Implementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302)
|
|
- Georgina Richardson
- 5 years ago
- Views:
Transcription
1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302) Operation Name: Sustainable Management of Mineral Resources (P096302) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive : 11-Aug-2014 Country: Tanzania Approval FY: 2009 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Technical Assistance Loan Implementing Agency(ies): Key s Board Approval 09-Jun-2009 Original Closing 30-Jun-2014 Planned Mid Term Review 15-Oct-2012 Last Archived ISR 10-Sep-2013 Effectiveness 22-Sep-2009 Revised Closing Actual Mid Term Review 12-Nov-2012 Project Development Objectives Project Development Objective (from Project Appraisal Document) To strengthen the Governments capacity to manage the mineral sector to improve the socioeconomic impacts of large and small-scale mining for Tanzania and Tanzanians and enhance private local and foreign investment. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost A. Improving the Benefits of the Mineral Sector for Tanzania: Artisanal and Small-scale Mining, and Local Economic Development, B. Strengthening Governance and Transparency in MIning 8.70 C. Stimulating Mineral Sector Investment D. Project Coordination and Management 2.50 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating Substantial Substantial Implementation Status Overview This ISR reports on progress since August The Bank carried out two supervision support missions during the period. The first mission was held from October 20th-30th 2013 with a continued focus on monitoring of disbursement targets agreed with the Ministry for December The second mission was held from March 31st - April 11th 2014 with a focus on assessing the extension request and on-going monitoring of project implementation. Page 1 of 6
2 Implementation progress remains Satisfactory. During the period, the project has made noticeable progress towards achieving its development objectives: total cumulative disbursements have now risen to US$41.4 million or 83% of the original project funds. The backlog on processing of licenses is now completely reduced and licenses now take up to 2 weeks only for processing prospecting licenses and only 1 week for primary mining licenses. Mine audits are now regularly occurring. Digitization of geological maps is still ahead of schedule. The completion of geological data interpretation has been completed from the high resolution airborne geophysical surveys in selected parts of the country with high minerals potentials. The survey has already identified previously unknown geological structures including potential new gold and Tanzanite mineralization. For the small-scale mining components which had known significant delays up until l1 year ago, there has been remarkable progress. The Small Grants Program, Phase 1, was launched during the March 2014 mission in Dodoma and officiated by the Prime Minister Hon. Mizengo Pinda. Of the 11 successful grant applicants selected by the Tanzanian Investment Bank (TIB), who is administering the pilot grant project on behalf of the SMMRP, 4 are women mine owners and one has a long-term disability. Already another 9 applications have been received by TIB, demonstrating the strong demand for support to the development of the small-scale mining sector in Tanzania. Multi-Stakeholder Partnership Initiative (MSPI) on ASM-LSM Coexistence in Tanzania launched the design phase for the two pilot sites (Geita and North Mara). Locations Country First Administrative Division Location Planned Actual Tanzania Mara Region Tarime District Tanzania Not Entered United Republic of Tanzania Tanzania Tanga Region Tanga Region Tanzania Kilimanjaro Region Same District Tanzania Kilimanjaro Region Rombo District Tanzania Rukwa Region Mpanda District Tanzania Not Entered Morogoro Urban Tanzania Mbeya Region Mbozi District Tanzania Mbeya Region Mbeya Region Tanzania Singida Region Manyoni District Tanzania Lindi Region Mandawa Tanzania Iringa Region Makete District Tanzania Kilimanjaro Region Kilimanjaro Region Tanzania Kigoma Region Kasulu District Tanzania Shinyanga Region Kahama District Tanzania Kagera Region Kabanga Page 2 of 6
3 Country First Administrative Division Location Planned Actual Tanzania Singida Region Itigi Tanzania Mwanza Region Geita District Tanzania Mbeya Region Chunya District Tanzania Shinyanga Region Bukombe Tanzania Kagera Region Bukoba District Tanzania Kagera Region Biharamulo District Tanzania Arusha Region Arusha Tanzania Kagera Region Kagera Tanzania Mtwara Region Mtwara Region Tanzania Ruvuma Region Mbinga District Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Percentage increase of household income Percentage Value levels in selected ASM communities 2009-baseline US$4/day Draft survey was completed in US$8/day May Income has decreased as result of lower gold prices. Client and Bank revising results, after which time a revision to the target number may be provided in the next ISR. Percent of citizens in participating communities Percentage Value who consider that their views have been taken 31-Dec-2010 into account in the local economic development strategic planning process (perception survey) Based on field survey under Two local economic the Benefits Study development workshops have resulted in targeting addtional communities. Page 3 of 6
4 Time to process mineral rights (exploration licenses). Months Value Jun Months was a rough 2 weeks for PLs and 1 week No more than two months for estimate at appraisal and was for PMLs after the backlog of review and approval of underestimated. old applications was cleared. prospecting licenses. Annual publication of mining sector revenue Yes/No Value No Yes Yes 30-Jun-2009 Draft fourth report has been released. Fourth report and compliant status Improvement in Tanzania's ranking as a mining investment destination as evidenced by independent investor survey (Fraser Institute). Text Value 48/71 for policy ranking & 22/71 for mineral potential 30-Jun-2009 Tanzania has risen back up this year to 62nd. The Frasier Institute's annual report raised Tanzania's ranking. It is still not a full recovery to the baseline but is remarkable improvement nonetheless. In fact, Tanzania was recognized as "the most improved" country in Africa for Percentage increase in mining revenue Percentage Value Jun-2009 Intermediate Results Indicators First EITI Report showed consolidated revenue of $100million. According to the fourth TEITI report covering 43 companies, government EI revenues increased by 52% to USD 468 million from the previous year. Increase of 2-3 points/palces or more over baseline in one or both indicators. Revenues increase of 5% over baseline. Indicator Name Core Unit of Measure Baseline Current End Target Improved performance in selected ASM Text Value 4.7 tons of gold TBD TBD coummunities as evidenced by increased 09-Jun-2009 production (quantity and USD). Baseline. Yearly targets to be With Small Grants program developed in tandem with ASM baseline survey (see PDO indicator 1). disbursing, first report results will be incorporated into the next ISR. Page 4 of 6
5 Percentage of pending mineral rights applications reduced. Percentage of country covered by geophysical airborne surveys at 1:100,000 scale. Percentage Value Mar-2009 Pending/backlog of applications from Oct March applications in total. All outstanding application were solved and the backlog cleared. Percentage Value Jun % of the country coverd by airborne geophysics 15.7% of the country covered by high resolution airborne geophysical survey (the incease of 1.5% is due to additional surveys in Merelani areas). The new survey included a total of 556,880 Line km of magnetic and radiometric, 57,980 line km of gravity and 20,000 line km of electromagnetic. Project monitoring and evaluation. Text Value Project start In progress Successful M&E 09-Jun-2009 Project M&E system, building on results framework, to be developed in Year 1 ASM Baseline to be incorporated into M&E. Regular project reporting will be used to track project results. Revised mineral law and regulations disseminated Number of mines inspections (including environmental) and remedial actions; number of audits. Data on Financial Performance (as of 03-Jul-2014) Financial Agreement(s) Key s Text Value Revisions ongoing Done Revisions and dissemination completed. 09-Jun-2009 Text Value 1,000 per year Regular inspections are the norm 09-Jun-2009 Large, medium and small scale mines were inspected on HSE. Regular and systemized inspections and audits Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IDA Effective 09-Jun Jul Sep Jun-2014 Page 5 of 6
6 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective XDR Disbursement Graph Key Decisions Regarding Implementation The October 2013 and March 2014 Supervisory Missions confirmed that the project development objective remains valid. The Project has received a one-year extension to complete remaining activities under the following components: i) Strengthening Governance and Transparency in the Mining Sector and ii) Stimulating the Private Sector Investment. Restructuring History Level two Approved on 25-Jun-2014 Related Projects P TZ Sustainable Management of Mineral Resources Page 6 of 6
Implementation Status & Results OECS Countries Telecommunications & ICT Development Project (P088448)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results OECS Countries Telecommunications & ICT Development
More informationImplementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956) Operation Name: Lagos Urban Transport Project
More informationImplementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658) Operation
More informationImplementation Status & Results Brazil BR-Housing Sector TAL (P050761)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR-Housing Sector TAL (P050761) Operation Name: BR-Housing Sector TAL (P050761) Project Stage:
More informationImplementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823) Operation Name: Jordan
More informationImplementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P49721) Operation Name: Agricultural Competitiveness
More informationImplementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210) Operation Name: Development of Inclusive
More informationImplementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806) Operation Name: Sri Lanka
More informationImplementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920) Operation Name: Gaza II Emergency Water
More informationImplementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221) Operation Name: DO APL1
More informationImplementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156) Operation Name: Swaziland Health,
More informationImplementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221) Operation Name: DO APL1
More informationImplementation Status & Results Benin ebenin Project (P113370)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin ebenin Project (P113370) Operation Name: ebenin Project (P113370) Project Stage: Implementation
More informationImplementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project
More informationImplementation Status & Results Morocco MA-Rural Roads II (P094007)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Rural Roads II (P094007) Operation Name:
More informationPublic Disclosure Copy. Implementation Status & Results Report Philippines: Extractive Industries Transparency Initiative Implementation (P128290)
Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Energy & Extractives Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 07-Jul-2015 ISR19833
More informationImplementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020) Operation Name: RCI- Emergency
More informationThe World Bank JM Youth Employment in Digital and Animation Industries (P148013)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Social Development Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 29-Jun-2015 ISR19585 Implementing
More informationImplementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Operation Name: Support for
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 03-May-2018
More informationImplementation Status & Results Guinea National Rural Infrastructure Project (P065127)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guinea National Rural Infrastructure Project (P065127) Operation Name: National Rural Infrastructure
More informationThe World Bank Sustainable Rural Sanitation Services Program for Results (P154112)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Water Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 1 ARCHIVED on 05-Nov-2015 ISR21200 Implementing Agencies:
More informationThe World Bank Research and Innovation in Science and Technology Project (P121842)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 8 ARCHIVED on 22-Jun-2017 ISR27107 Implementing Agencies: Ministry
More informationImplementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712) Operation Name: Second
More informationImplementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221) Operation Name: Water and Sanitation
More informationImplementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070) Operation Name: Support for
More informationImplementation Status & Results Indonesia Health Professional Education Quality Project (P113341)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Health Professional Education Quality Project (P113341) Operation Name: Health Professional
More informationImplementation Status & Results Morocco MA-Rural Roads II (P094007)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Rural Roads II (P094007) Operation Name: MA-Rural Roads II (P094007) Project Stage: Implementation
More informationImplementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620) Operation Name: Forest
More informationThe World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 27-Jun-2016 ISR24063 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Burundi Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 20-Dec-2017 ISR29199 Implementing Agencies:
More informationImplementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223) Operation Name: Healthcare
More informationPublic Disclosure Copy
LATIN AMERICA AND CARIBBEAN Brazil Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 17-May-2017 ISR27363 Implementing Agencies: Key Dates Key Project Dates Bank
More informationPublic Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)
Public Disclosure Authorized AFRICA Lesotho Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 08-May-2018 ISR30476 Implementing
More informationImplementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P9765) Operation Name: ID SPADA in Aceh and Nias (P9765) Project
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 25-May-2017 ISR27984 Implementing Agencies: National Bank
More informationPublic Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626)
Public Disclosure Authorized AFRICA Senegal Energy and Mining Global Practice Recipient Executed Activities Technical Assistance Loan FY 2014 Seq No: 1 ARCHIVED on 18-Jun-2015 ISR19209 Implementing Agencies:
More informationThe World Bank Africa Higher Education Centers of Excellence Project (P126974)
AFRICA Africa Education Global Practice IBRD/IDA Specific Investment Loan FY 2014 Seq No: 3 ARCHIVED on 25-Jun-2015 ISR19488 Implementing Agencies: National University Commision, Ministry of Higher Education,
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 01-Nov-2017 ISR29517 Implementing Agencies:
More informationThe World Bank Health Professional Education Quality Project (P113341)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Health, Nutrition and Population Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 9 ARCHIVED on 24-Dec-2014 ISR17306 Implementing
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 06-Dec-2017 ISR30229 Implementing Agencies: National Bank
More informationImplementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P083377)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P83377) Operation Name:
More informationKey Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions
The World Bank EUROPE AND CENTRAL ASIA Kyrgyz Republic Procurement Global Practice Institutional Development Fund FY 2014 Seq No: 2 ARCHIVED on 08-Jun-2015 ISR19571 Implementing Agencies: Public Procurement
More informationThe World Bank JM Youth Employment in Digital and Animation Industries (P148013)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Jamaica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on
More informationINDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)
Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global
More informationPublic Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)
LATIN AMERICA AND CARIBBEAN Colombia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2007 Seq No: 15 ARCHIVED on 04-Dec-2014 ISR17292 Implementing Agencies: Key Dates Key Project Dates Board Approval
More informationImplementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527) Operation Name: Morocco Urban WS&S Access Pilots
More informationThe World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)
Public Disclosure Authorized AFRICA Swaziland Health, Nutrition & Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 29-Jun-2017 ISR28124 Implementing Agencies:
More informationThe World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)
Public Disclosure Authorized SOUTH ASIA India Education Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 1 ARCHIVED on 27-Jun-2017 ISR28685 Implementing Agencies: Ministry of Skill Development
More informationImplementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620) Operation Name: Forest
More informationThe World Bank Burkina Faso - Bagre Growth Pole Project (P119662)
Public Disclosure Authorized AFRICA Burkina Faso Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 11-Jun-2017 ISR28154 Implementing Agencies: BagrePole,
More informationOBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)
Public Disclosure Authorized AFRICA Ghana Water Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 10-May-2017 ISR25522 Implementing Agencies: Public
More informationImplementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756) Operation Name: GUATEMALA
More informationThe World Bank The Gambia - Growth & Competitiveness (P114240)
Public Disclosure Authorized AFRICA Gambia, The Financial and Private Sector Development Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 23-Dec-2014 ISR17317 Implementing
More informationThe World Bank Kenya GPE Primary Education Development Project (P146797)
Public Disclosure Authorized AFRICA Kenya Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 15-Feb-2017 ISR26822 Implementing Agencies:
More informationThe World Bank St. Petersburg Economic Development Project (P069063)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Russian Federation Urban Development Global Practice IBRD/IDA Financial Intermediary Loan FY 2003 Seq No: 23 ARCHIVED on 08-Dec-2014 ISR17382 Implementing
More informationImplementation Status & Results Report MENA- Desert Ecosystems and Livelihoods Knowledge Sharing and Coordination Project (P130343)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Middle East and North Africa Environment & Natural Resources Global Practice Global Environment Project Technical Assistance Loan FY 2013 Seq No:
More informationThe World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Serbia Trade & Competitiveness Global Practice Recipient Executed Activities Technical Assistance Loan FY 2015 Seq No: 1 ARCHIVED on 30-Oct-2015 ISR20707
More informationImplementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P099369)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P99369) Operation Name: Ceara Regional
More informationThe World Bank Second Karnataka State Highway Improvement (P107649)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY
More informationThe World Bank Social Accountability Knowledge, Skills, Action and Networking (P147835)
Public Disclosure Authorized AFRICA Mozambique Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 12-Jan-2018 ISR29464 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Transport & ICT Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 3 ARCHIVED on 15-Jun-2017 ISR28180 Implementing Agencies:
More informationAgenda. Health NKRA Focus Area. HRH Distribution. Health Facilities. Health Commodities RMNCH. Funding Situation. Anticipated Challenges
Agenda Health NKRA Focus Area HRH Distribution Health Facilities Health Commodities RMNCH Funding Situation Anticipated Challenges Moving Forward AOB 1 The focus areas of BRN Healthcare NKRA and the initiatives
More informationThe World Bank Integrated Growth Poles and Corridor Project 2 (P113971)
Public Disclosure Authorized AFRICA Madagascar Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 27-Dec-2017 ISR30958 Implementing Agencies: Ministry
More informationPublic Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Liberia Education Global Practice Recipient Executed Activities Specific Investment
More informationThe World Bank Romania Secondary Education Project (P148585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ROMANIA SECONDARY EDUCATION PROJECT APPROVED ON MARCH 16, 2015 TO ROMANIA
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC China Health, Nutrition & Population Global Practice IBRD/IDA Program-for-Results FY 2017 Seq No: 2 ARCHIVED on 25-Feb-2018 ISR31105 Implementing Agencies:
More informationThe World Bank MDTF-Economic Revitalization of KP and FATA (P124268)
Public Disclosure Authorized SOUTH ASIA Pakistan Trade & Competitiveness Global Practice Recipient Executed Activities Emergency Recovery Loan FY 2012 Seq No: 11 ARCHIVED on 06-Dec-2016 ISR25587 Implementing
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22379 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationPublic Disclosure Copy
SOUTH ASIA Pakistan Agriculture and Rural Development Global Practice Recipient Executed Activities Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 26-Nov-2014 ISR17007 Implementing Agencies: KP
More informationMr. Sang-wan, Byun, Vice President of the EXIM Bank of Korea, Members of the Press, Distinguished Guests, Ladies and Gentlemen:
STATEMENT BY HON. MUSTAFA HAIDI MKULO (MP.), MINISTER FOR FINANCE ON THE OCCASION OF SIGNING TWO AGREEMENTS BETWEEN THE GOVERNMENT OF THE UNITED REPUBLIC OF TANZANIA AND THE EXIM BANK OF KOREA AT THE TREASURY
More informationLEAD PROJECT INVESTMENT FUND GUIDANCE NOTES
LEAD PROJECT INVESTMENT FUND GUIDANCE NOTES LEAD PROJECT INVESRMENT FUND, 2 nd ROUND GUIDANCE NOTES Page 1 of 11 CONTENTS 1. LEAD Project Investment Fund 2 2. LEAD Project Investment Fund Application Process
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Nigeria Public Sector Governance Global Practice Recipient Executed Activities Specific Investment Loan FY 20 Seq No: 4 ARCHIVED on 3-Feb-205 ISR7805 Implementing Agencies:
More informationP4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC
Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES29928 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationTHE UNITED REPUBLIC OF TANZANIA MINISTRY OF HEALTH AND SOCIAL WELFARE
THE UNITED REPUBLIC OF TANZANIA MINISTRY OF HEALTH AND SOCIAL WELFARE Baseline survey on quality of paediatric care in Tanzania Published by the Ministry of Health and Social Welfare, Dar es Salaam, The
More informationREGIONAL REFFERRAL HEALTH MANAGEMENT NEWSLETTER
REGIONAL REFFERRAL HEALTH MANAGEMENT NEWSLETTER PMORALG Coordinating Role of the Regional Secretariat towards Development to capacitate Regional Health Management The Government of Tanzania is committed
More informationSustainable Drug Seller Initiatives Partners
Sustainable Drug Seller Initiatives Partners Institutionalizing Training to Ensure Continuous Availability of ADDO Dispensers Ramadhan S. Mwampambe, PSA Stakeholder s Dissemination Meeting Arusha August
More informationThe World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF VIETNAM CLIMATE INNOVATION CENTER (VCIC) RETF APPROVED ON OCTOBER 30,
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SINDH GLOBAL PARTNERSHIP FOR EDUCATION PROJECT
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: (RES20635) Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationEmergency Plan of Action (EPoA) Tanzania: Floods
Emergency Plan of Action (EPoA) Tanzania: Floods DREF Operation : MDRTZ019 Glide n Date of issue: 03 February 2016 Date of disaster: 18 January 2016 Operation manager (responsible for this EPoA: Andreas
More informationThe World Bank Gabon Investment Promotion & Competitiveness Project (P129267)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GABON INVESTMENT PROMOTION & COMPETITIVENESS PROJECT APPROVED ON MARCH
More informationNATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA
The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES25530 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR 2012-2015 APPROVED ON
More informationSTRENGTHENING MICRO-ENTREPRENEURSHIP FOR DISADVANTAGED YOUTH APPROVED ON JUNE 27, 2013 MINISTRY OF ECONOMY AND FINANCE (TGR)
The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES26443 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING MICRO-ENTREPRENEURSHIP FOR DISADVANTAGED YOUTH APPROVED ON JUNE 27,
More informationIncreasing Access to Subsidized Artemisininbased Combination Therapy through Accredited Drug Dispensing Outlets in Tanzania
RESEARCH Open Access Increasing Access to Subsidized Artemisininbased Combination Therapy through Accredited Drug Dispensing Outlets in Tanzania Edmund Rutta 1*, Bryceson Kibassa 2, Brittany McKinnon 3,
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22380 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationGuideline for Regional Referral Hospital Advisory Board (RRHAB)
Ministry of Health, Community Development, Gender, Elderly and Children President Office Regional Administration and Local Government Guideline for Regional Referral Hospital Advisory Board (RRHAB) June
More informationOFFICIAL r0 4 DOCUMENTS
Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD
More informationAbout ABG Maendeleo Fund
Annual Report 2013 Table of Contents About ABG Maendeleo Fund...3 Message from the CEO...4 The ABG Maendeleo Fund Community Investment Committee...6 2013 Investment Summary...8 ABG Maendeleo Projects and
More informationBUILDING INFRASTRUCTURE FOR ICT DEVELOPMENT IN TANZANIA
BUILDING INFRASTRUCTURE FOR ICT DEVELOPMENT IN TANZANIA By Eng. Dr. Zaipuna O. Yonah, CEng.(T), Director Data Networks Tanzania Telecommunications Company Limited Simunet Project engyonah@ttcl.co.tz Paper
More informationTanzania Work Plan FY 2018 Project Year 7
Tanzania Work Plan FY 2018 Project Year 7 October 2017 September 2018 ENVISION is a global project led by RTI International in partnership with CBM International, The Carter Center, Fred Hollows Foundation,
More informationRepublic of Congo: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY
Assignment: TF010691 Republic of Congo: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY Task Team Leader: 00000242041 Approving Manager: 00000086169 - Julian Lee - Benoit Bosquet Summary
More informationCorporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationNational Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism
National Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism DHS Standards Program Review August 29, 2006 Name - DA Schauer
More informationMay 2017
APPLICANT RESOURCE BOOK May 2017 www.dliinnovationchallenge.com Summary In 2015, the United States President s Emergency Plan for AIDS Relief (PEPFAR) and the Millennium Challenge Corporation (MCC) launched
More informationCURRENT PRACTICE OF PHARMACOVIGILANCE IN TANZANIA. Alex F. Nkayamba, MD. Officer, Clinical Trials and Pharmacovigilance Department
CURRENT PRACTICE OF PHARMACOVIGILANCE IN TANZANIA Alex F. Nkayamba, MD Officer, Clinical Trials and Pharmacovigilance Department PHARMACOVIGILANCE MILESTONES 1989 PV program was first introduced (Tanzania
More informationAEITI Country Work Plan Amended
re Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Extractive Industries Transparency Initiative (AEITI) Islamic Republic of Ministry of Finance AEITI
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BUSINESS DEVELOPMENT AND INVESTMENT PROJECT GRANT H865-0-HT
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES15978 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BUSINESS DEVELOPMENT
More informationThe Toyota Foundation 2018 International Grant Program Application Form
The Toyota Foundation 2018 International Grant Program Application Form Notes: Please be sure to read the Program Guidelines before filling out this form. DO NOT alter the size of the text boxes. Altered
More informationPresentations from the 17 th Joint Annual Health Sector Review Technical Review Meeting
Presentations from the 17 th Joint Annual Health Sector Review Technical Review Meeting Karimjee Hall 3. & 4. November 2016 Volume II THE UNITED REPUBLIC OF TANZANIA MINISTRY OF HEALTH, COMMUNITY DEVELOPMENT,
More information