Architecture for Coalition Cooperation Navy Surface Warfare Future Readiness
|
|
- Harold Holland
- 6 years ago
- Views:
Transcription
1 Architecture for Coalition Cooperation Navy Surface Warfare Future Readiness RDML James P. McManamon Statement A: Approved for Public Release; Distribution is unlimited 24 January
2 Team Ships Organization PROGRAM EXECUTIVE OFFICER SHIPS RDML DAVE LEWIS SWE SUPPORT DEPUTY COMMANDER FOR SURFACE WARFARE RDML JAMES McMANAMON PEO STAFF SURFACE WARFARE DIRECTORATE COMBATANTS OFFICE AMPHIBIOUS & AUXILIARY SEALIFT OFFICE EXECUTIVE DIRECTOR EXECUTIVE DIRECTOR EXECUTIVE DIRECTOR FLEET READINESS SEA 21A SHIPS ACQUISITION MANAGEMENT OFFICE DIRECTOR DEPUTY DIRECTOR PMS 377 LHD8 / LCAC / LHAR / AADS COMMANDING OFFICER SURFACE SHIP ENGINEERING PLANNING PROGRAM (SURFMEPP) DEPUTY PMS 400D DDG51 PMS 317 LPD-1 7/ JCC(X) PMS 400F CGs / FFGs / DDG51s PMS 500 DDG 1000 PMS 501 LCS PMS 502 CG(X) PMS 325 AUXILIARY SHIPS / SMALL BOATS & CRAFTS PMS 385 STRATEGIC AND THEATER SEALIFT PMS 470 AMPHIBIOUS /AUXILIARY/MINE PMS 333 INACTIVE SHIPS/ SHIP TRANSFERS PMS 326 INTERNATIONAL FLEET SUPPORT PMS 333/336 INACTIVE SHIPS/ SHIP TRANSFERS INACTIVE SHIPS SHIP TRANSFERS 2
3 PMS 326 Business Base PMS 326 Business Base Total Case Value (TCV) $4.7B Total Capital Avail (TCA) $296.9M Follow on Technical Support (FOTS) Cases TCV $2.778B / TCA $192.2M Combat Systems Cases TCV $2.149B / TCA $76.89M Other Miscellaneous Cases TCV $311.2M / TCA $27.8M Serving as TYCOM to the World s Fleet by adapting USN processes to meet FMS requirements Actively supporting ~150 ships representing 23 countries:» Several ex-usn ships plus foreign built with USN combat systems» Additional countries with stand alone systems (Radar, CIWS, SLQ32, etc.) Legacy Support is provided on >25 different combat systems in 16 countries» Includes AAW, ASUW, ASW, and EW» Includes ASROC, MK 92 FCS, CIWS Blk 0 International FFG Working Group (IFWG) SHIPYARD Upgrades Industrial Training Program Port Engineer OTHER FACILITIES FACDAR Land-based Radar Systems Land-based Test Sites FUNCTIONS International TYCOM Engineering Tech Support Ship Platform/FOTS Overall Program/Project Management $107.4M DSRA / PMA Planning and Execution Maintenance Support Combat Systems Systems Upgrade Coastal and Radar/ Integration Configuration Mgmt/Supply Other & Material Support $63.5M HM&E Support / Upgrades Software, Pubs, Manuals /Training Infrastructure Legacy Systems PLATFORMS Current/ex-USN: FFG 7, MHC, FF1052, LST, LSD, KIDD, LCAC Future: LPD, Ticonderoga Indigenous: DD, DE, DDH, PFG, PCG, PGG, MEKO, DDG, SA AR 5 Other International: Corvette/Frigate Class Ships 3
4 Product Lines International Fleet Support COMPETENCIES Program/Project Management Financial Management Operation and Maintenance Tech Services Ship Overhaul Support Services Engineering and Logistics PLATFORMS Current/ex-USN: FFG 7, MHC, FF1052, LST, LSD, KIDD, LCAC Indigenous: DD, DE, DDH, PFG, PCG, PGG, MEKO, DDG, SA AR 5 Other International: Corvette/ Frigate Class Ships SHIPYARD Upgrades Industrial Training Program Port Engineers IMA/ISEA Development/Support OTHER FACILITIES FACDAR Land-based Radar Systems Land-based Test Sites FUNCTIONS International TYCOM Engineering Tech Support Overall Program / Project Management DSRA / PMA Planning and Execution Maintenance Support Systems Upgrade and Integration Configuration Mgmt Material Support HM&E Support / Upgrades Software, Pubs, Manuals OJT and Country Tailored Training Infrastructure Legacy Systems 4
5 Follow On Technical Support Program Representative Process for Technical Support Services FOTS Request from Foreign Customer FOTS Request for Technical Assistance Non-USN Supported Equipt/Systems PMS 326 USN Supported Equipt/Systems Engineering Services Supportability Contract USN Fleet Support Activities Operational and Maintenance Training Sonar Dome X-Ray MTT/LOA 1200 PSI Propulsion Systems Boiler / SSDG / HM&E / LST LM2500 Tech Services NSWCDD-SSES General /Special Tech Support Regional Maintenance Centers Industrial Upgrade Equip / ALT Kitting / Spares Navy Inventory Control Point Industrial Upgrade Tech Assist Puget Sound Naval Shipyard Routine Boiler Inspections Job Planning Spvsr Welding and NDT Boilermaker HM&E - Auxiliary Systems Electronic Warfare / MSO NSWC Crane Surveillance / C2 / ASW NUWC Keyport Communications NAWC-AD St. Indigoes NSDC Dam Neck Configuration Data Panama City Coastal Defense Mk 13 & Mk 26 GMLS Mk 42 5 /54 Gun Systems MK 74 & Mk 68 Gun Fire Control Systems AN/SQS-26 CX & Other Sonar Systems AN/SQS-26 Sonar Dome Rubber Window Replacements TARTAR, Mk 13, MK 92 NSWC-PHD Tech Doc NSWC-PHD NSDSA / ISEA RAST / HRS / SGSI / VLA NAWC Lakehurst HM&E / Combat Systems OEMs PARMs Training Devices NAWC-TSD Orlando Calibration NWAD-PHD Corona Mk 75 Gun Systems NSWC ORDSTA Louisville AN/SQR-17 / AN-SQR-19 AN/SQS-56 PMS 411 5
6 Initiatives International Frigate Working Group (IFWG) A First Step May 2009 Inaugural IFWG Meeting hosted and chaired by USN May Second IFWG Meeting hosted and chaired by Turkey October 2010 IFWG SMART Logistics Team Meeting May rd IFWG Meeting NAS North Island, San Diego CA Participation and leadership at the flag level Several countries briefed major modernization programs Identified opportunities for sharing technology and significant cost savings Charter established, now nine navies Stepped forward in shared logistics Underway demo of Turkey s GENESIS combat management system Limited industry participation NAVICP Mechanicsburg Key opportunity for modernizing future material support Established SMART Acquisition and Inventory Management Team (Turkey & USN lead) Opportunities for shared International logistics Procurement, Sharing, Asset Visibility Interim meeting to be hosted by NAVICP in October 2010 Third Party Transfer Process (USN lead) Pre-approval by US State Dept for transfer of parts & data between IFWG countries DoS coordinating USG interagency review Future with and after SM-1 (USN lead) Explore practical implementation of FFG-7 Anti-Air Warfare modernization Examine broader applicability of Turkish Navy ESSM and RAN SM-2 Blk IIIB programs Standard Missile MK56 Dual Thrust Rocket Motor (DTRM) (RAN & USN lead) Address common concerns: Cost and uncertainty of sustaining viable SM-1 DTRM Explore affordable options Other Initiatives Configuration and Modernization Data Base (Spain lead) Green Ship Initiative (USN lead) Awareness of international responsibilities to operate and maintain our ships in an environmentally conscious manner 6
7 FMS vs DCS DCS - Management U.S. Government only involved in export license review Procurement contract between U.S. industry & foreign government Contractor directly interfaces with customer No U.S. Government involvement Disputes resolved by foreign government Report to Congress if sale meets 36(c), AECA DCS Financial May represent more risk for seller Freedom from FAR & DFARS may reduce cost Less than economic quantity purchase Commercial banking procedures Prompt incremental and final billing Prompt contract closure FMS - Management DoD Program management Leave the driving to us Experienced personnel familiar with the equipment FMS charges for this management service Administrative Surcharge & Non-Recurring costs Contract administration services (CAS) Defined Services Lines FMS - Financial LOA estimated prices What will the actual cost be? Will LOA payment schedule match actual execution performance profile? When will the case be closed? USG consolidates purchases for better prices Prompt & reliable payments to contractor 7
8 Surface Ship End-to-End Process Map, Maintenance & Modernization Process Gaps Assessment Plan/Policy IMA Capacity/ Capability Sustainment Program SURFMEPP Avail Execution/Wor k Certification Need for Integrated Assessment Program Need for Integrated Sustainment Program SSLCM scope limitations No Maintenance Material Management Need for sufficiently Engineered Work Packages Availability Schedule Milestones Maintenance and Modernization Integration Establish appropriate Avail Type, Schedule and Duration Insufficient IT support systems Work Package Development, Logistics Lack of QA oversight Reconstitution of IMA Capacity/Capability I Level No Existing Avail Completion/Work Certification Process Gaps Identified 8
9 Surface Ship Readiness Initiative (SSRI) Fleet Intro Expected Service Life Decom Assess Ship TSRA Continuous Sustainment Process Maintain Readiness Sustainment Execute Avail. Avail Ex. & Work Cert Plan Maintenance SURFMEPP Assessments: Skilled techs performing documented procedures Utilize NMD & other tools Mission specific focus SURFMEPP: Class Maint. Planning Availability Planning Maint. Planning Data Systems Cost Engineering Material Management Avail Ex. & Work Cert: Technical Adjudication of work Event Readiness Test & Certification of work Sustainment: Maintenance Engineering Performance Monitoring Fleet Engineering Support Training & Tech. Docs Obsolescence 9
10 MAJOR DELIVERABLES 5 - PHASED APPROACH ONGOING TFs READINESS SEA 21 READINESS TASK FORCES COORDINATED + Readiness is defined as the ability of forces, units, weapons systems, or equipments to deliver the outputs for which they are designed. CORE ELEMENTS + Optimal Readiness + READINESS = f(p,e,s,t) HISTORICAL READINESS TRENDS + Task Force Mission: Perform a coordinated, comprehensive, holistic assessment of a system or Class of Ships and develop Actionable Readiness Recommendations. AWS-SPY - 48 Actionable Recommendations - Phase: 5 Phase1: Issue Extrapolation Scope Readiness Task Force Mission Assess Impact and Severity of System Issues MCM CLASS - 51 Actionable Recommendations - Phase: 5 Phase 2: Needs / Requirements Assessment Metrics Deep Dive Evaluation of Current System Requirements Needs Assessment of non-existing requirements Phase 3: Gap Analysis Issues identified in Phase 1 evaluated against system requirements Preliminary Recommendations Formulated LPD 17 CLASS Draft Recommendations - Phase: 3 Phase 4: Alternative Analysis and Solution Selection Historical study analysis Alternative solution identification Integration of historical data with preliminary recommendations Feasibility Assessment BMD MISSION Draft Recommendations - Phase: 3 Phase 5: Implementation and Control Develop concise Implementation Plan Monitor Execution Timeline Participants include (but not limited to): -USFF -CNSF -NAVPERS -SEA04 -SEA05 -SEA21 -PEO SHIPS -PEO IWS -NAMDC -NAVICP COMPREHENSIVE Obsolete Equipment Departures from Specifications Changes in system employment Adequacy of Training APL / AEL Accuracy 2M Repair Ability FIGHT SUSTAIN Factors Examined Spare Parts Support Past system alterations HOLISTIC Execute Mission Requirements -ISEAs -PYs -SUPSHIP -NAVMAC -CRMC -NSWCs -OPNAV -NAVSUP -CLASRONs -Others System aging factors COSAL Effectiveness LLTM Management ILS Documentation Self-sufficiently Sustain Operations Manning Reductions Past Studies Minimized on-thejob training Parts Obsolescence Metrics INSURV Scores Common Themes Deferred Maintenance Increased Reliance on shore-support Material Unavailability Root Cause Issues Requirements Analysis Readiness Issue Performance Evaluation Requirement Action Lead Preliminary Solution Issue A Requirement A Action Lead A Solution A Issue B Requirement B Action Lead B Solution B Issue C Requirement C Action Lead C Solution C Issue D Requirement D Action Lead D Solution D Issue E Requirement E Action Lead E Solution E Recommendation Selection Recommendation Execution Our Goal: Not to be a reference in a future Readiness study. J.P. McManamon MOBILIZE RESULTS Enable Ships to Get Underway The results of the TF effort will be referenced for years to come as the most comprehensive readiness study ever conducted. -VADM McCoy on AWS-SPY TF 10
11 AEGIS BMD Technology Evolution 11
12 PB11 DDGM & CGM Fielding Profiles 12
13 DDG Modernization Description Provide a comprehensive Modernization strategy for the DDG 51 class ships to ensure a mission relevant service life of 35 years Primary objective is to reduce workload and total ship class ownership costs via HM&E technology insertion and provide warfighting improvements Provides Multi-Mission Signal Processor (MMSP) BMD capability Supports a Force Structure requirement of 313 ships Applies to DDG 51 Class (Flight I & II First, DDG 51-78) 13
14 DDG Modernization Requirements C4I *NAVSSI BLK 4 *IFF Mode 5 CEC Warfighting Upgrades AAW CIC Display Upgrades Open Architecture Computing Plant VLS Modifications AWS ACB 12 Computer Program Multi-Mission SIGPRO SPY-1D Transmitter Upgrades Multi-Mission BMD SM6/NIFC-CA (IOC FY14) FCS STAMO Upgrades SHIP/FORCE PROTECTION ESSM *CIWS-1B *NULKA *SEWIP *SSTD (ATT) IOC FY13 MK 54 Torpedo/DFCI SQQ-89A(V)15 w/mfta GUN WEAPON SYSTEM MK-160 Mod X Gun Computing System HM&E Modernization Full IBNS Upgrade MCS/DCS Upgrades GEDMS Wireless Communications Digital Video Surveillance Quality of Life Upgrades Advanced Galley Mission Life Extension Upgrades 14
AEGIS Ballistic Missile Defense
AEGIS Ballistic Missile Defense 2 Cruisers and 1 Destroyer are Capable of Firing SM-3 Interceptors and Conducting Long Range Surveillance and Tracking Operations (LRS&T) 10 Destroyers are Capable of Conducting
More informationCommander, Navy Regional Maintenance Command
Commander, Navy Regional Maintenance Command Prepared for : JINII Planning Session RDML (Sel) Dave Gale 9 February 2011 Change is Needed Many sources of motivation for these changes VADM McCoy s Task to
More informationSea Air Space. Sea Power to the Hands of Our Sailors. RDML Jon Hill April 13, 2015
Sea Air Space Sea Power to the Hands of Our Sailors RDML Jon Hill April 13, 2015 Sea Power to the Hands of Our Sailors AMOD IAMD Flight III AMDR Lethality & Commonality Activation Romania Poland Lethality
More informationVirginia Ship Repair Association Commonality and Flexibility in Combat Systems
Virginia Ship Repair Association Commonality and Flexibility in Combat Systems RADM Joe Horn Program Executive Officer Integrated Warfare Systems March 25, 2014 Program Executive Officer Executive Director
More informationChallenges and opportunities Trends to address New concepts for: Capability and program implications Text
Challenges and opportunities Trends to address New concepts for: Offensive sea control Sea based AAW Weapons development Increasing offensive sea control capacity Addressing defensive and constabulary
More information9 th Annual Disruptive Technologies Conference
9 th Annual Disruptive Conference Navy IAMD Distribution Statement A: Approved for Public Release; Distribution Unlimited. (12/05/2012). This Brief is provided for Information Only and does not constitute
More informationUNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION
APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 4 COST (In Millions) Total PE Cost 0164 / COMBAT SYSTEM INTEGRATION 9999 / CONGRESSIONAL ADDS EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0603582N/COMBAT
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 Base PE 65863N: RDT&E Ship & Aircraft Support OCO Total FY 213 FY 214 FY 215 FY 216 Navy Page
More informationOffice of Executive Director for Conventional Ammunition (O/EDCA)
UNCLASSIFIED Office of Executive Director for Conventional Ammunition (O/EDCA) EDCA UNCLASSIFIED EDCA 2/18/2010 Integration of the O/EDCA with PEO AMMO/SMCA at Picatinny Arsenal Integrated Concept Project
More informationGun and Missile Systems An Integrated Warfare Perspective
Gun and Missile Systems An Integrated Warfare Perspective Mr. Christopher Deegan Executive Director PEO Integrated Warfare Systems Distribution Statement A: Approved for public release; distribution is
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Missile Defense Agency DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 286.142 306.185
More informationCOTS Impact to RM&S from an ISEA Perspective
COTS Impact to RM&S from an ISEA Perspective Robert Howard Land Attack System Engineering, Test & Evaluation Division Supportability Manager, Code L20 DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE:
More informationCNRMC PSSRA Brief. Mr. Kevin Taylor May 19, 2016
CNRMC PSSRA Brief Mr. Kevin Taylor May 19, 2016 Intent of this information is to provide U.S. DoD industry contractors a general schedule for information and planning purposes for upcoming surface ship
More informationThe Ship Acquisition Process: Status and Opportunities. NDIA Expeditionary Warfare Conference 24 October 07
The Ship Acquisition Process: Status and Opportunities NDIA Expeditionary Warfare Conference 24 October 07 RDML Chuck Goddard Program Executive Officer, Ships Distribution Statement A: Approved for Public
More informationCommand Overview Naval Surface Warfare Center, Carderock Division
Command Overview Naval Surface Warfare Center, Division CAPT Mark Vandroff Commanding Officer, NSWCCD February 2018 Dr. Paul Shang Technical Director (Acting), NSWCCD Distribution Statement A: Approved
More informationFFG(X) Update National Symposium - Surface Navy Association
FFG(X) Update National Symposium - Surface Navy Association Dr. Regan Campbell January 9, 2018 1 FFG(X) System Description Mission: Anti-Submarine Warfare, Surface Warfare, Electromagnetic Maneuver Warfare,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationEXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW)
APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 5 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0604757N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW) COST (In Millions) Total PE Cost 0954 / Shipboard
More informationInnovations in elearning Symposium. Integrating Engineering and the SEA Warrior Process. Greg Maxwell NAVSEA 03 7 JUNE 2005
Innovations in elearning Symposium Integrating Engineering and the SEA Warrior Process Greg Maxwell NAVSEA 03 7 JUNE 2005 SEA 03 Functional Responsibilities HSI Technology Investment, Assessment, Transition
More informationASNE Combat Systems Symposium. Balancing Capability and Capacity
ASNE Combat Systems Symposium Balancing Capability and Capacity RDML Jim Syring, USN Program Executive Officer Integrated Warfare Systems This Brief is provided for Information Only and does not constitute
More informationDEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA
UNITED STATES OF AMERICA DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA 23511-2325 CNRMCINST 4790.14 Code 300 CNRMC INSTRUCTION 4790.14 From:
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 6437N: Surface Combatant Cmbt Sys FY 213 OCO FY 213 Total FY 214 FY 215 FY
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 22 R-1 Line #105
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy : March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY
More informationRapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract October 2009
Small Arms Air Platform Integration Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract 8851 28-October 2009 Joseph Burkart Crane Division, Naval Surface
More informationState of IAMD 2014 IAMD Achievements. RADM Joseph Horn. Program Executive Officer Integrated Warfare Systems June 12, 2014
State of IAMD 2014 IAMD Achievements RADM Joseph Horn Program Executive Officer Integrated Warfare Systems June 12, 2014 1 Program Executive Officer RADM J. Horn Executive Director W. Bray (SES) Chief
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service
More informationOPNAVINST F N4 5 Jun 2012
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 4440.19F N4 OPNAV INSTRUCTION 4440.19F From: Chief of Naval Operations Subj: POLICIES
More informationShip Maintenance: Provider Perspective. VADM Paul Sullivan Naval Sea Systems Command
Ship Maintenance: Provider Perspective VADM Paul Sullivan Naval Sea Systems Command Desired Outcomes Understand NAVSEA role in the Navy Enterprise Understand ship maintenance requirements Understand ship
More informationPMS 339 Surface Training Systems
PMS 339 Surface Training Systems 09 January 2018 Presented to: Surface Navy Association Presented by: Captain Sam Pennington PMS 339 SURFACE TRAINING SYSTEMS PROGRAM MANAGER PMS 339 Surface Training Systems
More informationFFG UPGRADE Brochure Delivering tag integrated line warfare solutions.
Brochure Delivering tag integrated line warfare solutions www.thalesgroup.com.au FFG UPGRADE Delivering Integrated Warfare Solutions Overview UPGRADE PROGRAM Thales Australia has developed a comprehensive
More informationUNCLASSIFIED UNCLASSIFIED
: February Exhibit R, RDT&E Budget Item Justification: PB 119: Research, Development, Test & Evaluation, / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY R1 Program Element
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11
Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun
More informationCommand Overview. Dr. Joseph T. (Tim) Arcano, Jr. Technical Director, NSWCCD. CAPT Rich Blank Commanding Officer, NSWCCD
CAPT Rich Blank Commanding Officer, NSWCCD Command Overview Distribution Statement A: Approved for Public Release Dr. Joseph T. (Tim) Arcano, Jr. Technical Director, NSWCCD Division We envision the future
More informationSmall Business Opportunities with the Naval Air Systems Command
Small Business Opportunities with the Naval Air Systems Command Presented by: LtCol David Walsh Program Manager, PMA-226 25 September 2013 NAVAIR Public Release 2012-299 Distribution Statement A Approved
More informationCol Alan Pratt, USMC Commander. Distribution Statement A Approved for Public Release. Mr. Matthew Craig Acting Technical Director
1 Col Alan Pratt, USMC Commander Mr. Matthew Craig Acting Technical Director 2 TEAM Crane 3 rd Largest Naval Installation in the World (100 Square Miles) TEAM Crane $2.24 B FY 11 Business Base 4,372+ Govt.
More informationMK 41 Vertical Launching System (VLS)
MK 41 Vertical Launching System (VLS) Mark Zimmerman Page 1 Presentation Outline Introduction System Description New Development Page 2 Presentation Outline Introduction System Description New Development
More informationRapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract May 2011
Small Arms Air Platform Integration Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract 12109 25-May 2011 Joseph Burkart Crane Division, Naval Surface Warfare
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Order Code RS22595 Updated December 7, 2007 Summary Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,
More informationDDG 1000 Class Destroyer
DDG 1000 Class Destroyer 10 April 2018 Sea Air Space (SAS) DDG 1000 October February 2016 2017 DDG 1001 July February 20162018 DDG 1000 Program Manager, PMS 500 DDG 1002 December October 2016 2017 CAPT
More informationAir and Missile Defense Radar (AMDR)
DISTRIBUTION STATEMENT A: Approved for public release; Distribution Unlimited Air and Missile Defense Radar (AMDR) Sea Power to the Hands of Our Sailors Presented by: CAPT Seiko Okano Major Program Manager
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 29.669 0.858 0.824 1.214-1.214
More informationOPNAVINST DNS 25 Apr Subj: MISSION, FUNCTIONS AND TASKS OF COMMANDER, NAVAL SUPPLY SYSTEMS COMMAND
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.349 DNS OPNAV INSTRUCTION 5450.349 From: Chief of Naval Operations Subj: MISSION,
More informationCapabilities Presentation
Capabilities Presentation Corporate Profile Established in 1977 Small Business (FAR subpart 19.001) Over 300 Professional Staff Members DUNS Number - 094744138 Cage Code - 1W582 Primary NAICS (541330,
More informationNDIA Munitions Executive Summit Sustaining Industrial Readiness
NDIA 2007 Munitions Executive Summit Sustaining Industrial Readiness RDML (Sel) James P. McManamon Director, DON Weapons and Ordnance Safety (SEA 00V) and NAVSEA Deputy Commander for Warfare Systems Engineering
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs April 29, 2009 Congressional Research Service CRS Report for Congress Prepared
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationGeneral Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships
June 18, 2012 Contact: Dixie Stedman Tel: 207 442 1203 dixie.stedman@gdbiw.com General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships BATH, Maine The U. S. Navy has
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs December 22, 2009 Congressional Research Service CRS Report for Congress Prepared
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY
More informationMEDIA CONTACTS. Mailing Address: Phone:
MEDIA CONTACTS Mailing Address: Defense Contract Management Agency Attn: Public Affairs Office 3901 A Avenue Bldg 10500 Fort Lee, VA 23801 Phone: Media Relations: (804) 734-1492 FOIA Requests: (804) 734-1466
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) All Prior Years FY 212 FY 213 # Base PE 6437N: Surface Combatant Cmbt OCO ## FY 215 FY 216 FY 217 FY 218 To
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 12 R-1 Line #147
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013 FY 2014 FY
More informationAVW TECHNOLOGIES, INC.
AVW Technologies, Inc. is actively seeking applicants for the following positions. Please fill out an application (found at the bottom of our homepage) and submit your resume via email to dykes@avwtech.com.
More informationThis Product Area Directorate encompasses the following core equities:
SEAPORTe FUNCTIONAL AREAS The 22 functional areas supported by SeaPort-e are: 3.1 Research & Development Support 3.2 Engineering, System Engineering, & Process Engineering Support 3.3 Modeling, Simulation,
More informationDistribution Statement A: Approved for Public Release; Distribution Unlimited
Wallops Island History 1941 Established the Chincoteague Naval Air Station 1979 Navy (Dahlgren Detachment) Bldg Z41 1986 Aegis Combat Systems Center (ACSC) Operational 1998 ACSC/SSDS Merger 2000 Surface
More informationUS Navy Ships. Surface Warfare Officer First Tours
US Navy Ships Surface Warfare Officer First Tours CVN Carriers Nimitz Class: Class Size 10 ships Built 1975-2009 Cost - $8.5 Billion Crew Size 200 officers, 3,000 enlisted Air Wing - 500 officers, 2,300
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program Element
More informationRESEARCH PROTECTIONS UPDATE News and Comment on the Protection of Human Subjects in Navy and Marine Corps Research
RESEARCH PROTECTIONS UPDATE News and Comment on the Protection of Human Subjects in Navy and Marine Corps Research Vol. 4 Number 4 human.research@med.navy.mil FALL 2013 Comment Surface Warfare, HRPP Our
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #82 To Program Element - -
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 44.172 29.787 6.704-6.704 5.696 4.409
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete Total Total Program Element 57.922
More informationSubj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 8010.13E N96 OPNAV INSTRUCTION 8010.13E From: Chief of Naval Operations Subj: DEPARTMENT
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2a, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH TEST & EVALUATION, NAVY / BA-5 Submarine Tactical Warfare System/0604562N COST ($ in Millions)
More informationNavy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs February 3, 2012 CRS Report for Congress Prepared for Members and Committees
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07
APPROPRIATION/BUDGET ACTIVITY RDT&E,N/ 07 EXHIBIT R-2, RDT&E Budget Item Justification R-1 ITEM NOMENCLATURE Surface ASW Combat System Integration/ 0205620N COST ($ in Millions) FY 1999 FY 2000 FY 2001
More informationARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR
ARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR Navy ACAT IC Program Prime Contractor Total Number of Systems: 57 Bath Iron Works (Shipbuilder) Total Program Cost (TY$):
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0603563N/Ship Concept Advanced Design COST ($ in Millions)
More informationNAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION
NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION PRESENTED TO: NAVAIR SMALL BUSINESS AVIATION TECHNOLOGY CONFERENCE 1 RDML STEVE EASTBURG ASSISTANT
More informationAmphibious Ships and Landing Craft Data Book
MCRP 3-31B Amphibious Ships and Landing Craft Data Book U.S. Marine Corps PCN 144 000103 00 To Our Readers Changes: Readers of this publication are encouraged to submit suggestions and changes that will
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 1.613 1.418 1.56-1.56
More informationMILITARY PERSONNEL, NAVY
February 2003 Appropriation Tables MILITARY PERSONNEL, NAVY Table A-1 Military Personnel, Navy Pay and Allowances of Officers 5,232 5,291 5,594 Pay and Allowances of Enlisted 13,355 14,877 15,914 Pay and
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)
More informationOPNAVINST N9 16 Jun Subj: CHIEF OF NAVAL OPERATIONS SIMULATOR DEVELOPMENT AND TRAINING STRATEGY
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 1500.84 N9 OPNAV INSTRUCTION 1500.84 From: Chief of Naval Operations Subj: CHIEF OF
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6454N: Air Control FY 213 FY 214 FY 215 FY 216 To Complete Program Element 6.373 5.665
More informationVADM David C. Johnson. Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017
DAU's Acquisition Training Symposium VADM David C. Johnson Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017 Defense Acquisition Organization
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element 49.625
More informationN/SHIP SELF DEFENSE - DEM/VAL
APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 4 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0603755N/SHIP SELF DEFENSE - DEM/VAL COST (In Millions) Total PE Cost 2133 / QRCC 2184 / Force
More informationSubj: MISSION, FUNCTIONS, AND TASKS OF NAVAL SPECIAL WARFARE COMMAND
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 5450.221E N3/N5 OPNAV INSTRUCTION 5450.221E From: Chief of Naval Operations Subj: MISSION,
More informationBilling Code:
This document is scheduled to be published in the Federal Register on 12/11/2015 and available online at http://federalregister.gov/a/2015-31245, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE
More informationNaval VAMOSC Overview
Naval VAMOSC Overview Department of the Navy Cost Analysis Symposium 08 Sep 2011 Naval Center for Cost Analysis Visibility and Management of Operating & Support Costs (VAMOSC) Web-enabled management information
More informationDefense Security Cooperation Agency
Defense Security Cooperation Agency Defense Solutions for America s Global Partners The Foreign Military Sales Program (FMS) Mike Slack STRATEGY (POLICY) Virginia Conference on World Trade Thursday, October
More informationSUMMARY OF CHANGES CONTENTS CHAPTER I CHAPTER II CHAPTER III CHAPTER IV
SUMMARY OF CHANGES The NEC manual is published quarterly (JAN, APR, JUL, and OCT) to provide updated NEC information in a timely manner. Changes (establishments, revisions, disestablishments) to NEC codes
More informationPMS 339. Captain Jeff Sinclair. Surface Navy Association. 11 January Presented by: Presented to:
PMS 339 11 January 2017 Presented to: Surface Navy Association Presented by: Captain Jeff Sinclair PMS 339 SURFACE TRAINING SYSTEMS PROGRAM MANAGER PMS 339 Surface Training Systems (STS) The Surface Training
More informationSTATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
More informationDATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY
BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) All Prior Years FY 212 FY 213 # Base OCO ## FY 215 FY 216 FY 217 FY 218 Navy Page 1 of 32 R-1 Line #5 To Complete
More informationNavy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs February 14, 2013 CRS Report for Congress Prepared for Members and Committees
More informationNavy Information Warfare Pavilion 19 February RADM Matthew Kohler, Naval Information Forces
Navy Information Warfare Pavilion 19 February 2016 1030 RADM Matthew Kohler, Naval Information Forces It s All About Warfighting 2 IDC Reserve Command July 2012 Information Dominance Forces TYCOM October
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 22.63 3.676 32.789-32.789 35.932
More informationOPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationFuture of MIW from the LCS Platform
Future of MIW from the LCS Platform 24 October 2011 RDML Jim Murdoch, USN PEO LCS Distribution Statement A: Approved for Public Release; Distribution Unlimited. (11/16/2011). This Brief is provided for
More informationCRS Report for Congress
CRS Report for Congress Received through the CRS Web Order Code RS21059 Updated May 31, 2005 Navy DD(X) and CG(X) Programs: Background and Issues for Congress Summary Ronald O Rourke Specialist in National
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Combat System Integration FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 Total FY 213 FY 214 FY 215 FY 216 Navy Page 1 of 24 R-1 Line Item #5 To Complete Total Total
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost
More informationSTATEMENT OF MR. JOHN J. YOUNG, JR. ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT, AND ACQUISITION) AND
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE SEAPOWER SUBCOMMITTEE STATEMENT OF MR. JOHN J. YOUNG, JR. ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT, AND ACQUISITION)
More informationDEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA
DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA 23511-2325 CNRMCINST 4790.2 Code 200 CNRMC INSTRUCTION 4790.2 From: Commander, Navy Regional
More information