Massachusetts Department of Transportation: Problem Statement/Research Process
|
|
- Jade Lucinda Shields
- 6 years ago
- Views:
Transcription
1 Massachusetts Department of Transportation: Problem Statement/Research Process 1 April 21, 2017
2 Table of Contents 2017 Problem Statement/Research Lessons Learned 2018 Problem Statement/Research Flow of Problem Statements Programs Research Process Key Points 2
3 Acronyms Project Champion (PC): MassDOT/MBTA Employee Principal Investigator (PI) Project Manager/Administrator (PM) Scope of Work (SOW) Interdepartmental Service Agreement (ISA) 3
4 2017 Problem Statements (PS)/Research Projects Problem Statements Research Projects Highway MBTA Planning Rail & Transit Aeronautics Highway MBTA Planning Rail & Transit Aeronautics Short-Term Medium-Term Long Term *Short Term: < 9 months *Medium Term: 9 18 months *Long Term: > 18 months 4
5 2017 Lessons Learned Selection of projects based on Rank, Funding and applicability to Capital Investment Plan. Interest statements (from PI) is part of the selection process for the PCs. Evidence to show your knowledge of the subject and how you would address the PS (3 5 Sentences) FHWA shall be a part of the selection of research. 5
6 Problem Statement Solicitation Process 6
7 Problem Statement (PS) Project Champion (MassDOT/MBTA) Review/ Ranking Division Administrator Highway/MBTA (5) Other (3 per Division) Selection Process Initiate Research Research Section FHWA Research Section/ Project Champion 7
8 Synthesis One Center Access to State Universities Short Term Research One Center Access to State Universities Pooled Fund: NETC TPF Other: (NCHRP, TCRP, ACRP, etc.) Long/Medium Term Research State Universities Private Consultants Private Universities 8
9 2018 Problem Statement Schedule Task Start Completion PS Solicitation April 24, 2017 June 23, 2017 MassDOT Admin. Review June 26, 2017 July 21, 2017 Selection Process July 24, 2017 August 25, 2017 Literature Review* - - Notification of Research August 28, 2017 September 1, 2017 *Literature Review would be conducted upon request and/or to confirm whether research has already been conducted. (Note: Any MassDOT/MBTA employee can request a Literature Review at any time.) *Goal: To start research projects (NTP) by January 2018 or August
10 Selected Problem Statements: PI Selection Process (ISA) MassDOT (w/ One Center) will notify University representatives of selected Problem Statements. Important to have a designated contact (MassDOT to confirm) Universities will be asked for the following: Interested PIs, University, Title, Interest Statement. Project Champion (PC) will select the their top three PIs (based on the interest statements). One Center will request/send CVs for the top three PIs. PC (w/ Research Section) will choose the preferred PI. 10
11 Selected Problem Statements: Public Procurement MassDOT will develop SOW. Selection of the preferred PI will follow MassDOT s public procurement process. Consultants, Private Universities and Public Universities may bid on the Research Project. 11
12 Research Process (ISA) Problem Statement Selection Selection of PI Development of the SOW Facilitation of ISA Notice to Proceed Research Project Closeout 12
13 Research Process (Public Procurement) Problem Statement Selection Development of the SOW Selection of the PI Facilitation of Contract Notice to Proceed Research Project Closeout 13
14 Research Section: Key Points PSs will only be accepted from PCs. Emphasis on projects that can lead to implementation (or Pilot Programs) The Research Section will only review and track the ranked PSs from the Division Administrators. 14
15 Questions??? 15
16 Research Section Name Title Curtis T. Bradley Manager Gabriel Sherman Planner If you have any questions or concerns about the Problem Statement Solicitation process, please contact a representative from the Research Section. Please Note: The Research Section will not participate in connecting PIs with PCs. 16
National Cooperative Highway Research Program (NCHRP)
National Cooperative Highway Research Program (NCHRP) Update AASHTO Highway Subcommittee on Construction August 6, 2008 Crawford Jencks, Deputy Director Cooperative Research Programs Transportation Research
More informationVice President & Corporate Bridge Engineer Arora and Associates, P.C.
TRB & AASHTO Harry A. Capers, Jr., P.E., MPA Vice President & Corporate Bridge Engineer Arora and Associates, P.C. (formally Manager, Structural Engineering (State Bridge Engineer) ( g g ),New Jersey Department
More informationAn Overview of National Transportation Research
An Overview of National Transportation Research Education and Training Task Group AASHTO Research Advisory Committee July 2008 Adapted from Transportation Research: Value to the Nation Value to the States
More informationUniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards Preparing campus for what is changing and what is not What is Grants Reform and when is it effective? What
More informationThanks to all who helped make this possible. Special thanks to Senator Michael Rodrigues for his advocacy.
January 14, 2015 Vision: The Westport Community School District is an exemplary 21 st Century learning community whose graduates are empowered through an engaging, inspiring and personalized curriculum
More informationSPR2 Program Manual. Third Edition New Hampshire Department of Transportation State Planning and Research Part 2 Program
SPR2 Program Manual Third Edition 2015 New Hampshire Department of Transportation State Planning and Research Part 2 Program New Hampshire Department of Transportation Page i TABLE OF CONTENTS I)
More informationRAC 101 AN INTRODUCTION TO THE AASHTO RESEARCH ADVISORY COMMITTEE
101 AN INTRODUCTION TO THE AASHTO RESEARCH ADVISORY COMMITTEE OUTLINE Welcome and Introduction, Skip Paul The Community, Cynthia Gerst Resources, Sue Sillick Responsibilities, David Jared Research Investments,
More informationODOT RD&T MANUAL OF PROCEDURES
ODOT RD&T MANUAL OF PROCEDURES CONTENTS Chapter 1... General Information Chapter 2... Roles and Responsibilities Chapter 3... National Program Development Chapter 4... Local Program Development Chapter
More informationPARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director
PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation 1995 2001, 2005, 2008 Revisions to
More informationProcedures for Local Public Agency Project Administration (Revised 5/2014)
Procedures for Local Public Agency Project Administration (Revised 5/2014) OVERVIEW A Local Public Agency (LPA) is defined as a county, municipal corporation, state or local authority, board, commission,
More informationTucson Modern Streetcar
Tucson Modern Streetcar Framework for Project Management Oversight Mayor & Council Presentation April 20, 2010 Project Goals An element of region s seamless transit system Create permanent & short term
More informationState DOT Oversight of Facility Projects
State DOT Oversight of Facility Projects FINAL REPORT Prepared for: National Cooperative Highway Research Program Transportation Research Board Of The National Academies John Clare Milligan & Company,
More informationIntegral Art MBTA REQUEST FOR QUALIFICATIONS (RFQ): SILVER LINE GATEWAY PHASE 2 - NEW CHELSEA CR STATION CALL FOR ARTISTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Integral Art MBTA REQUEST FOR QUALIFICATIONS (RFQ): SILVER LINE GATEWAY PHASE 2 - NEW CHELSEA CR STATION CALL FOR ARTISTS Call For Artists/RFQ: Friday, July 17,
More informationFlorida Department of Transportation (FDOT) Business Participation Plan FY 13/14
(FDOT) FY 13/14 1. Mission, Vision, and Statement of Commitment for Enhancing Supplier Diversity FDOT is responsible for the state highway systems and public transportation systems including air, transit,
More informationTransportation Library Connectivity and Development
Transportation Library Connectivity and Development Pooled Fund Project (TPF) Solicitation Missouri Department of Transportation 8/16/2010 Solicitation information for a pooled fund including: its background,
More informationSponsored by. Center for Accelerated Bridge Construction (ABC) Center at Florida International University. Website: abc.fiu.edu
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Recent Durability Performance Results in Closure Joints of Modular Bridge Decks Sponsored by Center for Accelerated Bridge Construction
More informationWestern Federal Lands Highway Division. Procurement. Elizabeth Firestone Contract Development Engineer
Western Federal Lands Highway Division Procurement Elizabeth Firestone Contract Development Engineer Western Federal Lands Highway Division (WFLHD) Who we are What we do Where we work How we procure A&E,
More informationINVITATION TO SUBMIT A RESEARCH PROPOSAL
January 2, 2018 INVITATION TO SUBMIT A RESEARCH PROPOSAL The New England Transportation Consortium (NETC) invites proposals for the following research project: NETC QR17-1: Quick Response: New England
More informationDRAFT MINUTES NETC ADVISORY COMMITTEE MEETING
DRAFT MINUTES NETC ADVISORY COMMITTEE MEETING DATE: October 28, 2014 TIME: 11 AM 12 PM LOCATION: Conference Call (605) 781-1000, Participant Access Code: 867375# ITEMS 1. Call to Order: Amanda Hanaway-Corrente,
More informationFunding Sources for Transportation Research Competitive Programs
Funding Sources for Transportation Research December 2008 CONTENTS Contributors 4 Chapter 1: Introduction 5 Chapter 2: What Are Characteristics of Research You Would Like Funded? 7 Chapter 3: Which Research
More informationNCHRP Leveraging Resources for Better Transportation
NCHRP Leveraging Resources for Better Transportation Waseem Dekelbab, PhD, PE, PMP Sr. Program Officer National Cooperative Highway Research Program Transportation Research Board Overview Organization
More informationBrownfields Conference Oklahoma City, OK May 22, What is FHWA?
Brownfields Conference Oklahoma City, OK May 22, 2012 What is FHWA? 2 1 What does FHWA do? The Federal Highway Administration: Improves Mobility on the Nation s highways through National Leadership, Innovation
More informationTransportation Research Funding in Three Acts
Transportation Research Funding in Three Acts Cast of Characters Act I - Leni Oman, Washington State DOT Act II Amy Schutzbach, Illinois DOT and Skip Paul, Louisiana DOT and Development Act III Sue Sillick,
More informationWelcome to Webinar on Accelerated Bridge Construction
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Everyday Solutions: ABC Standard Designs from SHRP2 Sponsored by Center for Accelerated Bridge Construction (ABC) Center at
More informationContract Administration Policy
Contract Administration Policy Guidelines for contract approval March 15, 2010 5420 Old Orchard Road Skokie, Illinois 60077-1083 847.966.6200 Fax 847.966.9781 www.cement.org Guidelines for Contract Approval
More informationGuidebook for Implementing FAA s Airports Geographic Information System (AGIS) Program
ACRP Problem No. 12-03-02 Guidebook for Implementing FAA s Airports Geographic Information System (AGIS) Program ACRP Staff Comments: Consideration would need to be given in developing a research objective
More informationAugust 2003 RESEARCH MANUAL. Nevada Department of Transportation 1263 S. Stewart Street Carson City, Nevada Jeff Fontaine, P.E.
Nevada Department of Transportation August 2003 RESEARCH MANUAL Nevada Department of Transportation 1263 S. Stewart Street Carson City, Nevada 89712 Jeff Fontaine, P.E. Director Prepared by The Research
More informationTips & Tricks of Research Administration #UDResearch April 13, 2016
Tips & Tricks of Research Administration #UDResearch April 13, 2016 Presenters Peggy Thomas, Billing Coordinator Research Office Susan Tkachick, Sponsored Research Accountant - Research Office Susan Tompkins,
More informationProject Selection Advisory Council
Project Selection Advisory Council March 13, 2014 Sheri Warrington, Manager of MPO Activities Office of Transportation Planning 1 Project Selection Criteria Best Practices Degree of implementation in other
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: May 12, 2015 To: All Proposers From: Procurement Office RE: Questions and Answers RFP-DOT-14/15-9030-GH-ReAd: EMERGENCY MANAGEMENT SERVICES Notice
More information9. Positioning Ports for Grant Funding and Government Loan Programs
9. Positioning Ports for Grant Funding and Government Loan Programs 9.1. Grant Funding Overview Grant funding continues to be a key factor for ports in meeting capital investment requirements. Grants can
More informationModule 2 Planning and Programming
Module 2 Planning and Programming Contents: Section 1 Overview... 2-2 Section 2 Coordination with MPO... 2-4 Section 3 Functional Classification... 2-6 Section 4 Minute Order for Designation as Access
More informationUPDATE OF THE SIGNAL TIMING MANUAL
Project No. 3-103 COPY NO. X UPDATE OF THE SIGNAL TIMING MANUAL PRELIMINARY DRAFT FINAL REPORT Prepared for National Cooperative Highway Research Program Transportation Research Board of The National Academies
More informationMassachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY
Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth
More informationBureau of Recreation and Conservation (BRC)
COMMONWEALTH OF PENNSYLVANIA Department of Conservation and Natural Resources Bureau of Recreation and Conservation (BRC) SUBJECT: Planning Project Management Process Policy EFFECTIVE DATE: 5/25/09 REVISED
More informationFOR REINVESTMENT ACT. NILAH DEVANEY NWRO, AWARDING OFFICIAL
1 PL 93-638 AWARD PROCESS FOR AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) NILAH DEVANEY NWRO, AWARDING OFFICIAL 503-872-2867 E-Mail: nilah.devaney@bia.gov 2 ARRA OVERVIEW ON DEADLINES FEBRUARY 17, 2010,
More informationITS Maryland 2013 Annual Conference October 8, 2013
Leveraging Maryland's Public Private Partnership (P3) Legislation for Investment in Transportation Technology ITS Maryland 2013 Annual Conference October 8, 2013 Towards a More Comprehensive P3 Approach
More informationUniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (New Uniform Guidance)
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (New Uniform Guidance) Spring Research Administrators Series March 19, 2015 1 Agenda Background UW-Madison
More informationSafety Projects and the Local Agency Program (LAP)
Safety Projects and the Local Agency Program (LAP) Wednesday, January 8, 2014 Lawrence Taylor Consultant D7 Safety/LAP Project Manager Workshop Series Wed. Oct. 30 Wed. Nov. 6 Wed. Nov. 13 Wed. Nov. 20
More informationMassachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY
Massachusetts Department of Transportation (MassDOT) The High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth
More informationArchitectural & Engineering Services for Cath Lab RFP
Architectural & Engineering Services for Cath Lab RFP 2016-004 Questions to be submitted by March 14. Proposals due March 28, 2016. The following questions were submitted with regards to RFP 2016-004.
More informationWednesday, January 4, 2012
Massachusetts Department of Transportation Secretary s Report Meeting of the Massachusetts Department of Transportation Board Room, 10 Park Plaza, Boston, Massachusetts Wednesday, January 4, 2012 1. Opening
More information11 MASSDOT COMMUNITY TRANSIT GRANT PROGRAM
11 MASSDOT COMMUNITY TRANSIT GRANT PROGRAM INTRODUCTION The Federal Transit Administration (FTA) provides financial assistance to states through a number of programs to develop new transit systems and
More informationTransportation Advisory Board Regional Program Year Policy
Transportation Advisory Board Regional Program Year Policy - The Regional Program Year Policy is intended to manage the development and timely delivery of transportation projects awarded federal funds
More informationPlans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio)
10.14.11 Plans and Programs Committee October 18, 2011 Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio) Maria Lombardo Chief
More informationSubmissions can now be done electroni cally and we are streamlining the submission process by using a PDF fo rm.
US. Deportment of Transportation Federal Highway Administration Memora ndum Subject: INFORMATION: Roadside Safety Hardware -Federal-Aid Reimbursement Eligibility Process..,-...,.._; Date: MAY 2 \ 20\2
More information4/6/2018. Guidelines for Administering Equal Employment Opportunity in Public Contracts
Guidelines for Administering Equal Employment Opportunity in Public Contracts Procurement and contracting responsibilities are a fundamental part of government. Successful implementation of these functions
More informationOther Transaction Agreement (OTA) Management Office. Mr. Randal Gaereminck, Director 16 October 2017
Other Transaction Agreement (OTA) Management Office Mr. Randal Gaereminck, Director 16 October 2017 1 AGENDA What is the OTA Management Office? What is an Other Transaction Agreement? History of Other
More informationMassachusetts Transportation Infrastructure Funding Gap: Revenue Alternatives - The Challenge and Potential Solutions
Massachusetts Transportation Infrastructure Funding Gap: - The Challenge and Potential Solutions Paul T. Godfrey, PE Associate Vice President, HNTB 1 Why are we considering this?? Federal and State Transportation
More informationPARTNERSHIPS FOR ENHANCED ENGAGEMENT IN RESEARCH PROGRAM (PEER)
Office of the Director: Research Private Bag X17, Bellville 7535, South Africa Email : director-research@uwc.ac.za PARTNERSHIPS FOR ENHANCED ENGAGEMENT IN RESEARCH PROGRAM (PEER) Summary guideline for
More informationAPPENDIX A SCOPE OF WORK
APPENDIX A SCOPE OF WORK General Approach The Yuma Metropolitan Planning Organization (YMPO) encourages Proposers to be creative in developing a sound approach which achieves the goals for this project.
More informationI want to begin by recognizing some familiar faces and some new ones in accordance with our Employee Recognition Program.
Massachusetts Department of Transportation Secretary s Report Meeting of the Massachusetts Department of Transportation Board of Directors Board Room, 10 Park Plaza, Boston, Massachusetts Wednesday, March
More information1. Department of Defense (DoD) Human Subjects Protection Regulatory Requirements
Information for Investigators: Headquarters, U.S. Special Operations Command Human Research Protection Office (HRPO) Human Research Protections Regulatory Requirements 1. Department of Defense (DoD) Human
More informationGIS Research Needs and. March 27, 2007 GIS T T 2007 Symposium Nashville Airport Marriot Nashville, Tennessee
GIS Research Needs and STEP March 27, 2007 GIS T T 2007 Symposium Nashville Airport Marriot Nashville, Tennessee What is this about? Suggestions for GIS T T research topics/activities Why are we doing
More information2016 REGIONAL TRANSPORTATION PLAN. Technical Appendix L: Title VI/ Nondiscrimination Program
2016 REGIONAL TRANSPORTATION PLAN Technical Appendix L: Title VI/ Nondiscrimination Program Draft June 15, 2015 INTENTIONAL BLANK PAGE Table of Contents Title VI... 1 Environmental Justice... 2 Public
More informationMICHIGAN ASSOCIATION OF COUNTIES
MICHIGAN ASSOCIATION OF COUNTIES HOW WE GOT STARTED WHO WE ARE WHAT SERVICES WE PROVIDE EXAMPLES OF COOL STUFF MEETING THE NEEDS OF OUR COUNTIES Early in 2004 we sent out a survey to all of our small and
More informationTHE RFP PROCESS. Back to the Basics
THE RFP PROCESS Back to the Basics COURSE OUTLINE I. Defining the RFP II. Developing the Solicitation III. Advertising the Solicitation IV. Pre-Proposal Conference V. RFP Opening VI. Evaluating Responses
More informationInterstate Tolling for Wisconsin: Why and How
Interstate Tolling for Wisconsin: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation http://reason.org/transportation bob.poole@reason.org Interstate reconstruction/modernization
More informationOverview of the Procurement and Project Milestones
Overview of the Procurement and Project Milestones November 3, 2016 Charles A. Kilpatrick, P.E. Commissioner of Highways Virginia Department of Transportation Project Development The Path to Date Summer
More informationAppendix 6 APPLICATION FOR COURSE/CURRICULUM CHANGE
Appendix 6 APPLICATION FOR COURSE/CURRICULUM CHANGE Requesting Department Chairperson of Request Signature Program Major Code & Title Proposed of Change (Semester/Year) Indicate type of change: Local Change
More informationUnsolicited Proposals Policy and Procedures
Unsolicited Proposals Policy and Procedures An unsolicited proposal is a written proposal that is submitted to the Orange County Transportation Authority (AUTHORITY) for the purpose of developing a partnership
More informationEvaluation Plan. February 2004
Evaluation Plan February 2004 TABLE OF CONTENTS Section Page INTRODUCTION...2 PROGRAM PROCESS...3 PROJECT YEAR 2004 (PY 2004) PROGRAM...5 APPENDIX A: WORK PLAN...8 1 INTRODUCTION The Midwest Smart Work
More informationUNIVERSITY OF KANSAS Changing for Excellence. Process Inventory
The following inventory includes all departmental HR, finance and research administration processes. This inventory is a starting point for discussion of processes that may move into a SSC. Financial Process
More informationProject Implementation: From RFP to Project Closeout
FEDERAL ENERGY MANAGEMENT PROGRAM Project Implementation: From RFP to Project Closeout February 2011 5 FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Course Overview Course is part of the FEMP renewable
More informationState of West Virginia Solicitation Response
Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130 State of West Virginia Solicitation Response Proc Folder : 419619 Solicitation Description : ADDENDUM_3:
More informationREQUEST FOR PROPOSAL (RFP) BUILDING INFORMATION MODELING (BIM)
REQUEST FOR PROPOSAL (RFP) BUILDING INFORMATION MODELING (BIM) FOR BRIDGES AND STRUCTURES ISSUED BY: AASHTO COBS TECHNICAL COMMITTEE ON TECHNOLOGY AND SOFTWARE (T-19) STUDY NUMBER: TPF-5(372) LEAD AGENCY:
More informationRe: Annual Development of the 2013 to 2016 TIP Project Listing
MEMORANDUM Date: March 28, 2012 To: CC: From: Board of Selectmen Community Administrators & Managers Central Massachusetts Metropolitan Planning Organization CMMPO Advisory Committee Neighboring MPOs Central
More informationSECTION 9: FORMAL PROCEDURES
SECTION 9: FORMAL PROCEDURES 9.0 General 9.0.1 Items or services which are anticipated to be over formal level will normally be acquired through formal written quotations or proposals. The splitting of
More informationRequest For Information
Request For Information December 10, 2014 Lot 5 Boston, Massachusetts Massachusetts Department of Transportation Frank Depaola, Acting Secretary REQUEST FOR INFORMATION RELATIVE TO THE LOT 5 PARKING FACILITY
More informationOMB Uniform Guidance ( UG ) Briefing. ASRSP & OSR Brown Bag Tuesday, January 27 th
OMB Uniform Guidance ( UG ) Briefing ASRSP & OSR Brown Bag Tuesday, January 27 th Background The UG is the single biggest regulatory change in the last fifty years in research administration Interesting
More informationNational Cooperative Highway Research Program (NCHRP) Report 740/ NCHRP (32): A Transportation Guide for All-Hazards Evacuation
National Cooperative Highway Research Program (NCHRP) Report 740/ NCHRP 20-59 (32): A Transportation Guide for All-Hazards Evacuation Summary Findings and Guide Overview EM Forum - September 25, 2013 Presentation
More informationConnected and Automated Vehicles. September 13, 2017 STSMO Annual Meeting Rapid City, SD
Connected and Automated Vehicles September 13, 2017 STSMO Annual Meeting Rapid City, SD Overview AASHTO STSMO Connected and Automated Vehicles (CAV) Task Group Blaine Leonard, Utah DOT Greg Larson, CalTrans
More informationSpecial Approval per TAC Part A - LG Qualifications Statement (Local Government Agency management of project development process elements)
Special Approval per TAC 15.52 Part A - LG Qualifications Statement (Local Government Agency management of project development process elements) Project CSJ: Local government (LG) agencies may manage elements
More informationUTD Proposal Submission w/ UTSW Sub Work Flow
UTD Proposal Submission w/ UTSW Sub Work Flow Proposal Submission Award Request Cost Center Office of Finance If human subjects in proposal, contact Saki McCallister x4577 in IRB If vertebrate animals
More informationDeval Patrick, Governor Timothy P. Murray, Lieutenant Governor Jeffrey B. Mullan, Secretary of Transportation and Chief Executive Officer
Ca p i ta l In v e s t m e n t Pl a n September 2010 Deval Patrick, Governor Timothy P. Murray, Lieutenant Governor Jeffrey B. Mullan, Secretary of Transportation and Chief Executive Officer Chapterone
More informationBureau of Rail Freight, Ports and Waterways Grant Program Policy
Bureau of Rail Freight, Ports and Waterways Grant Program Policy A. Background The Rail Freight Assistance Program (RFAP) and Rail Transportation Assistance Program (RTAP), also known as Rail TAP in the
More informationBig Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management
Big Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management Date: May 9-10, 2018 Location: Salt Lake City, UT (UDOT Learning Center) Overview This customized exchange will provide
More informationSAN JOSE CAPITAL OF SILICON VALLEY
CITY OF "3 SAN JOSE CAPITAL OF SILICON VALLEY COUNCIL AGENDA: 11/29/16 ITEM: Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL FROM: Barry Ng Jim Ortbal SUBJECT: 7652 - ST. JOHN STREET MULTI MODAL IMPROVEMENTS
More informationAirport Cooperative Research Program TRANSPORTATION RESEARCH BOARD
Airport Cooperative Research Program TRANSPORTATION Airport Cooperative Research Program Authorized by Congress. Sponsored (funded) by FAA. Driven by and for the airport industry. ACRP Oversight Committee
More information#NLCU. Lessons Learned from Crisis Leadership
Lessons Learned from Crisis Leadership #NLCU March 11, 2017 Washington, DC Blake Ratcliff, Steve Traina, Brian Delvaux, Erica Bueno Institute for Building Technology & Safety Workshop Agenda Eligibility
More informationSTANDARD PROCEDURE Number: S410.10
Page: 1 of 8 PURPOSE: To establish procedures for the competitive procurement of goods and services utilizing an Invitation to Bid (ITB) or Invitation to Quote (ITQ) solicitation process or small purchase
More informationSlides by: Ms. Shree Jaswal. Chapter 10 1
Chp 10: Managing Project Procurement and Outsourcing Slides by: Ms. Shree Jaswal Slides by: Ms. Shree Jaswal 1 Introduction, o Project procurement management, Outsourcing. Topics Slides by: Ms. Shree Jaswal
More informationNew Building Canada Fund: Provincial-Territorial Infrastructure Component National and Regional Projects
New Building Canada Fund: Provincial-Territorial Infrastructure Component National and Regional Projects What is it? The $10-billion Provincial-Territorial Infrastructure Component (PTIC) provides funding
More informationFinance Committee October 18, 2011
10.13.11 Finance Committee October 18, 2011 Finance Committee: Commissioners Mar (Chair), Elsbernd (Vice Chair), Cohen, Farrell, Kim and Mirkarimi (Ex Officio) Leroy Saage Deputy Director for Capital Projects
More informationAugust AASHTO Update. King W. Gee Director, Engineering and Technical Services AASHTO W W W. T R A N S P O R T A T I O N.
August 2015 AASHTO Update King W. Gee Director, Engineering and Technical Services AASHTO Reauthorization of the Federal Transportation Bill AASHTO Board of Directors developed recommendations to Congress
More informationNORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT
NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL PLANNING SERVICES FOR AIRPOPRT MASTER PLAN AND AIRPORT LAYOUT PLAN UPDATES I. REQUEST FOR QUALIFICATIONS
More informationFEDERAL FUND CLOSEOUT. RAF August 13, 2015 Yoon Lee
FEDERAL FUND CLOSEOUT RAF August 13, 2015 Yoon Lee Agenda Communication update Applicability and population Next steps Resources 2 Federal Fund Closeout Procedure: Communication Update April 2015 Presented
More informationBackground. To achieve these objectives, Pact partners with local NGOs in Phnom Penh, Battambang, Pursat, Kampong Cham, and Mondulkiri.
AUDITEE PROJECT NAME RFP-2016-001 REQUEST FOR PROPOSAL FOR INDEPENDENT FINANCIAL AUDIT Pact Institute d/b/a Pact Cambodia Promoting Citizen Engagement in Democratic Development (PROCEED) II DONOR Swedish
More informationFWD Calibration Center Operator Certification Program
FWD Calibration Center Operator Certification Program Calibration Center Operators Meeting September 19, 2010 The Transition Pooled-Fund study is coming to an end Calibration protocol is greatly improved
More informationReal Property 1 (RP1) Property Management and Project Delivery Services
Real Property 1 (RP1) Property Management and Project Delivery Services Fairness Monitor Final Report June 10, 2014 Submitted to: Director Fairness Monitoring and Business Dispute Management, Departmental
More informationLTRC MANUAL OF RESEARCH PROCEDURES
LTRC MANUAL OF RESEARCH PROCEDURES July 2016 Edition TABLE OF CONTENTS 1 FORWARD... 7 2 ADMINISTRATION... 8 2.1 Description... 8 2.2 Facilities... 8 2.2.1 LTRC Main Office Building... 8 2.2.2 Transportation
More informationCONTRACTING AND PURCHASING
CONTRACTING AND PURCHASING 2017 Educational Series CONTRACTING AND PURCHASING INTRODUCTION GOODS AND SERVICES Texas Department of Transportation (TxDOT) contracting activities are established and controlled
More informationDEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 2 NAVY ANNEX WASHINGTON, DC MCO K RAM-5 29 Dec 94
DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 2 NAVY ANNEX WASHINGTON, DC 20380-1775 MCO 1001.39K RAM-5 29 Dec 94 MARINE CORPS ORDER 1001.39K From: Commandant of the Marine Corps To: Distribution
More informationStrategic Projects Division
Strategic Projects Division DESIGN BUILD: The Texas Story 2012 AASHTO Conference May 2, 2012 Portland, Oregon Don Toner, Jr., SRWA Director Strategic Projects Right of Way Strategic Projects Division Texas
More informationMassachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016
Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority
More informationARRA Overview. ATTWG Symposium Anchorage, AK April 7, 2009
ARRA Overview ATTWG Symposium Anchorage, AK April 7, 2009 Disclaimer Updates to this PowerPoint presentation are on-going. The final FHWA approved presentation will be made available to all users through
More informationUniversity of Illinois at Urbana-Champaign Capital Programs Division
University of Illinois at Urbana-Champaign Capital Programs Division EQUIPMENT PURCHASE OR CAPITAL PROJECT. WHO ARE YOU GOING TO CALL? TED CHRISTY, ASSOCIATE DIRECTOR University Procurement Authority 2
More informationUniversity of San Francisco Office of Contracts and Grants Subaward Policy and Procedures
Summary 1. Subaward Definitions A. Subaward B. Subrecipient University of San Francisco Office of Contracts and Grants Subaward Policy and Procedures C. Office of Contracts and Grants (OCG) 2. Distinguishing
More informationOffice of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES
2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but
More informationInfrastructure Financing: A Guide for Local Government Managers
Infrastructure Financing: A Guide for Local Government Managers Dr. Can Chen, Assistant Professor Florida International University Dr. John R. Bartle, Professor and Dean University of Nebraska at Omaha
More information