U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Similar documents
PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

PUBLIC NOTICE Application for Permit

November 20, 2017 PUBLIC NOTICE

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA September 17, 2018 PUBLIC NOTICE

Regulatory Guidance Letter 92-01

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

Regulatory Division General Information: January 2016

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Corps Regulatory Program Update

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

DEPARTMENT OF THE ARMY GENERAL PERMIT

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

2017 Nationwide Permit Reissuance

SPD Emergency Procedures and SPK Regional General Permit 8 for Emergency Actions

PUBLIC NOTICE.

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

JOINT PUBLIC NOTICE. October 1, 2018

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

DEPARTMENT OF THE ARMY. U.S. Army Corps of Engineers, Los Angeles District. Regulatory Division

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

State of New Jersey In-Lieu Fee Mitigation Program Final Instrument. August 31, 2015 Revised March 10, 2016, February 12, 2018

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

Joint Application Form for Activities Affecting Water Resources in Minnesota

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT P.O. BOX 2946 PORTLAND, OREGON August 9, 2016

South Sacramento HCP Regional General Permit

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

WHOLE WATERSHED RESTORATION INITIATIVE

Part IV. Appendix C: Funding Sources

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

ORANGE COUNTY TRANSPORTATION AUTHORITY. Measure M2 Freeway Environmental Mitigation Program Status Update. PowerPoint

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA JUN 2 S 2017

PASPGP-5 REPORTING CRITERIA CHECKLIST

MEMORANDUM OF UNDERSTANDING LANDSCAPE CONSERVATION OF NATURAL RESOURCES IN CALIFORNIA THROUGH THE CALIFORNIA CONSERVATION PARTNERSHIP

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

ARIZONA ASSOCIATION OF CONSERVATION DISTRICTS STRATEGIC PLAN P age 75 Years of Locally Led Conservation

55644 Federal Register / Vol. 66, No. 213 / Friday, November 2, 2001 / Notices

1. Introduction to the National Fish and Wildlife Foundation and the Angeles National Forest partnership 2. Overview of Wildfires Restoration Program

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB-f

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: September 4, 2018 Expires: September 24, 2018

-2- 4) The Corps will ensure the biological assessment is prepared in accordance with the Corps' "Biological Assessment Template."

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

ORANGE COUNTY TRANSPORTATION AUTHORITY. Measure M2 Environmental Mitigation Program Update. Staff Report

The Use of Wis DNR Grants for Stream Monitoring. Eileen Trainor and Pat Sheahan Wisconsin DNR October 6, 2007

REQUEST FOR PROPOSALS Northeastern Region Grantee Technical Assistance for Federal Compliance

Marshes Mitigation Banking Pilot. CM Services Informational Session 10:00 AM 12:00 PM July 10, 2015

NEBRASKA ENVIRONMENTAL TRUST BOARD RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484

Shellfish Aquaculture Permitting Program Update

Wisconsin DNR Administered Programs. Aids For The Acquisition And Development Of Local Parks (ADLP)

Great Peninsula Conservancy Strategic Plan November 17, 2015

Rio Grande Water Fund Request for Proposals 2018

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 STANDARD OPERATING PROCEDURES. June 5, 2014

Thank you for joining us!

WHOLE WATERSHED RESTORATION INITIATIVE Request for Proposals for Community-based Habitat Restoration Projects in Oregon and Washington

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler

EXECUTIVE SUMMARY. Environmental Compliance

Conservation Appendix C: Conservation Budget Overview

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS

DEPARTMENT OF THE ARMY PERMIT

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

Hurricane Sandy Coastal Resiliency Competitive Grants Program

MEMORANDUM OF UNDERSTANDING ON IMPLEMENTATION OF THE SOUTH BAY SALT POND RESTORATION PROJECT

Loblaw Water Fund 2014/15 Guidelines

The Sport Fish Restoration and Boating Trust Fund

COASTAL CONSERVANCY. Staff Recommendation November 9, 2006 SAN FRANCISCO BAY NON-NATIVE OYSTER REMOVAL PROJECT

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

Department of Defense. Natural Resources Funding Manual

SECTION 401 CERTIFICATION BEST PRACTICES

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

COORDINATION PLAN. As of November 14, 2011

Project Priority Scoring System Texas Recreation & Parks Account Non-Urban Indoor Recreation Grant Program (Effective May 1, 2014)

Analysis Item 23: Parks and Recreation Department Southern Oregon Land Conservancy Land Acquisition

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012

26,614,000. Article 1 Sec moves to amend H.F. No. 707 as follows: 1.2 Delete everything after the enacting clause and insert:

Direct Component Project Evaluation Form

FROM: CITY MANAGER DEPARTMENT: COMMUNITY SERVICES

An Invitation: Establishing a community forest with the U.S. Forest Service

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP ]

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP ]

YOLO HABITAT CONSERVANCY: A NEVER ENDING STORY

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

REGIONAL PERMIT. Effective date: August 15, 2013 Expiration Date: August 15, 2018

APPENDIX J FUNDING SOURCES

MEMORANDUM OF AGREEMENT FOR IMPLEMENTATION OF MINNESOTA WETLANDS CONSERVATION PLAN

Part III Guidelines

Angeles National Forest Wildfires Restoration Grant Program

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

Passaic County Open Space, Farmland, and Historic Preservation Trust Fund Rules and Regulations Page 1 of 24

Transcription:

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT Proposed Re-Authorization of an Existing In-Lieu Fee Program Public Notice/Application No.: SPL-2000-01063-JWM Program: California State Coastal Conservancy In-Lieu Fee Program Comment Period: December 5, 2012 to January 3, 2013 Project Manager: John Markham; 805-585-2150; John.W.Markham@usace.army.mil Program Sponsor Peter Brand California State Coastal Conservancy 1330 Broadway, 13 th Floor Oakland, California 94612 brand@scc.ca.gov Location The Program service area would encompass the Calleguas Creek watershed (Hydrologic Unit Code 18070103), and is located entirely within Ventura County, California. Activity To modify the existing California State Coastal Conservancy In-Lieu Fee ( ILF ) Program ( Program ) pursuant to the requirements of the Corps-EPA Compensatory Mitigation Rule 1 (33 CFR 332.8(d)) ( Mitigation Rule ) (see attached map). For more information refer to the following pages of this notice. Supporting documents are available online or at the address below. Interested parties are hereby notified that a Prospectus has been received in order to reauthorize an existing ILF Program for the purpose of mitigating impacts to waters of the United States authorized, or enforcement actions resolved, under section 404 of the Clean Water Act. Interested parties are invited to provide their comments on the proposed re-authorization of this Program, which will become a part of the record and will be considered as part of this proposal. 1 The mitigation rule was promulgated by the U.S. Army Corps of Engineers and U.S. Environmental Protection Agency at 33 C.F.R. Part 332 and 40 C.F.R. Part 230, respectively.

Comments should be mailed to: U.S. Army Corps of Engineers Los Angeles District, Regulatory Division Attn: John W. Markham, Project Manager Ventura Field Office 2151 Alessandro Drive, Suite 110 Ventura, CA 93001 Alternatively, comments can be sent electronically to: john.w.markham@usace.army.mil. Background The California State Coastal Conservancy ( Conservancy ) has requested the Corps reauthorization of this Program. If re-authorized, this Program would continue to receive monies from individuals or entities ( project proponent ) receiving Corps authorization under section 404 of the Clean Water Act and, when appropriate, to resolve Section 404 enforcement actions within the proposed service area (see attached map). The Conservancy (http://scc.ca.gov/) was established in 1976, as a state agency that uses entrepreneurial techniques to purchase, protect, restore, and enhance coastal resources, and to provide public access to the shore. The Conservancy, pursuant to its authority under Division 21 of the California Public Resources Code, undertakes projects and awards grants to public agencies and nonprofit organizations for the restoration and enhancement of coastal watersheds. Program funds would provide for restoration, establishment, and enhancement activities, preservation, in-perpetuity protection, long-term maintenance, and monitoring on Conservancy-owned and managed lands protected under Corps-approved conservation easements or deed restrictions. The In-Lieu Fee Program for the Calleguas Creek watershed formally began in 2003, when the Corps and the Conservancy signed the Agreement for Establishment and Administration of the Calleguas Creek Watershed (Ventura County, California) Aquatic Resource In-Lieu Fee Compensatory Mitigation Program (dated March 17, 2003) Pursuant to the Mitigation Rule, all existing ILF programs are required to comply with the Rule in order to continue operating beyond the June 9, 2010 deadline specified in the Rule. Program objectives include but are not limited to the following: To facilitate a holistic approach to aquatic resource management in the Calleguas Creek watershed, allocating money where there is the greatest opportunity for long-term ecological benefit; Meet the federal policy of no net loss (in terms of functions/services and/or acreage) of the nation's aquatic resources; Provide a viable alternative to compensatory mitigation for Corps permit applicants and alleged violators; Provide more efficient use of Agencies staff resources with respect to review of compensatory mitigation plans, monitoring reports, site protections, and compliance inspections; and Improve the overall effectiveness of compensatory mitigation required by the Agencies permits and enforcement actions, and Habitat Conservation Plans.

With the existing Program, between June 1997 to April 2006, the Corps has allowed the Program sponsor to accept fees from twenty-four project proponents associated with twenty-six, separate Corps permits. In summary, the Corps has required a total of 22.2 acres of compensatory mitigation for 10.4 acres of permanent impacts (losses) to waters of the U.S. To date, the Conservancy has implemented three restoration projects amounting to 10.64 acres, 2.14 acres of which has been credited by the Corps. At present, the current balance to be mitigated is 20.06 acres. The next planned mitigation project is the restoration and enhancement of streambed, freshwater wetland, riparian, and adjacent upland areas at Camarillo Regional Park. The Conceptual Mitigation Plan prepared by the Conservancy and approved in a July 2008 letter from the Corps, would result in the restoration, enhancement, and preservation of approximately 62.7 acres of aquatic resources, including streambed (~2 acres), deciduous riparian woodland (~24 acres), emergent freshwater wetlands (~2 acres) and riparian scrub (~35 acres). Additionally, up to 12 acres of Venturean coastal sage scrub could be re-established where fill dirt, removed from the wetlands, is proposed for placement on disturbed upland habitat on site. Based upon these initial estimates, upon satisfying the remainder of previously purchased mitigation credits (20.02 acres), the Conservancy estimates that this mitigation project would result in approximately 47 acres of aquatic resource mitigation. Upon reaching the final performance criteria, this project is expected to cover the balance of currently required mitigation, and to generate enough additional credits to cover a significant portion of the mitigation required by Corps Regulatory Division over the next five to ten years for the Calleguas Creek watershed. As described in the Prospectus, there are nine other additional sites that can be pursued for future restoration which would also result in substantial functional gain to the wetland and riparian areas of the Calleguas Creek Watershed. Mitigation Approval and Permitting Processes Mitigation requirements for a particular project are negotiated between the project proponent and the Corps. The project proponent must therefore first submit a mitigation proposal to the Corps that describes the proposed use of an ILF Program or Mitigation Bank. If appropriate credits are not available at a Mitigation Bank located within the service area, and the Corps determines that the Program is the most appropriate approach to mitigation implementation, then the project proponent would contact the Program sponsor to discuss mitigation options. The Program sponsor would review copies of all permits issued to the project proponent and then submit a proposal to the project proponent, including the estimated cost of the proposed mitigation work. Prior to acceptance of payment ( credit sale ), the Program sponsor would also contact the Corps in order to verify the Corps requirements. Upon receipt of payment, the Program sponsor becomes legally responsible for initiating the necessary mitigation and monitoring within three growing seasons of receipt of payment. During this time, the Program sponsor would submit a complete Mitigation Plan 2 to the Corps and Interagency Review Team (IRT) 3 as well as an application for Corps permit(s) 4 should the proposed in-lieu fee mitigation project activities involve a discharge of dredge or fill material within waters of the U.S. or work within navigable waters of the U.S. The Corps would complete consultation, as appropriate, under the Endangered Species Act, the Magnuson-Stevens Fishery Conservation and Management Act, the National Historic Preservation Act and other applicable laws, prior to any permit authorization. 2 The content of a complete Mitigation Plan is described in the Mitigation Rule, at 33 CFR 332.4(c)(2-14). 3 The Interagency Review Team (IRT) consists of member Agencies, and may include U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, National Marine Fisheries Service, California Department of Fish and Game, and Los Angeles Regional Water Quality Control Board 4 The proposed mitigation activities may also require separate approvals from the Regional Water Quality Control Board and California Department of Fish and Game.

Program funds would be held in a Program account, and all credit sales would be tracked and reported by the Program sponsor to the Corps at a minimum on an annual basis, and also uploaded to the Corps Regulatory In-lieu Fee and Banking Information Tracking System (RIBITS) (http://geo.usace.army.mil/ribits/index.html). To ensure permanent protection of the Program mitigation sites, the Program sponsor would secure in-perpetuity conservation easements or grant deed restrictions to be recorded at the appropriate County s Registry of Deeds. The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts and benefits of the proposed re-authorization of the Program. Any comments received will be considered by the Corps to determine whether the proposal has the potential to provide mitigation opportunities for permitees authorized to impact waters of the U.S. under section 404 of the Clean Water Act or as a means of resolving Section 404 enforcement actions. Additional details are provided in the Prospectus, available in the Cyber Repository for the California State Coastal Conservancy ILF Program on Los Angeles District s list of pending ILF Programs under ILF Programs on the Corps Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) site: http://geo.usace.army.mil/ribits/index.html. The Prospectus is also available at the Corps Ventura Field office at the address above. For additional information please contact John Markham of my staff via phone at 805-585-2150 or via e-mail at John.W.Markham@usace.army.mil. This public notice is issued by the Chief, Regulatory Division. Regulatory Program Goals: To provide strong protection of the nation's aquatic environment, including wetlands. To ensure the Corps provides the regulated public with fair and reasonable decisions. To enhance the efficiency of the Corps administration of its regulatory program. U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT DEPARTMENT OF THE ARMY VENTURA FIELD OFFICE 2151 ALESSANDRO DRIVE, SUITE 110 VENTURA, CALIFORNIA 93001

Exhibit A: Service Area