LEASING OPPORTUNITY

Mainlands of Tamarac by the Gulf Unit 3 Board of Directors Meeting February 27, PM

Hurricane Response Overview for UWF Senior Administrators. Peter Robinson, Director, OEM

EMERGENCY SHELTER RELOCATION/EXPANSION

Capital Projects Levy

Board of Directors. From: Michael Ford, Chief Executive Officer. Date: October 17, Blake Transit Center. History

SFY 2017 Neighborhood Development Center Small Business Programs Direct Appropriation

Park District of Oak Park

ENTRY FORM SUMMIT COUNTY BUILDERS ASSOCIATION 2017 PARADE OF HOMES

CAPITAL IMPROVEMENT PROGRAM (CIP)

BID SPECIFICATIONS FOR CLEANING & MAINTENANCE SERVICES FOR CITY OF ZION

DISTRICT OF KITIMAT. Business Façade Improvement Program 2017

NCRC Special Event Guidelines

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III)

FY 2013 Annual Capital Plan

Sorted by TSUS Component Capital Improvements Program FY

The Killeen ISD Board of Trustees unanimously approved calling a $426 million bond election, consisting of two propositions, to be held on May 5,

Bond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations

Request for Proposal CLEANING SERVICES FOR FAIR HAVEN COMMUNITY HEALTH CENTER. Fair Haven Health Community Health Center, Inc.

Asbury Communities, Inc. Asbury Methodist Village Human Resources Department

AMENDED MEMORANDUM of UNDERSTANDING BETWEEN THE CITY OF WILLIAMSBURG AND THE WILLIAMSBURG ECONOMIC DEVELOPMENT AUTHORITY

HUDSON DRI PROJECT SUMMARY (2/21/18)

Mike Campitelli, Director Campus Recreation Programs and Intramural Sports program coordinator

Academic Affairs & Research Employee Relations Committee Wednesday, February 8, 2017, 1:30-3:00 pm Fred Brown Hall Room 146 C

Table 1: Types of Emergencies Potentially Affecting Urgent Care Centers o Chemical Emergency

Dauphin Island Sea Lab Revision: June 2006 Hurricane Emergency Preparedness Plan

SCHEDULE OF EVENTS. Friday, September 29, 2017

COLONIAL INTERMEDIATE UNIT 20 POSITION DESCRIPTION AND STANDARDS OF PERFORMANCE. TITLE: Building Maintenance/Custodial Worker (Cluster 3G)

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Proposed Legislation Bond Issuance Meeting Date: April 19, 2013

MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

MIDDLESEX COUNTY VIRGINIA

Transcription:

Archibus: Get Ready, Get Set GO! Archibus will be going live on Monday, January 5, 2015. Please make sure you are working on the scripts you were given in Archibus and are training those employees who report to you. In preparation for the transition, A/C, Electric, Plumbing, Building Services and Grounds will need to prepare their warehouse areas for inventory. In addition to the inventory, if you have not spent time with Ed and the Central Supply team learning how to complete the daily warehouse reconciliation and stock adjustments, you will need to utilize the next four days to learn how to complete this task. The reconciliation will need to be completed daily for all warehouses beginning on January 5, 2015. Shops: The equipment spreadsheets you have been working on should be submitted to Kevin no later than 12:00PM on Wednesday, December 17 th for upload into Archibus. REMINDER: Monthly employees now need to turn in a time sheet at the first of each month. These approved time sheets will need to be submitted starting Jan. 1, 2015 (turn them in anytime within the first week of the month). Time sheets must reflect any leave, holidays, administrative closures, etc. Non-exempt employees that are paid monthly need to record all time worked and all leave taken. Sign Shop: Working on 7 th floor signage at SMC. Working on signage for Communications. Working on signage for Jessie Harris. Making various name plates. Paint Shop: Painting rooms 24 & 24A at Jessie Harris. Painting common areas at Jessie Harris. Building Finishes: Repaired brick at Dunford Hall. Reset pavers at entrance at McClung Museum. Repaired brick at Brehm Animal Science. Working on epoxy injection at HPER. Replaced door at Ceramics Building. Installed tile at Jessie Harris. Worked on marble floor at Hodges Library. Arena: Tuesday, December 16th: Lady Vols Basketball Game vs. Wichita State at 7 p.m. Friday, December 19th: Men s Basketball Game vs. Tennessee Tech. at 7 p.m. Saturday, December 20th: Lady Vols Basketball Game vs. Stanford at 1 p.m. Monday, December 22nd: Men s Basketball Game vs. Mercer at 7 p.m. Saturday, December 27th: Men s Basketball Game vs. Texas at 8:30 p.m. Sunday, December 28th: Lady Vols Basketball Game vs. Oregon State at 1 p.m. Wednesday, December 31st: Men s Basketball Game vs. ETSU at 1:00 p.m. Friday, January 2nd: Lady Vols Basketball Game vs. Missouri at 9 p.m.

UT Recycling is in the process of planning for RecycleMania, a recycling competition for residence halls and Greek life, which will be held during the month of February. This event will be promoted alongside general recycling educational posters, that w i l l i n c l u d e r e c y c l i n g f a c t s a n d tips that show students and faculty how they can be more environmentally friendly. Installments, educational posters have been placed in Dunford and will be placed in Massey and Hess before students return from break. They will also make an appearance in TRECS in an abbreviated fashion. Dougherty Engineering install locks. Perkins Hall install locks/repair doors. Delta Zeta sorority rekey kitchen/dining room. Sign Shop replace lock. Leaf removal on-going throughout campus. Begin detailing bed edges. Irrigation system winterization on-going. Removal of old light bases in Fraternity Park. Assist Building Finishes with concrete repairs at SV, Hodges, and other campus areas. Asphalt repair near Graphic Arts Services. Begin Pre-Evaluations for 2014 annual performance reviews. Pick up plant material for landscape installation at Thorton Athletics. Controls at SERF. Elevator training. Alignment tool training. Buehler rooms 213+204. Buehler rooms 602+603+604. SERF 213. Building scoping Ferris. Zone 3: Working on doors at Auxiliary Services. Working on lighting at parking services & auxiliary services. Working on women s restroom at HPER. Continuing to finish the equipment information list. Replaced several door closers this week in Zone 3. Zone 4: Changing filters in units as scheduled. At Hodges Library we re changing lights and ballasts, cleaned west and south machine rooms. Installed new rotor hinge on second floor north entry door. Zone 5: Also, took down floor entry door to replace pivot. Replacing broken marble benches in Haslam. Still replacing CFL lighting to led in SMC lobbies. Unclogging drain in kitchen of Haslam. Finished all repairs on 4th floor of Haslam for event this weekend. Zone 8: Serviced all Liebert units in SMIC, M floor. General maintenance. With the holidays rapidly approaching our team is ready for some needed time with our families. The past year has been productive. We as a team have worked hard to achieve a high level of customer satisfaction. Two of our team members received their career ladder promotions to Maintenance Specialists 2. Johnathan Fuller and Chris Morris worked hard and I am very proud of them. We will be making sure that all of our buildings are ready to go after the break over the next week. John Patton will be retiring over the holidays. John has been with the University for 23 years. He is a valuable team member. John will be missed. He worked at Joe Johnson Animal Research and Teaching Unit (JJARTU). We wish John the best in his retirement!

Zone 11: Working at Neyland Stadium on both the East and West Skyboxes for different campus events, and working on the players locker room and Wolf Kaplian with lights and restrooms for recruits. At Anderson Training we are working on drain lines for some new sinks, also we are working on general maintenance issues at Brenda Lawson, and Neyland Thompson for football recruits, and visitors. Purchased new TeleTime Server. Happy Holidays from the Training Team. We wish you and yours a safe and blessed holiday season. Archibus training continues this week. Please check your emails and register for a class. Supervisors please remember to start training your staff on how to request time off. It is important that they know how to do this before we start using the new Archibus system. 2015 OSHA online training will begin in January. Employees will have their entire birth month to complete their training. We will send out a notice no later than the beginning of each month stating which employees have training due. Training is set to begin in January for Landscape Academy which is a part of Facilities Services University. Instructor training for Facilities Services University continues this week. As the new semester roles in please be reminded that student employees are also required to go through the orientation and training process. So if you hire a student, the Training Office must be notified and the student must go through orientation with us. This is important because in some instances they are exposed to the same dangers as our full time staff so they are entitled to the same training and protection. We look forward to seeing everyone at the Facilities Services Holiday Party at the Neyland Stadium TN Terrace starting at noon Wednesday, December 17 th. The bus schedule for the party can be found on the last page of this newsletter. The APPA NACUBO and FPI surveys have both been submitted. We are compiling a report regarding energy savings. Five UT buildings/projects will be submitted this week to the American School & University Educational Interiors publication. We are working on branding campaigns for several Facilities Services units. We have been working on various internal announcements. Several department policies are in the final editing and approval phases. REMINDER: You can always nominate a deserving member of our team for Employee of the Month at fs.utk.edu. REMINDER: Monthly employees now need to turn in a time sheet at the first of each month. These approved time sheets will need to be submitted starting Jan. 1, 2015 (turn them in anytime within the first week of the month). Time sheets must reflect any leave, holidays, administrative closures, etc. Non-exempt employees that are paid monthly need to record all time worked and all leave taken. With campus closing soon, UT has the potential save a lot of energy and money over break with the help of the campus community. To reduce energy consumption, faculty, staff and students are asked to POWER DOWN and do the following before leaving for the winter holiday: Turn off all lights and shut down electronics/appliances. Shutdown electronics/appliances and unplug power cords from the outlets (computers, faxes, printers, coffee makers, mini-refrigerators, etc.) Even when electronics are off, energy is consumed when they are plugged. Learn more about Phantom Energy on our website! (Link: http://environment.utk.edu/2014/06/25/ eliminate-vampire-power/). Shut interior and exterior doors and remember to close and lock all windows. If possible, close blinds to reduce the impact of leaching windows. Report windows and doors that are left open or unable to be closed to Facilities Service s One Call at 865-946-777. For more winter energy saving tips as well as ways you can make your holiday season green, visit our website: environment.utk.edu.

UTFS Security system upgrade campus UTFS Fire Alarm Systems FA System minor repairs/ testing various buildings on campus. UTFS SV Events. New Construction fire alarm/ building security support. UTFS Metering/Wireless. UTFS HV Strong Hall temporary power. UTFS West Campus support. UTFS Christmas Break electrical work UTFS UC power outage. UTFS HV Steam Plant contract support. UTFS Vol Hall plumping support. UTFS SERF Emergency power/fire alarm testing. UTFS Clarence Brown theater support. We produced 3,453,529 pounds of steam last Wednesday and had 85,410 gallons of make-up water. The price of natural gas is higher than coal this month so we are burning more coal. The contractor continues to work hooking up the piping for the new storage tanks for oil which will be our only backup fuel after Mach 1 of 2015. We have our schedule done for the Christmas holidays and the steam plant people continue to work because the steam plant operators 24/7 365. Install valves at Brehm. Repair hot water leak at HPER. Install a bottle filler at Dunford Replace water valves at Humanities. Unstop drain line at Steam Plant. Unstop drain at Vet school. Clean out storm line at Baseball. Prep to install waterline at baseball. Repair steam leak at student health. Repair steam leak at English Language Institute. Install new pipe for heat converter in McCord Hall. Repair condensate pump at UC. Repair condensate pump at Greve Hall. Prepare chilled water lines to install gauges and thermometers at Presidential. Fabricate and install gates and fencing around units at Greve Hall. Master Planning: Utilities Master Plan Hill Master Plan Programming: Engineering Services Building Schematic Design: University Ave. buildings Austin Peay handicap ramp Baseball Stadium pressbox West Campus Redevelopment Construction Documents: New residence hall and parking garage planned for the former Gibbs Hall and Stokely Athletic Center sites, respectively New Support Services Building on Sutherland (ER4) 13th & Cumberland lab building New classroom/laboratory building planned for the Strong Hall site Construction Administration: Henson Hall interior renovation New classroom/laboratory building planned for the Strong Hall site New University Center (Phase 1) New Support Services Building on Sutherland (ER1) New residence hall and parking garage planned for the former Gibbs Hall and Stokely Athletic Center sites, respectively Volleyball Practice Facility JIAMS Building

Ayres Hall North Slope / West Connector project: begin fall tree planting East Edge Campus Improvement Project (Second Creek): merging with Engineering Quad project Supervising the new Strong Hall s site development and tree protection Updating the Campus Landscape Vision and Site Standards Wayfinding Master Plan: mocking up building signs; developing assembly and installation documents TREC landscape installation: coordination with inhouse crew Torchbearer Plaza and Circle Park. Moving into CD s Proposed site for grant-funded silva cell research. Mapping existing ADA/unisex restrooms. Coordinating planting at Thornton Center with inhouse crews Overseeing planting at corner of Lake Loudoun and Chamique Holdsclaw. Current Projects (In-House): Stokely Management 720 conference room electrical to be added,paint,carpet. Morgan Hall install cooling/heating,ceiling and painting. Nielsen Physics install Projector mount & projector screen and wiring that is needed for OTI. Carpeting 2nd floor SMC. Painting 7th floor SM. Henson Hall. Completed ADA route through Austin Peay to top of hill. Finishing up converting Haslam 607 to a conference room. Dougherty room 110 welding lab renovation. Dougherty 102 machine shop reconfiguration. Brehm Animal Science room 149 create new office space. Perkins Hall room 51 renovation of room to make space for new student work area. University Commons bookstore install security system. Current Projects (Bid Projects): Henson Hall- Renovations to building. Neyland Stadium- DAS installation throughout stadium. Thompson-Boling arena- DAS installation throughout arena. 11th Street Garage- Installation of solar panel, charging stations, connect to Min Koa building for experiments. Dougherty Engineering- Unit Ops on 1st floor. Dougherty Engineering- Unit Ops on entire 6th floor. Dougherty Engineering- Lab renovation on 3rd floor. Campus Roofs- 16 roofs either working or scheduling to start. Austin Peay second floor renovation finalizing construction. Contract with GEM technologies, Inc. Classroom 2015 summer projects. Working with Sanders and Pace on design projects. Estimating: Thornton Athletics Center-Door changes per Fire Marshal Report Dunford Hall- Painting, lighting, furniture for corridors and other areas on the 6th floor Food Safety and Processing Building-Adding a wall and door to room 127 James A Haslam Business Building-Replacing LED lighting under shelving in the Anderson Center PAVING AREA LOTS around Terrace, Lake Avenue, Chi Phi Ave.; Renovation of Perkins; Glass doors for Howard Baker Ctr.