1 US Navy Strategic Maintenance Process USFF / N June 2009 United States Fleet Forces Ready Fleet Global Reach 1

2 Variation Strategic Maintenance Process Inefficiencies represent lost maintenance opportunties Process stage United States Fleet Forces Ready Fleet Global Reach 2

3 Variation Strategic Maintenance Process Inefficiencies represent lost maintenance opportunties Process stage United States Fleet Forces Ready Fleet Global Reach 3

4 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process AFEB Standardization Depot Work Integration : AIT Programs United States Fleet Forces Ready Fleet Global Reach 4

5 Take-A-Fix Port Loading Assessments MSMO Spiral 2 Docking Interval Analysis TFR MACFIT (INSURV) CWP Parametric Studies RMC Re-alignment AWP TOC Lean Six Sigma SSLCM VSB LCS - ISP Parametric Analysis CIERP ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP United States Fleet Forces Ready Fleet Global Reach 5

6 JINII JINII JINII JINII SURFACE SHIP TEAM ONE SURFACE SHIP TEAM ONE SURFACE SHIP TEAM ONE SURFACE SHIP TEAM ONE UTR UTR Availability Close / Hotwash AFEB MFOM / DRRS Feedback / Governance United States Fleet Forces Ready Fleet Global Reach 6

7 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 MRS/MRS Tailoring (Maintenance Requirement System) Builds realistic requirements projections and articulates the potential mission impact (risk) of funding constraints. It does not predict or dictate the specific maintenance performed on each ship in the future, but, using feedback, it does project the types and costs of required maintenance. United States Fleet Forces Ready Fleet Global Reach 7

8 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 Availability Tailoring text United States Fleet Forces Ready Fleet Global Reach 8

9 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 MER (Maintenance Effectiveness Review) A continuous improvement opportunity to upgrade and streamline maintenance programs without the intensity and costs required to perform continuous reliability centered maintenance (RCM). The purpose of the MER process is to provide a continuous improvement step to a Condition-Based Maintenance process. It is not designed to replace the RCM process, but to enhance it and find weaknesses in the original program, as well as to support the program through the implementation of a continuous process. It utilizes the original information, regardless of the type or rigorous-ness of the original process, and meets the requirements of an RCM program. United States Fleet Forces Ready Fleet Global Reach 9

10 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 CSMP / UTR (Current Ship s Maintenance Project / Unfunded Technical ) A ship s company is required to document deferred preventive and corrective maintenance in the ship s CSMP. A CSMP work candidate entry is required prior to any assistance being provided by an off-ship activity. Maintenance authorities use a ship s CSMP as the source document to validate and broker work. It is essential for this document to be up-to-date, since it serves as the basis for funding of required maintenance. Only work that is documented in the CSMP is authorized for completion. Unfunded Technical are all scheduled work items that have been deferred due to a lack of funds. United States Fleet Forces Ready Fleet Global Reach 10

11 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 Capability Plans text United States Fleet Forces Ready Fleet Global Reach 11

12 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 Technical Authority The SYSCOMs have established a hierarchy of technical authority to include waterfront Chief Engineers who oversee a defined Area Of Operation (AOR) for which they provide support to the waterfront and ships. If they can not answer an issue, they will coordinate with the appropriate command to get the answer. United States Fleet Forces Ready Fleet Global Reach 12

13 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 TMA/TMI Program (Top Management Attention/Top Management Initiative) This is the Navy s official program for identifying and addressing troubled systems and equipment. TMA is the O-6 and below working group that meets four times a year to oversee the efforts to improve troubled systems/equipment. When troubled systems/equipment issues are of such significance or require substantial funding, they mat be briefed at TMI (flag level group) which oversees and assists the TMA group. It is jointly chaired by the Fleet and NAVSEA. United States Fleet Forces Ready Fleet Global Reach 13

14 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 MegaRust A TMA/TMI program that was chartered to specifically address corrosion and preservation. It is a public-private partnership that has been formed to improve shipboard preservation, lower costs and reduce corrosion. It is jointly chaired by the Fleet and NAVSEA. United States Fleet Forces Ready Fleet Global Reach 14

15 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 PESC (Propulsion Executive Steering Committee) A TMA/TMI program that was chartered to specifically address propulsion systems (boilers, diesels, marine gas turbines), shafting and propellers. This principally government committee was formed to improve the readiness and lower costs of shipboard propulsion systems. It is jointly chaired by the Fleet and NAVSEA. United States Fleet Forces Ready Fleet Global Reach 15

16 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 ERM (Engineering For Reduced Maintenance) A TMA/TMI program that was chartered to reduce maintenance and improve mean time between failure by taking advantage of new technology or equipment This principally government group was formed to look for opportunities to introduce technology or equipment that can improve readiness and lower maintenance costs for shipboard systems and equipment. United States Fleet Forces Ready Fleet Global Reach 16

17 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 Avail Close / Hot Wash text United States Fleet Forces Ready Fleet Global Reach 17

18 MRS/MRS Tailoring Availability Tailoring MER CSMP / UTR Capability Plans Technical Authority TMA TMI Program MegaRust PESC ERM Avail Close / Hot Wash SEA 21 SEA 21 (Naval Sea Systems Command - Branch 21) text United States Fleet Forces Ready Fleet Global Reach 18

19 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP Take-A-Fix Text United States Fleet Forces Ready Fleet Global Reach 19

20 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP Docking Interval Analysis Text United States Fleet Forces Ready Fleet Global Reach 20

21 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP Parametric Studies Text United States Fleet Forces Ready Fleet Global Reach 21

22 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP SSLCM (Surface Ship Life Cycle Maintenance) An activity of a dedicated group of engineers whose sole purpose is to focus on surface ship class lifecycle maintenance. Their purpose is to document the actual technical requirements for each class ship to achieve the expected service life of our ships. United States Fleet Forces Ready Fleet Global Reach 22

23 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP Parametric Analysis Assessing adequacy of maintenance strategies by comparing (normalized) key maintenance indicators amongst classes of ships. United States Fleet Forces Ready Fleet Global Reach 23

24 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP ICMP Improvement (Integrated Class Maintenance Plan) The ICMP is a database of maintenance tasks, including ship alteration and depot-level, intermediate-level, and organizational-level tasks requiring off-ship assistance. It is developed from information and experience gained from repair and maintenance histories of prior ship classes and similar systems and equipment, as well as feedback from maintenance managers, port engineers, ships forces, NAVSEA/fleet technical offices, the Naval Ships Technical Manual (NSTM), and type commander (TYCOM) maintenance manuals. United States Fleet Forces Ready Fleet Global Reach 24

25 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP ABS Hull Life Survey (American Bureau of Shipping) ABS is conducting engineering surveys of ship hull structures to determine true quantity of service life consumed. Actual scantling and distributed system dimensions are measured and loaded into a finite element model (FEM) for computation of remaining hull life (endurance strength), and localization of vulnerable areas. Four classes being assessed: LSD, CG, DDG, FFG United States Fleet Forces Ready Fleet Global Reach 25

26 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP BAWP (Baseline Availability Work Package) Text United States Fleet Forces Ready Fleet Global Reach 26

27 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP CSSP (Critical Shipboard Spare Parts) A government working group developing a process to identify and manage spares parts that are determined to have high value, long-lead time (e.g. reduction gears, turbines, shaft sections) with potential to adversely impact a required capability or mission area for a ship preparing to deploy, already deployed or places the ship out of service if not available. Any high value, long-lead time items, if not available, that could have the potential to significantly increase costs (10% or more) associated with new construction, modernization or maintenance. United States Fleet Forces Ready Fleet Global Reach 27

28 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP C5IMP (Combat System (CS) and C4I Installations and Improvements) The process was initially established (as the D-30 process) by both Fleet Commanders to ensure the PEOs and SYSCOMs adhere to the procedures for continuous implementation of CS/C4ISR systems across the Strike Force (SF). The process is web service based architecture to revolutionize the Navy s approach to planning, assessing, scheduling, and maintaining configuration control under the guidance of the C5I modernization process for Strike Force deployment baselines. United States Fleet Forces Ready Fleet Global Reach 28

29 Take-A-Fix Docking Interval Analysis Parametric Studies SSLCM Parametric Analysis ICMP Improvement ABS Hull Life Surveys BAWP CSSP C5IMP LCS - ISP LCS - ISP (Littoral Combat Ship Interim Support Plan) Service provided by General Dynamics and Lockheed Martin to LCS as to a traditional planning yard. They provide maintenance, supply, engineering, and training support for selected systems on their respective hull types. The interim contracts would end three years after delivery of each lead ship at which time long term support plan decisions will be made. United States Fleet Forces Ready Fleet Global Reach 29

30 JINII SURFACE SHIP TEAM ONE UTR MFOM / DRRS JINII (Joint Industry Navy Innovation Initiative) In order for the Department of the Navy, and more specifically, the Fleet Forces Command (FFC) and the Naval Sea Systems Command (NAVSEA), to better address and resolve areas of concern that impact the timeliness and cost effectiveness of building and repairing Navy vessels, the Joint Industry-Navy Improvements Initiative (JINII) is chartered to foster communication and factual interchange between contractors and the Government regarding business and technical processes used in the construction and repair of Navy ships. United States Fleet Forces Ready Fleet Global Reach 30

31 Surface Ship Team One Text JINII SURFACE SHIP TEAM ONE UTR MFOM / DRRS United States Fleet Forces Ready Fleet Global Reach 31

32 JINII SURFACE SHIP TEAM ONE UTR MFOM / DRRS UTR (Unfunded Technical ) Unfunded Technical are all validated depot work candidates that have been deferred due to a lack of funds. UTR is computed annually, and is only computed for ships having a CNO availability in that year. UTR is then applied to the programming year as an adjustment to CM funding. Not all UTR is programmed for accomplishment ( dampened feedback). United States Fleet Forces Ready Fleet Global Reach 32

33 MFOM / DRRS (Maintenance Figure of Merit / Defense Readiness Reporting System) JINII SURFACE SHIP TEAM ONE UTR MFOM / DRRS Computer based tool built on a hierarchical structure that calculates material condition against operational requirements. Designed to consistently and objectively calculate a material condition readiness value for equipment, systems, tasks, missions or the ship. Provides the Navy Maintenance community with a single, authoritative, centrally managed application that provides the necessary data upgrades and improvements to support readiness and maintenance reporting. DRRS provides a comprehensive readiness assessment network to calculate the capabilities and preparedness of military units to conduct wartime missions and other contingencies. United States Fleet Forces Ready Fleet Global Reach 33

34 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife FRP Metrics / Presence (Fleet Response Plan) Under the negotiated Global Force Mgt (GFM) plan, the Fleet CDRs are required to deliver Ao or presence to Combatant Commanders/ Naval Component Commanders. The three TYCOMs each have FRP entitlements that deliver three levels of readiness: X : Y : Z X = Sustainment phase ships ships certified ready for deployment, on deployment, or recently returned from deployment. Y = Ships deployable within 30 days Phases Z = Ships deployable in 90 days FRP reqts can be compared to force structure to identify liquidity problems. United States Fleet Forces Ready Fleet Global Reach 34

35 FRP Metrics / Presence Risk Decisions Risk Decisions Planned Service Life Industrial Base Consideration text COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife United States Fleet Forces Ready Fleet Global Reach 35

36 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Planned Service Life The concept of Planned Service Life (PSL) includes a trigger to initiate a proactive analysis of mission needs prior to the end of asset life. Another element of the PSL concept is to evaluate the capability of the asset to meet designed mission needs. United States Fleet Forces Ready Fleet Global Reach 36

37 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Industrial Base Considerations Wide cyclical variations in loading (especially at regional level) drive quantifiable and unproductive costs into shipyard cost structures. Efforts need to be strengthened to minimize cyclical variations. United States Fleet Forces Ready Fleet Global Reach 37

38 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife COW / Supplementals (Cost of War) text United States Fleet Forces Ready Fleet Global Reach 38

39 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Persistent Presence / OCO (Overseas Contingency Operations) The Department of Defense renamed Persistent Presence as Overseas Contingency Operations. US Navy s mission effort overseas have increased. By providing support overseas to two major operations, humanitarian assistance, and anti-piracy, our ships are under heavy pressure to maintain readiness in both materiel and training. This continued presence is increasing the wear and tear on the ships. United States Fleet Forces Ready Fleet Global Reach 39

40 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Budget Resolutions / Planords / Fiscal Guidance ( Orders) text United States Fleet Forces Ready Fleet Global Reach 40

41 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife 9 Step Process In order to increase the fidelity of the maintenance budget and reduce the churn associated with work deferral or availability cancellation, the Navy instituted a process improvement starting in August of This improved process, known as the 9-step process, provides a hull-by-hull review of individual ship maintenance requirements to better refine notional ship maintenance requirements and tailor them to the physical condition of individual platforms as they get closer to the point in time when they will be inducted into their scheduled availability period. The process also considers expected shipyard performance, conducts shipyard capacity analysis, and develops alternative courses of action for the completion of any work requirements that exceed the available capacity. United States Fleet Forces Ready Fleet Global Reach 41

42 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Deferred Maintenance Report text United States Fleet Forces Ready Fleet Global Reach 42

43 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Mod / Midlife Modernization Programs text United States Fleet Forces Ready Fleet Global Reach 43

44 FRP Metrics / Presence Risk Decisions Planned Service Life Industrial Base Consideration COW / Supplementals Persistent Presence / OCO Budget Resolutions / Planords / Fiscal Guidance 9 Step Process Deferred Maintenance Report Modernization Programs Capstone / BMD / AEGIS Programs Mod / Midlife (Banked) Capstone / BMD / AEGIS Mod / Midlife (Ballistic Missile Defense) text United States Fleet Forces Ready Fleet Global Reach 44

45 Port Loading TFR RMC Re-alignment Port Loading Text United States Fleet Forces Ready Fleet Global Reach 45

46 Port Loading TFR RMC Re-alignment TFR (Task Force Readiness) Task Force Readiness is a model that computes levels of FRP/Ao delivered, based on readiness account funding levels. SWE developing red-lines as trip-wires for readiness funding. United States Fleet Forces Ready Fleet Global Reach 46

47 Port Loading TFR RMC Re-alignment RMC Re-alignment (Regional Maintenance Center) Text United States Fleet Forces Ready Fleet Global Reach 47

48 JINII SURFACE SHIP TEAM ONE UTR JINII (Joint Industry Navy Innovation Initiative) In order for the Department of the Navy, and more specifically, the Fleet Forces Command (FFC) and the Naval Sea Systems Command (NAVSEA), to better address and resolve areas of concern that impact the timeliness and cost effectiveness of building and repairing Navy vessels, the Joint Industry-Navy Improvements Initiative (JINII) is chartered to foster communication and factual interchange between contractors and the Government regarding business and technical processes used in the construction and repair of Navy ships. United States Fleet Forces Ready Fleet Global Reach 48

49 Surface Ship Team One Text JINII SURFACE SHIP TEAM ONE UTR United States Fleet Forces Ready Fleet Global Reach 49

50 JINII SURFACE SHIP TEAM ONE UTR UTR (Unfunded Technical ) Unfunded Technical are all validated depot work candidates that have been deferred due to a lack of funds. UTR is computed annually, and is only computed for ships having a CNO availability in that year. UTR is then applied to the programming year as an adjustment to CM funding. Not all UTR is programmed for accomplishment ( dampened feedback). United States Fleet Forces Ready Fleet Global Reach 50

51 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones SHIPMAIN / MCIT (Ship Maintenance / Maintenance Continuous Improvement Team) SHIPMAIN was launched to improve maintenance planning for surface ships and nonnuclear aircraft carriers, from the point at which work is first identified by a ship s force through the start of execution of that work in a maintenance availability. It concentrates on gaining efficiencies across multiple organizations by identifying and eliminating redundancies. By streamlining the planning process for ship maintenance, SHIPMAIN expects to capture significant savings. United States Fleet Forces Ready Fleet Global Reach 51

52 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones MT (Maintenance Team) text United States Fleet Forces Ready Fleet Global Reach 52

53 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones PB4M ( Board for Maintenance) text United States Fleet Forces Ready Fleet Global Reach 53

54 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones MMBP (Maintenance and Modernization Business Plan) text United States Fleet Forces Ready Fleet Global Reach 54

55 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones CSMP / BVS (Current Ship Maintenance Plan / Best Value Standardization) text United States Fleet Forces Ready Fleet Global Reach 55

56 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Continuous Maintenance text United States Fleet Forces Ready Fleet Global Reach 56

57 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones MSMO PMO (Multi Ship Multi Option Program Management Office) text United States Fleet Forces Ready Fleet Global Reach 57

58 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Milestones text United States Fleet Forces Ready Fleet Global Reach 58

59 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Assessments text United States Fleet Forces Ready Fleet Global Reach 59

60 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones POETS (Pre Overhaul Engineering Teams) text United States Fleet Forces Ready Fleet Global Reach 60

61 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Tank Inspection Program text United States Fleet Forces Ready Fleet Global Reach 61

62 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones SEMAT / CEMAT (Carrier Engineering Maintenance Assist Team / Surface Ship Engineering Maintenance Assist Team ) Provide engineering and technical services to accomplish specific requirements in support of maintenance and planning for the overhaul and repair of equipment and systems associated with U.S. Navy aircraft carriers (CV/CVN) and U.S. Navy Surface Ships. United States Fleet Forces Ready Fleet Global Reach 62

63 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones ICAS / IPARS (Integrated Condition Assessment System) The ICAS is an online automated machinery condition monitoring and assessment. It is a commercial off-the-shelf software, although the Navy holds government purpose license rights. ICAS gathers and processes real-time equipment data from system interfaces and machinery sensors, as well as periodic data from hand-held devices, for evaluating the operational condition of monitored equipment. As an implementing tool for CBM, ICAS compares live data against expected equipment operational data profiles, thus identifying abnormal conditions or performance degradation prior to a catastrophic failure. United States Fleet Forces Ready Fleet Global Reach 63

64 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones SWEAP (Surface Warfare Enterprise Assessment Program) An initiative to assist ship's force with assessment and documentation of shipboard material conditions. Similar to HM&ERA. Can be tailored based on upcoming maint window(s). Pilots conducted with MSMO support, and have been successful in mitigating PMA execution risk for LSDs. United States Fleet Forces Ready Fleet Global Reach 64

65 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Port Engineer Program text United States Fleet Forces Ready Fleet Global Reach 65

66 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones SSRAC (Standard Specification for Ship Repair and Alteration Program ) A public-private partnership established in 1970 to carry out the development, revision, and control of standard specifications for non-nuclear surface ships. This program ensures that appropriate contract language is used in transmitting technical, quality, and environmental/safety requirements to the contractor or AIT. United States Fleet Forces Ready Fleet Global Reach 66

67 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Master Specification Catalogue text United States Fleet Forces Ready Fleet Global Reach 67

68 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Contract Governance An initiative to streamline and coordinate all shipboard production executed via contracts. Ensures all contracts are solicited by properly-warranted Navy contracting officers. Ensures all contracts include and are executed with proper technical content under proper Navy technical authority. Ensures all shipboard production is integrated & coordinated through a Naval Supervising Activity, with proper oversight. Reduces the number of duplicative, niche and redundant contracts. United States Fleet Forces Ready Fleet Global Reach 68

69 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Depot Work Integration : AIT (Alteration Installation Team) text United States Fleet Forces Ready Fleet Global Reach 69

70 SHIPMAIN / MCIT Assessments POETS Tank Inspection Program SEMAT / CEMAT ICAS / IPARS SWEAP Port Engineer Program SSRAC Master Specification Catalogue Contract Governance Depot Work Integration : AIT Contracts Portfolio / Seaport MT PB4M MMBP CSMP / BVS Continuous Maintenance MSMO PMO Milestones Contracts Portfolio / Seaport () text United States Fleet Forces Ready Fleet Global Reach 70

71 Assessments MACFIT (INSURV) AWP VSB CIERP Assessments Text United States Fleet Forces Ready Fleet Global Reach 71

72 Assessments MACFIT (INSURV) AWP VSB CIERP MACFIT (INSURV) (Material Assessment Cross functional Team) A USFF chartered working group, chaired by INSURV, to organize and consolidate the procedures, processes, tools and data used for assessments of shipboard systems and equipment. It is also chartered to improve shipboard personnel s ability to self assess. There are two principle groups, one lead by NAVSEA addressing the development, execution, scheduling and performance of assessment procedures; and one lead by USFF N43 addressing assessment processes, tools and data warehousing. United States Fleet Forces Ready Fleet Global Reach 72

73 Assessments MACFIT (INSURV) AWP VSB CIERP AWP (Availability Work Package) Text United States Fleet Forces Ready Fleet Global Reach 73

74 Assessments MACFIT (INSURV) AWP VSB CIERP VSB (Validation, Screening & Brokering) A new web based software application being developed by MFOM to replace Regional Maintenance Automated Information System (RMAIS) for the screening, broking and validation of work candidates. United States Fleet Forces Ready Fleet Global Reach 74

75 Assessments MACFIT (INSURV) AWP VSB CIERP CIERP (Continuous Estimating Incremental Review Process) Text United States Fleet Forces Ready Fleet Global Reach 75

76 JINII SURFACE SHIP TEAM ONE Availability Close / Hotwash JINII (Joint Industry Navy Innovation Initiative) In order for the Department of the Navy, and more specifically, the Fleet Forces Command (FFC) and the Naval Sea Systems Command (NAVSEA), to better address and resolve areas of concern that impact the timeliness and cost effectiveness of building and repairing Navy vessels, the Joint Industry-Navy Improvements Initiative (JINII) is chartered to foster communication and factual interchange between contractors and the Government regarding business and technical processes used in the construction and repair of Navy ships. United States Fleet Forces Ready Fleet Global Reach 76

77 Surface Ship Team One Text JINII SURFACE SHIP TEAM ONE Availability Close / Hotwash United States Fleet Forces Ready Fleet Global Reach 77

78 JINII SURFACE SHIP TEAM ONE Availability Close / Hotwash Availability Close / Hotwash () Text United States Fleet Forces Ready Fleet Global Reach 78

79 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process AFEB Standardization MSMO (Multi Ship / Multi Option) The practice of awarding a single overarching contract to a prime contractor responsible for depot-level maintenance work on multiple ships in a class. This allows the contractor the flexibility to quickly bring the appropriate resources and personnel to bear to meet evolving demands. (It also places on the contractor the responsibility for meeting the demand.) Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 79

80 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process RMC Standardization (Regional Maintenance Center) text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 80

81 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process DoD Obligation Policy (Department of Defense) text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 81

82 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process LOE Guidance () text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 82

83 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process WAF Process (Work Authorization Form) text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 83

84 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process AFEB Standardization (Awards Fee Board) text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 84

85 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process? () text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 85

86 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process? () text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 86

87 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process? () text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 87

88 MSMO RMC Standardization DoD Obligation Policy LOE Guidance WAF Process Depot Work Integration : AIT (Alteration Installation Team) text AFEB Standardization Depot Work Integration : AIT United States Fleet Forces Ready Fleet Global Reach 88

89 MSMO Spiral 2 CWP TOC Lean Six Sigma LCS - ISP MSMO Spiral 2 (Multi Ship Multi Option) Text United States Fleet Forces Ready Fleet Global Reach 89

90 MSMO Spiral 2 CWP TOC Lean Six Sigma LCS - ISP CWP (Cumbersome Work Package) A TMA/TMI program that was chartered to eliminate and clarify technical specifications, requirements and processes that are confusing, outdated or burdensome. This principally government group is expected to improve maintenance processes and practices to lower costs. It has been recently focused on ways to lower costs in Naval Shipyards. United States Fleet Forces Ready Fleet Global Reach 90

91 MSMO Spiral 2 CWP TOC Lean Six Sigma LCS - ISP TOC Lean Six Sigma (Theory Of Constraints) A process that investigates problems from a strategic level in order to measure overall performance of the system or process. TLS is used to identify existing or potential constraints with a system or process. The next step is to apply Lean to remove inefficiencies and then apply Six Sigma to optimize process variability and error. United States Fleet Forces Ready Fleet Global Reach 91

92 MSMO Spiral 2 CWP TOC Lean Six Sigma LCS - ISP LCS - ISP (Littoral Combat Ship Interim Support Plan) Service provided by General Dynamics and Lockheed Martin to LCS as to a traditional planning yard. They provide maintenance, supply, engineering, and training support for selected systems on their respective hull types. The interim contracts would end three years after delivery of each lead ship at which time long term support plan decisions will be made. United States Fleet Forces Ready Fleet Global Reach 92

93 JINII SURFACE SHIP TEAM ONE AFEB JINII (Joint Industry Navy Innovation Initiative) In order for the Department of the Navy, and more specifically, the Fleet Forces Command (FFC) and the Naval Sea Systems Command (NAVSEA), to better address and resolve areas of concern that impact the timeliness and cost effectiveness of building and repairing Navy vessels, the Joint Industry-Navy Improvements Initiative (JINII) is chartered to foster communication and factual interchange between contractors and the Government regarding business and technical processes used in the construction and repair of Navy ships. United States Fleet Forces Ready Fleet Global Reach 93

94 Surface Ship Team One Text JINII SURFACE SHIP TEAM ONE AFEB United States Fleet Forces Ready Fleet Global Reach 94

95 JINII SURFACE SHIP TEAM ONE AFEB AFEB (Awards Fee Board) Text United States Fleet Forces Ready Fleet Global Reach 95

96 Variation Strategic Maintenance Process United States Fleet Forces Ready Fleet Global Reach 96

97 United States Fleet Forces Ready Fleet Global Reach 97

98 FRP Phases M O C N H T A H N L G Y E COLOR CODE LEGEND MAINTENANCE TYPE AVAIL/ AVAILABILITIES IN EXECUTION PIA CVN XX CARRIER IMPACT ON NO IMPACT ON BASIC PHASE INTEGRATED PHASE SUSTAINMENT DEPLOYED A 0 Risk PRIOR J F M A M J J A S O N D J F M A M J J A S O N FRP GFM MONTH # SCHEDULE FRTP(Churn) START D J F M A M J J A S O N D PLANNED 01/09 CURRENT 2008 TODAY ERP SSN XXX SUBMARINE PLANNED 03/04 CURRENT 2008 DMP SSN XXX SUBMARINE PLANNED CURRENT ERO SSN XXX732 SUBMARINE PLANNED CURRENT Return United States Fleet Forces Ready Fleet Global Reach 98

Commander, Navy Regional Maintenance Command

Commander, Navy Regional Maintenance Command Commander, Navy Regional Maintenance Command Prepared for : JINII Planning Session RDML (Sel) Dave Gale 9 February 2011 Change is Needed Many sources of motivation for these changes VADM McCoy s Task to

More information

CNRMC PSSRA Brief. Mr. Kevin Taylor May 19, 2016

CNRMC PSSRA Brief. Mr. Kevin Taylor May 19, 2016 CNRMC PSSRA Brief Mr. Kevin Taylor May 19, 2016 Intent of this information is to provide U.S. DoD industry contractors a general schedule for information and planning purposes for upcoming surface ship

More information

Ship Maintenance: Provider Perspective. VADM Paul Sullivan Naval Sea Systems Command

Ship Maintenance: Provider Perspective. VADM Paul Sullivan Naval Sea Systems Command Ship Maintenance: Provider Perspective VADM Paul Sullivan Naval Sea Systems Command Desired Outcomes Understand NAVSEA role in the Navy Enterprise Understand ship maintenance requirements Understand ship

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs April 29, 2009 Congressional Research Service CRS Report for Congress Prepared

More information

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE SUBCOMMITTEE ON MILITARY READINESS OF THE HOUSE ARMED SERVICES COMMITTEE APRIL 6, 2005 1 Chairman

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 Base PE 65863N: RDT&E Ship & Aircraft Support OCO Total FY 213 FY 214 FY 215 FY 216 Navy Page

More information

FOR OFFICIAL USE ONLY. Naval Audit Service. Audit Report

FOR OFFICIAL USE ONLY. Naval Audit Service. Audit Report FOR OFFICIAL USE ONLY Naval Audit Service Audit Report Business Process Reengineering Efforts for Selected Department of the Navy Business System Modernizations: Shipyard Management Information System

More information

GAO MILITARY READINESS. Navy Needs to Assess Risks to Its Strategy to Improve Ship Readiness. Report to Congressional Committees

GAO MILITARY READINESS. Navy Needs to Assess Risks to Its Strategy to Improve Ship Readiness. Report to Congressional Committees GAO United States Government Accountability Office Report to Congressional Committees September 2012 MILITARY READINESS Navy Needs to Assess Risks to Its Strategy to Improve Ship Readiness GAO-12-887 Date

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

For More Information

For More Information THE ARTS CHILD POLICY CIVIL JUSTICE EDUCATION ENERGY AND ENVIRONMENT This PDF document was made available from www.rand.org as a public service of the RAND Corporation. Jump down to document6 HEALTH AND

More information

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA 23511-2325 CNRMCINST 4790.2 Code 200 CNRMC INSTRUCTION 4790.2 From: Commander, Navy Regional

More information

NAVY FORCE STRUCTURE. Actions Needed to Ensure Proper Size and Composition of Ship Crews

NAVY FORCE STRUCTURE. Actions Needed to Ensure Proper Size and Composition of Ship Crews United States Government Accountability Office Report to Congressional Committees May 2017 NAVY FORCE STRUCTURE Actions Needed to Ensure Proper Size and Composition of Ship Crews GAO-17-413 May 2017 NAVY

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Order Code RS22595 Updated December 7, 2007 Summary Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,

More information

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9094.1C N96 OPNAV INSTRUCTION 9094.1C From: Chief of Naval Operations Subj: FULL POWER

More information

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 4 COST (In Millions) Total PE Cost 0164 / COMBAT SYSTEM INTEGRATION 9999 / CONGRESSIONAL ADDS EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0603582N/COMBAT

More information

CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 IN REPLY REFER TO OPNAVINST 3120.28C N86 OPNAV INSTRUCTION 3120.28C From: SUbj: Chief of Naval

More information

NAVY SHIP MAINTENANCE

NAVY SHIP MAINTENANCE United States Government Accountability Office Report to Congressional Committees November 2016 NAVY SHIP MAINTENANCE Action Needed to Maximize New Contracting Strategy's Potential Benefits GAO-17-54 Highlights

More information

We acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan

We acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan The Naval Research, Development & Acquisition Team 1999-2004 Strategic Plan Surface Ships Aircraft Submarines Marine Corps Materiel Surveillance Systems Weapon Systems Command Control & Communications

More information

DOD INSTRUCTION DEPOT MAINTENANCE CORE CAPABILITIES DETERMINATION PROCESS

DOD INSTRUCTION DEPOT MAINTENANCE CORE CAPABILITIES DETERMINATION PROCESS DOD INSTRUCTION 4151.20 DEPOT MAINTENANCE CORE CAPABILITIES DETERMINATION PROCESS Originating Component: Office of the Under Secretary of Defense for Acquisition and Sustainment Effective: May 4, 2018

More information

Subj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC

Subj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 IN REPLY REFER TO OPNAVINST 5450.223B N87 OPNAV INSTRUCTION 5450.223B From: Chief of Naval Operations

More information

DEPARTMENTOFTHENAVY COMMANDER, REGIONAL MAINTENANCE CENTERS 9170 SECOND STREET, SUITE 245 NORFOLK, VA

DEPARTMENTOFTHENAVY COMMANDER, REGIONAL MAINTENANCE CENTERS 9170 SECOND STREET, SUITE 245 NORFOLK, VA DEPARTMENTOFTHENAVY COMMANDER, REGIONAL MAINTENANCE CENTERS 9170 SECOND STREET, SUITE 245 NORFOLK, VA 23511-2393 REGIONAL MAINTENANCE CENTER INSTRUCTION 4700.1 CRMCINST 4700.1 Code 00 JAN 8 2008 Subj:

More information

OPNAVINST A N Oct 2014

OPNAVINST A N Oct 2014 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3501.360A N433 OPNAV INSTRUCTION 3501.360A From: Chief of Naval Operations Subj: DEFENSE

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs December 22, 2009 Congressional Research Service CRS Report for Congress Prepared

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

ASSESSMENT DIRECTOR (AD)

ASSESSMENT DIRECTOR (AD) ASSESSMENT DIRECTOR (AD) DESK GUIDE (This page intentionally blank.) UNITED STATES OF AMERICA DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA

More information

Chapter 12 Environmental, Safety and Health (ES&H) Regulatory Compliance and Contractor Oversight Program

Chapter 12 Environmental, Safety and Health (ES&H) Regulatory Compliance and Contractor Oversight Program Chapter 12 Environmental, Safety and Health (ES&H) Regulatory Compliance and Contractor Oversight Program Table of Contents 12.1 Introduction 12-4 12.1.1 ES&H Directives 12-4 12.1.2 SUPSHIP Roles and Responsibilities

More information

MEDIA CONTACTS. Mailing Address: Phone:

MEDIA CONTACTS. Mailing Address: Phone: MEDIA CONTACTS Mailing Address: Defense Contract Management Agency Attn: Public Affairs Office 3901 A Avenue Bldg 10500 Fort Lee, VA 23801 Phone: Media Relations: (804) 734-1492 FOIA Requests: (804) 734-1466

More information

OPNAVINST DNS 25 Apr Subj: MISSION, FUNCTIONS AND TASKS OF COMMANDER, NAVAL SUPPLY SYSTEMS COMMAND

OPNAVINST DNS 25 Apr Subj: MISSION, FUNCTIONS AND TASKS OF COMMANDER, NAVAL SUPPLY SYSTEMS COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.349 DNS OPNAV INSTRUCTION 5450.349 From: Chief of Naval Operations Subj: MISSION,

More information

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP)

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP) PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP) 1.0 MISSION OBJECTIVE: Provide sustainment and logistics support to the Theater

More information

DOD MANUAL , VOLUME 1 DOD MANAGEMENT OF ENERGY COMMODITIES: OVERVIEW

DOD MANUAL , VOLUME 1 DOD MANAGEMENT OF ENERGY COMMODITIES: OVERVIEW DOD MANUAL 4140.25, VOLUME 1 DOD MANAGEMENT OF ENERGY COMMODITIES: OVERVIEW Originating Component: Office of the Under Secretary of Defense for Acquisition and Sustainment Effective: March 2, 2018 Releasability:

More information

CAPT Heide Stefanyshyn-Piper

CAPT Heide Stefanyshyn-Piper NAVSEA 05 Chief Technology Officer Perspective on Naval Engineering Needs Naval Engineering for the 21 st Century Workshop January 13-14, 2010 CAPT Heide Stefanyshyn-Piper SEA 05 Chief Technology Officer

More information

9 th Annual Disruptive Technologies Conference

9 th Annual Disruptive Technologies Conference 9 th Annual Disruptive Conference Navy IAMD Distribution Statement A: Approved for Public Release; Distribution Unlimited. (12/05/2012). This Brief is provided for Information Only and does not constitute

More information

Subj: MISSIONS, FUNCTIONS, AND TASKS OF UNITED STATES FLEET FORCES COMMAND

Subj: MISSIONS, FUNCTIONS, AND TASKS OF UNITED STATES FLEET FORCES COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5440.77B DNS-33/USFF OPNAV INSTRUCTION 5440.77B From: Chief of Naval Operations Subj:

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

https://www.metricsthatmatter.com/url/u.aspx?0cbf11b3e Guest Presenter Jay Bottelson

https://www.metricsthatmatter.com/url/u.aspx?0cbf11b3e Guest Presenter Jay Bottelson Defense Acquisition University Lunch n Learn Navy VAMOSC 12 April 2017 Session will start at 1230 EDT (1130 CDT). Audio will be through DCS there will be a sound check 30 minutes prior to the session.

More information

DEPARTMENT 20 OVERVIEW AND CONTRACTS FORECAST

DEPARTMENT 20 OVERVIEW AND CONTRACTS FORECAST DEPARTMENT 20 OVERVIEW AND CONTRACTS FORECAST Debra Dezendorf Machinery Programs & Platforms Acquisition Manager 11 May 2016 Department 20 Machinery Programs & Platforms Mission Statement: Provide program

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3120.28D N96 OPNAV INSTRUCTION 3120.28D From: Chief of Naval Operations Subj: CERTIFICATION

More information

OPNAVINST F N4 5 Jun 2012

OPNAVINST F N4 5 Jun 2012 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 4440.19F N4 OPNAV INSTRUCTION 4440.19F From: Chief of Naval Operations Subj: POLICIES

More information

OPNAVINST B N8 7 Nov Subj: NAVY TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT, AUTOMATIC TEST SYSTEMS, AND METROLOGY AND CALIBRATION

OPNAVINST B N8 7 Nov Subj: NAVY TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT, AUTOMATIC TEST SYSTEMS, AND METROLOGY AND CALIBRATION DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3960.16B N8 OPNAV INSTRUCTION 3960.16B From: Chief of Naval Operations Subj: NAVY TEST,

More information

DEPARTMENT OF THE NAVY CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3090.1 N2 JM6 OCT 5 2009 OPNAV INSTRUCTION 3090.1 From: Chief of Naval Operations Subj: COMKWD, CONTROL,

More information

Strategic Cost Reduction

Strategic Cost Reduction Strategic Cost Reduction American Society of Military Comptrollers May 29, 2014 Agenda Cost Assessment and Program Evaluation Budget Uncertainty Efficiencies History Specific Efficiency Examples 2 Cost

More information

US Navy Ships. Surface Warfare Officer First Tours

US Navy Ships. Surface Warfare Officer First Tours US Navy Ships Surface Warfare Officer First Tours CVN Carriers Nimitz Class: Class Size 10 ships Built 1975-2009 Cost - $8.5 Billion Crew Size 200 officers, 3,000 enlisted Air Wing - 500 officers, 2,300

More information

SECNAVINST B ASN (RDA) 22 Dec 2005 PRODUCT DATA REPORTING AND EVALUATION PROGRAM (PDREP)

SECNAVINST B ASN (RDA) 22 Dec 2005 PRODUCT DATA REPORTING AND EVALUATION PROGRAM (PDREP) DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON, DC 20350-1000 SECNAVINST 4855.3B ASN (RDA) SECNAV INSTRUCTION 4855.3B From: Subj: Secretary of the Navy PRODUCT DATA REPORTING

More information

DOD INSTRUCTION DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS

DOD INSTRUCTION DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS DOD INSTRUCTION 4151.24 DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS Originating Component: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics Effective: October

More information

Naval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives

Naval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives Inspector General U.S. Department of Defense Report No. DODIG-2016-063 MARCH 18, 2016 Naval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives Mission Our

More information

Naval VAMOSC Overview

Naval VAMOSC Overview Naval VAMOSC Overview Department of the Navy Cost Analysis Symposium 08 Sep 2011 Naval Center for Cost Analysis Visibility and Management of Operating & Support Costs (VAMOSC) Web-enabled management information

More information

ESTIMATE OF THE ANNUAL COST OF CORROSION FOR NAVY SHIPS

ESTIMATE OF THE ANNUAL COST OF CORROSION FOR NAVY SHIPS ESTIMATE OF THE ANNUAL COST OF CORROSION FOR NAVY SHIPS FY2008 10 UPDATE REPORT DAC21T1 Eric F. Herzberg Paul N. Chang Mitch L. Daniels Norman T. O'Meara, PhD SEPT EMBER 2012 NOTICE: THE VIEWS, OPINIONS,

More information

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow Department of the Navy FY 26/FY 27 President s Budget Winning Today Transforming to Win Tomorrow 4 February 25 1 1 Our budget resources are aligned to support both present responsibilities and future capabilities.

More information

It s All about the Money!

It s All about the Money! 2011 DOD Maintenance Symposium Breakout Session: It s All about the Money! Chien Huo, Ph.D. Force and Infrastructure Analysis Division (FIAD) Cost Assessment and Program Evaluation (CAPE) Office of the

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

ASN (RDA) Chief Engineer

ASN (RDA) Chief Engineer ASN (RDA) Chief Engineer Naval Power 21 Integration & Interoperability Improvement 21 October 2008 Mr. Carl Siel ASN(RDA) Chief Engineer carl.siel@navy.mil Unclassified Mr. J. Kevin Smith Technical Director

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #31

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #31 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

Capabilities Presentation

Capabilities Presentation Capabilities Presentation Corporate Profile Established in 1977 Small Business (FAR subpart 19.001) Over 300 Professional Staff Members DUNS Number - 094744138 Cage Code - 1W582 Primary NAICS (541330,

More information

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3430.23C N2/N6 OPNAV INSTRUCTION 3430.23C From: Chief of Naval Operations Subj: ELECTRONIC

More information

OPNAVINST E N97 7 Nov 2017

OPNAVINST E N97 7 Nov 2017 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 1540.51E N97 OPNAV INSTRUCTION 1540.51E From: Chief of Naval Operations Subj: SUBMARINE

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013

More information

a GAO GAO AIR FORCE DEPOT MAINTENANCE Management Improvements Needed for Backlog of Funded Contract Maintenance Work

a GAO GAO AIR FORCE DEPOT MAINTENANCE Management Improvements Needed for Backlog of Funded Contract Maintenance Work GAO United States General Accounting Office Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives June 2002 AIR FORCE DEPOT MAINTENANCE Management Improvements

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Combat System Integration FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Combat System Integration FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 Total FY 213 FY 214 FY 215 FY 216 Navy Page 1 of 24 R-1 Line Item #5 To Complete Total Total

More information

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY

More information

OPNAVINST G N09P 17 Jul Subj: MISSION, FUNCTIONS, AND TASKS OF THE BOARD OF INSPECTION AND SURVEY

OPNAVINST G N09P 17 Jul Subj: MISSION, FUNCTIONS, AND TASKS OF THE BOARD OF INSPECTION AND SURVEY DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5420.70G N09P OPNAV INSTRUCTION 5420.70G From: Chief of Naval Operations Subj: MISSION,

More information

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS)

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS) EXCERPT FROM CONTRACTS W9113M-10-D-0002 and W9113M-10-D-0003: C-1. PERFORMANCE WORK STATEMENT SW-SMDC-08-08. 1.0 INTRODUCTION 1.1 BACKGROUND WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT

More information

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 8010.13E N96 OPNAV INSTRUCTION 8010.13E From: Chief of Naval Operations Subj: DEPARTMENT

More information

Subj: SUPPLY CHAIN INTEGRATION; MARINE CORPS PARTICIPATION IN THE DEFENSE LOGISTICS AGENCY (DLA) WEAPON SYSTEM SUPPORT PROGRAM (WSSP)

Subj: SUPPLY CHAIN INTEGRATION; MARINE CORPS PARTICIPATION IN THE DEFENSE LOGISTICS AGENCY (DLA) WEAPON SYSTEM SUPPORT PROGRAM (WSSP) DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 Canc: Jan 2016 MCBul 4105 LPC-2 MARINE CORPS BULLETIN 4105 From: Commandant of the Marine

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) All Prior Years FY 212 FY 213 # Base OCO ## FY 215 FY 216 FY 217 FY 218 Navy Page 1 of 32 R-1 Line #5 To Complete

More information

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text Challenges and opportunities Trends to address New concepts for: Offensive sea control Sea based AAW Weapons development Increasing offensive sea control capacity Addressing defensive and constabulary

More information

OPNAVINST B N96 29 Jul 2014

OPNAVINST B N96 29 Jul 2014 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9200.3B N96 OPNAV INSTRUCTION 9200.3B From: Chief of Naval Operations Subj: OPERATING

More information

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities Fiscal Year 2009 National Defense Authorization Act, Section 322 Study of Future DoD Depot Capabilities Update for the DoD Maintenance Symposium Monday October 26, 2009 Phoenix, Arizona Goals For Today

More information

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3400.10G N9 OPNAV INSTRUCTION 3400.10G From: Chief of Naval Operations Subj: CHEMICAL,

More information

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012 U.S. NAVY Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned 14-15 November 2012 Jimmy Johnson Lockheed Martin Senior Fellow Lockheed Martin Mission Systems & Sensors

More information

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA UNITED STATES OF AMERICA DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA 23511-2325 CNRMCINST 4790.14 Code 300 CNRMC INSTRUCTION 4790.14 From:

More information

NOTICE OF DISCLOSURE

NOTICE OF DISCLOSURE NOTICE OF DISCLOSURE A recent Peer Review of the NAVAUDSVC determined that from 13 March 2013 through 4 December 2017, the NAVAUDSVC experienced a potential threat to audit independence due to the Department

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

S. ll. To provide for the improvement of the capacity of the Navy to conduct surface warfare operations and activities, and for other purposes.

S. ll. To provide for the improvement of the capacity of the Navy to conduct surface warfare operations and activities, and for other purposes. TH CONGRESS D SESSION S. ll To provide for the improvement of the capacity of the Navy to conduct surface warfare operations and activities, and for other purposes. IN THE SENATE OF THE UNITED STATES llllllllll

More information

DEPUTY SECRETARY OF DEFENSE 1010 DEFENSE PENTAGON WASHINGTON, DC

DEPUTY SECRETARY OF DEFENSE 1010 DEFENSE PENTAGON WASHINGTON, DC DEPUTY SECRETARY OF DEFENSE 1010 DEFENSE PENTAGON WASHINGTON, DC 20301-1010 The Honorable John McCain Chairman Committee on Armed Services United States Senate Washington, DC 20510 JUN 3 0 2017 Dear Mr.

More information

AVW TECHNOLOGIES, INC.

AVW TECHNOLOGIES, INC. AVW Technologies, Inc. is actively seeking applicants for the following positions. Please fill out an application (found at the bottom of our homepage) and submit your resume via email to dykes@avwtech.com.

More information

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 4400.11 N41 OPNAV INSTRUCTION 4400.11 From: Chief of Naval Operations Subj: HUSBANDING

More information

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK February 2018 Table of Contents The Fiscal Year 2019 Budget in Context 2 The President's Request 3 Nuclear Weapons and Non-Proliferation 6 State

More information

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014 Navy ManTech Program ManTech Update Tom Hite CTC 15 October 2014 Navy ManTech Overview Agenda CNST Recompete Update Navy ManTech Support Recompete FY16 Investment Strategy Affordability Assessment Update

More information

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 LPC MARINE CORPS ORDER 4790.18C From: Commandant of the Marine Corps To: Distribution

More information

NSWCCD-SSES SSES COMMAND OVERVIEW. 12 June Patricia C. Woody Department Head Machinery Research and Engineering

NSWCCD-SSES SSES COMMAND OVERVIEW. 12 June Patricia C. Woody Department Head Machinery Research and Engineering NSWCCD-SSES SSES COMMAND OVERVIEW 12 June 2009 Patricia C. Woody Department Head Machinery Research and Engineering Our Chain of Command Secretary of Defense Secretary of the Navy Navy Acquisition Executive

More information

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC OPNAVINST DNS-3 11 Aug 2011

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC OPNAVINST DNS-3 11 Aug 2011 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.341 DNS-3 OPNAV INSTRUCTION 5450.341 Subj: MISSION, FUNCTIONS, AND TASKS OF COMMANDER,

More information

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence OHIO Replacement Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence 1 Why Recapitalize Our SSBN Force? As long as these weapons exist, the United States will maintain a safe, secure,

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

Be clearly linked to strategic and contingency planning.

Be clearly linked to strategic and contingency planning. DODD 4151.18. March 31, 2004 This Directive applies to the Office of the Secretary of Defense, the Military Departments, the Chairman of the Joint Chiefs of Staff, the Combatant Commands, the Office of

More information

CRS Report for Congress

CRS Report for Congress CRS Report for Congress Received through the CRS Web Order Code RS21059 Updated May 31, 2005 Navy DD(X) and CG(X) Programs: Background and Issues for Congress Summary Ronald O Rourke Specialist in National

More information

ASNE Combat Systems Symposium. Balancing Capability and Capacity

ASNE Combat Systems Symposium. Balancing Capability and Capacity ASNE Combat Systems Symposium Balancing Capability and Capacity RDML Jim Syring, USN Program Executive Officer Integrated Warfare Systems This Brief is provided for Information Only and does not constitute

More information

Depot Contributions to Weapons Readiness

Depot Contributions to Weapons Readiness Depot Contributions Weapons Readiness Ship Depot Maintenance Portsmouth Naval Shipyard Norfolk Naval Shipyard Puget Sound NSY & IMF Pearl Harbor NSY & IMF DoD Maintenance Symposium RDML(S) Joseph F Campbell,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017

More information

NAVAIR Commander s Awards recognize teams for excellence

NAVAIR Commander s Awards recognize teams for excellence NAVAIR News Release NAVAIR Commander Vice Adm. David Architzel kicks of the 11th annual NAVAIR Commander's National Awards Ceremony at Patuxent River, Md., June 22. (U.S. Navy photo) PATUXENT RIVER, Md.

More information

April 25, Dear Mr. Chairman:

April 25, Dear Mr. Chairman: CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Douglas Holtz-Eakin, Director April 25, 2005 Honorable Roscoe G. Bartlett Chairman Subcommittee on Projection Forces Committee on Armed Services

More information

Abstract. Presented at the 2018 ICEAA Professional Development & Training Workshop - Proactive estimating June 2018 QinetiQ 2018

Abstract. Presented at the 2018 ICEAA Professional Development & Training Workshop -  Proactive estimating June 2018 QinetiQ 2018 Abstract Fed up with being reactive to cost estimating and forecasting requests? Had enough of being last in the queue for time and resources? Dismayed at being consulted at the last minute for an opinion

More information

Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL SPECIAL WARFARE COMMAND

Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL SPECIAL WARFARE COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 5450.221E N3/N5 OPNAV INSTRUCTION 5450.221E From: Chief of Naval Operations Subj: MISSION,

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5200.39 September 10, 1997 SUBJECT: Security, Intelligence, and Counterintelligence Support to Acquisition Program Protection ASD(C3I) References: (a) DoD Directive

More information

STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and

STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and NOT FOR PUBLICATION UNTIL RELEASED BY THE SEAPOWER AND EXPEDITIONARY FORCES SUBCOMMITTEE STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and RDML WILLIAM HILARIDES

More information

DATE: FY 2012 President's Budget February 2011

DATE: FY 2012 President's Budget February 2011 APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships (Dollars in Millions) QUANTITY End Cost Less Advance Procurement (1) BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: February 2011 P-1 LINE ITEM NOMENCLATURE

More information

Cybersecurity United States National Security Strategy President Barack Obama

Cybersecurity United States National Security Strategy President Barack Obama Cybersecurity As the birthplace of the Internet, the United States has a special responsibility to lead a networked world. Prosperity and security increasingly depend on an open, interoperable, secure,

More information

ARS 2004 San Diego, California, USA

ARS 2004 San Diego, California, USA ARS 2004 San Diego, California, USA The Challenge of Supporting Aging Naval Weapon Systems RDML Michael C. Bachman Assistant Commander for Aviation Logistics Naval Air Systems Command PRESENTATION SLIDES

More information

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved United States Government Accountability Office Report to Congressional Committees June 2018 F-35 JOINT STRIKE FIGHTER Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 6015.17 January 13, 2012 Incorporating Change 1, November 30, 2017 SUBJECT: Military Health System (MHS) Facility Portfolio Management References: See Enclosure

More information