Acquisition of Information Technology Trends Within The Department of Defense
|
|
- Alberta Summers
- 5 years ago
- Views:
Transcription
1 OASD (Networks and Information Integration) Acquisition of Information Technology Trends Within The Department of Defense September 10, 2009 Don Johnson Advisor to the Defense Science Board Task Force Investigating DoD Policies and Procedures in the Acquisition of Information Technology
2
3 ASD NII/DoD CIO Organization Secretary of Defense Deputy Secretary of Defense Assistant Secretary of Defense (NII) / DoD Chief Information Officer Defense Information Systems Agency Deputy Assistant Secretaries of Defense (DASD) for: Information Management, Integration and Technology C3ISR & IT Acquisition Command, Control, Communications, Space and Spectrum Information and Identity Assurance Resources Deputy for National Leadership Command Capabilities Five DASD s, One Agency - Driving Net Centric Information Sharing 3
4 ASD(NI)/ DoD CIO Running the Enterprise Title 10 Assistant Secretary of Defense Principal Staff Assistant Titles 10, 40 & 44 Chief Information Officer Advise the Secretary Command and Control Comm & Information Networks Information Assurance RF Spectrum Management Position, Navigation, Timing Non-Intelligence Space Net-Centric Operations Expertise Authorities NII Charter (DoDD May 2, 2005) Section 113, Title 40, U.S.C., (formerly Clinger-Cohen Act of 1996 as amended) Responsibilities and Control Matrix Enable Net-Centric Operations Executive Enterprise-level strategist from the information & IT perspective Enterprise-wide information policy Information Technology architect for the DoD Enterprise DoD-wide information sharing executive Ensure the capability is delivered 4
5 Challenges in the New Strategic Era National Academies sponsored Is America Falling Off the Flat Earth, Norm Augustine, 2007 Nearly 60% of the patents filed with the US Patent and Trademark Office in the field of IT now originate in Asia In Business Week s ranking of the world s IT companies, only 1 of the top 10 is based in the US China has supplanted the US as the world s number 1 hightechnology exporter (in 10 year period US went from $40B in exports to $50B of imports of high tech manufacturing) IT is the essential fuel that will propel the knowledge-based society of the 21st century In the 18th and 19th century we faced a threat where ships crossed the ocean in days..in World War II, aircraft could cross the ocean in hours In the Cold War, missiles could do it in minutes.and now today, cyberattacks can strike in milliseconds. 5
6 Challenges in the New Strategic Era If attacked in milliseconds, we can t take days to organize and coordinate our defenses If our networks to be were to be disrupted or damaged, we d need to respond rapidly, at network speed, before the networks could become compromised and ongoing operations or the lives of our military are threatened In addition to speed, IT resides in a domain where change occurs in small timeframes, both for technology and for the ability of adversaries to procure, adapt, and employ the technologies 6
7 Current Generation of C4I War Fighters Today's leaders & soldiers are digital natives and use IT technologies to their advantage for situational awareness and collaborative, agile decision making Lack of information and services that are visible, accessible and understandable Information silos -- capability needed to move information from one stove-pipe to another Hard-wire interfaces aimed at predetermined needs unresponsive to dynamic environment Continue to not leverage the latest information technology solutions available commercially digital natives trapped in industrial-era institution 7
8 View of DoD s Acquisition Process 2009 FOREIGN AFFAIRS Today s acquisition process is resulting in platforms growing even more baroque The efficacy of the current acquisition process is in question, given the apparent need to bypass existing institutions and procedures To protect U.S. troops on the battlefield to counter improvised explosive devices, build Mine Resistant Ambush Protected (MRAP) vehicles, and quickly expand U.S. ISR capabilities 8
9 Call For Change DoD Leadership Responsible for IT Hon John Grimes (Former ASD(NII)/DoD(CIO) Hardware development processes ill-suited to IT acquisition LTG Charles Croom (Former DISA Commander) I would change the acquisition process in how the DoD buys IT in a New York minute. LTG Jeff Sorenson (Army CIO/G-6) How we can make it better. Policy Acquiring IT not like tanks Defense Acquisition Performance Assessment (3/2006) The current system is focused on programs, not on improving and standardizing the processes of acquisition; it inhibits rather than promotes steady improvement in achieving program success GAO Assessment on Information Technology: DOD s Acquisition Policies and Guidance Need To Incorporate Additional Best Practices And Controls (July/2004) As you know, the way in which DOD has historically acquired information technology (IT) systems has been cited as a root cause of these systems failing to deliver promised capabilities and benefits on time and within budget 9
10 Outline
11 Congressional Direction 2008 National Defense Authorization Act mandating a Defense Science Board (DSB) to Study: DOD policies and procedures for acquiring information technology, to include national security systems, major automated information systems and business information systems, and other information technology Roles and responsibilities in implementing policies and procedures Application of such policies and procedures to information technologies that are an integral part of critical weapons or weapon systems Suitability of DOD acquisition regulations, including DODD , DODI 500.2, and accompanying milestones, to the acquisition of IT systems Adequacy and transparency of metrics used by DOD for acquiring IT systems Adequacy of operational and development test resources (including infrastructure and personnel) 11 11
12 March 2009 DSB on IT Policies & Procedures in Acquisition of IT Panel Co-Chairs Executive Secretary Vince Vitto,* Private Consultant Ron Kerber,* Private Consultant Panel Members Pricilla Guthrie, IDA Paul Hoeper, Private Consultant Paul Kaminski,* Technovation Tony Lengerich, Oracle Noel Longuemare, Private Consultant Mark Maybury, MITRE Richard Roca, JHU APL John Stenbit, Private Consultant Alan Wade, Private Consultant Skip Hawthorne, OUSD(AT&L) Government Advisor Don Johnson, OASD(NII) Military Assistants Karen Walters, OUSD(AT&L) * DSB Members 12
13 Bottom Line Information Technology (IT) is a critical enabler and force multiplier; offers unprecedented interoperability across spectrum of operations Equally critical to embedded and stand alone systems (infrastructure, business, C2, weapon systems) Can offer a significant comparative advantage with its inherent flexibility and agility to respond to changing environments Growing concerns with IT has become a national issue via cyber threats and pipeline of available/skilled workforce Deliberate and cumbersome process through which IT is acquired by DoD today cannot keep pace with: Speed at which new capabilities are being introduced in today s information age Speed with which potential adversaries can produce, adapt, and employ those same capabilities against our national interests DoD is not effectively organized at highest levels to address concerns Need to Fix/Improve IT Acquisition System 13
14 Acquisition Complexity Information technology systems are pervasive through DOD, ranging from administrative systems to weapons their importance is growing Software is a consistent and persistent thread through all DoD system acquisition programs Whereas in 1970, IT accounted for approx 20% of weapon system functionality, by 2000 it accounted for as much as 80% Today it is reported IT can deliver 90% or more of functionality Rapidly growing software code base, e.g., Navy DDG M LOC, 36% > Aegis 7.1R baseline FA18 is 10M LOC going to 20M in JSF COTS OS growing to 100M LOC Embedded weapon systems (such as, handheld grenade launcher with smart projectiles guided by 2,000 lines of code) Increased interconnectivity (e.g., GIG, coalitions) Lines of Code (M)
15 Available Skilled Workforce Declining U.S. software pipe line Increased gap in supply/demand Globalization and off shoring* worsen situation Low skill/experience results in expensive rework (GAO Report - 40% rework)
16 U.S. National Security Apparatus Requires Significant Reforms to Meet the Challenges of a New Strategic Era (Cont) Stove Pipes Ope Middleware Open Services 1970 / 1980 Stove piped systems 1990 / 2000 Middleware glued to mission applications Today Service-oriented architecture (SOA) Shared CBM applications Tool and services Future Middleware SOA Infrastructure Operating System Network/Servers Infrastructure Commercial Infrastructure and Standards Acquisition Paradigms & Existing Business Models Ill-Suited
17 Today s Acquisition Cycle Time Planning Phase Milestone B Build Phase Initial Operational Capability Analysis of Alternatives Economic Analysis Development MS C Test 5 Long Cycle-Time Driven by Processes Developed to Counter a Cold War Adversary In Industrial Age Society *Metrics calculated by OASD(NII) on 32 Major Automated Information Systems (MAIS) 17
18 As Is: Acquisition Process The Materiel Development Decision precedes entry into any phase of the acquisition management system User Needs Technology Opportunities & Resources Entrance criteria met before entering phase Evolutionary Acquisition or Single Step to Full Capability A B (Program Initiation) C IOC FOC Materiel Solution Analysis Technology Development Engineering and Manufacturing Development Production & Deployment Operations & Support Materiel Development Decision Post- PDR A Post- CDR A LRIP/IOT&E FRP Decision Review Pre-Systems Acquisition Systems Acquisition Sustainment = Decision Point = Milestone Review = Decision Point if PDR is not conducted before Milestone B Big Bang Approach Equally Applied to IT and Major Hardware Acquisitions 18
19 New IT Acquisition Process ICD Materiel Design Decision Business Case Analysis and Development Architectural Development and Risk Reduction Prototypes Coordinated DOD stakeholder involvement Up to 2 years Milestone Build Decision CDD RELEASE 1 Development & Demonstration Iteration1 Iteration 2 Iteration N Integrated DT / OT 6 to 18 months Fielding RELEASE 2 Prototypes Development & Demonstration Iteration 1 Iteration 2 Iteration 3 Fielding ICD Initial Capability Document CDD Capabilities Development Document Decision Point RELEASE N Prototypes Development & Demonstration Iteration 1 Iteration 2 Iteration 3 Fielding Continuous Technology/Requirements Development & Maturation Requirement Documents established by streamlined Joint Staff validation process Acquisition baseline for N releases established at milestone build decision All releases fully funded at milestone build decision Release N+1 restarts entire process 19
20 Imperatives of a New IT Acquisition Model Effective & Value-add Governance Community of Interest (COI) Concept Upfront System Architecture and System Engineering Technical Peer Relationship With Contractor Iterative Requirements Prioritization Small, Time-Definite Increments Modern IT Practices Agile, Scrum, Test Driven Development, Model Driven Development, 20
21 Authority 2010 NDAA Policy Section 804 Demonstration Authority For Alternative Acquisition Process For Defense Information Technology May designate up to 10 IT programs annually to be included in a demonstration of an alternate acquisition process for rapidly acquiring IT capabilities Procedures SECDEF should establish procedures for the exercise of authority including processes for measuring effectiveness of an alternative acquisition processes SECDEF should notify Congressional Defense Committees of those procedures before any exercise of that authority Annual Reports By March 1st of each year beginning in March 1, 2010 and ending on March 1, 2016, the SECDEF shall submit to the Congressional defense committees a report on
22 Implementation Strategy Overview Policy, Procedure, Guidance Development Governance Structure Selecting & Executing Pilot Projects Characteristics of Pilots Changes to Acquisition Strategy and Source Selection Process Select & Define IT Platforms Define Initial Test & Integration Capability Change Management, Communications, and Awareness Reporting and Metrics
23 Detailed Guidance IT Services COTS Integration Custom Development SOA Applications Legacy IT 23
24 Way Ahead Objectives What is the Congress & Warfighter demanding of IT SPEED -- Dramatically reduced cycle times AGILITY -- Ability to accommodate changing requirements, evolving operational environment and new opportunities TRANSPARENCY -- Visibility & data needed to evolve the solution and build confidence EFFICIENCY -- Maximize the value per dollar invested by eliminating unproductive acquisition activities and management 24
REQUIREMENTS TO CAPABILITIES
Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military
More informationMiddle Tier Acquisition and Other Rapid Acquisition Pathways
Middle Tier Acquisition and Other Rapid Acquisition Pathways Pete Modigliani Su Chang Dan Ward Contact us at accelerate@mitre.org Approved for public release. Distribution unlimited 17-3828-2. 2 Purpose
More informationCybersecurity United States National Security Strategy President Barack Obama
Cybersecurity As the birthplace of the Internet, the United States has a special responsibility to lead a networked world. Prosperity and security increasingly depend on an open, interoperable, secure,
More informationThe Role of T&E in the Systems Engineering Process Keynote Address
The Role of T&E in the Systems Engineering Process Keynote Address August 17, 2004 Glenn F. Lamartin Director, Defense Systems Top Priorities 1. 1. Successfully Successfully Pursue Pursue the the Global
More informationEnabling Greater Productivity
Enabling Greater Productivity An Imperative to Improve Materiel Readiness Panel Discussion June 2017 Productivity Defined Productivity* [proh-duhk-tiv-i-tee, prod-uhk ] noun 1. the quality, state, or fact
More informationProduct Support Manager Workshop. Rapid Capabilities. Mr. Chris O Donnell Director, Joint Rapid Acquisition Cell
Product Support Manager Workshop Rapid Capabilities Mr. Chris O Donnell Director, Joint Rapid Acquisition Cell June 8, 2017 17-S-1832 Deliberate Requirements vs. Urgent / Rapid Requirements Lanes Urgent
More informationRECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY BEFORE THE COMMITTEE ON ARMED SERVICES UNITED STATES SENATE
RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY BEFORE THE COMMITTEE ON ARMED SERVICES UNITED STATES SENATE FIRST SESSION, 115TH CONGRESS ON THE CURRENT STATE OF DEPARTMENT
More informationEvolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress
Order Code RS21195 Updated December 11, 2006 Summary Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress Gary J. Pagliano and Ronald O Rourke Specialists in National
More informationDEFENSE LOGISTICS AGENCY THE NATION S COMBAT LOGISTICS SUPPORT AGENCY
DEFENSE LOGISTICS AGENCY THE NATION S COMBAT LOGISTICS SUPPORT AGENCY DLA Information Operations (J6) AFCEA Mr. Robert Foster Deputy Director, DLA Information Operations April 4, 2018 WARFIGHTER FIRST
More informationA New Approach for Delivering Information Technology Capabilities in the Department of Defense
A New Approach for Delivering Information Technology Capabilities in the Department of Defense Report to Congress November 2010 Office of the Secretary of Defense Pursuant to Section 804 of the National
More informationUNCLASSIFIED. FY 2011 Total Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 The Joint Staff DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 for the Warrior (C4IFTW) FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete
More informationUNCLASSIFIED
Exhibit R-2, RDT&E Budget Item Justification DATE: February 2006 R-1 ITEM NOMENCLATURE Joint Command and Control /PE 0303158K COST (in Millions) FY05 FY06 FY07 FY08 FY09 FY10 FY11 Joint Command and Control
More informationDepartment of Defense Investment Review Board and Investment Management Process for Defense Business Systems
Department of Defense Investment Review Board and Investment Management Process for Defense Business Systems Report to Congress March 2012 Pursuant to Section 901 of the National Defense Authorization
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125
More informationMiddle Tier Acquisition and Other Rapid Acquisition Pathways
Middle Tier Acquisition and Other Rapid Acquisition Pathways Pete Modigliani Su Chang Dan Ward Colleen Murphy 28 Jul 18 Contact us at accelerate@mitre.org Approved for public release. Distribution unlimited
More informationEvolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress
Order Code RS21195 Updated April 8, 2004 Summary Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress Gary J. Pagliano and Ronald O'Rourke Specialists in National Defense
More informationWe acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan
The Naval Research, Development & Acquisition Team 1999-2004 Strategic Plan Surface Ships Aircraft Submarines Marine Corps Materiel Surveillance Systems Weapon Systems Command Control & Communications
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 Army
More informationRelationship of the DOD Information Technology Standards Registry (DISR) with the Defense Standardization Program
Relationship of the DOD Information Technology Standards Registry (DISR) with the Defense Standardization Program Michael O Connor DISA, GE33 9 March 2005 Agenda Responsibilities of the DOD Executive Agent
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Key Management Infrastructure Increment 2 (KMI Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655
More informationUNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 12 R-1 Line #203
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Defense Information Systems Agency : March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationTHE JOINT STAFF Research, Development, Test and Evaluation (RDT&E), Defense-Wide Fiscal Year (FY) 2009 Budget Estimates
Exhibit R-2, RDT&E Budget Item Justification February 2008 R-1 Line Item Nomenclature: 227 0902298J Management HQ ($ IN Millions) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 Total PE 3.078
More informationUNCLASSIFIED. Exhibit R-2, RDT&E Budget Item Justification DATE: February 2005 APPROPRIATION/BUDGET ACTIVITY RDT&E, Defense-Wide/05
/PE 0303158K A. Mission Description & Budget Item Justification: (JC2) is the next generation of command and control for the Department of Defense (DoD). JC2 is the follow-on to the Global Command and
More informationAn Independent Perspective From a former PM & PEO. NDIA 13th Annual Systems Engineering Conference 26 Oct 10
n Independent Perspective From a former PM & PEO NDI 13th nnual Systems Engineering Conference 26 Oct 10 Purpose To offer some thoughts on how System Engineering can (should) contribute as The DoD seeks
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Net Centricity FY 2012 OCO
COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 1.425 29.831 14.926-14.926 24.806 25.592 26.083
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125
More informationDoD Joint Federated Assurance Center (JFAC) 2017 Update
DoD Joint Federated Assurance Center (JFAC) 2017 Update Thomas Hurt Office of the Deputy Assistant Secretary of Defense for Systems Engineering 20th Annual NDIA Systems Engineering Conference Springfield,
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 0400: Research, Development, Test &, Defense-Wide COST ($ in Millions) All Prior FY 2014 Years FY 2012
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 8100.1 September 19, 2002 Certified Current as of November 21, 2003 SUBJECT: Global Information Grid (GIG) Overarching Policy ASD(C3I) References: (a) Section 2223
More informationAcquisition Reforms for the New Administration
Acquisition Reforms for the New Administration Creating a 21 st Century Transformation The Honorable Jacques S. Gansler* Professor and Roger C. Lipitz Chair Director, Center for Public Policy and Private
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Global Combat Support System-Marine Corps Logistics Chain Management Increment 1 (GCSS-MC LCM Inc 1) Defense Acquisition Management Information Retrieval
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in
More informationSUBJECT: Army Directive (Implementation of Acquisition Reform Initiatives 1 and 2)
S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Army Directive 2017-22 (Implementation of Acquisition Reform Initiatives 1 and 2) 1. References. A complete
More informationDepartment of Defense
Department of Defense DIRECTIVE NUMBER 5144.1 May 2, 2005 DA&M SUBJECT: Assistant Secretary of Defense for Networks and Information Integration/ DoD Chief Information Officer (ASD(NII)/DoD CIO) Reference:
More informationDOD DIRECTIVE DOD SPACE ENTERPRISE GOVERNANCE AND PRINCIPAL DOD SPACE ADVISOR (PDSA)
DOD DIRECTIVE 5100.96 DOD SPACE ENTERPRISE GOVERNANCE AND PRINCIPAL DOD SPACE ADVISOR (PDSA) Originating Component: Office of the Deputy Chief Management Officer of the Department of Defense Effective:
More informationFiscal Year (FY) 2011 Budget Estimates
Fiscal Year (FY) 2011 Budget Estimates Attack the Network Defeat the Device Tr ai n the Force February 2010 JUSTIFICATION OF FISCAL YEAR (FY) 2011 BUDGET ESTIMATES Table of Contents - Joint Improvised
More informationTest and Evaluation of Highly Complex Systems
Guest Editorial ITEA Journal 2009; 30: 3 6 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation of Highly Complex Systems James J. Streilein, Ph.D. U.S. Army Test and
More informationDepartment of Defense INSTRUCTION. 1. PURPOSE. This Instruction, issued under the authority of DoD Directive (DoDD) 5144.
Department of Defense INSTRUCTION NUMBER 8410.02 December 19, 2008 ASD(NII)/DoD CIO SUBJECT: NetOps for the Global Information Grid (GIG) References: See Enclosure 1 1. PURPOSE. This Instruction, issued
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Mission Planning System Increment 5 (MPS Inc 5) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common
More informationSUBJECT: Army Directive (Acquisition Reform Initiative #6: Streamlining the Contracting Process)
S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Army Directive 2017-32 (Acquisition Reform Initiative #6: Streamlining the 1. References. A complete list
More informationSoftware Sustainment: Continuous Engineering to
Software Sustainment: Continuous Engineering to Deliver Warfighter Capability Michael H. McLendon (SEI) John Stankowski (OSD) Dr. Forrest Shull (SEI) Stephany Bellomo (SEI) Software Engineering Institute
More informationDefense Travel Management Office
Travel System Modernization Update GovTravels 2018 Department of Defense Agenda Defense Travel Management Office DoD Travel System Pilot Lessons Learned Cross Functional Team Travel (CFT-T) Modernization
More informationStrategic Vision. Rapidly Delivering Cyber Warfighting Capability From Seabed to Space. Space and Naval Warfare Systems Command
Space and Naval Warfare Systems Command Strategic Vision 2018 2027 Space and Naval Warfare Systems Command 4301 Pacific Highway San Diego, CA 92110-3127 www.spawar.navy.mil DISTRIBUTION STATEMENT A: Approved
More informationDepartment of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 8320.02 August 5, 2013 DoD CIO SUBJECT: Sharing Data, Information, and Information Technology (IT) Services in the Department of Defense References: See Enclosure
More informationRequirements Management
Requirements Management The Need to Overhaul JCIDS Thomas H. Miller 36 Acquisition reform continues to receive a great deal of attention from both the Senate and House Armed Service Committees. Reform
More informationMiddle Tier Acquisition and Other Rapid Acquisition Pathways
Middle Tier Acquisition and Other Rapid Acquisition Pathways Pete Modigliani Su Chang Dan Ward 26 Jun 18 Contact us at accelerate@mitre.org Approved for public release. Distribution unlimited 17-3828-3.
More informationThe Future of US Ground Forces: Some Thoughts to Consider
The Future of US Ground Forces: Some Thoughts to Consider Jeff Bialos Sutherland, Asbill & Brennan LLP Senior Conference 50 West Point June 2 2014 Copyright, Jeffrey P. Bialos May 2014. All Rights Reserved.
More informationUS Army Combined Arms Center SOLDIERS AND LEADERS - OUR ASYMMETRIC ADVANTAGE. Synthetic Training Environment (STE) STE Update to PALT
Synthetic Training Environment (STE) STE Update to PALT Forward to STE As Is 1980s technology limits ability to train Combined Arms operations 47 terrain formats Concurrency challenges and not designed
More informationInformation Technology
September 24, 2004 Information Technology Defense Hotline Allegations Concerning the Collaborative Force- Building, Analysis, Sustainment, and Transportation System (D-2004-117) Department of Defense Office
More informationCOMMON AVIATION COMMAND AND CONTROL SYSTEM
Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationUNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test &, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)
More informationGLOBAL INFORMATION GRID NETOPS TASKING ORDERS (GNTO) WHITE PAPER.
. Introduction This White Paper advocates United States Strategic Command s (USSTRATCOM) Joint Task Force Global Network Operations (JTF-GNO) and/or AF Network Operations (AFNETOPS) conduct concept and
More informationEXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA4
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA4 R-1 ITEM NOMENCLATURE 0603237N Deployable Joint Command & Control (DJC2) COST
More informationDoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process
Inspector General U.S. Department of Defense Report No. DODIG-2015-045 DECEMBER 4, 2014 DoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process INTEGRITY EFFICIENCY ACCOUNTABILITY
More informationNDIA Ground Robotics Symposium
NDIA Ground Robotics Symposium Mr. Tom Dee DASN ELM 703-614-4794 Pentagon 4C746 1 Agenda Context Current environment Robotics Way Ahead AAV MRAP Family of Vehicles 2 ELM Portfolio U.S. Marine Corps ground
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Integrated Personnel and Pay System-Army Increment 2 (IPPS-A Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To
More informationU.S. Air Force Electronic Systems Center
U.S. Air Force Electronic Systems Center A Leader in Command and Control Systems By Kevin Gilmartin Electronic Systems Center The Electronic Systems Center (ESC) is a world leader in developing and fielding
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026
More informationGOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS:
Keynote by Dr. Thomas A. Kennedy Chairman and CEO of Raytheon Association of Old Crows Symposium Marriott Marquis Hotel Washington, D.C. 12.2.15 AS DELIVERED GOOD MORNING THANK YOU, GENERAL ISRAEL FOR
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing
More information3 rd Annual Electromagnetic Spectrum Operations Summit
Defense Strategies Institute professional educational forum: 3 rd Annual Electromagnetic Spectrum Operations Summit ~ Delivering EW and Cyber Capabilities for Multi-Domain Operations ~ June 20-21, 2017
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
More informationDevelopmental Test & Evaluation OUSD(AT&L)/DDR&E
Developmental Test & Evaluation OUSD(AT&L)/DDR&E Chris DiPetto 12 th Annual NDIA Systems Engineering Conference Agenda DT&E Title 10 USC overview Organization DDR&E imperatives What Title 10 means for
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationTest and Evaluation and the ABCs: It s All about Speed
Invited Article ITEA Journal 2009; 30: 7 10 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation and the ABCs: It s All about Speed Steven J. Hutchison, Ph.D. Defense
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Office of Secretary
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Support to Networks and Information Integration. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Office of Secretary Of Defense DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Office of Secretary Of Defense Page 1 of 20 FY 2012
More informationT&E in a Time of Risk and Change
Enhancing our Competitive Edge: T&E in a Time of Risk and Change Maj Gen Matt Zap Molloy Commander, Air Force Operational Test and Evaluation Center Albuquerque, NM Distribution A: Approved for public
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Logistics Modernization Program Increment 2 (LMP Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #71
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Defense Enterprise Accounting and Management System-Increment 1 (DEAMS Inc 1) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED
More information2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT
ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.
More information2016 Major Automated Information System Annual Report. Department of Defense Healthcare Management System Modernization (DHMSM)
2016 Major Automated Information System Annual Report Department of Defense Healthcare Management System Modernization (DHMSM) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED
More informationJoint Interoperability Certification
J O I N T I N T E R O P E R B I L I T Y T E S T C O M M N D Joint Interoperability Certification What the Program Manager Should Know By Phuong Tran, Gordon Douglas, & Chris Watson Would you agree that
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA 5 0604230N Naval Support System Prior Total COST ($ in
More informationMOTION IMAGERY STANDARDS PROFILE
MOTION IMAGERY STANDARDS PROFILE Department of Defense/Intelligence Community/ National System for Geospatial Intelligence (DoD/IC/NSG) Motion Imagery Standards Board MISP-2015.2: U.S. Governance February
More informationPROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)
EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in
More informationUNCLASSIFIED UNCLASSIFIED
: February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element
More informationDepartment of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 5100.91 October 28, 2008 USD(I) SUBJECT: Joint Intelligence Interoperability Board (JIIB) References: See Enclosure 1 1. PURPOSE. This Instruction: a. Establishes
More informationThe Shifting Sands of Government IP. John McCarthy Karen Hermann Jon Baker
The Shifting Sands of Government IP John McCarthy Karen Hermann Jon Baker Overview What is MOSA, and why do I care? Proposed changes to the Bayh- Dole regulations Government intellectual property considerations
More informationArmy Identity and Access Management (IdAM)
Army Identity and Access Management (IdAM) 3 APR 18 Sergio Alvarez Product Lead Enterprise Content Collaboration and Messaging (EC2M) 703-704-3788 sergio.m.alvarez.civ@mail.mil Purpose and Vision Purpose:
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 3.140 0.000 0.000 0.000
More information2016 Major Automated Information System Annual Report
2016 Major Automated Information System Annual Report Teleport Generation 3 (Teleport Gen 3) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common Acronyms
More informationDepartment of Defense INSTRUCTION
Department of Defense INSTRUCTION NUMBER 4630.8 June 30, 2004 SUBJECT: Procedures for Interoperability and Supportability of Information Technology (IT) and National Security Systems (NSS) ASD(NII)/DoD
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007
More informationDoD Analysis Update: Support to T&E in a Net-Centric World
Session C: Past and Present T&E Lessons Learned 40 Years of Excellence in Analysis DoD Analysis Update: Support to T&E in a Net-Centric World 2 March 2010 Dr. Wm. Forrest Crain Director, U.S. Army Materiel
More informationTask Force Innovation Working Groups
Task Force Innovation Working Groups Emerging Operational Capabilities Adaptive Workforce Information EMERGING OPERATIONAL CAPABILITIES (EOC) WORKING GROUP VISION Accelerate Delivery of Emerging Operational
More information(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910
TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.
More informationCHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION
CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-8 CJCSI 3170.01C DISTRIBUTION: A, B, C, J, S JOINT CAPABILITIES INTEGRATION AND DEVELOPMENT SYSTEM References: See Enclosure C 1. Purpose. The purpose
More informationThe Department of Defense s reliance on
12 Vertically Synchronizing Operational Contract Support Col. Ed Keller, USAF The Department of Defense s reliance on contractors for the conduct of contingency operations can best be described as significant.
More informationDevelopment Planning Working Group Update
Development Planning Working Group Update Ms. Aileen Sedmak Office of the Deputy Assistant Secretary of Defense for Systems Engineering 16th Annual NDIA Systems Engineering Conference Arlington, VA October
More informationDEPARTMENT OF THE NAVY DEPUTY CHIEF INFORMATION OFFICER MARINE CORPS ROLES AND RESPONSIBILITIES
DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 MCO 5400.52 C4 MARINE CORPS ORDER 5400.52 From: To: Subj: Ref: Commandant of the Marine
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 8140.01 August 11, 2015 Incorporating Change 1, July 31, 2017 DoD CIO SUBJECT: Cyberspace Workforce Management References: See Enclosure 1 1. PURPOSE. This directive:
More information