Observations of Implementing the Nuclear Promise for CAP

Similar documents
NRC INSPECTION MANUAL STSB

NRC INSPECTION MANUAL IRIB

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

July 29, 2009 WATTS BAR NUCLEAR PLANT NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT /

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

Procedure for Corrective Action and Non-conformities

DRAFT REGULATORY GUIDE

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF REACTOR REGULATION WASHINGTON, DC September 26, 2005

CORRECTIVE ACTION REQUEST

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

A GLOWING RESEMBLANCE A COMPARE AND CONTRAST OF MEDICAL AND NUCLEAR PERFORMANCE IMPROVEMENT INITIATIVES

English text only NUCLEAR ENERGY AGENCY COMMITTEE ON NUCLEAR REGULATORY ACTIVITIES INSPECTION OF LICENSEE'S CORRECTIVE ACTION PROGRAMME

Problem Solving Tools

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Corrective Action Process

Safety Management Functions, Responsibilities and Authorities Manual (FRAM) Revision 1

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

Standard NUC Nuclear Plant Interface Coordination

AC291 Special Inspection Agencies ACCREDITATION CRITERIA FOR IBC SPECIAL INSPECTION AGENCIES AC291

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

Liz Gombash Executive Director, Strategic Grants Planning and Development, Seminole State College of Florida

ECRI Patient Safety Organization HFACS and Healthcare

Department of Defense

NUCLEAR SAFETY PROGRAM

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

DRAFT REGULATORY GUIDE

Clinical Research Seminar

February 8, 2017 SUBJECT: GRAND GULF NUCLEAR STATION - NRC INTEGRATED INSPECTION REPORT /

APPENDIX VII OTHER AUDIT ADVISORIES

Wellness Director. FLSA Status: Salaried, Exempt Updated: SUMMARY OF POSITION FUNCTIONS

Metro-North Railroad Guide for Incident Reporting

How to Draft New & Update Old Policies and Procedures. Agenda. Why?

U.S. Department of Energy Office of Inspector General Office of Audit Services. Audit Report

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012

GAO NUCLEAR REGULATION. Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed

Insider Mitigation Program for Nuclear Facilities. Joe Rivers Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission

TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

Emergency Preparedness Final Rule Implementation

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

Guide to Incident Reporting for General Medical Devices and Active Implantable Medical Devices

Index as: DEPARTMENTAL AUDITS AND INSPECTIONS

MINNESOTA DEPARTMENT OF HEALTH

Archived. DPC: Corrective Action. Quality Manual

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

EXHIBIT San Onofre Nuclear Generating Station (SONGS) Requirements For Site Access And Access To Protected/Restricted Radiologically Controlled Areas

EFFECTIVE ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PROCESS

Special Edition: MAXIMUS Impact Assessment of January 2017 Updates to CAS Best Practices Manual. February 24, 2017

QUALITY TIPS FOR CLINICAL SITES. Athena Thomas-Visel. Clinical Quality Consultant QUALITY TIPS FOR CLINICAL SITES

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

General Procurement Requirements

TANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword

APHL Position Statement

Minutes Board of Trustees

Guide to Incident Reporting for In-vitro Diagnostic Medical Devices

Brachytherapy-Radiopharmaceutical Therapy Quality Management Program. Rev Date: Feb

C H A P T E R HAZARD ANALYSIS

Oversight Review April 8, 2009

DEPARTMENT OF THE ARMY *III CORPS & FH REG 40-7 HEADQUARTERS, III CORPS AND FORT HOOD Fort Hood, Texas JULY 1999

HOME AND COMMUNITY-BASED SERVICES (HCBS) STATEWIDE SETTINGS TRANSITION PLAN

GUIDELINES FOR CRITERIA AND CERTIFICATION RULES ANNEX - JAWDA Data Certification for Healthcare Providers - Methodology 2017.

Draft Version Presentation Draft

RADIOLOGICAL MONITORING AND SURVEYS

CITY OF LOS ANGELES - STEAM PLANT ASSISTANT 1 message

COMMON FACTORS CHECKLIST

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

Section I Referenced Publications. ANSI/IES-RP American National Standards Institute and Illuminating Engineering Society standard

Pars Oil & Gas Company HEALTH, SAFETY AND ENVIRONMENT PROCEDURE. HSE Anomaly Reporting Procedure DOCUMENT ID - PR-74-POGC-002 REVISION 0.

Technical Basis for the Emergency Preparedness Rulemaking

CHAPTER 10 Grant Management

APPENDIX D CHECKLIST FOR PROPOSALS

A. Occupational Safety and Health Act of 1970 (OSH Act of 1970), Section 19, Federal Agency Safety Programs and Responsibilities.

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

Medication Management at Acme Medical Center

CNAS-RL01. Rules for the Accreditation of Laboratories

OPERATIONS DIVISION STANDARD OPERATING POLICY AND PROCEDURE. Duties of Shift Operators (Central Plants)

INTERNAL AUDIT DIVISION REPORT 2018/025

DEPARTMENT OF MANAGED HEALTH CARE CALIFORNIA HMO HELP CENTER DIVISION OF PLAN SURVEYS

The Safety Audit. Safety Audits Why Bother? Oh no.. 4/26/2017. I need some help but where can I get it????? Does it really matter? I hate metrics!

Authorized Personnel to Review

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 302. FIELD LABORATORY ACCREDITATION

Air Force Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

AUDIT OF THE OFFICE OF COMMUNITY ORIENTED POLICING SERVICES AND OFFICE OF JUSTICE PROGRAMS GRANTS AWARDED TO THE CITY OF BOSTON, MASSACHUSETTS

Final Rule for Veterans (VEVRAA)

Office of the Inspector General Department of Defense

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

ASME Nuclear Conformity Assessment. Bernard E. Hrubala Sr. Vice President Code and Standards October 7, 2008

REQUEST FOR PROPOSALS: PROFESSIONAL AUDITING SERVICES

Licensing of Nuclear Installations

Safety Best Practices Manual

Quality Management Plan

May 23, Docket No License No. DPR-12

Identification and Protection of Unclassified Controlled Nuclear Information

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

NRC INSPECTION MANUAL

Dry Cask Storage License Renewal Implementation

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

Transcription:

Jack Martin Vice President, Consulting BackPacker Jack, Inc.- F-11070 TX Observations of Implementing the Nuclear Promise for CAP A Pendulum Swing in CAP

Objectives CAP Regulatory Requirement The evolution of CAP. Barnacles on the CAP boat An industry revolution Are we burning bridges- observations of the pendulum swing Cautions and observations Questions?

CAP Regulatory Requirement (10 CFR 50 Appendix B Criterion XVI Corrective Action) Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action 3 taken shall be documented and reported to appropriate levels of management.

Evolution of CAP 10CRR50Appx B- Identify QA applicable and Non-Quality Systems, Structures and Components SSCs). Added Supplemental QA applicable (supporting SSCs) Recognition of need to have a structured analysis process for SCAQ Added 10CFR21, Fire Protection, Maintenance Rule, Emergency Planning, Security, Safety Culture ROP added cross-cutting issues Single-entry systems- included CAP and Non-CAP issues

Barnacles Differentiation between CAP and Non-CAP issues became weak All issues in the system treated the same Developed Apparent Cause Analysis and Lower levels of cause analysis 1000 page RCAs; 100 s of pages ACEs; dozens of pages Simple cause 100 s of CAs for a single event Industry inconsistent approach to cause analysis- RCA, ACE, Basic Operations Operability Evaluations overwhelms Control Room Inconsistent use of Operating Experience Inadequate Extent of Condition and Extent of Cause (where required)

Revolution INPO 14-04 Conduct of Performance Improvement CNOs concern- accumulation of low-value process controls and administrative requirements that have been established in station performance improvement programs over the years. CNOs recognized station leaders were spending an inordinate amount of time and resources administrating the performance improvement process Outlines desired behaviors and practices that support excellence in problem prevention, detection, and correction for an operating commercial nuclear power plant. Graded approach to addressing issues: Corrective Action Program (SCAQ, CAQ & CAQ+) Approved processes (CAQ+) Management Action (Non-CAQ)

More of the Revolution NEI Efficiency Bulletin: 16-10 Reduce Cumulative Impact From the Corrective Action Program - Issues identified: CAP Process & administrative requirements impacting effectiveness of plant supervisors and managers and challenging sustained high levels of plant performance. Station leaders rely on CAP process to manage business Trending of all issues through CAP Cause evaluations applied to issues outside CAP Tendency to layer on CAs and establish additional reviews or committees to address issues of relatively low significance.

Revolution Solution NEI Efficiency Bulletin: 16-10 Reduce Cumulative Impact From the Corrective Action Program - Solutions: CRs used to identify issues Issues that affect Quality documented in a CAP Most CAQ addressed without cause evaluation Cause Evaluations for SCAQ-assigned a CAPR Condition reports for issues that do not meet the criteria established by 10 CFR 50, Appendix B, Criterion XVI, the station s quality assurance program requirements, or other regulatory standards, are closed to other management systems and processes.

Revolution continues NEI 16-07 CAP Enhancements for Improving Safety & Efficiency Increase efficiency for reporting and resolving issues. Elimination of low-value work activities and administrative requirements Less time processing CRs More time on identifying and fixing problems. Organizational focus on conditions affecting safety and operational performance Leadership to spend time in the field observing work and coaching worker behaviors. The enhanced CAP will maintain the ability of the nuclear power plant workers to identify and address undesired conditions in accordance with U.S. Nuclear Regulatory Commission (NRC) regulations and guidance.

Burning bridges or a Pendulum Swing Objective of INPO 14-04 was to return CAP to 10CFR50 Appendix B Eliminate the Find, Analyze and Fix model of CAP- everything does not have to be analyzed! New model is Prevent, Find, Bin, Analyze the Bin & Fix Have we forgotten why we added so many things into CAP? Can we put this genie back in the bottle?

NRC IP 71152 Problem Identification and Resolution More than simple review of Appendix B Issues associated with Safety Culture-all 10 traits Defects & Non-conformances (Appendix B and 10CFR21) Maintenance Rule Operator Work Arounds

NRC IP 71152 Problem Identification and Resolution 01.01 To evaluate the effectiveness of the licensee s corrective action program in identifying, prioritizing evaluating, and correcting problems. 01.02 To confirm that licensees are complying with NRC regulations regarding corrective action programs. 01.03 To help the NRC gauge supplemental response when ROP Action Matrix thresholds are crossed. 01.04 To confirm the licensee s appropriate use of industry and NRC operating experience.

NRC IP 71152 Problem Identification and Resolution 01.05 To evaluate the effectiveness of licensee audits and selfassessments. 01.06 To confirm licensees have established a safety conscious work environment. 01.07 To follow-up on corrective actions for selected previously identified compliance issues (e.g., non-cited violations (NCVs)). 01.08 To verify that licensees are identifying and placing potential 10 CFR21 issues into the Corrective Action Program (CAP) and appropriately evaluating them.

Cautions and Observations Failure to recognize Significant Conditions-typically loss of safety function Failure to recognize regulations other than 10CFR50 Appendix B 10CFR26.31 FFD program personnel qualifications 10CFR26 Subpart I Fatigue Management-Inadequate control of work hours 10CFR50.47 Emergency Plans- classification 10CFR50.65 Maintenance Rule issues- recognition of a(1) status Other Regulations including Environmental, State & Local, etc. Assuming that the cause of an event is well understood without any analysis

Deficiencies Observed Failure to properly identify CAQ- issues to be addressed in the CAP Failure to maintain traceability of CAP in other management systems Failure to adequately address Maintenance Rule equipment failures Inadequate depth of investigation of SCAQ Failure to provide adequate documentation of actions taken Setting arbitrary limits on the number of CAs for an issue Coding CAs from CAP issues as non-cap (Regulator does not care)