Mountmellick. Draft Local Area Plan Stage 3: Chief Executive s Report On

Similar documents
Manager s report on submissions received in respect of the Draft Navan Local Area Plan

Chief Executive s Report on the Submissions Received on the Proposed Material Amendments to the Draft Louth County Development Plan

Ferrybank/Belview Local Area Plan Review

Manager s Report on Submissions Received in respect of the Amendments to the Draft Navan Local Area Plan

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.

RESERVOIR LEGISLATION IN NORTHERN IRELAND

Comprehensive Plan 2009

The proposed Christchurch Replacement District Plan

Kildare County Council

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Proposed National Forensic Mental Health Service Hospital

Adamstown Strategic Development Zone Planning Scheme Amendment No. 1. Approved by South Dublin County Council

Planning: a Short Guide

Manager s Report Draft Meath County Development Plan TABLE OF CONTENTS

Dear Councillor, PAGE. 14 Report No. 199/2017 of the Assistant Chief Executive (R. Shakespeare) - Ballymun LAP (to be circulated separately) 3-102

Local Area Key Issues Paper No.12: Cane lands

Report. To the Chair and Members of CABINET

METHODOLOGY - Scope of Work

Central Bedfordshire Council. Determination of Proposal to Commission New Middle School Places in Leighton Buzzard

SISTERS OF ST JOHN OF GOD CARE AND ACCOMMODATION STRATEGY REGIONAL LEADERSHIP TEAM FOLLOWING CONSULTATION WITH

COMMUNITY CARE FACILITY - CLASS B AND GROUP RESIDENCE GUIDELINES

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

Rural Regeneration and Development Fund

Mayor Strathdee and Members of Council. Grant Brouwer, Director of Building and Development

Mississippi Emergency Support Function #14 Long Term Recovery Annex

Greater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital

Contents. The Rural Development (LEADER) Programme Co. Kildare s Local Development Strategy Who can apply?...

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

BOROUGH OF POOLE COUNCIL. 15 December 2015

CONTRACT. Between THE TOWN OF LENOX. And HERITAGE STRATEGIES, LLC

Distinctly Boerne! Boerne Master Plan ( ) JOINT MEETING OVERVIEW & PRIORITIZATION

Guidelines APPLICATION FORM.

LANGUAGE SCHEME FOR THE NATIONAL GALLERY OF IRELAND

Kilkenny Local Authorities Estate Management Plan DRAFT

NOW THEREFORE, the parties enter into the following Agreement:

Downtown Shoulder Area Community Improvement Plan. Investing in our Community

Draft Greater Sydney Region Plan

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

Personal Budgets and Direct Payments

Departmental Guidelines adapted for DLR LCDC THE APPLICATION FORM.

2011 SURVEY OF MUNICIPAL REGULATIONS AND FIRE CODE REGULATIONS AFFECTING CHILD CARE FACILITIES DEVELOPMENT IN SANTA CLARA COUNTY

Marine Protection Rules Part 130B Oil Transfer Site Marine Oil Spill Contingency Plans

Town of the Blue Mountains Community Improvement Plan

Chiltern Chamber of Commerce Response to Local Plan Consultation

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

ATTACHMENT A. Nova Homes Residential Project. Initial Study/Mitigated Negative Declaration City Council Resolution

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

Reservation of Powers to the Board & Delegation of Powers

REQUEST FOR PROPOSALS

This report will be open to the public on 11 July 2017.

Application Form. Green Infrastructure Fund

National Productivity Investment Fund for the Local Road Network Application Form

Policy for Special Rate/Charge Schemes in Retail/Commercial Precincts or Centres April 2014

Streamlining Planning Assessments. The Updated Residential Code (New Dwellings and Additions to Existing Dwellings) Frequently Asked Questions

INTERGOVERNMENTAL COORDINATION ELEMENT:

Item 9 - Consideration of 2014 OCP

The Southwark Plan. Life Chances November Supplementary Planning Guidance for consultation

Sample Privacy Impact Assessment Report Project: Outsourcing clinical audit to an external company in St. Anywhere s hospital

Version 5 24 th August City Deal and Growth Deal Programme Board. Business Case Approval Form

Department of Defence. Scheme under Section 15 of the

Royal Irish Academy Standing Committee for Archaeology

The Nursing and Midwifery Order 2001 (SI 2002/253)

Chief Executive s Report

POLICY NUMBER: C553B AUTHORITY: City Manager EFFECTIVE DATE: October 31, Development Incentive Program Procedures

Optimizing critical city infrastructures. Tom Leahy Executive Manager Dublin City Council

Appendix 2 LIVERPOOL STATEMENT OF COMMUNITY INVOLVEMENT

Child Safeguarding Statement

Bartlesville City Planning Commission SITE DEVELOPMENT PLAN PROCEDURE AND APPLICATION

Local Government and Regeneration Committee. Regeneration Inquiry. Submission from West Dunbartonshire Council

Nassau County 2030 Comprehensive Plan. Public School Facilities Element (PSF) Goals, Objectives and Policies. Goal

Revision Date Description. National Council AGM Revisions 2018 Details of changes at rear of document O 08/04/2017

COUNTY OF SACRAMENTO CALIFORNIA

VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN

PATIENTS FIRST AN AGREED AGENDA ON A PATIENT SAFETY AUTHORITY.

OPERATING PERMITS FAQs

POLICY. Edith Cowan University (ECU) recognises that a safe and healthy working environment is conducive to job satisfaction and productivity.

ADMINISTRATIVE VARIANCE APPLICATION PACKET

SPECIFIC AND MASTER PLANS

Comprehensive Planning Grant. Comprehensive Plan Checklist

TOWN CENTRE REGENERATION EXECUTIVE COMMITTEE. 4 October Report by Corporate Transformation and Services Director 1 PURPOSE AND SUMMARY

A Case Review Process for NHS Trusts and Foundation Trusts

Guidelines for Developers and Local Governments

Economic Development Plan For Kent County, Maryland

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

England. Questions and Answers. Draft Integrated Care Provider (ICP) Contract - consultation package

City of Tecumseh DDA Façade Incentive Grant Program Guidelines

Nursing Homes Ireland in association with Irish Small and Medium Enterprises Association (ISME)

Rotorua Lakes Closure Guidelines 2011 (August 2011)

TOWN COUNCIL WORKSHOP AGENDA DOCUMENTATION

TRANSPORTATION FUNDING PROGRAMS

KNIGHTSEN TOWN COMMUNITY SERVICES DISTRICT

INTERGOVERNMENTAL COORDINATION ELEMENT

Tourism Leases in National Parks: Guidance Note

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

Case Study: City of Waverly, Iowa

Honorable Mayor Shaw and Members of the City Council

Meaford Energy Centre Section 47 Planning Act 2008 Statement of Community Consultation

The Historic Preservation Plan

Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS

Transcription:

Mountmellick Draft Local Area Plan 2018-2024 Stage 3: Chief Executive s Report On Stage 2: Submissions and Observations received during the Draft Plan Public Consultation 30 th May 2018

CONTENTS 1.0 INTRODUCTION... 3 1.1 Next steps... 3 1.2 Consultation Process & List of Submissions... 4 1.3 Considering the Submissions... 5 1.4 Guidance for the Elected Members... 5 2.0 SUMMARY OF ISSUES RAISED, CHIEF EXECUTIVE S OPINION AND RECOMMENDATION... 6 2.1 Prescribed Bodies... 6 2.2 Public Submissions... 10 3.0 PRESCRIBED BODIES... 21 4.0 INVENTORY OF SUBMISSIONS... 22 2

1.0 INTRODUCTION This Chief Executive s Report is submitted under Section 20(3)(c) of the Planning and Development Act 2000 (as amended). It is part of the formal statutory process of the preparation of a Local Area Plan (LAP). This Report contains the following: (i) (ii) (iii) a list of the persons or bodies that made submissions, a summary of the issues raised by them, the opinion of the Chief Executive in relation to the issues raised, and his recommendations in relation to the proposed LAP, taking account of the proper planning and sustainable development of the area, the statutory obligations of any Local Authority in the area and any relevant policies or objectives of the Government or of any Minister of the Government. The members of the Planning Authority are required to consider the proposal to make the Local Area Plan and this report of the Chief Executive. 1.1 NEXT STEPS Following consideration of this Chief Executive s Report, the Local Area Plan shall be deemed to be made in accordance with the recommendations of the Chief Executive as set out in this report, 6 weeks after the furnishing of this report to the members, unless the Planning Authority, by resolution, decides to either: (i) (ii) make or amend the plan otherwise than as recommended in this report, or not make the plan. Where, following consideration of the Chief Executive s Report, it appears to the members of the authority that the Draft LAP should be altered, and the proposed alteration would if made be a material alteration of the Draft LAP, the Planning Authority shall, not later than 3 weeks after the passing of a resolution, publish notice of the proposed material alteration in one or more newspapers circulating in the area, and send notice of the proposed material alteration to the Minister, the Board and the prescribed authorities (enclosing where the authority considers it appropriate a copy of the proposed material alteration). In the event that material amendments to the draft plan are proposed, the Planning Authority shall determine if a Strategic Environmental Assessment (SEA) and/or an Appropriate Assessment (AA) as the case may be, is or are required to be carried out with respect to one or more than one proposed material amendments to the Draft LAP. The Chief Executive shall, not later than 2 weeks after a determination that SEA/AA of a material amendment is required, specify such period as he or she considers necessary following the passing of 3

the resolution, as being required to facilitate an assessment. The Planning Authority shall carry out an assessment required of the proposed material amendment of the Draft Local Area Plan within the period specified by the Chief Executive. The Planning Authority shall publish notice of the proposed material amendment, and where appropriate in the circumstances, the making of a determination that an SEA and/or AA is required. The Planning Authority shall carry out the assessment within the period specified by the Chief Executive. The notice relating to material amendments shall state: (i) (ii) that a copy of the proposed material amendment and of any determination by the authority that an SEA/AA is required may be inspected during a stated period of not less than 4 weeks, and, that written submissions or observations with respect to the proposed material amendment and of any determination by the authority that an SEA/AA is required, may be made to the Planning Authority and shall be taken into consideration before the making of any material amendment. 1.2 CONSULTATION PROCESS & LIST OF SUBMISSIONS The Draft Mountmellick Local Area Plan 2018 2024 was on public display during the period 21 st March 2018 8 th May 2018. Public Information Sessions were held in Laois County Council on 5 th April 2018 and the Former Town Council Chamber, Mountmellick Civic Offices/ Library on 17 th April 2018 where the public attended and interacted with the plan team. During the public display period, a total of 11 no. submissions were received as follows: Group A Prescribed Bodies No. Organisation Representative A1 Offaly County Council Olivia Hughes, Administration Officer A2 Irish Water Suzanne Dempsey A3 Dept. Housing, Planning & Local Government Niall Cussen Group C Individual Submissions No. Group Name/Surname Representative/ Forename C1 Buggy Paddy C2 MDA Paddy Buggy C3 MDA Paddy Buggy C4 Rochford Michael, Gerard & Bernard C5 Hourigan Martha C6 TII Michael McCormack C7 Kingscroft The Planning Partnership C8 Delaney Noel & Lucia Marie 4

1.3 CONSIDERING THE SUBMISSIONS The written submissions have been analyzed by the Planning Executive of the County Council. The submissions are summarised and the opinion and recommendations of the Chief Executive have been given in Section 2 below. The Chief Executive has made a number of recommendations, they are outlined in Section 2 below. Amended / new text is highlighted in red and deleted text is outlined in blue strikethrough. This Report is submitted to the Members for their consideration. 1.4 GUIDANCE FOR THE ELECTED MEMBERS Responsibility for approving a Local Area Plan, including the various policies and objectives contained within it, in accordance with the various provisions of the Planning and Development Act 2000 (as amended) rests with the Elected Members of the Planning Authority, as a reserved function under Section 20 of the Act. In making the Local Area Plan, the elected representatives, acting in the interests of the common good and the proper planning and sustainable development of the area, must, in accordance with the Code of Conduct for Councilors prepared under the Local Government Act 2001, carry out their duties in this regard in a transparent manner, must follow due process and must make their decisions based on relevant considerations, while ignoring that which is irrelevant within the requirements of the statutory planning framework. The members, following consideration of the Draft Plan and this report, shall decide whether to adopt the Local Area Plan or to amend the Plan. 5

2.0 SUMMARY OF ISSUES RAISED, CHIEF EXECUTIVE S OPINION AND RECOMMENDATION 2.1 PRESCRIBED BODIES Submission Number A1 Prescribed Body Offaly County Council Summary of Issues Raised 1) Cycle network on the Old Canal: Chapter 9 Economic Development should include a policy to investigate the feasibility of connecting up Mountmellick with regional and national cycle networks via the Old Canal Line. This line extends from a point to the east of Mountmellick to Monasterevin, which may be suitable for cycle ways providing positive economic, social and cultural benefits to the town and wider rural hinterland. 2) Flood Management: Objective FM03 of Chapter 17 Flood Management should reflect any short or long term infrastructural and flood defence works proposed to alleviate flooding in Mountmellick, and should take account of any potential impact on the town of Portarlington and its hinterland which is downstream on the River Barrow and is particularly sensitive to significant change in land run off and river flow from works up stream. Opinion of Chief Executive 1) Laois County Council shall include a policy as highlighted in the submission by Offaly County Council. 2) The plan will comply with The Planning System and Flood Risk Management Guidelines for Planning Authorities (DoEHLG, 2009). Following the severe and unprecedented flooding in November 2017 Laois County Council has agreed in conjunction with the Office of Public Works (OPW), the urgent commencement of detailed design and engineering specifications for flood defenses in Mountmellick. The detailed design will include a review of the Catchment Flood Risk Assessment and Management Mapping (CFRAM) taking into account the recorded flood depths on 22 nd November 2017 and the identification of any additional flood defenses necessary. A Project Office will be established locally to manage the design, implementation and construction of a flood relief scheme on behalf of and in partnership with the OPW during the lifetime of this plan. The flood Relief Scheme shall consider the impacts of any flood defenses on areas downstream of Mountmellick. Chief Executive s Recommendation 1) Include a policy in Chapter 12 as follows: 6

TM P11: Examine the feasibility of connecting Mountmellick with regional and national cycle networks via the Old Canal Line for cycle ways to encourage positive economic, social and cultural benefits to the town and wider rural hinterland. 2) No further action. 7

Submission Number A2 Prescribed Body Irish Water C/O Susanne Dempsey Summary of Issues Raised No comments relating to water services. Irish Water will only be in a position to confirm water and wastewater availability for site specific new development through Irish Water s pre-connection enquiry process. Opinion of Chief Executive Noted Chief Executive s Recommendation No further action 8

Submission Number A3 Prescribed Body Dept. Housing, Planning & Local Government C/O Niall Cussens Summary of Issues Raised The Department advocates close adherence to the sequential approach to flood risk management in the plan process in accordance with the Flood Risk Management Guidelines (2009). Lands identified Flood Zones A & B should not be zoned for residential or other highly vulnerable development. The Council is advised to examine the Draft LAP to ensure that proposed zoning objectives are fully integrated with the Strategic Flood Risk Assessment and the 2009 Guidelines. Opinion of Chief Executive The plan will comply with The Planning System and Flood Risk Management Guidelines for Planning Authorities (DoEHLG, 2009). Chief Executive s Recommendation No further action 9

2.2 PUBLIC SUBMISSIONS Submission Number C1 Name Paddy Buggy Summary of Issues Raised Medium to low density designated areas are required in the areas identified for future residential development. In order to: -Attract inward investment and appeal to senior management and decision makers; -Enable senior managers to own nice big detached houses with large gardens; -Have building policy in harmony with the Business Development section of Laois County Council trying to attract inward investment. Opinion of Chief Executive Lands have been zoned Residential 2 to cater for residential densities in accordance with the Dept. of Environment, Heritage and Local Government s Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas (Cities, Towns & Villages) (2009). Higher density developments will be encouraged within the Town Centre zoning. Chief Executive s Recommendation No further action 10

Submission Number C2 Name MDA C/O Paddy Buggy Summary of Issues Raised Seek zoning of open space lands for Industrial and Commercial development at the MDA Business Park. The Business Park employees 110 people and this zoning is crucial to the growth of employment. Opinion of Chief Executive The subject lands are located immediately adjacent to the Owenass River and are located within Flood Zone A in the Mountmellick SFRA which accompanies the Draft Plan. Flood Zone A defines areas with the highest risk of flooding from rivers (i.e. more than 1% probability or more than 1 in 100). On the basis of the final CFRAM (Catchment Flood Risk Assessment Management) maps for Mountmellick it would be inappropriate to zone lands for further development at this location. However, the Planning Authority may facilitate future expansion plans that would not impact on the flood zone. Chief Executive s Recommendation No action 11

Submission Number C3 Name MDA C/O Paddy Buggy Summary of Issues Raised Requests that once the proposed flood defences are installed that the areas protected by these defences are re-designated as not being prone to flooding to allow property owners regain insurance. Opinion of Chief Executive In accordance with the Planning System and Flood Risk Management Guidelines for Planning Authorities (DoEHLG, 2009), the Flood Zones are defined without the benefit of defences or other mitigating measures. As stated on page 16 of the Guidelines, "the presence of flood protection structures should be ignored in determining the flood zones". Taking the Planning Guidelines into account, future amendment to the SFRA following installation of flood defence works is not appropriate and it is not recommended that any changes are made to the SFRA. Chief Executive s Recommendation No action 12

Submission Number C4 Name Michael, Gerard & Bernard Rochford Summary of Issues Raised 1) Seeks the change of zoning from Enterprise & Employment to Residential (LS7634 & LS14693) The submission includes the following justification: -The lands are bound on three sides by residential development; -Close proximity to the town centre of a main service town; -Direct access onto the N80; -Area can be enhanced by quality housing; -Well located between Portlaoise and Tullamore; -Family members require housing which would eliminate ribbon development and septic tanks; -Zoning of lands would be consistent with the objectives of the LAP; -Willing to commit to no one off houses on the observers lands for the duration of the LAP. 2) Seeks the change from Enterprise & Employment to Open Space & Amenity (LS18553) The submission includes the following justification: -The lands are farmland and will remain so for the duration of the LAP; -There is adequate Enterprise and Employment zoned land in the town. 13

Opinion of Chief Executive 1) The lands are located to the north of the town centre and are currently in agricultural use. The lands are bound by low density long standing dwellings in a ribbon type development. An access point to the lands is possible via the site of a fire damaged dwelling. The lands are not located in a designated flood zone. Mountmellick has a housing land requirement of 27 hectares up to the target year of 2024, as set out in Chapter 2 Development Strategy. There are currently 15.45 hectares zoned to meet the targets of the Core Strategy. The additional 2.56 hectares proposed within this submission is considered reasonable. The site has the potential for access within the speed limits of the town on the N80. The site can be serviced and capacity is available. 2) The land is located immediately east of the Bay Road Business Park and is currently zoned Enterprise and Employment. The Bay Road represents the largest area of zoned Enterprise and Employment lands within the town. Two other areas have such a zoning, at the Harbour and at Acragar. Both of these areas are limited and have restrictions for further expansion. It is considered important that adequate lands are zoned within the town for Enterprise and Employment, in order to cater for future employment related development to meet the jobs targets of the National Planning Framework. Chief Executive s Recommendation 1) Change the zoning from Enterprise and Employment to Residential 2. 2) Retain the Enterprise and Employment zoning on the land as proposed in the Draft Plan. 14

Submission Number C5 Name Martha Hourigan Summary of Issues Raised Supports the de-zoning of lands and alteration of the settlement boundary to exclude lands at Harbour Street. Opinion of Chief Executive Noted Chief Executive s Recommendation No further action 15

Submission Number C6 Name Transport Infrastructure Ireland C/O Michael McCormack Summary of Issues Raised TII welcomes the policies presented in Policies TM P8, TM P9 and TM P10 concerning the safeguarding of the strategic function of the national road network. An N80 Relief road is not provided for in Project Ireland 2040/ National Development Plan 2018-2027. However, local improvements to the existing national road network planned over the term of the plan may be identified by the Council in consultation with and subject to the agreement of TII. TII may not be responsible for funding of any schemes or improvements. The Industry and Warehousing zoning objective to the south of Mountmellick adjoining the N80 requires a co-ordinated access strategy for the lands to avoid a proliferation of access onto the national road by way of an objective in the LAP. The development of such land, individually or cumulatively should be subject to a Traffic and Transport Assessment in accordance with TII Traffic and Transport Assessment Guidelines (2014). Consideration should be given to including the requirements of Chapter 3 of the DoECLG Spatial Planning and National Roads Guidelines into the LAP concerning specific objectives relating to Traffic and Transport Assessment (TTA), Road Safety Audit, Environmental Noise requirements and Signage etc. The Council are requested to reference the TII Traffic and Transport Assessment Guidelines (2014) in the LAP relating to development proposals with implications for the national road network. Thresholds advised in the TII Traffic & Transport Assessment Guidelines (2014), including sub-threshold TTA requirements, relate specifically to development proposals affecting national roads. Reference to the Design Manual for Roads and Bridges (DMRB) in Policy TM P10 of the Draft LAP and TII recommends that this reference should be updated to TII publications. Opinion of Chief Executive Noted. Policies should be included to reflect the contents of the TII submission. Chief Executive s Recommendation Include the following policies in the Mountmellick Local Area Plan: 1. Require the submission of a Traffic and Transport Assessment including mobility management plans in accordance with the guidelines in the Traffic and Transport Assessment Guidelines 2014, for developments with the potential to create significant additional demands on the traffic network by virtue of the nature of their activity, the number of employees, their location or a combination of these factors and for significant developments affecting the national and non national road network. 16

2. Require a Road Safety Audit for developments that require a new access to a national road or significant changes to an existing access in accordance with the guidance included in the NRA [TII] Design Manual for Roads and Bridges. 17

Submission Number C7 Name Kingscroft C/O The Planning Partnership Summary of Issues Raised Seeks zoning of lands for Residential and Open Space at Irishtown, Ballycullenbeg, Mountmellick. Opinion of Chief Executive The Planning Authority is opposed to this zoning proposal having regard to the following consideration: Flooding The vast majority of the site is in Flood Zone A in the Mountmellick SFRA which accompanies the draft Plan. Flood Zone A defines areas with the highest risk of flooding from rivers (i.e. more than 1% probability or more than 1 in 100). In accordance with the Planning System and Flood Risk Management Guidelines for Planning Authorities (DoEHLG, 2009), land included in Flood Zone A is the most sensitive as regards residential development and should be avoided. 18

The configuration of the site and the location of the flood zone make developing a residential development on the site difficult. Chief Executive s Recommendation No further action required 19

Submission Number C8 Name Noel & Lucia Marie Delaney Summary of Issues Raised Seeks change of zoning from Residential to Enterprise and Employment at Lord Edward Street. Opinion of Chief Executive The subject lands are located to the rear of dwellings on Lord Edward Street. There is a significant history of commercial development on the site with permission granted in the 1980s for a warehouse. Most recently permission was granted on a temporary basis for a bouncy castle business (17/327 refers). It is considered appropriate that the zoning reflect the existing permitted use on site and the proposed amendment is recommended. Chief Executive s Recommendation Amend the residential zoning to Enterprise and Employment. 20

3.0 PRESCRIBED BODIES The following prescribed bodies were notified of the Draft Local Area Plan in accordance with the requirements of the Act: Minister of Housing, Planning and Local Government Minister of Culture, Heritage and the Gaeltacht Irish Water Carlow County Council Kildare County Council Kilkenny County Council Offaly County Council Tipperary County Council 21

4.0 INVENTORY OF SUBMISSIONS Group A Prescribed Bodies No. Organisation Submission relates to: A1 Offaly County Council 1) Cycle Network on the Old Canal Line 2) Flood Management A2 Irish Water Water services A3 Dept. Housing, Planning & Local Government Sequential approach to zoning of land Group C Individual Submissions No. Group Name/Surname Submission relates to: C1 Paddy Buggy Designation of areas for low to medium density residential development C2 MDA Provision of Industrial and Commercial zoning at MDA C3 C4 C/O Paddy Buggy MDA C/O Paddy Buggy Michael, Gerard & Bernard Rochford Following installation of flood defences the areas protected by these defences should be re-designated as not being prone to flooding to allow property owners regain insurance Change of zoning from Enterprise and Employment to Residential at N80/Bay Road Change of zoning from Enterprise and Employment to Open Space & Amenity at Bay Road C5 Martha Hourigan Welcomes the de-zoning of lands at Harbour Street C6 TII Road infrastructure related objectives C7 Kingscroft C/O The Planning Seeking the Residential zoning of lands at Irishtown Partnership C8 Noel & Lucia Marie Delaney Change of zoning from Residential to Enterprise & Employment at Lord Edward Street 22