Engineering Sanitary Sewer

Similar documents
1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals:

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM

REQUEST FOR PROPOSAL

MASSACHUSETTS WATER RESOURCES AUTHORITY

Figure 1: ALCOSAN ORGANIZATION CHART

City of Culver City. Staff Report

STATE WATER RESOURCES CONTROL BOARD

DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE

PRIORITIZATION MODEL RESULTS SANITARY Prioritization Project Prioritization Rank Name Score 1 Facilities Renovation Offset Mitigation 58.

Fort Monroe Authority. Capital Improvement Plan Fiscal Years 2017 Through 2022

CWSRF Intended Use Plan

CITY OF BUENA PARK SEWER SYSTEM MANAGEMENT PLAN

3-Party Consent Decree Status Report: Quarter No

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, August 28, 2018, 2:15 p.m.

City of Los Angeles Department of Public Works Bureau of Sanitation (LASAN) On-call Consultant Services Contract

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION

BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

CCHS Health Care for the Homeless Co-Applicant Governing Board

The requirements for the Organization element of the SSMP are:

THE CITY OF SAN MATEO/ESTERO MUNICIPAL IMPROVEMENT DISTRICT WASTE WATER TREATMENT PLANT Request for Qualification 2015 Design Theme Competition San

THE ROSE GARDEN LIBRARY CLOSES AT 7:00PM

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

I. Background. Definitions

Inkspot GREETINGS FROM THE PRESIDENT. March 2007

INVITATION FOR EXPRESSION OF INTEREST

AGENDA. 1603rd MEETING OF THE BOARD OF TRUSTEES THE METROPOLITAN ST. LOUIS SEWER DISTRICT

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

4/14/2017. Green Infrastructure Funding Opportunities

j Water Utility Authority

Clean Water Intended Use Plan

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

REQUEST FOR PROPOSALS FOR. Jed Smith Pipeline Replacement Project

K Sewer Inspection, Operation, and Reporting Services

FY 2016 Capital Improvement Program (CIP) BOWC Update. March 4, 2015

The DRC Outside Agency Review/Approval Checklist is also available for your convenience.

A-3 RECLAMATION NOTICE OF AVAILABILITY

Five-Year Capital Improvement Plan

DAILY & WOODS A PROFESSIONAL LfMlTED LIABILITY COMPANY ATTORNEYS AT LAW

Request for Proposal. 23rd Street Streetscape Improvement Project. Richmond Community Redevelopment Agency. Request for Proposal for: July 2007

REGIONAL WATER & SEWER DISTRICT FEASIBILITY STUDY, PETITION, AND PLAN OF OPERATION REQUEST FOR PROPOSALS

FY 2016 Clean Water Fund Competitive Grants Policy

FY 2017 Proposed Capital Improvement Program

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION

MADISON COUNTY MISSISSIPPI UNITED FOR PROGRESS

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

City of Punta Gorda Capital Improvement & Capital Outlay Programs FY 2017 to FY Capital Improvement Programs: Utilities Construction Fund 1

County of San Joaquin Community Infrastructure Projects. Community Infrastructure Needs in Unincorporated Areas of San Joaquin County

REQUEST FOR PROPOSAL (RFP) SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT. RFP RELEASE DATE January 17, 2014

Procedure For Processing An Application. For A Permit To Install Or Modify An Individual Sewer System

2017 MUNICIAL STATE BOND FUND INFLOW & INFILTRATION (I&I) GRANT PROGRAM

2.2 DEPARTMENT OF PUBLIC WORKS (DPW) ORGANIZATIONAL CHART CITY COUNCIL CITY MANAGER. PUBLIC WORKS DEPARTMENT Director of PW

F I N A L D R A F T. Capital Improvement Plan. City of Black Diamond

The Border Environment Cooperation Commission

GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372

Request for Proposal Engineering Consultant for City of Ingleside

EXHIBIT 2 Page 1 of 9

APPROVED BUDGETS. district of columbia water and sewer authority. Section VII DEPARTMENTAL SUMMARIES

ELECTRONIC PACKET FEBRUARY 12, 2018 OPERATIONS COMMITTEE MEETING. RELEASED: Monday, February 5, 2018

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

SAFETY DIRECTIVE. This directive applies to all departments and employees of the Town of Marana.

Environmental Management Chapter

HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS

PUBLIC FACILITIES FINANCING

CWSRF Intended Use Plan

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #68-14 REQUEST FOR PROPOSAL

Edric has done a great job as City Engineer for Richmond and we wish him well in his new position.

WATER QUALITY MANAGEMENT PERMIT

CITY OF MOUNT CARROLL CAPITAL IMPROVEMENTS PROGRAM UPDATE

CITY OF SOUTH SAN FRANCISCO

Supply & Demand of RNs in the LA-Orange-Ventura region

FY 2018 Watershed-Based Funding Pilot Program Policy

General County. Project Title

Florida Department of Environmental Protection

Bylaw No OFF-SITE LEVY BYLAW

Supply & Demand of RNs in the Sacramento & Northern regions

City Council Weekly Digest

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Regulatory Division General Information: January 2016

S A W P A SANTA ANA WATERSHED PROJECT AUTHORITY Sterling Avenue, Riverside, California (951)

Arizona s Drinking Water Revolving Fund

NADBank News Vol. V, Edition 4 March 7, In this edition:

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Appendix B Review Matrix Text & Table Footnotes

State of Delaware Clean Water Advisory Council

O H I O P U B L I C W O R K S C O M M I S S I O N P R O J E C T G R A N T A G R E E M E N T

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

U.S. Army Corps of Engineers Navigation Program Update

Traffic-Calming & Pedestrian Safety Project

Element 07 Capital Facilities

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

5384 Appendices

City of Painesville, Ohio

The Resort Improvement District (RID) is seeking a full-time GRADE 1 WATER/WASTEWATER TREATMENT PLANT OPERATOR

Department of Defense INSTRUCTION

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

WATERWORKS ENGINEER, 7248 SENIOR WATERWORKS ENGINEER, 9405

AGENDA CITY COUNCIL FRANCHISE/PUBLIC INFRASTRUCTURE SUBCOMMITTEE MONDAY, MAY 15, :00 PM COUNCIL CHAMBERS 525 HENRIETTA STREET MARTINEZ, CA 94553

Transcription:

Engineering Sanitary Sewer Prepared by: Rich Davidson, Director Assisted by: Mary Phelps Verle Holland Steven Tam Andy Yeung Gina De la Torre Serenity Cummings

Engineering Department Sanitary Sewer Mission: To provide continuous operations and maintenance of the City of Richmond Municipal Sewer District conveyance system for domestic, commercial and industrial wastewater in the Richmond area of Contra Costa County Overview: Sewer Drain Improvements The Wastewater program of the Engineering Division is to Rehabilitate and provide preventative maintenance to the subsurface network of pipes and conduits. This division is also responsible for ensuring compliance with the City s Wastewater Discharge Permit (Order No. 01-144, NPDES permit CA0038539) issued by the Regional Water Quality Control Board San Francisco Bay Region. The related appurtenances include more than 250 miles of underground pipes and remote sanitary sewage life stations and an FM telemetry system. This program is organized via a 20-year contract with Veolia Water North America under the direction of the City Engineer. Treatment Plant The majority of funds in the Sanitary Sewer System Capital Program are used to construct sewer improvement projects. Construction projects in the Proposed CIP fall into one of two categories: (a) enhance sewer capacity in substantially built-out areas and/or less developed areas; or (b) rehabilitate existing sewers, with higher priorities given to those with extensive, severe deterioration. A project that will enhance capacity and rehabilitate existing sewers is considered a rehabilitation project for the purpose of this budget. Emphasis is placed on larger lines within each category. Sources of Funding Wastewater Bond ($17,173,199) Digester Tank E-1

Program Highlights Sanitary Sewer Collections San Pablo Ave/Solano & Bissell Avenues FY2006 - FY2008 The long-term goal of this project is to prevent bottlenecking in the sanitary sewer system. This will be accomplished by increasing the pipe size to prevent the possibility of exceeding the systems hydraulic capacity, which could result in a Sanitary Sewer Overflow. (Program Cost $1,566,000) Sanitary Sewer Manhole Rehabilitation FY2006 - FY2011 This is an on-going project over a 10 year life cycle, which will be funded by the Wastewater Bond. The purpose of this project is to remedy the existing problems of deteriorated manholes which could result in Inflow and Infiltration in the collection system. (Program Cost $552,700) Harbour Way South @ Hall Ave & Marina Way South Tidal Groundwater Infiltration Rehabilitation Project FY2006-FY2007 This area has been identified as a main source of tidal inflow and infiltration (I&I) as indicated in the Wet Weather Flow study. (Program Cost $1,500,000) First Street between Cutting Blvd and Macdonald Avenue FY2007 - FY2008 This area has been identified as a hot-spot for sanitary sewer problems (back-ups, bottleneck, etc.), as indicated from the Closed Circuit Televising [CCTV] (Program Cost $2,500,000) I-580 Freeway @ Castro Street FY2006 FY2007 This area has been identified as a hot-spot for sanitary sewer problems (back-ups, bottleneck, etc.) (Program Cost $1,000,000) Performance Measures A set of performance measures have been designed to set goals and meet target dates. The performance levels established are for Wastewater s Capital program. There is also contract language with milestones and deadlines for completion. Completion of Capital project within two (2) months of the approved schedule; Keep the budget costs for the Capital projects within the adopted budget; Better project delivery costs for construction costs; Contract language milestones; The sanitary sewer collection system s priority is always to comply with all local, state and federal Regulatory Agency requirements. This will be accomplished by Staff participating in off-site conferences, trainings, and workshops. E-2

Engineering Department Sanitary Sewer FY2006-2007 through FY2010-2011 CIP 2006-2011 2006-2007 2006-2007 2007-2008 2008-2009 5yr Strategic Goals 5yr Goal 1-yr Target Estimate 1-yr Target 2-yr Target Performance Outcome: 1 - % of CIP projects delivered within 2 months of approved baseline schedule 2 - % of CIP projects that are completed** within the approved baseline budget 85% 85% 75% 85% 85% 90% 90% 85% 90% 90% 3 - Project delivery costs (exclusive of city-wide overhead) as % of the total construction costs for completed costs: less than $500,000-30% 30% 35% 30% 30% between $500,000 and $3M- 25% 25% 28% 25% 25% greater than $3M- 15% 15% 20% 15% 15% Total (all construction costs) 4 - % of operations and maintenance divisions rating new or rehabilitated capital facilities as being functional and sustainable after first year of use 5 - % of customers rating new or rehabilitated CIP projects as meeting established goals (4 or better based on a scale of 1-5) 80% 80% 80% 80% 80% 85% 85% 85% 85% 85% Notes: * Projects are considered to be "delivered" when they are available for their intended use. ** Projects are considered to be "completed" when the final cost accounting has occurred and the project has been accepted. ***Not applicable. E-3

City of Richmond FY2006-2007 - FY2010-11 CIP 3b. Sanitary Sewer Prior Year Project Name FY2005-06 FY2006-07 FY2007-08 FY2008-09 FY2009-10 FY2010-11 5 Year Total 1 San Pablo Ave/ Solano & Bissell Mainline Replacement $763,900 $802,100 $1,566,000 2 Sanitary Sewer Manhole Rehabilitation $100,000 $105,000 $110,300 $115,800 $121,600 $552,700 3 Potrero Ave/ 20th & Marina Bay Mainline Replacement $126,075 $126,075 4 1st Street b/t Chansler & Ohio Mainline Replacement $108,750 $108,750 5 580 Freeway @ Castro NW/ Western Dr. Off Ramp $488,580 $488,580 Subtotal Sanitary Sewer $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Funded $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Unfunded Sources WW Bond Fund $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105 Total Sanitary Sewer $1,478,555 $1,015,850 $110,300 $115,800 $121,600 $2,842,105

Richmond 2006/07-2010/11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: San Pablo Ave. between Solano & Bissell Avenues - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Remove 4,500 feet of 10-inch line and replace with 15-inch line at San Pablo Ave. between Solano and Bissell Avenues. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $1,566,000 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/07 5104WWB WW Fund $763,900 $802,100 1

Richmond 2006/07-2010/11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: Sanitary Sewer Manhole Rehabilitation Rich Davidson Engineering - Wastewater Collections Annual funding for rehabilitation of 15-20 deteriorated sanitary sewer manholes. Justification: Reduce inflow and infiltration. Total Estimated Cost: $552,700 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/07 5104WWB WW Fund $100,000 $105,000 $110,300 $115,800 $121,600 1

Richmond 2006/07-2010/11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: Potrero Ave. between 20th St. & Marina Way So. - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Replace existing 790 feet of 6-inch line with 10-inch line at Potrero Ave. between 20th St. & Marina Way So. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $126,075 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/07 5104WWB WW Fund $126,075 1

Richmond 2006/07-2010/11 Capital Improvement Program Project Description Report Project Name: Project Manager: Department Responsible: Project Description: 1st St. between Chanslor Ave. and 250 feet north of Ohio Ave. - sanitary sewer mainline replacement Rich Davidson Engineering - Wastewater Collections Replace existing 350 feet of 20-inch line with 24-inch line at 1st St. between Chanslor Ave. and 250 feet north of Ohio Ave. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $108,750 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/07 5104WWB WW Fund $108,750 1

Richmond 2006/07-2010/11 Capital Improvement Program Project Description Report Project Name: 580 Freeway from west of Castro St. northwest to 1,700 feet east of the 580 Freeway/Western Dr. off ramp - sanitary sewer mainline replacement Project Manager: Department Responsible: Project Description: Rich Davidson Engineering - Wastewater Collections Replace existing 2,344 feet of 6-inch line and 12-inch line with 15-inch line at John T. Knox Freeway (580) west starting 1,300 feet west of Castro St. on the north side of 580 Freeway, then northwest and parallel to 580 Freeway to 1,700 feet east of the 580 Freeway/Western Dr. off ramp. Justification: 2006 Sanitary Sewer Master Plan. Total Estimated Cost: $488,580 Source Of Funding Fund No Fund Name Requested FY Projected FY 07/08 Projected FY 08/09 Projected FY 09/10 Projected FY 10/11 06/07 5104WWB WW Fund $488,580 1