99th Air Base Wing Nellis Air Force Base Col Charlie Perham Mission Support Group Commander This Briefing is: UNCLASSIFIED
Overview Introduction Installation Overview Construction Program
5 Hours of FAA Civil Tracks A NATIONAL TREASURE
Installation Complex 4
Addition to the Mission
What our engineers do Fire Protection Explosive Ordnance Disposal Emergency Management Housing and Dormitory Management Facility Construction, Maintenance, and Repair Infrastructure and Utility Operations, Maintenance and Repair Project Planning, Design, and Construction Management Base Comprehensive Planning Real Property Management Energy Management Environmental Management Natural Resources Management
Nellis / Creech MILCON Pgm ACTIVE PROGRAM SUMMARY FY11: 1 Projects, $8.4M FY12: 3 Projects, $25.2M FY14: 7 Projects, $98.0M FY15: 3 Projects, $53.9M NAF: 2 Projects, $27.3M FY16+ 6 Projects, $102.2M F-35 6 Bay Maintenance Hangar/AMU F-35 AGE Maintenance Facility Add/Alter F-35 POL Fillstand FY16+ 240 Person Dormitory - FY14 Security Forces Complex - FY16+ Communication NCC Facility - FY12 F-35 Parts Store - FY14 NAF 60 Unit TLF - FY16+ F-35 AME Storage FY14 F-22 Flight Simulator FY15 F-35 Add/Alter Fuel Cell Maint FY14 F-35 Mun Maint Facs Area 2 - FY16+ NAF Add/Alter Fam Camp - FY15+ F-35 Weapons School - FY15 RPA Weapons School FY14 F-35 Airfield Pavement FY16+ F-16 Maint Hangar/AMU - FY16+ F-35 LOLA Expansion - FY16+ F-35 Add/Alter Engine Shop FY12 F-35 6 Bay Maint Hangar/AMU - FY11 F-35 AGE Maint Facility FY12 F-35 4 Bay Maint Hangar/AMU - FY15 Communication NCC Facility ACTIVE CREECH PROJECTS FY11 Airfield Fire Rescue Station - $8.4M * FY14 RPA Physical Protection - $11.7M * FY14 Casino Land Acquisition - $15.0M * Emergency Construction/Reprogramming Creech Airfield Fire Rescue Station FY11 FY16 Nellis/Creech MILCON Program: $350M 8
F-35 Live Ordnance Loading Area (LOLA) MILCON Nellis AFB Potential FY16 MILCON Scope: Construct LOLA Expansion and New Crew Operations Facility Contract: TBD User: 57 th WG Estimated Design Start: 30 Mar 15 ECD (Design): 30 Sep 15 Status: In-house USACE Customer Concept Document (CCD) completed Jan 15.
F-35 Add/Alter Munitions Maintenance Facilities Potential FY16 MILCON Scope: Construction 3,000 SF Additions to Munitions Maintenance Facility and Missile Maintenance Facility MILCON Nellis AFB Area 2 Project Sites: Contract: TBD User: 57 th WG Estimated Design Start: 30 Mar 15 ECD (Design): 30 Sep 15 Status: Projects 15% design complete; awaiting FY15 design funds.
F-35 Airfield Pavements MILCON Nellis AFB Potential FY16+ MILCON Scope: Construct 94K SY Aircraft Parking Apron Addition Contract: TBD User: 57 th WG Estimated Design Start: TBD ECD (Design): TBD Status: Planning charrette complete. Awaiting AF Design Instruction to begin formal design.
Replace Hydrant Fuel System MILCON Nellis AFB Potential FY16 DLA MILCON Scope: Construction of two new 10K barrel above ground tanks, secondary containment systems, two truck fill stands, parking area, new pump house and new fuel hydrant loop Contract: TBD User: LRS ECD (Design): 30 Sep 15 Status: Projects 35% design complete. Awaiting DLA approval to proceed to next design phase
NAF Nellis AFB Add/Alter FAMCAMP Potential FY16 MILCON Scope: 40 RV spaces in a wagon wheel type configuration; 40 unimproved RV spaces; 74 pull thru RV spaces; and 2 support buildings @ 700 SF each with restrooms, showers and laundry facilities. Contract: Design-Bid-Build User: 99 FSS Award Date: TBD Est. Completion: TBD Status: Project is 100% designed awaiting NAF approval.
NAF Nellis AFB Temporary Lodging Facility Potential FY17 MILCON Scope: New 72,000 SF, 60 unit, 2-Story Facility on Old Gym site Contract: Design-Bid-Build User: 99 FSS Award Date: TBD Est. Completion: TBD Status: Project is 65% designed awaiting NAF approval to proceed.
Add/Alter F-35 POL Fill Stand MILCON Nellis AFB Potential FY17 MILCON Scope: Construct Additional Fill Stands and Canopy for F-35 Contract: TBD User: 99 LRS PM: Mo Zamanian Design Start Date: TBD ECD (Design): TBD Status: In-house USACE Customer Concept Document (CCD) completed Jan 15.
O&M Pgm FY 14 Program - 85 projects awarded for $50M FY 15 Program - underway
Current P4 Initiatives K-8 Charter School Additional 14 MW Solar Array
Summary Unique missions $5.1B Economic Impact to Southern Nevada Encroachment Challenges/Opportunity Proactive Community Partnerships Healthy Construction Program
Contacts For information on all Nellis contract solicitations: Go To - FedBizOpps.gov Army Corps of Engineers, Nellis Resident Office: 702-644-8070 Nellis AFB Contracting Office: 702-652-3360 Nellis AFB Civil Engineer Office: 702-652-4833
CPI Success Stories