CENTRAL LINE ASSOCIATED BLOOD STREAM INFECTION PREVENTION PROJECT FINAL REPORT JULY 2012

Size: px
Start display at page:

Download "CENTRAL LINE ASSOCIATED BLOOD STREAM INFECTION PREVENTION PROJECT FINAL REPORT JULY 2012"

Transcription

1 CENTRAL LINE ASSOCIATED BLOOD STREAM INFECTION PREVENTION PROJECT FINAL REPORT JULY

2 EXECUTIVE SUMMARY... 3 BACKGROUND... 5 ANZICS CLABSI PREVENTION PROJECT... 6 Project Aims... 6 Project Management... 6 PREPARATION - COMMUNICATION AND CONSULTATION... 7 ACSQHC Committees... 7 Jurisdictional Safety & Quality Departments, Surveillance Bodies... 8 ICU Directors and Nurse Unit Managers... 9 Hospital Infection Control Departments Reference/Expert Groups Conference Presentations Newsletters Overall Impressions PREPARATION - INFRASTRUCTURE Surveillance National Database and Reporting ANZICS Central Line Insertion and Maintenance Guideline Checklist & compliance calculator Other material Website LAUNCHES Tasmania: November Perth: December Alice Springs: January Victoria: February Adelaide: February New South Wales: April Queensland: May Launch evaluation Overall impressions THE FUTURE CONCLUSIONS

3 EXECUTIVE SUMMARY The true incidence of Central Line Associated Bloodstream Infections in Australian intensive care units is unknown; however the cost in morbidity and healthcare dollars was high. Surveillance existed, but was inconsistent and the results variably reported to clinicians. Prevention strategies targeting central line insertion techniques had previously had the most success, both in Australia and overseas and formed the basis for this project. However this was later expanded to include guidelines on central line maintenance. In 2010 The Australian and New Zealand Intensive Care Society (ANZICS) was awarded funding to undertake the ANZICS CLABSI Prevention Project. The project included public and private, adult and paediatric ICUs across Australia, but excluded NSW and ACT public ICUs as they were involved in a similar project in The aims of the project were to facilitate a process for accurate and consistent measurement and reporting of CLABSI in ICUs throughout Australia, implement an agreed, evidence- based approach to reduce CLABSI in all Australian ICUs to <1/1000 line days achieve the above by building on existing processes where possible As an adjunct to the CLABSI Prevention Project, the ANZICS Centre for Outcome and Resource Evaluation was granted funding to establish a national CLABSI database and reporting system (see separate report). A senior intensive care nurse was appointed as fulltime project manager, and the chair of the steering committee provided medical input on an ad- hoc basis. There was widespread communication and consultation with stakeholders at the beginning of the project. This included surveys of intensive care directors and nurse unit managers, infection control practitioners, and jurisdictional surveillance bodies; these were followed by face- to- face meetings. These meetings both informed project design, and introduced the idea of change. There were also close links with various Commission committees; and an infectious diseases expert group was convened to advise on areas were there was insufficient or out- dated evidence. There was some reticence/caution both from ICU staff and jurisdictions, especially where a significant amount of change would be required. However the overall response was remarkably positive, and engendered confidence that the project would be successful if a respectful, patient and inclusive approach was taken. Within the intensivist group there was also a significant degree of scepticism about adopting tools designed for an American audience, and the bundle concept was particularly unpopular. These responses emphasised the importance of tailoring the project to an Australian setting, and using language with which people were familiar and comfortable; the term bundle was therefore omitted, and words such as policy, protocol, and guideline were adopted. The Commission s Healthcare Associated Infection Technical Working Group included CLABSI surveillance in its workplan, resulting in a national CLABSI definition and Implementation Guide for Surveillance of Central Line Associated Bloodstream Infection based on the US Center for Disease Control and Prevention (CDC), National Healthcare Safety Network (NHSN) surveillance process. All 3

4 jurisdictions were gradually changing to the national definition, allowing them to submit data to the national CLABSI database and reporting system. An assortment of tools were developed to assist with project implementation at unit level: the ANZICS Central Line Insertion and Maintenance Guideline, an Insertion Checklist, a checklist compliance calculator, powerpoint presentations and surveillance information. All these were made available on a specific website that also provided a discussion forum for clinicians to share ideas. The prevention part of the project was launched in late 2011/early The launches followed much the same pattern, but were adapted according to the size and jurisdiction of the audience. The response to the launches was very positive, both on the day and in the subsequent evaluation, with the presentations from local ICUs about their strategies to prevent CLABSI being particularly well- received. The changes implemented during the project were intended to be sustainable, with the Executive Officer of the ANZICS Safety and Quality Committee providing ongoing support, and project materials available on the website. Due to delays in implementation of the Prevention Project and establishment of the national database, it is not yet possible to say whether the aim of reducing CLABSI in all Australian ICUs to <1/1000 line days was achieved, however the other aims were achieved. The ANZICS CLABSI Prevention Project was a successful national quality improvement project lead by a professional organisation with backing from the Australian Commission on Safety and Quality in Healthcare. This successful cost- effective model is recommended for future quality improvement interventions that target clinician behaviour. 4

5 BACKGROUND Patients in intensive care units (ICU) are at high risk of developing healthcare associated infections (HAI), with 20-30% of all HAIs occurring in ICU; one of the most important and common ICU HAIs is central line associated blood stream infection (CLABSI). A recent Australian paper suggested an episode of CLABSI in intensive care results in an extra 10 days in hospital and costs at least an extra $14,000 to treat 1. Attributable mortality varies across the literature from 4-20% 2. In spite of the significant impact of CLABSI on morbidity and mortality, length of stay and cost, its true prevalence throughout Australia is unknown. Surveillance has developed on an ad- hoc basis, with collection methods, definitions, analysis and feedback mechanisms differing widely between, and within jurisdictions. As a result, there has been little opportunity for broader benchmarking or sharing of successful CLABSI infection control strategies. Preventative measures against CLABSI have been well documented in the literature over the last fifteen years, but uptake has been inconsistent. However, recently there has been increasing success with strategies involving the bundle concept first touted by the American Institute for Healthcare Improvement (IHI). The bundles consist of several evidence- based steps that must be completed for each procedure. To further enhance bundle uptake, the IHI recommends the Collaborative model, whereby a large number of ICUs are invited to participate in a program of quality improvement, and encouraged to engage in shared problem- solving and benchmarking. The best- known example of this approach for CLABSI reduction is the work done by Pronovost et al 3 in which a collaborative cohort study of 108 ICUs decreased their median rate of CLABSI from 2.7/1000 catheter days to 0 (mean from 7.7/1000 catheter days to 1.4/1000 catheter days) in an 18 month period. Importantly, the decreased rate of infection was sustained over a further 18- months 4. Subsequent CLABSI reduction strategies based on this approach, termed were successfully adopted with local adaptations in England ( Matching Michigan ), Spain and Peru among others. In Australia the most recent example was the NSW CLAB- ICU Project in The NSW CLAB- ICU Project enlisted 38 ICUs throughout the state, and over 15 months demonstrated a decrease in CLABSI from a mean of 3/1000 line days to 1.2/1000 line days. The project was underpinned by a simple evidence- based guideline for central line insertion, and a central data repository that interpreted data for contributors and provided timely feedback. 1 Halton KA, Cook D, Paterson DL, Safdar N, Graves N (2010) Cost- Effectiveness of a Central Venous Catheter Care Bundle. PLoS ONE 5(9): e12815.doi: /journal.pone Harrington G, Richards M, Solano T, Spelman D, Adult intensive care unit acquired infection, in Cruickshank M & Ferguson 2 Harrington J eds, G, Richards Reducing M, Harm Solano to Patients T, Spelman from D, Health Adult Care intensive Associated care unit Infections: acquired The infection, Role of Surveillance, in Cruickshank Australian M & Commission Ferguson J eds, on Reducing Safety and Harm Quality to Patients in health from Care, Health 2008 Care Associated Infections: The Role of Surveillance, Australian 3 Commission Pronovost P, on Needham Safety and D, Quality Berenholtz in health S, Sinopoli Care, 2008 D, Chu H, Cosgrove S, Sexton B, Hyzy R, Welsh R, Roth G, Bander J, Kepros 3 Pronovost J, Goeschel P, Needham C. An Intervention D, Berenholtz to S, Decrease Sinopoli D, Catheter- Related Chu H, Cosgrove Bloodstream S, Sexton B, Infections Hyzy R, Welsh in the R, ICU. Roth New G, Bander England J, Journal Kepros J, of Goeschel Medicine C. 2006, An Intervention Vol 355, No to 26 Decrease Catheter- Related Bloodstream Infections in the ICU. New England 4 Journal Pronovost of Medicine P, Goeschel 2006, C, Vol Colantuoni 355, No E, 26 Watson S, Lubomski LH, Berenholtz SM, Thompson DA, Sinopoli D, Cosgrove S, Sexton 4 Pronovost JB, Marsteller P, Goeschel JA, C, Hyzy Colantuoni RC, Welsh E, Watson R, Posa P, S, Schumacher Lubomski LH, K, Berenholtz Needham SM, D. Sustaining Thompson reductions DA, Sinopoli catheter D, Cosgrove related S, bloodstream Sexton JB, Marsteller infections JA, in Hyzy Michigan RC, Welsh intensive R, Posa care P, units: Schumacher observational K, Needham study.bmj D. Sustaining 2010; 340:c309 reductions in catheter related 5 bloodstream Harrington G, infections Richards in M, Michigan Solano T, intensive Spelman care D, Adult units: observational intensive care study.bmj unit acquired 2010; infection, 340:c309 in Cruickshank M & Ferguson J eds, Reducing Harm to Patients from Health Care Associated Infections: The Role of Surveillance, Australian Commission on Safety and Quality in health Care,

6 ANZICS CLABSI PREVENTION PROJECT In 2008 the Australian Commission on Safety and Quality in Health Care (ACSQHC) 5 recommended a mandatory continuous national surveillance system to collect and report on an agreed minimum dataset for central line associated blood stream infections in all ICUs Australian expert consensus is required to agree on national definitions for central line associated blood stream infections... Following publication of this document, the ACSQHC HAI Advisory Committee endorsed the establishment of a national CLABSI prevention project and development of a national CLABSI surveillance system. In early 2010 The Australian and New Zealand Intensive Care Society (ANZICS) was awarded funding for one year to undertake the ANZICS CLABSI Prevention Project; this was subsequently extended for a further year until the end of June The project included public and private, adult and paediatric ICUs across Australia, but excluded NSW and ACT public ICUs as they had recently been involved in the NSW project. Project Aims The aims of the project were to facilitate a process for accurate and consistent measurement and reporting of CLABSI in ICUs throughout Australia, implement an agreed, evidence- based approach to reduce CLABSI in all Australian ICUs to <1/1000 line days achieve the above by building on existing processes where possible As an adjunct to the CLABSI Prevention Project, in early 2011 the ANZICS Centre for Outcome and Resource Evaluation (CORE) was granted funding to establish a national CLABSI database and reporting system (see separate report). Project Management The project was conducted under the auspices of the ANZICS Safety and Quality Committee which also acted as the project steering committee. This committee was comprised of intensivists from all Australian states, and a representative from the Australian College of Critical Care Nurses (ACCCN). The Safety and Quality Committee was guided by Terms of Reference that included To lead and participate in the development and distribution of suitable tools for the monitoring of... safety and quality in intensive care practice. To assist in the development of comparative measures which allow intensive care services to evaluate their performance against other similar services and national desirable benchmarks To promote membership participation in the use of such appropriate means for measuring and comparing practice safety and quality This group therefore had the knowledge, influence and mandate to help implement sustainable CLABSI prevention strategies in Australian ICUs. The impact of the Safety and Quality Committee was 5 Harrington G, Richards M, Solano T, Spelman D, Adult intensive care unit acquired infection, in Cruickshank M & Ferguson J eds, Reducing Harm to Patients from Health Care Associated Infections: The Role of Surveillance, Australian Commission on Safety and Quality in health Care,

7 also strengthened by its chairman having been the project director and clinical lead of the NSW CLAB- ICU Project. In addition, the ANZICS Safety and Quality Committee had a strong history of achievement, with one of its major endeavours being the annual International Conference on Safety, Quality, Audit & Outcomes Research in Intensive Care, 2012 being its sixth year. An intensivist was employed as medical lead for one day per week, however when he resigned after five months, it was decided to proceed with the chair of the steering committee acting in this capacity as required. A senior intensive care nurse was appointed as the fulltime project manager for the duration of the project. She had recent experience both as a clinician and manager in tertiary ICUs, experience with research, and a well- established network of medical and nursing colleagues across the country. This model differed from other CLABSI projects, especially those in the USA and England, where the leader was clearly a doctor, and a much greater pool of human and material resources were allocated. Much of the success of this model was due to the seniority and clinical credibility within intensive care, of both the Project Manager and the steering committee chair. PREPARATION - COMMUNICATION AND CONSULTATION The success of any project largely depends on communication. Most stakeholders were identified at the commencement of the project, however the list was modified as more accurate information was collected; stakeholders included Australian Commission on Safety and Quality in Health Care (ACSQHC) o Healthcare Associated Infection (HAI) Advisory Committee: members were predominantly doctors working in infectious diseases and/or microbiology o o Implementation Committee: members were infection control practitioners (ICP) Technical Working Group (TWG): members were from a range of professions, but all working in jurisdictional surveillance bodies Membership for all the above committees covered all jurisdictions. Jurisdictional Quality and Safety Departments and Surveillance Bodies. ICU Directors and Nurse Unit Managers Hospital Infection Control Departments Expert Infectious Diseases (ID) Group. ACSQHC Committees HAI Advisory Committee The HAI Advisory Committee provided important information on jurisdictional matters, and the necessary links to inform project development and design. As CLABSI data is primarily collected and held at jurisdictional level, and several jurisdictions had previously established CLABSI strategies, the HAI Advisory Committee was vital in facilitating negotiations concerning the development and implementation of the project. HAI Implementation Committee The ANZICS project emphasised the importance of inter- disciplinary collaboration. Feedback from the NSW CLAB- ICU project identified inadequate communication with infection control practitioners (ICP) as a significant issue, so the Implementation Committee provided an invaluable link with senior 7

8 ICPs, which was a key factor in encouraging their colleagues early engagement in the project, and thereby avoiding the problems experienced in NSW. HAI Technical Working Group The work of the HAI TWG was primarily to develop documents to assist with national standardisation of specific surveillance processes. In mid 2010 the group included CLABSI in their work plan, and invited the ANZICS Project Manager to join their monthly teleconferences. A national CLABSI definition was ratified in early 2011 and posted on the ACSQHC website, and a consultation edition of the Implementation Guide for Surveillance of Central Line Associated Bloodstream Infection was posted in early December 2011; the final version was pending at the time of this report. Project Manager involvement The project manager attended HAI Advisory Committee and Implementation Committee meetings in person for the first half of the project, and subsequently attended via teleconference. This reporting structure facilitated early support of all the above ACSQHC committees, which undoubtedly contributed to the positive response to the project. Jurisdictional Safety & Quality Departments, Surveillance Bodies Over the previous five to ten years, many jurisdictions had tried to address the issue of central line associated blood stream infections. These projects were usually conducted under the auspices of jurisdictional Quality Departments and/or Surveillance Bodies, and had varying degrees of success; most notable of these was probably the national Safer Systems Saving Lives campaign. It was important to engage with all these bodies at the outset of the project, and to be mindful of previous projects and their outcomes, as well as current processes around surveillance; and most importantly, to gain their support for a long- term process of consistent national data collection, which would involve significant practice changes for some. In April/May 2010, surveillance bodies were asked to provide information on their CLABSI surveillance processes; this revealed: Only three jurisdictions used the same CLABSI definition There was no central CLASBI data collection in Tasmania or the Northern Territory CLASBI surveillance in the private sector varied widely Local reporting and benchmarking varied significantly between jurisdictions, with ICU clinicians in only two jurisdictions receiving timely and relevant information about their CLABSI rate There was no avenue for paediatric ICUs to benchmark There was no national reporting or benchmarking Where surveillance was undertaken, the majority of data was collected by ICPs, but a significant number of ICUs assisted with the process. The Project Manager subsequently visited each of the jurisdictional surveillance bodies to provide them with information about the ANZICS project, and learn more about their surveillance processes. These meetings laid the groundwork for further discussions during the project, and the construction of a national database. Information was also sent to heads of the jurisdictional quality departments, and several took the opportunity to meet with the Project Manager. 8

9 ICU Directors and Nurse Unit Managers Active opposition and non- engagement of intensivists was identified as a major risk to the project, and it was thought the Medical Lead would have a substantial role in engaging and placating this group. Luckily, these fears ended up being unfounded. Similarly, the ICU director s influence meant it was vital they were engaged in the project. Ideally they would lead the project within their ICU, however as long as they were known to fully support the project, it was hoped the project would be successful. The role of the NUM is usually more subtle. However their engagement in the project was just as important, especially given the large numbers of nurses who would need to be educated about the project, and encouraged to intervene should the proceduralist not follow the guidelines. Antagonism was not anticipated from this group, nevertheless their engagement would be easier if the project was supported by the ICU Director. This was demonstrated at the very end of the project when a NUM who had not previously shown interest, enquired how to submit data - the ICU director had recently changed and he received the last project update the previous day. It was identified that communication and consultation with this group would need to be honest and concise, with any suggestions/claims being well substantiated. Conversely, if there was little evidence to support a certain practice, this should be acknowledged, with clear reasons why it was suggested. The project team would need to be consultative and flexible. Communication with ICU directors and nurse unit managers (NUMs) started very early. As an ANZICS project, contact details for all Australian ICU directors and NUMs were immediately available, and in April 2010 a survey was sent to all ICU directors and NUMs (excluding NSW and the ACT) to ascertain current practice around central line insertion, and their understanding of CLABSI surveillance. Considering the length of the survey (45 questions), the response rate was exceptionally good: 63 individual responses (total sent 178) representing 53 out of 164 ICUs. Responses to ICU Directors & NUMs Survey Surveys to ICU Dir NT Qld SA Tas Vic WA Total & NUM Sent Returned (%) 3 (100) 20 (28) 6 (27) 2 (29) 26 (45) 6 (35) 63 (35) The survey included six specific elements of the insertion process that had been prescribed in previous insertion guidelines and were intended to be recommended in the ANZICS insertion process: inclusion in local protocols varied from 41% to 100%. These results provided forewarning of the areas that would be contentious hats and full- body draping. Element Inclusion in protocol wear hat 43% wear mask 43% Chlorhexidine handwash 88% sterile gown & gloves 100% Chlorhexidine & alcohol skin preparation 100% full- body draping 41% 9

10 Knowledge about CLABSI surveillance also varied considerably, with only 54% of respondents in ICU knowing that pulmonary artery catheters and temporary dialysis catheters were classified as a central line for the purposes of CLABSI surveillance. Hospital Infection Control Departments Communication between ICU and hospital- based Infection Control/ID departments varied considerably between institutions and jurisdictions. In some ICUs, ID consultants did regular ward rounds of ICU patients and/or provided advice on sources of infection and appropriate treatment. Infection control departments often performed CLABSI surveillance, however reporting methods and frequency varied considerably, especially in regard to reporting back to ICU clinicians. Although not specifically stated as an objective of this project, a high degree of consultation and collaboration was encouraged, as it supports optimum CLABSI diagnosis and treatment, and increases awareness of its incidence. Input from infection control was therefore valued and promoted in this project. Contact with this group was initially difficult, and in the first instance relied on responses to the survey sent to directors and NUMs, that provided 45 ICP addresses. The same survey as above was sent to them, but only yielded ten responses, although several replied they had contributed to the director s or NUM s survey. Once meetings had occurred with the surveillance bodies and the HAI Implementation Committee, they were helpful in providing links to ICPs, and their subsequent interest in general, and attendance at the launches was significantly better. Reference/Expert Groups It was initially envisaged there would be two types of expert group, 1. CLABSI definition and prevention groups that would provide information on existing local CLABSI prevention strategies and advice on the implications of local culture. 2. A surveillance group that would provide information on local surveillance data collection and management processes, and advice on how they may be integrated into a national process. The roles of the respective groups altered when the HAI TWG incorporated CLABSI surveillance into their work plan, and it became clear the surveillance data would primarily be submitted to the national database by jurisdictional surveillance bodies. The groups became jurisdictional reference groups, and an expert ID group. Reference Groups Expressions of interest were sought from all ICU directors and NUMs, and associated ICPs to join reference groups in most jurisdictions. These groups were deliberately small (six to twelve people), but in general, there was a good mix of public and private ICU staff, and ICPs. Meetings with the Project Manager were held in Brisbane, Hobart, Burnie, Melbourne, Adelaide and Perth. These groups provided invaluable insight into how each jurisdiction was slightly different, both in processes and inter- departmental relationships. Expert ID Group This group was convened in late 2010 when it became apparent there was insufficient or outdated evidence in the literature regarding several aspects of central line maintenance. The group comprised specialists in infectious diseases, one of whom was closely involved in CLABSI surveillance; an intensivist and a nurse researcher, both with expertise in central lines. The group was drawn from four jurisdictions. 10

11 The group provided advice on issues such as disconnecting and reconnecting administration sets and/or dialysis circuits, re- wiring of existing lines, and replacement of lines if inserted under emergency conditions. The process worked very well, with only one meeting via teleconference. The group was also invited to comment on the final document, and provided valuable suggestions. Conference Presentations The Project Manager was fortunate in being able to present the project at various conferences around Australia, and therefore increase the reach of the project Poster, ANZICS & ACCCN Annual Scientific Meeting on Intensive Care. Free paper, Infection Control Odyssey, Australian Infection Control Association Invited speaker, 5 th International Congress of the Asia Pacific Society of Infection Control Invited speaker, Annual Seminar, Victorian Infection Control Professionals Association Invited speaker, Australian Society for Infectious Diseases Annual Scientific Meeting Importantly, delegates included infection control personnel from the Asia Pacific region as well as Australia. And at the intensive care meeting, a delegate from England commented he thought the ANZICS project much simpler than the one he had been involved in. Newsletters Reports on the project were published in quarterly editions of the ANZICS newsletter The Intensivist. In addition, due to the presence of an ACCCN representative on the steering committee, reports were also published in two editions of the ACCCN newsletter Critical Times. It was originally planned to send quarterly project updates to all stakeholders; however as progress slowed, it was decided not to send material that was not particularly useful, although communication continued with specific groups to keep them informed. One- page Updates were sent to all stakeholders in January 2011 and June Overall Impressions As expected, there was some reticence/caution both from ICU staff and jurisdictions, especially where a significant amount of change would be required. However the overall response was remarkably positive, and engendered confidence the project would be successful if a respectful, patient and inclusive approach was taken. Within the intensivist group there was also a significant degree of scepticism about adopting tools designed for an American audience, and the bundle concept was particularly unpopular. These responses emphasised the importance of tailoring the project to an Australian setting, and using language with which people were familiar and comfortable; the term bundle was therefore omitted, and words such as policy, protocol, and guideline were adopted. To further emphasise the project as being Australian, the launch presentations included anecdotes the audience could recognise, and where possible, local ICU staff were asked to share their experiences; these sessions were rated very highly in subsequent launch evaluations. 11

12 PREPARATION - INFRASTRUCTURE Surveillance As well as being one of the aims of the project, the establishment of a national CLABSI database and reporting system provided further impetus for a consistent national CLABSI definition and surveillance process to be developed. As most jurisdictions were already using a version of the US Center for Disease Control and Prevention (CDC), National Healthcare Safety Network (NHSN) surveillance definition, the TWG decided to use the most recent CDC NHSN definition (2008), and also base the Implementation Guide for Surveillance of Central Line Associated Bloodstream Infection on the CDC NHSN processes. The definition was readily agreed upon, however it took more than eighteen months to achieve consensus within the group on the implementation guide. All jurisdictions gradually changed to the national definition, however where surveillance was not already being performed, the delay in the implementation guide slowed its commencement. Similarly, data could not be entered into the national database until it was collected using the same/national definition. For those ICUs where CLABSI surveillance was not already established, an overview of surveillance processes and specific tools to assist in data collection were included on the website. National Database and Reporting It was originally intended the reporting system would be similar to the one developed for the NSW CLAB- ICU project, where data was entered at hospital level, and real- time reports would be generated in a process control chart. However after discussions with the jurisdictional surveillance bodies, it became apparent there were already very efficient data collection systems in place in most jurisdictions, and it would be foolish to create a duplicate process. In addition, unlike the NSW project, data forwarded to a national database would only be identified to hospital/icu level, therefore making audit almost impossible, as it required patient identification information only available at jurisdictional level. The jurisdictions could also undertake other quality control processes, as well as ICP education, that would not be possible otherwise. The disadvantage to this process was that reports would not be real- time. In mid 2011 most jurisdictional heads granted conditional permission for public ICU CLABSI data to be submitted to the national database, and negotiations with the fourteen private sector providers and NSW was proceeding at the time of this report. General information about the reports was included on the website, with a link to CORE to obtain further details re data submission. Details of the database development and functions were submitted in a separate report from ANZICS CORE. ANZICS Central Line Insertion and Maintenance Guideline Like most other CLABSI reduction programs, the original focus of the ANZICS project was the central line insertion process. Insertion is a discrete event, and compliance with an insertion checklist can easily be calculated, and therefore provide a simple marker for quality improvement interventions. However, results from the NSW project suggested the protective effect of optimum insertion 12

13 practices only lasts up to seven to nine days 6. In addition, there are reports in the paediatric literature suggesting gains from optimising central line insertion practice are not as marked as in the adult population, unless coupled with careful attention to maintenance practices 7. The ANZICS project therefore developed comprehensive maintenance guidelines to complement the insertion guideline and checklist. Although this project was based on introducing an insertion guideline developed for NSW ICUs, that was also largely consistent with guidelines in other successful CLABSI prevention programs, it was essential all recommendations be evidence- based if possible. This raised a dilemma in several instances: new evidence suggested an addition to the insertion process, the literature was out- dated eg. contemporary insertion practice had rendered a 2011 CDC recommendation inaccurate as their reference was twenty years old. respected organisations had based their recommendations on each other s recommendations rather than the original evidence that suggested a slightly different approach there was nothing in the literature regarding the topic These scenarios were the basis of the deliberations by the ID Expert Group, and resulted in a document that is based on the most current evidence at the time, but in some instances, may not be in line with other organisations recommendations. Checklist & compliance calculator The insertion checklist was developed with 10 key steps to observe maximal barrier precautions and aseptic technique, with the capacity to add or delete other information as desired. It included a reminder that the assistant/observer should inform the proceduralist if he/she breaches the sterile field. The compliance calculator was then designed for easy data input and calculation of compliance with the key items. Although compliance with the checklist is emphasised in much of the literature, collecting and collating this data can be time- consuming and onerous unless specific time is dedicated to it. In keeping with making the ANZICS CLABSI Prevention Project activities sustainable, rather than collecting data on all central lines inserted, it was suggested auditing compliance with the insertion checklist be undertaken at least three times per year for a month and when CLABSI rates rose. Other material A significant deterrent to implementing change for a large group, especially if it is not specifically funded, is the amount of work required; much of which is developing the materials for staff education. The ANZICS CLABSI Prevention Project therefore provided powerpoint presentations that could be adapted to local circumstances, as well as the Project Team s launch presentations; several of the local speakers also consented to their presentations being accessible on the website. 6 McLaws ML, Burrell AR. Zero risk for central line- associated bloodstream infection: are we there yet? Crit Care Med Feb;40(2): Miller MR, Griswold M, Harris JM 2nd, Yenokyan G, Huskins WC, Moss M, Rice TB, Ridling D, Campbell D, Margolis P, Muething S, Brilli RJ. Decreasing PICU catheter- associated bloodstream infections: NACHRI's quality transformation efforts. Pediatrics Feb;125(2): Epub 2010 Jan

14 Website The website was intended as the primary source of information and resources for the ANZICS CLABSI Prevention Project. Unfortunately it was very delayed due to several issues, primarily involving the vendor. Nevertheless, the response from ICU staff was very encouraging when it was finally launched, with the following message from an ICU NUM: Congratulations on a job well done! You have managed to make a somewhat dry topic very interesting, interactive and manageable LAUNCHES The term launch was adopted to convey a sense of excitement, rather than workshop or learning session which imply people will have to work. Between mid November 2011 and March 2012 launches were conducted in Hobart, Melbourne, Perth, Alice Springs and Adelaide; launches in Brisbane and NSW were in May Launches were initially intended to be about six hours, however when only a few people registered, they were decreased to three hours with a tea break to allow conversation. Subsequent feedback via the on- line evaluation was that this was the ideal length. The launches followed much the same pattern, but were adapted according to the size and jurisdiction of the audience. The Project Manager attended all launches in person, and the chair of the steering committee attended all except Alice Springs, either in person or via teleconference. The presentations emphasised how easily the project could be implemented with very little effort, and did not include language and processes with which ICU staff would be unfamiliar, eg. quality improvement or plan/do/study/act cycles. The methodology was: Measure CLABSI (this would involve new processes for some) Incorporate changes into usual practise Measure CLABSI and review individual cases (ICU & Infection control +/- ID) Check insertion compliance as required Keep measuring and reviewing CLABSI Tasmania: November 2011 At the time there was no co- ordinated approach to CLABSI surveillance in Tasmania, but some hospital- based surveillance occurring. The launch was held in Hobart at the Tasmanian Infection Prevention and Control Unit (TIPCU) and attended by 15 people 10 attended in person, 5 via video- link ICU/HDU RNs: 6, ICPs: 6, Doctors: 3 three of four ICUs, Mersey High Dependency Unit and TIPCU were represented Several of the people who attended the reference group meeting the previous year attended the launch, so the proposals were not new. In general there was enthusiasm for the project; they were keen to commence surveillance as soon as the implementation guide was available, and start the infection prevention part soon afterwards. 14

15 Perth: December 2011 In 2006 all WA public ICUs were involved in the Safety and Quality Investment for Reform (SQuIRe), Clinical Practice Improvement (CPI) Program that included a CLABSI reduction component. By the end of 2010, CLASBI surveillance and reporting was mandatory in all public and specific private ICUs, and the combined CLABSI rate for was 0.55/1000 line days. Given the WA rate for CLABSI was already at the target of the ANZICS CLABSI Prevention Project, this launch was specifically advertised as being for new staff, or units that had not been involved in the SQuIRe CPI program either new ICUs or those in the private sector. It was hosted by the Communicable Disease Control Directorate (CDCD) and attended by 15 people ICU RNs: 4, ICPs: 6, Doctors: 2, Quality Managers: 3 nine of twelve ICUs and the CDCD represented Alice Springs: January 2012 Given there was only one ICU in Alice Springs, this launch was more informal, consisting of a discussion with the director and NUM, and a presentation to staff. In all, there were 4 Doctors, 7 RNs, 1 ICP and a pharmacist. The ICU director, ICU NUM and ICP were keen to implement the project, and subsequently made contact with the Project Manager for further advice. Victoria: February 2012 Since 2003 CLABSI surveillance had been co- ordinated by the Victorian Healthcare Associated Infection Surveillance System (VicNISS) in most public Victorian ICUs, with well- established mechanisms for ICU staff to receive reports. Some ICUs had already battled elevated rates, so there was a high degree of knowledge within the public sector staff. The most popular presentations were the ones by staff from an ICU that had managed an unacceptable CLABSI rate. The launch was held at the Department of Health 48 attended: 7 doctors, 18 ICU RNs, 21 ICPs, 2 Quality Managers 20 of 36 ICUs and VicNISS represented Adelaide: February 2012 Specific CLABSI surveillance was not previously performed in Adelaide ICUs, so undertaking this project involved changes in many departments. However, having previously met with several stakeholders, and given them time to consider how the changes might be implemented, the responses at the launch were encouraging. The launch was held at the Department of Health 30 attended: 7 Doctors, 7 ICU RNs, 2 CVC CNCs, 14 ICPs ten of twelve ICUs represented New South Wales: April 2012 This launch was only intended for private ICUs as they had not been well represented in the NSW CLAB- ICU project in , and permission had not yet been granted for NSW public ICU CLASBI surveillance data to be submitted to the national database. The launch was held at the ACSQHC attended by 6 people: 5 ICU RNs, 1 ICP three of sixteen ICUs represented 15

16 Although the people who attended were very enthusiastic, the number was disappointing. It was not clear why this was so, however the NSW CLAB- ICU project involved a significant amount of data collection for ICU staff, and perhaps it was not clearly enough stated the ANZICS CLABSI Prevention Project did not require the same amount of data collection, despite the prevention intervention being much the same. Queensland: May 2012 Similar to SA, specific CLABSI surveillance was not previously performed in Queensland ICUs, so undertaking this project involved changes for many people over a large geographic area. However, having previously met with staff from the Centre for Healthcare Related Infection Surveillance and Prevention (CHRISP), they were able to incorporate surveillance changes when they implemented new computer software; the ANZICS Prevention Project launch was scheduled to accommodate this. Although there was no specific ICU CLABSI reporting, many ICUs were involved in the Department of Health, Safety and Quality Unit, Clinical Practice Improvement Program to decrease CLASBI using a central line insertion checklist. The ANZICS Project Manager developed a strong working relationship with the coordinator of the State- wide Intensive Care Clinical Network (SICCN) at the beginning of the project, and was able to make suggestions about the contents of the checklist. In addition, the ANZICS Project Manager was invited to two SICCN meetings in 2010, one of which was attended by directors and NUMs from the majority of Queensland ICUs, including rural units. These activities resulted in a high proportion of Queensland ICUs already following many of the ANZICS recommendations by the time of the official launch in The formal launch of the ANZICS CLABSI Prevention Project was held at the Centre for Clinical Research 47 attended: 4 Doctors, 27 ICU RNs, 16 ICPs 20 of 35 ICUs, CHRISP and the SICCN were represented Responses were guarded until it was made clear data collection was minimal and tools had been provided. Launch evaluation A short on- line anonymous evaluation was sent to participants at the larger launches; 125 surveys were sent and 38 responses received. The response rates were Queensland: 23%, Victoria: 33% and South Australia: 37%, with almost equal numbers of ICU RNs and ICPs. Length of launch 3 hours Only one person said the launch was too short, and three people said it was too long, leaving 89% who thought it was about right. What topics would you like to have heard more about? This was a free text question with most responses falling into the categories of either information about the website, or examples of how specific processes would be done. What topics would you like to have heard less about? There were no responses to this question 16

17 Usefulness of information Categories Response count Response % (of all responders) Not at all 0 0 Slightly useful Moderately useful Very useful Extremely useful What other comments/suggestions would you like to make? This was a free- text question that elicited 20 responses, four typical responses were: The day was great, need to know, easy to digest and I found it extremely useful I thought it covered the topic well. Had both why the need for change and had information from a hospital that implemented change to address how you might implement change. Well done; we are fortunate that both ICU & Inf Control staff attended this - always gives us the same sense of direction for specific projects. Excellent Seminar. Unsolicited feedback via to the project Manager included: Thank you for such thorough planning and information I really enjoyed the workshop. It was fantastic. Well done. I now have lots of ideas. Congratulations on all the amazing work and enthusiasm you have channelled into CLABSI. Your hard work has made this concept a lot more accessible and digestible for novices like me. Overall impressions The response to the launches was very positive; recognising those who attended were most likely the converted. Nevertheless, participants asked challenging questions, especially about the validity of certain recommendations, and the presenters were always honest in their answers and acknowledged when the evidence was scant. Most importantly, the Project Team provided clinical examples the audience recognised. The presentations from local ICUs about their strategies to prevent CLABSI were particularly well- received, and would have enhanced other launches had their inclusion been possible. THE FUTURE The Project Manager role concluded at the end of June 2012, however it was always intended the changes implemented during the project should be sustainable. The Project Manager therefore worked closely with the Executive Officer of the ANZICS Safety and Quality Committee to enable her to provide ongoing support for the project. She will ensure the website material is kept up- to- date, field enquiries about the project, and provide assistance where possible. She also has a background as an intensive care nurse, and can draw upon the expertise of the ANZICS Safety and Quality Committee as necessary. The Executive Officer of the ANZICS Safety and Quality Committee will provide guidance about how CLABSI surveillance is conducted, but all aspects of data submission to the national ANZICS CLABSI database and access to reports, will be managed by ANZICS CORE. 17

18 CONCLUSIONS The ANZICS CLABSI Prevention Project was a successful national quality improvement project lead by a professional organisation with backing from the Australian Commission on Safety and Quality in Healthcare. Due to delays in implementation and establishment of the national database, it is not yet possible to say whether the aim of reducing CLABSI in all Australian ICUs to <1/1000 line days was achieved, however the other aims to facilitate a process for accurate and consistent measurement and reporting of CLABSI in ICUs throughout Australia, implement an agreed, evidence- based guideline were achieved with the added benefit of building on many existing processes. Although based on similar projects both within Australia and overseas, there were several specific factors that contributed to this project s success and acceptance Access to high- level committees through the ACSQHC that facilitated the development of an agreed national CLABSI surveillance process Input from ICU, infection control and the jurisdictional surveillance bodies was sought at the outset to inform content and approach The content and language was tailored to an Australian audience There was an emphasis on simplicity and building on existing processes Collaboration between ICU and Infection Control was encouraged The Project Team were experienced clinicians in the field of intensive care and therefore had credibility with the target audience, and knew how to communicate with them Tools were provided to assist implementation at a unit level Guidelines were based on the best evidence or expert opinion available This successful cost- effective model is recommended for future quality improvement interventions that target clinician behaviour. Gabrielle Hanlon Project Manager ANZICS CLABSI Prevention Project Tony Burrell Chair ANZICS Safety and Quality Committee 18

Patricia Church, MSN, RN, PCNS-BC, CPON Bernice Mowery, PhD, PNP, RN

Patricia Church, MSN, RN, PCNS-BC, CPON Bernice Mowery, PhD, PNP, RN Beyond the Bundle: Strategies to Prevent Catheter Related Blood Stream Infections in a Pediatric Oncology In- Patient Unit Patricia Church, MSN, RN, PCNS-BC, CPON Bernice Mowery, PhD, PNP, RN Objectives

More information

National Programme to Prevent Central-Line Associated Bacteraemia. Project Charter October 2011 to April 2013

National Programme to Prevent Central-Line Associated Bacteraemia. Project Charter October 2011 to April 2013 National Programme to Prevent Central-Line Associated Bacteraemia Project Charter October 2011 to April 2013 1. Overview Central-Line Associated Bacteraemia (CLAB) prevention is one of the most important

More information

Continuous quality improvement for the Australian medical profession

Continuous quality improvement for the Australian medical profession Continuous quality improvement for the Australian medical profession Continuous quality improvement for the Australian medical profession Avant s comments on revalidation in Australia May 2017 Position

More information

Implementation Guide for Central Line Associated Blood Stream Infection

Implementation Guide for Central Line Associated Blood Stream Infection Implementation Guide for Central Line Associated Blood Stream Infection March 27, 2013 Contents 1. Introduction... 3 2. Central Line Associated Blood Stream Infection Prevention Evidence-Based Practices...

More information

Translating Evidence to Safer Care

Translating Evidence to Safer Care Translating Evidence to Safer Care Patient Safety Research Introductory Course Session 7 Albert W Wu, MD, MPH Former Senior Adviser, WHO Professor of Health Policy & Management, Johns Hopkins Bloomberg

More information

Productivity Commission report on Public and Private Hospitals APHA Analysis

Productivity Commission report on Public and Private Hospitals APHA Analysis APHA Information Paper Series Productivity Commission report on Public and Private Hospitals APHA Analysis This document provides an analysis of the data presented in the Productivity Commission report

More information

An Educational Intervention to Increase CLABSI Bundle Compliance in the ICU. A thesis presented by. Shelby L. Holden

An Educational Intervention to Increase CLABSI Bundle Compliance in the ICU. A thesis presented by. Shelby L. Holden Shelby Holden 1 An Educational Intervention to Increase CLABSI Bundle Compliance in the ICU A thesis presented by Shelby L. Holden Presented to the College of Education and Health Professions in partial

More information

Allied Health Review Background Paper 19 June 2014

Allied Health Review Background Paper 19 June 2014 Allied Health Review Background Paper 19 June 2014 Background Mater Health Services (Mater) is experiencing significant change with the move of publicly funded paediatric services from Mater Children s

More information

UK Renal Registry 20th Annual Report: Appendix A The UK Renal Registry Statement of Purpose

UK Renal Registry 20th Annual Report: Appendix A The UK Renal Registry Statement of Purpose Nephron 2018;139(suppl1):287 292 DOI: 10.1159/000490970 Published online: July 11, 2018 UK Renal Registry 20th Annual Report: Appendix A The UK Renal Registry Statement of Purpose 1. Executive summary

More information

Clinical governance for Primary Health Networks

Clinical governance for Primary Health Networks no: 22 date: 21/04/2017 title Clinical governance for Primary Health Networks authors Amanda Jones Manager, Deeble Institute for Health Policy Research Australian Healthcare and Hospitals Association Email:

More information

19July Registry Special Interest Group (SIG) Funding Models for Clinical Registries. Sue Huckson CORE Manager

19July Registry Special Interest Group (SIG) Funding Models for Clinical Registries. Sue Huckson CORE Manager 19July 2013 -Registry Special Interest Group (SIG) Funding Models for Clinical Registries Sue Huckson Manager Registries Adult Patient Database (APD) n & New Zealand Paedatric Intensive Care Registry (ANZPICR)

More information

Changing behaviors through education to improve patient outcomes associated with vascular access devices

Changing behaviors through education to improve patient outcomes associated with vascular access devices Changing behaviors through education to improve patient outcomes associated with vascular access devices Fiona Fullerton Clinical Nurse Consultant Vascular Access Surveillance Princess Alexandra Hospital,

More information

Patient Safety: 10 Years Later Why is Improvement So Hard? Patient Safety: Strong Beginnings

Patient Safety: 10 Years Later Why is Improvement So Hard? Patient Safety: Strong Beginnings Patient Safety: 10 Years Later Why is Improvement So Hard? G. Ross Baker, Ph.D. Institute of Health Policy, Management & Evaluation University of Toronto 3 November 2014 Patient Safety: Strong Beginnings

More information

UK Renal Registry 13th Annual Report (December 2010): Appendix A The UK Renal Registry Statement of Purpose

UK Renal Registry 13th Annual Report (December 2010): Appendix A The UK Renal Registry Statement of Purpose Nephron Clin Pract 2011;119(suppl 2):c275 c279 DOI: 10.1159/000331785 Published online: August 26, 2011 UK Renal Registry 13th Annual Report (December 2010): Appendix A The UK Renal Registry Statement

More information

Key prevention strategies for MRSA bacteraemia: a case study. Dr. Michael A. Borg Director of Infection Prevention & Control Mater Dei Hospital Malta

Key prevention strategies for MRSA bacteraemia: a case study. Dr. Michael A. Borg Director of Infection Prevention & Control Mater Dei Hospital Malta Key prevention strategies for MRSA bacteraemia: a case study Dr. Michael A. Borg Director of Infection Prevention & Control Mater Dei Hospital Malta 1 Mortality following Staphylococcus aureus bacteraemia

More information

Clinical Handover in ICU Workshop Report

Clinical Handover in ICU Workshop Report Clinical Handover in ICU Workshop Report Acknowledgements Clinical Handover Workshop Participants Dr Sean Kelly, Director, NSW Intensive Care Coordination & Monitoring Unit Mr David White, Workshop Facilitator

More information

CASE STUDY The Safer Patients Initiative

CASE STUDY The Safer Patients Initiative CSE STUDY The Safer Patients Initiative Critical care in practice: Royal ree Hospital and the University Hospital of Wales 1. INTRODUCTION In late 4, the Health oundation funded the Institute for Healthcare

More information

M D S. Report Medical Practice in rural & remote Australia: National Minimum Data Set (MDS) Report as at 30th November 2006

M D S. Report Medical Practice in rural & remote Australia: National Minimum Data Set (MDS) Report as at 30th November 2006 M D S Report 2006 Medical Practice in rural & remote Australia: National Minimum Data Set (MDS) Report as at 30th November 2006 Health Workforce Queensland and New South Wales Rural Doctors Network 2008

More information

2018 Optional Special Interest Groups

2018 Optional Special Interest Groups 2018 Optional Special Interest Groups Why Participate in Optional Roundtable Meetings? Focus on key improvement opportunities Identify exemplars across Australia and New Zealand Work with peers to improve

More information

Staphylococcus aureus bacteraemia in Australian public hospitals Australian hospital statistics

Staphylococcus aureus bacteraemia in Australian public hospitals Australian hospital statistics Staphylococcus aureus bacteraemia in Australian public hospitals 2013 14 Australian hospital statistics Staphylococcus aureus bacteraemia (SAB) in Australian public hospitals 2013 14 SAB is a serious bloodstream

More information

Aged Care Access Initiative

Aged Care Access Initiative Aged Care Access Initiative Allied Health Component PROGRAM GUIDELINES July 2011 Table of Contents 1 Purpose 3 2 Program context and aims. 3 2.1 Background 3 2.2 Current components 3 2.3 Reform in 2012

More information

Frequently Asked Questions. Last updated: 17/11/10

Frequently Asked Questions. Last updated: 17/11/10 Frequently Asked Questions Last updated: 17/11/10 Completion of the Surveillance Form: For which patients in ICU should I complete a surveillance form? Fill out a form for all patients in your ICU that

More information

Hospital Managers Appeal and Renewal Hearings

Hospital Managers Appeal and Renewal Hearings Standard Operating Procedure 10 (SOP 10) Hospital Managers Appeal and Renewal Hearings Why we have a procedure? It is the Hospital Managers (Managers) who have the power to detain patients who have been

More information

Chiropractic Board of Australia Background information

Chiropractic Board of Australia Background information Chiropractic Board of Australia Background information 22 April 2016 Introduction The National Registration and Accreditation Scheme (the National Scheme) was established under the Health Practitioner

More information

Clinical Practice Guideline Development Manual

Clinical Practice Guideline Development Manual Clinical Practice Guideline Development Manual Publication Date: September 2016 Review Date: September 2021 Table of Contents 1. Background... 3 2. NICE accreditation... 3 3. Patient Involvement... 3 4.

More information

HEADER. Enabling the consumer role in clinical governance A guide for health services

HEADER. Enabling the consumer role in clinical governance A guide for health services HEADER Enabling the consumer role in clinical governance A guide for health services A supplementary paper to the VQC document Better Quality, Better Health Care A Safety and Quality Improvement Framework

More information

Describe the impact of CLABSI on patients and their families. Discuss three methods of reducing CLABSIs

Describe the impact of CLABSI on patients and their families. Discuss three methods of reducing CLABSIs Describe the impact of CLABSI on patients and their families. Discuss three methods of reducing CLABSIs Explore the essential elements of maintaining decreased CLABSIs 1 2001-43,000 CLABSIs In ICUs 2009-18,000

More information

CAREER & EDUCATION FRAMEWORK

CAREER & EDUCATION FRAMEWORK CAREER & EDUCATION FRAMEWORK FOR NURSES IN PRIMARY HEALTH CARE ENROLLED NURSES Acknowledgments The Career and Education Framework is funded by the Australian Government Department of Health under the Nursing

More information

Bundle Me Up! Using Central Line Bundles to Decrease Infection

Bundle Me Up! Using Central Line Bundles to Decrease Infection Bundle Me Up! Using Central Line Bundles to Decrease Infection Organization Name: Peninsula Regional : Acute Care Hospital Medical Center Contact Person: Regina Kundell Title: Dir, Women s and Children

More information

Central Vascular Catheter Insertion Checklist Standard Operating Procedure. Perform optimal care

Central Vascular Catheter Insertion Checklist Standard Operating Procedure. Perform optimal care Central Vascular Catheter Insertion Checklist Standard Operating Procedure Perform optimal care Improving process to improve outcome This checklist is adapted with kind permission from the checklist devised

More information

Accreditation Guidelines

Accreditation Guidelines Postgraduate Medical Education Council of Tasmania Accreditation Guidelines May 2016 Guidelines outlining the accreditation process for intern training programs in Tasmania Objectives of the Accreditation

More information

The Management and Control of Hospital Acquired Infection in Acute NHS Trusts in England

The Management and Control of Hospital Acquired Infection in Acute NHS Trusts in England Report by the Comptroller and Auditor General The Management and Control of Hospital Acquired Infection in Acute NHS Trusts in England Ordered by the House of Commons to be printed 14 February 2000 LONDON:

More information

Capacity Building in Indigenous Chronic Disease Primary Health Care Research in Rural Australia Final Project Report July 2014 December 2015

Capacity Building in Indigenous Chronic Disease Primary Health Care Research in Rural Australia Final Project Report July 2014 December 2015 Capacity Building in Indigenous Chronic Disease Primary Health Care Research in Rural Australia Final Project Report July 2014 December Alex Brown A C K N O W L E D G E M E N T S This research is a project

More information

Governance in action the first year of the National Standards Victorian Healthcare Quality Association. 25 October, 2013

Governance in action the first year of the National Standards Victorian Healthcare Quality Association. 25 October, 2013 Governance in action the first year of the National Standards Victorian Healthcare Quality Association 25 October, 2013 Overview Clinical governance: what is it? whose responsibility? Elements of a governance

More information

POPULATION HEALTH. Outcome Strategy. Outcome 1. Outcome I 01

POPULATION HEALTH. Outcome Strategy. Outcome 1. Outcome I 01 Section 2 Department Outcomes 1 Population Health Outcome 1 POPULATION HEALTH A reduction in the incidence of preventable mortality and morbidity, including through national public health initiatives,

More information

Engineering Vacancies Report

Engineering Vacancies Report Engineering Vacancies Report April 2017 Author: Mark Stewart Engineers Australia 11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au www.engineersaustralia.org.au

More information

UPDATE OF QUALITY ASSURANCE HANDBOOK

UPDATE OF QUALITY ASSURANCE HANDBOOK Box 7788 Canberra Mail Centre ACT 2610 Telephone 1300 653 227 TTY 1800 2606 420 www.facs.gov.au UPDATE OF QUALITY ASSURANCE HANDBOOK I am pleased to enclose the second edition of the Quality Assurance

More information

The Australian Council on Healthcare Standards NATIONAL REPORT ON HEALTH SERVICES ACCREDITATION PERFORMANCE

The Australian Council on Healthcare Standards NATIONAL REPORT ON HEALTH SERVICES ACCREDITATION PERFORMANCE 27 28 The Australian Council on Healthcare Standards NATIONAL REPORT ON HEALTH SERVICES ACCREDITATION PERFORMANCE The Australian Council on Healthcare Standards National Report on Health Services Accreditation

More information

National Accreditation Guidelines: Nursing and Midwifery Education Programs

National Accreditation Guidelines: Nursing and Midwifery Education Programs National Accreditation Guidelines: Nursing and Midwifery Education Programs February 2017 National Accreditation Guidelines: Nursing and Midwifery Education Programs Version Control Version Date Amendments

More information

Clinical Leadership in Community Health. Project Report

Clinical Leadership in Community Health. Project Report Clinical Leadership in Community Health Project Report March 2009 Table of Contents Introduction... 3 Background..3 Why Clinical Leadership 3 Project Overview... 4 Attributes and Tasks for Effective Clinical

More information

Engineering Vacancies Report

Engineering Vacancies Report Engineering Vacancies Report 2017 Update February 2018 Author: Mark Stewart Engineers Australia 11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au www.engineersaustralia.org.au

More information

Kidney Health Australia Survey: Challenges in methods and availability of transport for dialysis patients

Kidney Health Australia Survey: Challenges in methods and availability of transport for dialysis patients Victoria 5 Cecil Street South Melbourne VIC 35 GPO Box 9993 Melbourne VIC 3 www.kidney.org.au vic@kidney.org.au Telephone 3 967 3 Facsimile 3 9686 789 Kidney Health Australia Survey: Challenges in methods

More information

2015 Associations Matter Study Interim Results

2015 Associations Matter Study Interim Results 2015 Associations Matter Study Interim Results Introduction The 2015 Associations Matter Study was open between July and October, 2015, and attracted over 8500 responses from 14 different association across

More information

Advanced Measurement for Improvement Prework

Advanced Measurement for Improvement Prework Advanced Measurement for Improvement Prework IHI Training Seminar Boston, MA March 20-21, 2017 Faculty: Richard Scoville PhD; Gareth Parry PhD Thank you for enrolling in IHI s upcoming seminar on designing

More information

Australian Red Cross. Emergency Services

Australian Red Cross. Emergency Services Australian Red Cross Emergency Services Cover Image: Australian Red Cross / Rodney Dekker Published October 2015 Australian Red Cross This document may not be used, copied, reproduced or disseminated by

More information

National Health and Hospital Networks, COAG and Mental Health Reform

National Health and Hospital Networks, COAG and Mental Health Reform National Health and Hospital Networks, COAG and Mental Health Reform Sub-acute Care Initiative Position Paper The Commonwealth will provide $1.62 billion to fund fully the capital and recurrent costs of

More information

PROPOSAL TO LEGALISE VOLUNTARY ASSISTED DYING IN VICTORIA

PROPOSAL TO LEGALISE VOLUNTARY ASSISTED DYING IN VICTORIA PROPOSAL TO LEGALISE VOLUNTARY ASSISTED DYING IN VICTORIA Cancer Council Victoria / McCabe Centre cancer accounts for approximately one-third of deaths in Victoria most people in Victoria who are receiving

More information

CPD for Annual Recertification of Medical Imaging and Radiation Therapy Practitioners

CPD for Annual Recertification of Medical Imaging and Radiation Therapy Practitioners CPD for Annual Recertification of Medical Imaging and Radiation Therapy Practitioners Recertification includes a number of tools used by the Board to monitor the ongoing competence of all practising medical

More information

Chapter 13. Documenting Clinical Activities

Chapter 13. Documenting Clinical Activities Chapter 13. Documenting Clinical Activities INTRODUCTION Documenting clinical activities is required for one or more of the following: clinical care of individual patients -sharing information with other

More information

The impact of nighttime intensivists on medical intensive care unit infection-related indicators

The impact of nighttime intensivists on medical intensive care unit infection-related indicators Washington University School of Medicine Digital Commons@Becker Open Access Publications 2016 The impact of nighttime intensivists on medical intensive care unit infection-related indicators Abhaya Trivedi

More information

Control: Lost in Translation Workshop Report Nov 07 Final

Control: Lost in Translation Workshop Report Nov 07 Final Workshop Report Reviewing the Role of the Discharge Liaison Nurse in Wales Document Information Cover Reference: Lost in Translation was the title of the workshop at which the review was undertaken and

More information

Economic and Social Research Council North West Social Science Doctoral Training Partnership

Economic and Social Research Council North West Social Science Doctoral Training Partnership Last Update 2 nd August 2017 Economic and Social Research Council North West Social Science Doctoral Training Partnership CASE Studentship Application Guidance For October 2018 entry Introduction North

More information

Guidelines on continuing professional development

Guidelines on continuing professional development Guidelines on continuing professional development 7982 Introduction These guidelines on continuing professional development (CPD) have been developed by the Occupational Therapy Board of Australia (the

More information

This paper provides an update on the the recent national SPSP conference the programme of work for Tissue Viability Acute Adult Care SPSP

This paper provides an update on the the recent national SPSP conference the programme of work for Tissue Viability Acute Adult Care SPSP Greater Glasgow and Clyde NHS Board Board Meeting December 2016 Board Paper No. 16/81 Scottish Patient Safety Programme Update 1. Background The Scottish Patient Safety Programme (SPSP) is one of the family

More information

RACMA GUIDE TO PRACTICAL CREDENTIALING AND SCOPE OF CLINICAL PRACTICE PROCESSES

RACMA GUIDE TO PRACTICAL CREDENTIALING AND SCOPE OF CLINICAL PRACTICE PROCESSES DINO DEFAZIO 1 Contents 1. Introduction... 2 2. Definitions... 3 3. Roles of RACMA members... 3 4. Guiding Principles... 4 3.1 General... 4 3.2 Principles underpinning credentialing processes... 4 3.3

More information

Using Care Bundles to Reduce Catheter Associated Blood Stream Infections in the NICU. Dr David Ng Paediatric Medical Officer Sarawak General Hospital

Using Care Bundles to Reduce Catheter Associated Blood Stream Infections in the NICU. Dr David Ng Paediatric Medical Officer Sarawak General Hospital Using Care Bundles to Reduce Catheter Associated Blood Stream Infections in the NICU Dr David Ng Paediatric Medical Officer Sarawak General Hospital Outline of Presentation Introduction Definition of CABSI

More information

National Advance Care Planning Prevalence Study Application Guidelines

National Advance Care Planning Prevalence Study Application Guidelines National Advance Care Planning Prevalence Study Application Guidelines July 2017 Decision Assist: an Australian Government initiative. Austin Health is the lead site for Decision Assist. TABLE OF CONTENTS

More information

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA INTRODUCTION Continuing Professional Development (referred to as CPD ) is a mandatory requirement for all legal practitioners in each

More information

Stasis and VTE Is lack of order putting patients at risk?

Stasis and VTE Is lack of order putting patients at risk? Stasis and VTE Is lack of order putting patients at risk? Professor Cliff Hughes AO 29March 2012 Safe Driving - NSW (435) 376 CF Hughes 29 th March 2012 NSW Heavy Vehicle Statistics 2011 General fatalities

More information

THE PRIVACY ACT AND THE AUSTRALIAN PRIVACY PRINCIPLES FREQUENTLY ASKED QUESTIONS

THE PRIVACY ACT AND THE AUSTRALIAN PRIVACY PRINCIPLES FREQUENTLY ASKED QUESTIONS THE PRIVACY ACT AND THE AUSTRALIAN PRIVACY PRINCIPLES FREQUENTLY ASKED QUESTIONS CONTENTS How is Privacy governed in Australia?... 3 Does the Privacy Act apply to me?... 3 I have been told that my State/Territory

More information

Reducing CLABSI in the NICU with IV Tubing Competency

Reducing CLABSI in the NICU with IV Tubing Competency The University of San Francisco USF Scholarship: a digital repository @ Gleeson Library Geschke Center Master's Projects and Capstones Theses, Dissertations, Capstones and Projects Fall 12-18-2015 Reducing

More information

National Standards Assessment Program. Quality Report

National Standards Assessment Program. Quality Report National Standards Assessment Program Quality Report - March 2016 1 His Excellency General the Honourable Sir Peter Cosgrove AK MC (Retd), Governor-General of the Commonwealth of Australia, Patron Palliative

More information

Australian Nursing and Midwifery Council. National framework for the development of decision-making tools for nursing and midwifery practice

Australian Nursing and Midwifery Council. National framework for the development of decision-making tools for nursing and midwifery practice Australian Nursing and Midwifery Council National framework for the development of decision-making tools for nursing and midwifery practice September 2007 A national framework for the development of decision-making

More information

The NSW Health Clinical Information Access Project (CIAP) Web site: Leaping the Boundary Fence via the Internet

The NSW Health Clinical Information Access Project (CIAP) Web site: Leaping the Boundary Fence via the Internet The NSW Health Clinical Information Access Project (CIAP) Web site: Leaping the Boundary Fence via the Internet Michelle Wensley 5th National Rural Health Conference Adelaide, South Australia, 14-17th

More information

States / Territories where HCP are provided

States / Territories where HCP are provided Home Care Packages Consumers receiving services that exceed Package budget At the March NACA Home Care Packages / CDC Advisory Group it was discussed that in the lead up to July 2015, providers needed

More information

NURSE-LED CENTRAL VENOUS CATHETER INSERTION PROCEDURAL CHARACTERISTICS AND OUTCOMES OF THREE INTENSIVE CARE BASED CATHETER PLACEMENT SERVICES

NURSE-LED CENTRAL VENOUS CATHETER INSERTION PROCEDURAL CHARACTERISTICS AND OUTCOMES OF THREE INTENSIVE CARE BASED CATHETER PLACEMENT SERVICES NURSE-LED CENTRAL VENOUS CATHETER INSERTION PROCEDURAL CHARACTERISTICS AND OUTCOMES OF THREE INTENSIVE CARE BASED CATHETER PLACEMENT SERVICES ABSTRACT Background: Nurse-led central venous catheter placement

More information

HIMSS Submission Leveraging HIT, Improving Quality & Safety

HIMSS Submission Leveraging HIT, Improving Quality & Safety HIMSS Submission Leveraging HIT, Improving Quality & Safety Title: Making the Electronic Health Record Do the Heavy Lifting: Reducing Hospital Acquired Urinary Tract Infections at NorthShore University

More information

Models of Support in the Teacher Induction Scheme in Scotland: The Views of Head Teachers and Supporters

Models of Support in the Teacher Induction Scheme in Scotland: The Views of Head Teachers and Supporters Models of Support in the Teacher Induction Scheme in Scotland: The Views of Head Teachers and Supporters Ron Clarke, Ian Matheson and Patricia Morris The General Teaching Council for Scotland, U.K. Dean

More information

Executive Summary 10 th September Dr. Richard Wagland. Dr. Mike Bracher. Dr. Ana Ibanez Esqueda. Professor Penny Schofield

Executive Summary 10 th September Dr. Richard Wagland. Dr. Mike Bracher. Dr. Ana Ibanez Esqueda. Professor Penny Schofield Experiences of Care of Patients with Cancer of Unknown Primary (CUP): Analysis of the 2010, 2011-12 & 2013 Cancer Patient Experience Survey (CPES) England. Executive Summary 10 th September 2015 Dr. Richard

More information

Medicine Reconciliation FREQUENTLY ASKED QUESTIONS NATIONAL MEDICATION SAFETY PROGRAMME

Medicine Reconciliation FREQUENTLY ASKED QUESTIONS NATIONAL MEDICATION SAFETY PROGRAMME Medicine Reconciliation FREQUENTLY ASKED QUESTIONS NATIONAL MEDICATION SAFETY PROGRAMME The Process What is medicine reconciliation? Medicine reconciliation is an evidence-based process, which has been

More information

Healthcare- Associated Infections in North Carolina

Healthcare- Associated Infections in North Carolina 2018 Healthcare- Associated Infections in North Carolina Reference Document Revised June 2018 NC Surveillance for Healthcare-Associated and Resistant Pathogens Patient Safety Program NC Department of Health

More information

THE ROLE OF HUMAN FACTORS FOR INFECTION PREVENTION IN THE EMERGENCY DEPARTMENT

THE ROLE OF HUMAN FACTORS FOR INFECTION PREVENTION IN THE EMERGENCY DEPARTMENT THE ROLE OF HUMAN FACTORS FOR INFECTION PREVENTION IN THE EMERGENCY DEPARTMENT Connie Savor Price, MD Director, Infection Prevention and Chief, Division of Infectious Diseases Denver Health and Hospital

More information

re-credentialling APPliCATion PACKAge Credentialled infection Control Professional (CiCP) Application Number:

re-credentialling APPliCATion PACKAge Credentialled infection Control Professional (CiCP) Application Number: re-credentialling APPliCATion PACKAge Credentialled infection Control Professional (CiCP) Application Number: Version: 1-201 The Australasian College for Infection Prevention and Control Ltd 201 Australian

More information

This is a high level overview report to update the Board on the Acute Adult Safety Programme consisting of the following sections:

This is a high level overview report to update the Board on the Acute Adult Safety Programme consisting of the following sections: Greater Glasgow and Clyde NHS Board Board Meeting June 2014 Board Paper No. 14/34 Board Medical Director Scottish Patient Safety Programme Update 1. Background The Scottish Patient Safety Programme (SPSP)

More information

A program for collaborative research in ageing and aged care informatics

A program for collaborative research in ageing and aged care informatics A program for collaborative research in ageing and aged care informatics Gururajan R, Gururajan V and Soar J Centre for Ageing and Agedcare Informatics Research, University of Southern Queensland, Toowoomba,

More information

NSW Child Health Network Allied Health Education & Clinical Support Program Clinical Handover Report

NSW Child Health Network Allied Health Education & Clinical Support Program Clinical Handover Report NSW Child Health Network Allied Health Education & Clinical Support Program Clinical Handover Report Carmel Blayden (M Health Science), Allied Health Educator Western Child Health Network, Ward 11, Bloomfield

More information

Metro South Health Intensive Care Services Strategy

Metro South Health Intensive Care Services Strategy Metro South Health Intensive Care Services Strategy Draft for Consultation May 2017 Page 1 of 14 Introduction The availability of and access to intensive care services is vital to the health of the community

More information

Improving medical handover at the weekend: a quality improvement project

Improving medical handover at the weekend: a quality improvement project BMJ Quality Improvement Reports 2015; u207153.w2899 doi: 10.1136/bmjquality.u207153.w2899 Improving medical handover at the weekend: a quality improvement project Emma Michael, Chandni Patel Broomfield

More information

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA INTRODUCTION Continuing Professional Development (referred to as CPD ) is a mandatory requirement for all legal practitioners in each

More information

Indwelling Catheter Care: Areas for Improvement

Indwelling Catheter Care: Areas for Improvement Does your patient REALLY need a catheter? Indwelling Catheter Care: Areas for Improvement Monina H. Gesmundo, MN (Hons), PG Cert. TT, BSN, RN, RM, CNS DISCLOSURE AUTHOR: Monina Gesmundo Supervisors: Dr.

More information

Australian Medical Council Limited

Australian Medical Council Limited Australian Medical Council Limited Procedures for Assessment and Accreditation of Specialist Medical Programs and Professional Development Programs by the Australian Medical Council 2017 Specialist Education

More information

Review of Public Health Act 2010

Review of Public Health Act 2010 Review of Public Health Act 2010 3 June 2016 Phone: 02 9211 2599 Email: info@ Suite 301, Level 3, 52-58 William St, Woolloomooloo NSW 2011 About NCOSS The NSW Council of Social Service (NCOSS) works with

More information

Clinical analysis of coded data and the effect on quality of care

Clinical analysis of coded data and the effect on quality of care Clinical analysis of coded data and the effect on quality of care Colin McCrow Abstract Having an indication of the cost of healthcare is the fi rst step in achieving an activity-based funding (ABF) environment.

More information

National Suicide Prevention Conference 2018 Bursary/Scholarship Information and Application

National Suicide Prevention Conference 2018 Bursary/Scholarship Information and Application Thank you for your interest receiving financial support (a bursary) to attend the National Suicide Prevention Conference 2018 in Adelaide, South Australia. The Conference provides a limited number of bursaries

More information

Hospitals Face Challenges Implementing Evidence-Based Practices

Hospitals Face Challenges Implementing Evidence-Based Practices United States Government Accountability Office Report to Congressional Requesters February 2016 PATIENT SAFETY Hospitals Face Challenges Implementing Evidence-Based Practices GAO-16-308 February 2016 PATIENT

More information

Newborn bloodspot screening

Newborn bloodspot screening Policy HUMAN GENETICS SOCIETY OF AUSTRALASIA ARBN. 076 130 937 (Incorporated Under the Associations Incorporation Act) The liability of members is limited RACP, 145 Macquarie Street, Sydney NSW 2000, Australia

More information

Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION

Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION Ingham Institute for Applied Medical Research Data Scientist Emergency Medicine Research Unit POSITION DESCRIPTION Research Group: Status: Hours: Salary: Reports to: Emergency Medicine Research Unit Full-time

More information

Re-entry to practice - nursing and midwifery

Re-entry to practice - nursing and midwifery Re-entry to practice - nursing and midwifery Consultation Submission Template Submission submitted by: Insert full name & title Organisation: Contact detail: Insert phone and email details Submission type:

More information

Health informatics implications of Sub-acute transition to activity based funding

Health informatics implications of Sub-acute transition to activity based funding Health informatics implications of Sub-acute transition to activity based funding HIC2012 Carrie Schulman What is Sub-acute care? Patients receiving sub-acute care generally require much longer stays in

More information

Outcome data and quality: The critical role of policy

Outcome data and quality: The critical role of policy 1 of 6 3/07/2008 11:44 AM HIMJ: Reviewed articles HIMJ HOME Outcome data and quality: The critical role of policy Russell Renhard CONTENTS GUIDELINES MISSION CONTACT US HIMAA Locked Bag 2045 North Ryde,

More information

Michael Andrew Basinger University of Nevada, Las Vegas, UNLV Theses, Dissertations, Professional Papers, and Capstones

Michael Andrew Basinger University of Nevada, Las Vegas, UNLV Theses, Dissertations, Professional Papers, and Capstones UNLV Theses, Dissertations, Professional Papers, and Capstones 5-1-2014 The Reduction of Central Line-Associated Bloodstream Infections in Intensive Care Units through the Implementation of the Comprehensive

More information

Date of publication:june Date of inspection visit:18 March 2014

Date of publication:june Date of inspection visit:18 March 2014 Jubilee House Quality Report Medina Road, Portsmouth PO63NH Tel: 02392324034 Date of publication:june 2014 www.solent.nhs.uk Date of inspection visit:18 March 2014 This report describes our judgement of

More information

Engineering Vacancies Report. September 2017 Update

Engineering Vacancies Report. September 2017 Update Engineering Vacancies Report September 2017 Update 8 November 2017 Author: Mark Stewart Engineers Australia 11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au

More information

First Home Owner Grant

First Home Owner Grant DEPARTMENT of TREASURY and FINANCE First Home Owner Grant Act 2000 STATE REVENUE OFFICE ABN 25 628 526 128 FHG_0050 First Home Owner Grant Lodgement Guide and Application Form NOTE: Read the Terms Used

More information

Guide to Assessment and Rating for Regulatory Authorities

Guide to Assessment and Rating for Regulatory Authorities Guide to Assessment and Rating for Regulatory Authorities April 2012 Copyright The details of the relevant licence conditions are available on the Creative Commons website (accessible using the links provided)

More information

South Western Emergency Research Institute

South Western Emergency Research Institute Data Scientist South Western Emergency Research Institute POSITION DESCRIPTION Research Group: South Western Emergency Research Institute Status: Full-time for one (1) year with extension subject to funding

More information

NATIONAL GUIDELINES FOR THE ACCREDITATION OF NURSING AND MIDWIFERY PROGRAMS LEADING TO REGISTRATION AND ENDORSEMENT IN AUSTRALIA

NATIONAL GUIDELINES FOR THE ACCREDITATION OF NURSING AND MIDWIFERY PROGRAMS LEADING TO REGISTRATION AND ENDORSEMENT IN AUSTRALIA NATIONAL GUIDELINES FOR THE ACCREDITATION OF NURSING AND MIDWIFERY PROGRAMS LEADING TO REGISTRATION AND ENDORSEMENT IN AUSTRALIA NATIONAL GUIDELINES FOR THE ACCREDITATION OF NURSING AND MIDWIFERY PROGRAMS

More information

PACFA Organisational Structure Document. (Revised 2016)

PACFA Organisational Structure Document. (Revised 2016) PACFA Organisational Structure Document (Revised 2016) Aim of Document The Psychotherapy and Counselling Federation of Australia (PACFA) has developed the PACFA Organisational Structure Document to inform

More information

Enhancing the roles of practice nurses: outcomes of cervical screening education and training in NSW

Enhancing the roles of practice nurses: outcomes of cervical screening education and training in NSW Enhancing the roles of practice nurses: outcomes of cervical screening education and training in NSW AUTHORS Ms Shane Jasiak RN, RM, BNursing, Graduate Diploma Adolescent Health and Welfare Director of

More information