Massachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY

Size: px
Start display at page:

Download "Massachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY"

Transcription

1 Massachusetts Department of Transportation (MassDOT) The High Level P3 Project Suitability Assessment Report September 11, 2013

2 Contents Proposed Project Description Project Background and Status Commonwealth Considerations Transportation Need and Benefit Statement Assessment Criteria Potential Delivery Structures Key Findings Summary Considerations and Challenges Potential Next Steps Appendix: Market Precedents 1

3 Proposed Project Description The (SCR) will extend commuter rail service from the City of Boston to the South Coast of Massachusetts, including the cities of New Bedford and Fall River The service will run for 50 to 53 miles along an existing freight rail corridor running south from Taunton to Fall River and New Bedford The estimated cost of the project is $1.8 billion Key project elements include: Upgrades and improvements to track infrastructure Construction/reconstruction/widening of 45 bridges Construction/reconstruction of 46 at-grade crossings Ten new passenger stations Two overnight terminal layover facilities Rolling stock acquisition of six or seven train sets. Each train set may include one locomotive, five to eight coaches and one cab. The Draft Environmental Impact Report/Statement (DEIR/S) identified six alternatives for project delivery The preferred alternative selected from the DEIR/S provides new commuter rail service to South Station through Stoughton (Alternative 4) 2

4 Project Background and Status This report is part of the high-level screening process used to assess the suitability of delivering a project under a Public-Private Partnership: Project Background Project Name: Sponsoring Agency: Preliminary Schedule (SCR) Massachusetts Department of Transportation MEPA DEIR/S issued February 2011 MEPA DEIR/S approved June 2011 MEPA FEIR/S issuance Fall 2013 (anticipated) High level & detailed level P3 assessment Fall 2013 (anticipated) Provisional project permits (wetlands mitigation) Spring 2014 (anticipated) Record of Decision Spring 2014 (anticipated) Procurements for project conservator and final design Fall 2013 (anticipated) Construction period Estimated 4 5 years (anticipated) 3

5 Commonwealth s Considerations Project-specific considerations: To more fully meet the existing and future demand for public transportation between Fall River / New Bedford and Boston, MA and to enhance regional mobility To encourage economic development and job-creation by providing significantly improved transportation access to a historically underserved region with affordable housing and a growing population To promote smart and sustainable growth by encouraging residents to reduce their automobile-usage, particularly through transit-oriented development around new station locations To enhance tourism and preserve environmental resources for the culturally and historically rich South Coast area Indicative drivers for P3 delivery: Leverage revenue that could help offset project costs Use transit oriented development to provide additional funding Accelerate project delivery and construction schedule Transfer or share risk related to design/construction, financing, operations, maintenance, revenue and ridership Create economies of scale and introduce savings through whole life costing 4

6 Transportation Need and Benefit Statement Transportation Need and Benefit Statement To meet existing and future demand for public transportation between Fall River, New Bedford and Boston while encouraging economic development, job creation and tourism. Description of surrounding area: The South Coast region comprises 31 cities and towns with a combined population of approximately 740,000 By 2030 the regional population is predicted to grow to more than 900,000, making the South Coast one of the fastest growing regions of the State despite the recently declining populations in the cities of Fall River and New Bedford The current transportation system connecting Southeastern Massachusetts with Boston is primarily a highway system with few public transportation alternatives The South Coast communities of Fall River, New Bedford and Taunton are the only cities within 50 miles of Boston not served by commuter rail The selected preferred alternative SCR route follows existing freight lines from New Bedford and Fall River to Taunton and involves traversing through the Hockomock Swamp, wetlands and various sites of cultural value to Native American Tribes What is the existing transportation need? Population in the South Coast region of the State is projected to grow faster than any other region in Massachusetts There have been increased traffic volumes due to the lack of public transportation alternatives leading to traffic congestion and adverse effects on air quality, climate change and transportation safety Projected regional growth and the incentive of lower cost of living outside of Boston and the greater-boston region will exacerbate congestion How will the project address the existing transportation need? Restore commuter rail to the New Bedford/Fall River region, which was serviced prior to the 1950s Provide easier access between the metropolitan areas in and around Boston and the underserved populations in Fall River and New Bedford, in addition to other cities, spurring more regional connectivity and growth Ease traffic congestion along the highways and adjacent commuter rail lines Create opportunities for economic development and revitalization throughout the region 5

7 Assessment Criteria Addresses Commonwealth s Considerations Satisfies Public Transportation Need Addresses Priorities Identified in State, Regional and / or Local Transportation Plan High-Level Screening Criteria Commonwealth Considerations The project is addressing considerations such as: Enhance regional mobility and access to public transportation, jobs and affordable housing for residents between Boston and the underserved regions of Fall River and New Bedford Encourage smart growth, sustainable investment, economic development, job creation, land preservation and tourism Provides connectivity to a traditionally underserved region, reduction in regional congestion, safety improvements and economic development in the South Coast region Preliminary discussions between MassDOT and local municipalities and stakeholders indicate support for the project; however certain opponents believe that ridership projections are too low to justify the level of investment required. The project is not yet included in the state/local/regional transportation plan; however it does address the priorities identified in such plans. In June 2009 the South Coast Rail Economic Development and Land Use Corridor Plan (Plan) was developed to coordinate and encourage smart growth, sustainable investment, economic development, land protection and improved transportation access in municipalities along the SCR corridor In fall 2010 Governor Patrick issued Executive Order 525 calling for the implementation of the Plan through state agency actions and investments 6

8 Assessment Criteria (Continued) Opportunity for Private Sector Innovation Ability to Transfer Risk Accelerated Project Development High-Level Screening Criteria - Opportunity for Acceleration, Innovation and Efficiencies Opportunities for innovation may include: Cost efficiencies in greenfield construction, O&M, and whole-life costing Innovative rolling stock propulsion choice, procurement and financing strategies for fleet Marketing and sponsorship initiatives to generate additional revenues and ridership Station selection and trip schedule development Access to alternative financing sources Two limitations on potential innovation are the interface with other MBTA commuter rail lines in the system and environmental limitations imposed by Hockomock Swamp Risk transfer may include: revenue and ridership, design, construction, financing, operations and maintenance, and lifecycle risk. Some challenges to risk transfer may include: SCR not currently included within the scope of new 8 to 12-year contract for commuter rail operations and maintenance, which may impact the structure of a P3 transaction If maintenance risk were to transfer to the private sector, separate facilities or arrangement to use existing MBTA facilities may be required Revenue and ridership forecasts undertaken by MassDOT indicate that demand exists but does not achieve the levels associated with MBTA s busier lines MBTA s fare policy and market appetite will need to be considered with regards to transferring revenue/ridership risk P3 delivery could accelerate project development through the coordination of design and construction elements by a single entity and private sector incentives for completion Leveraging future receipts could provide additional funds for development 7

9 Assessment Criteria (Continued) Ability to Raise Capital Potential to Generate Revenue and Funding Requirement Market Precedent High-Level Screening Criteria Funding/Financing Similar projects have been financed in the market using public funds (milestone payments and availability payments). In limited cases transit projects were financed with revenue risk transfer. Financing will require reliable funding, which has not yet been identified. The size of recent transactions indicates that a project however the ability to fund the project is subject to market conditions and risk allocation According to MassDOT, the project received a $20 million TIGER grant to undertake improvements to three related railroad bridges; there is currently no state funding committed to the remainder of the $1.8 billion project The project could generate fare revenue to support at least a portion of the capital investment needed on this project. MassDOT has already completed a revenue ridership study, which projected moderate demand through 2035 Other sources of revenue may be explored, such as state and local contributions, freight user contributions, value capture, benefit assessment districts, and advertising, etc. Market precedent for P3 rail (commuter, LRT, tramway, HSR) projects includes: DBFOM/AP: Denver Fastracks Eagle P3 project (Colorado), HSL Zuid (Netherlands), Canada Line (British Columbia) DBFM/AP : Ottawa LRT (Quebec), Le Mans Rennes HSR (France), Nimes Montpellier HSR (France) DBFOM/Revenue risk: Gautrain Rapid Rail Link, UK rail franchises, Nottingham Express Transit LRT (UK), 8

10 Assessment Criteria (Continued) Consistent with Federal Requirements Readiness Can Be Structured as a P3 High-Level Screening Criteria - Readiness NEPA clearance is required The preferred route will cross through the Hockomock Swamp and will require permitting approval from the Army Corps of Engineers Yes No TBD The MEPA and NEPA processes for SCR are being run concurrently Based on MassDOT estimates, the FEIR/S will be issued in the Fall of 2013 MassDOT anticipates that the Record of Decision will not be issued until the provisional project permits for wetlands mitigation are obtained The SCR project is dependent upon completion of the South Station Expansion Project to accommodate the expected increase in daily capacity MassDOT estimates that they are already in possession of the required Right of Way Market precedent indicates that the project may be structured as a P3 Different payment mechanism can be used for the funding of the project, including availability payments, milestone payments, completion payments and transfer of limited ridership risk. Although some revenue risk deals have taken place in the past, market appetite will have to be tested. 9

11 Potential Delivery Structures Potential Delivery Model Option 1: DBFOM - Availability Payment Features Risk transfer: A developer will be responsible for the delivery of the project under a fixed price date certain design build contract and will be responsible for O&M, including rolling stock, and life-cycle costs during the term of the contract (approximately 35 years). Ridership and revenue risk, fare policy and fare collection are retained by the Commonwealth. Payment mechanism: Commonwealth collects the fare revenue and makes an annual payment to developer based on performance and availability. All or a portion of the availability payment may be fixed and/or indexed for inflation. The Commonwealth may fund payments though state or federal funds and fare revenue. Under an amended case, a portion of the payment to the developer may be linked to milestones during construction, construction completion or even ridership. Private investment: Typically, under this delivery model, projects are funded with a combination of debt and equity at a ratio between 85/15% to 90/10%. Option 2: DBFM Availability payment Similar to the previous option, but daily operation (conductors, engineers, etc.) of the line is retained by MBTA or transferred to MBTA s existing private sector commuter rail operator *Please note that these are illustrative examples. Other options or variations on these themes may exist. 10

12 Key Findings Summary High Level P3 Suitability Assessment Addresses Considerations: Yes. This project meets the needs of the existing and future demand for public transportation between Fall River, New Bedford and Boston while encouraging smart growth, economic development, job creation, sustainable development, and tourism. Opportunity for Acceleration, Innovation and Efficiencies Funding/Financing: Yes. This project has the potential for acceleration, innovation and efficiencies by transferring construction, operations and maintenance and long term capital maintenance to the private sector. Coordination will be required if the private sector partner were to be different from the MBTA then existing commuter rail system operator. TBD. Funding for the project is still under evaluation as it is not clear how much public funding will be available. Funding contributions could be made by the state, local governments and municipalities along the route, federal funding programs, advertising, naming rights and from other financial techniques such as value capture etc. Readiness: TBD. The project has an approved DEIR/S and is projected to issue the FEIR/S in the Fall of However, the project is contingent on the completion of the South Station Expansion project. In addition MassDOT must receive permits and approval from the Army Corps of Engineers due to the nature of the proposed project. Can the project be structure as a P3? Move to the next phase for further analysis? Yes [TBD by the Commission] 11

13 Key Considerations and Challenges Relatively low projected levels of ridership Market appetite for revenue and/or ridership risk Up-front public funding might be required to reduce financing costs Maintaining political and community support for a large investment of MassDOT resources Funding sources not yet identified for 99% of project cost (all costs except for $20 million in improvements to three related railroad bridges) Potential for use of federal funding programs, including New Starts and Congestion Mitigation Air Quality Grants Environmental concerns surrounding preserving the wildlife in the Hockomock Swamp; technical challenges associated with construction of trestles Expansion of South Station in Boston needed to accommodate South Coast Rail trains Determination of fare box policy in relation to the broader commuter rail system System integration and interfacing with the new MBTA O&M contractor Procurement of rolling stock Use of transit oriented developments to generate more revenue Assurance that proper studies for sensitive tribal sites have been conducted in the construction area 12

14 Potential Next Steps Update revenue and ridership study Refine estimates of capital, operating and maintenance costs Perform high-level financial feasibility analysis Assess different delivery models and payment mechanisms Analyze affordability and impact to MassDOT finances Identify and assess potential federal, state, and local funding and financing sources Continue outreach efforts to the surrounding cities, political members, as well as the Tribal communities to maintain support for the project Facilitate market sounding inquiries and market development Consider project-specific objectives and priorities 13

15 List of References Specific information in this report came from the following sources: South Coast Rail Economic Development and Land Use Corridor Plan, %20Corridor%20Plan%20Executive%20Summary.pdf, June 2009 Interview with Charles Planck, Senior Director Strategic Initiatives and Performance on August 6,

16 Denver FasTracks Eagle P3 Project Characteristic Project Type Sector Description Public sponsor Advisor Private sector partner Status Term Project size Delivery model Payment mechanism Project Detail Greenfield Transportation Light Rail The project entails construction of two commuter rail lines and an associated maintenance facility, provision of rolling stock, operations of commuter rail service, and maintenance of track and equipment The project will include 36 miles of new commuter rail, 37 major bridge structures, 14 new stations plus Denver Union Station hub & Maintenance Facility, 50 cars in married pair configuration, and 29 atgrade crossings shared with Class 1 Railroads Denver Regional Transportation District JP Morgan/Goldman Sachs John Laing-led Denver Transit Partners (Operator is Denver Transit Operators, comprising ACI, BBRI and Fluor) Financial Close August 2010; under construction 35 years $2.1 billion DBFOM Combined fixed and indexed availability payments Availability payment during Phase 1 construction - $38m Payment reductions are based on failure to achieve availability of rolling stock, performance and timeliness of trains, and station cleanliness RTD may terminate agreement if performance deductions exceed 3% of monthly payments in 6 out of 8 consecutive months RTD Sales Tax Revenue 6% Other Federal Grants 3% TIFIA 14% Funding Details: $2.1 billion $1.03 billion FTA New Starts Grant $396 million PABs Proceeds $280 million TIFIA Loan $128 million RTD Sales Tax Revenue $57 million Revenue Bond Proceeds $57 million Other Federal Grants $54 million Equity $40 million Public Grants Revenue Bond Proceeds 3% PABs 19% Public Grants 2% Equity 3% FTA New Starts Grant 50% 15

17 Denver FasTracks Eagle P3 Project Procurement Schedule Denver FasTracks Eagle P3 Project Map August 2008 October 2008 November 2008 October 2009 May 2010 June 2010 August 2010 RFQ Issued SOQ Due Date Shortlisted Proponents RFP Issued Final Proposals Received RTD Board Selected P3 Team Phase I Notice to Proceed Issued Note: The RFP was originally due to be released in June of 2009, but was delayed to October of 2009 to allow more time to resolve issues raised by shortlisted teams during the one-on-one sessions. Source: rtd-fastracks.com P3 suitability Major U.S. rail P3 set precedent for future projects A persistent political/policy champion is key to success Greenfield rail may be well-suited for a P3 approach Lessons Learned Funding / Financing Well structured AP deals may achieve attractive ratings (e.g. BBB versus BBBratings for most non-recourse new toll facilities) High leverage (90/10) available in AP structures can result in very attractive Weighted Average Capital Costs Other Initial P3 project should maintain a clearly identified timeline to build credibility and maximize private sector interest 16

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth

More information

Financing Transit Projects with Traditional and Innovative Sources And Mechanisms

Financing Transit Projects with Traditional and Innovative Sources And Mechanisms Financing Transit Projects with Traditional and Innovative Sources And Mechanisms Exploring the Potential for Bus Rapid Transit and Transit- Oriented Development in the I- 287/Tappan Zee Bridge Corridor

More information

Eagle Project Update

Eagle Project Update Construction of Peña Bridge November 2012 Eagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital Programs March 5, 2014 Regional Transportation District (RTD) Performs

More information

SUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014

SUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014 SUMMARY OF THE ACT As Submitted to Congress on April 29, 2014 The U.S. Department of Transportation (USDOT) submitted the Generating Renewal, Opportunity, and Work with Accelerated Mobility, Efficiency,

More information

Lessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District

Lessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District Lessons Learned for a Transit Public-Private Partnership Phillip A. Washington, General Manager Regional Transportation District Feb. 7, 2011 The RTD FasTracks Plan 122 miles of new light rail and commuter

More information

The RTD FasTracks Plan

The RTD FasTracks Plan Citizens Advisory Committee Quarterly Meeting June 16, 2010 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) 31 new park-n-rides with over 21,000

More information

NC General Statutes - Chapter 136 Article 19 1

NC General Statutes - Chapter 136 Article 19 1 Article 19. Congestion Relief and Intermodal 21 st Century Transportation Fund. 136-250. Congestion Relief and Intermodal Transportation 21 st Century Fund. There is established in the State treasury the

More information

Innovative Project Finance

Innovative Project Finance Innovative Project Finance National Governor s Association Utah State Planning Retreat on Public-Private Partnerships Ivan Marrero, P.E. Division Administrator, FHWA Utah October 7, 2016 The Status Quo:

More information

Regional Transit System Plan. Regional Task Force Meeting No. 1

Regional Transit System Plan. Regional Task Force Meeting No. 1 Regional Transit System Plan Regional Task Force Meeting No. 1 Thursday, December 2, 2010 James Wagner Welcome! Introductions Venue Packet Displays Opening Session 1 Agenda (5 mins) (20 mins) What is a

More information

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan % Funding Principles I. Infrastructure Incentives Initiative: encourages state, local and private investment in core infrastructure by providing incentives in the form of grants. Federal incentive funds

More information

Overview of the Procurement and Project Milestones

Overview of the Procurement and Project Milestones Overview of the Procurement and Project Milestones November 3, 2016 Charles A. Kilpatrick, P.E. Commissioner of Highways Virginia Department of Transportation Project Development The Path to Date Summer

More information

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR 29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 l metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 20, 2013 SUBJECT: ACTION: PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR RECEIVE

More information

Roanoke Regional Chamber of Commerce 2012 Legislative Policies

Roanoke Regional Chamber of Commerce 2012 Legislative Policies Roanoke Regional Chamber of Commerce 2012 Legislative Policies The Roanoke Regional Chamber works on behalf of its members to create a thriving business climate, strengthen private enterprise, and improve

More information

9. Positioning Ports for Grant Funding and Government Loan Programs

9. Positioning Ports for Grant Funding and Government Loan Programs 9. Positioning Ports for Grant Funding and Government Loan Programs 9.1. Grant Funding Overview Grant funding continues to be a key factor for ports in meeting capital investment requirements. Grants can

More information

Local Taxes and Highway Tolls: The New Normal

Local Taxes and Highway Tolls: The New Normal Local Taxes and Highway Tolls: The New Normal Los Angeles County Metropolitan Transportation Authority Public-Private Partnership Program August 16, 2012 Transportation and Infrastructure Summit Michael

More information

Appendix 5 Freight Funding Programs

Appendix 5 Freight Funding Programs 5. Chapter Heading Appendix 5 Freight Programs Table of Contents 4.1 Surface Transportation Block Grant (STBG);... 5-1 4.2 Transportation Investment Generating Economic Recovery Discretionary Grant Program

More information

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

Beth Day Director, FTA Office of Project Planning RailVolution October 2011 Beth Day Director, FTA Office of Project Planning RailVolution October 2011 What is a New or Small Start? New fixed guideways and extensions to existing systems Includes light rail, heavy rail, commuter

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION OKLAHOMA TURNPIKE AUTHORITY GILCREASE EXPRESSWAY RFI Issue Date: January 2, 2018 RFI Response Due Date: January 31, 2018 The Oklahoma Turnpike Authority ( Authority ) is seeking

More information

May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc.

May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc. May 22, 2013 Pamela Bailey-Campbell Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc. Public Partners Arizona Department of Transportation Office of P3 Initiatives City

More information

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives Lessons Learned from Virginia P3 Projects Dana C. Nifosi, Venable LLP

More information

I-225 Light Rail Design/Build/Finance Staff Recommendation. RTD FasTracks Monitoring Committee July 3, 2012

I-225 Light Rail Design/Build/Finance Staff Recommendation. RTD FasTracks Monitoring Committee July 3, 2012 I-225 Light Rail Design/Build/Finance Staff Recommendation RTD FasTracks Monitoring Committee July 3, 2012 FasTracks Guiding Principles Staff relied heavily on our Guiding Principles to develop our recommended

More information

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act General Overview Total authorizations (Highway Trust Fund, HTF, Contract Authority plus General Funds

More information

TRB National Cooperative Rail Research Program: Report 1. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects

TRB National Cooperative Rail Research Program: Report 1. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects TRB National Cooperative Rail Research Program: Report 1 (NCRRP 07-01) Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects Marc-André Roy December 2, 2015 APTA High Speed

More information

DISCUSSION ITEM EXECUTIVE SUMMARY

DISCUSSION ITEM EXECUTIVE SUMMARY F4 Office of the President TO THE MEMBERS OF THE COMMITTEE ON FINANCE: For the Meeting of DISCUSSION ITEM UPDATE ON THE 2020 PROJECT, MERCED CAMPUS EXECUTIVE SUMMARY Twenty years ago, the Regents of the

More information

Memorandum. Date: To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject:

Memorandum. Date: To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject: Memorandum Date: 02.14.18 To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject: Amber Crabbe Assistant Deputy Director for Policy and Programming Cycle 5 Lifeline

More information

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP. ITEM 13 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) to Add the Governor Harry W. Nice Bridge Improvement Project For the Maryland Transportation Authority

More information

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation 1995 2001, 2005, 2008 Revisions to

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

Memorandum. P:\Lifeline Program\2014 Lifeline Program\Call for Projects\LTP Cycle 4 Call - Memo.doc Page 1 of 7

Memorandum. P:\Lifeline Program\2014 Lifeline Program\Call for Projects\LTP Cycle 4 Call - Memo.doc Page 1 of 7 Memorandum Date: 10.29.14 To: Prospective Project Sponsors From: Seon Joo Kim Senior Transportation Planner Through: Amber Crabbe Assistant Deputy Director Subject: Cycle 4 Lifeline Transportation Program

More information

PPEA Guidelines and Supporting Documents

PPEA Guidelines and Supporting Documents PPEA Guidelines and Supporting Documents APPENDIX 1: DEFINITIONS "Affected jurisdiction" means any county, city or town in which all or a portion of a qualifying project is located. "Appropriating body"

More information

FUNDING SOURCES. Appendix I. Funding Sources

FUNDING SOURCES. Appendix I. Funding Sources Appendix I. Funding Sources FUNDING SOURCES planning and related efforts can be funded through a variety of local, state, and federal sources. However, these revenues have many guidelines in terms of how

More information

North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle

North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle March 17, 2015 Agenda Legislation Review / Turnpike Vision Beau Memory Turnpike Authority

More information

Commuter Rail Expansion and Transit Oriented Development in Northwest Indiana. Northwest Indiana Regional Development Authority

Commuter Rail Expansion and Transit Oriented Development in Northwest Indiana. Northwest Indiana Regional Development Authority Commuter Rail Expansion and Transit Oriented Development in Northwest Indiana Northwest Indiana Regional Development Authority REGIONAL DEVELOPMENT AUTHORITY TEAM RDA was created in 2006 to catalyze key

More information

DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION REPORT ON AUDIT FOR THE YEAR ENDED JUNE 30, 2005

DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION REPORT ON AUDIT FOR THE YEAR ENDED JUNE 30, 2005 DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION REPORT ON AUDIT FOR THE YEAR ENDED JUNE 30, 2005 AUDIT SUMMARY Our review included an examination of the accounts and activities of the Department of Rail and

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information

Delaware Smart Transportation: Save Money and Grow the Economy

Delaware Smart Transportation: Save Money and Grow the Economy Delaware Smart Transportation: Save Money and Grow the Economy Keep Delaware Moving in the Right Direction Save Money by Taking Better Care of What You Have 1. Dedicate more to maintain and repair existing

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) Public-Private Partnership Legal Advisor Services for the Diversion Channel and Associated Infrastructure Work Package of the Fargo-Moorhead Area Diversion Project Issue

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government TEXAS DEPARTMENT OF TRANSPORTATION Transportation and the Federal Government The Role of the Federal Government in State Transportation Programs U.S. Highway 290 BACKGROUND The Federal-Aid Highway Program

More information

Public-Private Partnership Program May 2015 Transit Coalition Update

Public-Private Partnership Program May 2015 Transit Coalition Update Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private

More information

2016 DOT Discretionary Grants

2016 DOT Discretionary Grants + 2016 DOT Discretionary Grants Presented by: Robert Mariner Office of the Assistant Secretary for Transportation Policy United States Department of Transportation + 2 $500 million multimodal, merit-based

More information

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS An Overview of the Public- Private Partnership Model in Québec June 6th, 2016 Agenda Introduction The P3 Approach

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared By: Mayor and City Council George Di Ciero, City and County Manager Debra Baskett, Transportation Manager

More information

November 4, 2013 Office of Transportation Public Private Partnerships

November 4, 2013 Office of Transportation Public Private Partnerships November 4, 2013 Office of Transportation Public Private Partnerships Dear Sirs, Via email: i66ppta@vdot.virginia.gov Re: Response of Shikun & Binui Ltd. (a member of the Arison Group) to the Request for

More information

Federal Public Transportation Program: In Brief

Federal Public Transportation Program: In Brief Federal Public Transportation Program: In Brief William J. Mallett Specialist in Transportation Policy December 2, 2013 Congressional Research Service 7-5700 www.crs.gov R42706 Contents Introduction...

More information

South Dakota Smart Transportation: Save Money and Grow the Economy

South Dakota Smart Transportation: Save Money and Grow the Economy South Dakota Smart Transportation: Save Money and Grow the Economy Keep South Dakota Moving in the Right Direction Save Money by Taking Better Care of What You Have 1. Dedicate more to maintain and repair

More information

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010

State Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010 State Route 91 Corridor Improvement Project Update State Route 91 Advisory Committee June 4, 2010 Presentation Agenda Recent Project Milestones Project Development Schedule Environmental Permitting Design-Build

More information

Client: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design

Client: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design Client: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design I. Applicant (Client) Information Organization Name and Address Boulder County Transportation, 2525 13th

More information

Peninsula Corridor Joint Powers Board Legislative Program

Peninsula Corridor Joint Powers Board Legislative Program Peninsula Corridor Joint Powers Board 2018 Legislative Program Purpose Legislative and regulatory actions have the potential to significantly benefit Peninsula Corridor Joint Powers Board (JPB) programs

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)

More information

Title VI: Public Participation Plan

Title VI: Public Participation Plan Whatcom Council of Governments Public Participation Plan Adopted October 14, 2009 Updated November 12, 2014 Whatcom Council of Governments 314 East Champion Street Bellingham, WA 98225 (360) 676 6974 Whatcom

More information

Caltrans Sustainable Transportation Planning Grant Program

Caltrans Sustainable Transportation Planning Grant Program Caltrans Sustainable Transportation Planning Grant Program FY 2017-18 Strategic Partnerships & Sustainable Communities Presented by California Department of Transportation (Caltrans) FY 2017-18 Update

More information

Construction of Peña Bridge - March 2013 Jersey Cutoff Bridge October Eagle Project Update. East Corridor Stakeholder Committee April 23, 2013

Construction of Peña Bridge - March 2013 Jersey Cutoff Bridge October Eagle Project Update. East Corridor Stakeholder Committee April 23, 2013 Construction of Peña Bridge - March 2013 Jersey Cutoff Bridge October 2012 Eagle Project Update East Corridor Stakeholder Committee April 23, 2013 FasTracks Plan 122 miles of new light rail and commuter

More information

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal CITY OF 7 S3 SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL STUDY SESSION: 3/30/2017 Memorandum FROM: Kim Walesh Jim Ortbal SUBJECT: DIRIDON STATION PLAN AND REGIONAL RAIL PROJECTS

More information

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads 1400 K Street, Suite 400 Sacramento, California 95814 Phone: (916) 658-8200 Fax: (916) 658-8240 www.cacities.org $5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets

More information

METRO Orange Line Extension Planning and Implementation

METRO Orange Line Extension Planning and Implementation METRO Orange Line Extension Planning and Implementation December 9, 2015 Planning has begun for an extension of METRO Orange Line south from Burnsville to the Kenrick Avenue park and ride in Lakeville.

More information

Proposals. For funding to create new affordable housing units in Westport, MA SEED HOUSING PROGRAM. 3/28/2018 Request for

Proposals. For funding to create new affordable housing units in Westport, MA SEED HOUSING PROGRAM. 3/28/2018 Request for 3/28/2018 Request for Proposals For funding to create new affordable housing units in Westport, MA SEED HOUSING PROGRAM TOWN OF WESTPORT SEED HOUSING PROGRAM WESTPORT, MA TABLE OF CONTENTS 1 General Information

More information

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066 3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066 The Transportation and Works Committee recommends the adoption of the recommendations

More information

City of Seattle Partnering Agreement. December 2017

City of Seattle Partnering Agreement. December 2017 City of Seattle Partnering Agreement December 2017 Agenda System Expansion Plan West Seattle and Ballard Link Extensions Partnering Agreement System expansion Sound Transit s system expansion means every

More information

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed This document is scheduled to be published in the Federal Register on 03/16/2018 and available online at https://federalregister.gov/d/2018-05354, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

Request for Proposals. For NEW HOPE TO WARMINSTER PASSENGER RAIL SHUTTLE FEASIBILITY STUDY

Request for Proposals. For NEW HOPE TO WARMINSTER PASSENGER RAIL SHUTTLE FEASIBILITY STUDY Request for Proposals For NEW HOPE TO WARMINSTER PASSENGER RAIL SHUTTLE FEASIBILITY STUDY The Bucks County Transportation Management Association, Inc. (TMA Bucks), on behalf of the Borough of New Hope,

More information

NOFA No MBI-01. Massachusetts Technology Collaborative 75 North Drive Westborough, MA

NOFA No MBI-01. Massachusetts Technology Collaborative 75 North Drive Westborough, MA FLEXIBLE GRANT PROGRAM NOTICE OF FUNDING AVAILABILITY FOR INNOVATIVE APPROACHES TO PROVIDE BROADBAND SERVICE TO UNSERVED TOWNS IN WESTERN MASSACHUSETTS NOFA No. 2018-MBI-01 Massachusetts Technology Collaborative

More information

Transit Operations Funding Sources

Transit Operations Funding Sources Chapter 7. Funding Operations Funding Funding has increased about 56% in absolute terms between 1999 and 2008. There have been major variations in individual funding sources over this time, including the

More information

Appendix Tactics and Metrics from State Agencies and Organizations

Appendix Tactics and Metrics from State Agencies and Organizations Appendix Tactics and Metrics from State Agencies and Organizations Florida s Economic Development Vision: Florida will have the nation s top performing economy and be recognized as the world s best place

More information

REQUEST FOR INFORMATION

REQUEST FOR INFORMATION REQUEST FOR INFORMATION REGARDING THE DEVELOPMENT OF AND PROCUREMENT PROCESS FOR THE GRAND PARKWAY PROJECT TEXAS DEPARTMENT OF TRANSPORTATION RFI Issuance Date: June 10, 2011 RFI Closing Date: July 6,

More information

APPENDIX METROFUTURE OVERVIEW OVERVIEW

APPENDIX METROFUTURE OVERVIEW OVERVIEW APPENDIX B METROFUTURE OVERVIEW OVERVIEW Land use decisions and many economic development decisions in Massachusetts are controlled directly by local municipalities through zoning. This planning is guided

More information

PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015

PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015 PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S J. Douglas Koelemay, Director October 7, 2015 VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS Virginia and California first P3 legislation in

More information

CHAPTER House Bill No. 5013

CHAPTER House Bill No. 5013 CHAPTER 2009-89 House Bill No. 5013 An act relating to transportation; amending s. 334.044, F.S.; revising the powers and duties of the Department of Transportation to provide for certain environmental

More information

Chapter 14 Emergency Projects

Chapter 14 Emergency Projects Chapter 14 Emergency Projects The state may use CDBG funds at any time during the program year to provide grants to eligible applicants for projects arising from bona fide emergencies. To be considered

More information

S E N A T E F I S C A L O F F I C E I S S U E B R I E F 2016-S RhodeWorks FEBRUARY 2, 2016

S E N A T E F I S C A L O F F I C E I S S U E B R I E F 2016-S RhodeWorks FEBRUARY 2, 2016 2016-S-2246 - RhodeWorks FEBRUARY 2, 2016 SUMMARY 2016-S-2246 - The Rhode Island Bridge Replacement, Reconstruction and Maintenance Fund Act of 2016, also known as RhodeWorks, does the following: Allows

More information

Montana Smart Transportation:

Montana Smart Transportation: Montana Smart Transportation: Save Money and Grow the Economy Keep Montana Moving in the Right Direction Save Money by Taking Better Care of What You Have 1. Dedicate more to maintain and repair existing

More information

Puget Sound Gateway Program

Puget Sound Gateway Program Puget Sound Gateway Program SR 167 Completion Project Tacoma Transportation Commission April 18, 2018 THOMAS SLIMAK, PE SR 167 ASSISTANT PROJECT MANAGER Agenda Puget Sound Gateway Program Overview Program

More information

Nevada Smart Transportation: Save Money and Grow the Economy

Nevada Smart Transportation: Save Money and Grow the Economy Nevada Smart Transportation: Save Money and Grow the Economy Keep Nevada Moving in the Right Direction Save Money by Taking Better Care of What You Have 1. Dedicate more to maintain and repair existing

More information

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan October 23rd, 2015 Attention: Qualified and Interested Consultants REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan The Posey County Economic Development Partnership, cooperatively

More information

APPENDIX B BUS RAPID TRANSIT

APPENDIX B BUS RAPID TRANSIT APPENDIX B BUS RAPID TRANSIT Table of Contents TABLE OF CONTENTS What is Bus Rapid Transit?... 2 BRT Features... 2 BRT Variations... 3 Where is BRT Currently Located?... 4 How Much Does BRT Cost?... 4

More information

Alternative Funding and Financing Mechanisms for Rail Projects: Summary and Relevance for Intercity Passenger Rail (NCRRP 07-01)

Alternative Funding and Financing Mechanisms for Rail Projects: Summary and Relevance for Intercity Passenger Rail (NCRRP 07-01) Alternative Funding and Financing Mechanisms for Rail Projects: Summary and Relevance for Intercity Passenger Rail (NCRRP 07-01) Socioeconomic and Financial Aspects of Intercity Passenger Rail Subcommittee,

More information

Design-Build Procurement Overview Manual. Alternative Project Delivery

Design-Build Procurement Overview Manual. Alternative Project Delivery Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

Chester County Vision Partnership Grant Program January 2017

Chester County Vision Partnership Grant Program January 2017 Chester County Vision Partnership Grant Program January 2017 Municipal Planning Grant Manual Bringing i growth and preservation together for Chester County Vision Partnership Program Grant Manual 1.0 Program

More information

Program Management Plan FTA Section 5310

Program Management Plan FTA Section 5310 Program Management Plan FTA Section 5310 Enhanced Mobility of Seniors and Individuals with Disabilities In conformance with the requirements of FTA Circular 9070.1G A. MAP-21 Introduction... 3 B. Statutory

More information

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for Capital District September 26, 2017 Transportation Committee The Community and Transportation Linkage Planning Program for 2018-19 Introduction The Community and Transportation Linkage Planning Program

More information

Florida Smart Transportation: Save Money and Grow the Economy

Florida Smart Transportation: Save Money and Grow the Economy Florida Smart Transportation: Save Money and Grow the Economy Keep Florida Moving in the Right Direction Save Money by Taking Better Care of What You Have 1. Dedicate more to maintain and repair existing

More information

Capital Investment Program

Capital Investment Program Capital Investment Program FY08-FY13 DRAFT Massachusetts Bay Transportation Authority Draft FY08 FY13 Capital Investment Program Slide 1 Profile of the MBTA Fifth largest transit agency in America 4.5

More information

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and

WHEREAS, Mn/DOT has been asked to participate in consultation for and to be an invited signatory to this Programmatic Agreement (PA); and PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE MINNESOTA STATE HISTORIC PRESERVATION OFFICE THE ADVISORY COUNCIL ON HISTORIC PRESERVATION THE DEPARTMENT OF THE ARMY, CORPS OF ENGINEERS,

More information

Policies and Procedures. Unsolicited Proposals. Western Lands

Policies and Procedures. Unsolicited Proposals. Western Lands Metropolitan Washington Airports Authority Real Estate Development Policies Policies and Procedures Regarding Unsolicited Proposals for Western Lands at Washington Dulles International Airport March 3,

More information

I want to begin by recognizing some familiar faces and some new ones in accordance with our Employee Recognition Program.

I want to begin by recognizing some familiar faces and some new ones in accordance with our Employee Recognition Program. Massachusetts Department of Transportation Secretary s Report Meeting of the Massachusetts Department of Transportation Board of Directors Board Room, 10 Park Plaza, Boston, Massachusetts Wednesday, March

More information

Attracting Private Sector Investment in Infrastructure Experiences from India

Attracting Private Sector Investment in Infrastructure Experiences from India UNESCAP High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development Attracting Private Sector Investment in Infrastructure Experiences from India Cherian Thomas

More information

Florida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014

Florida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014 Florida s Future: Funding Growth Through Public Private Partnerships Ed Turanchik March 10, 2014 Fla. Statute 287.05712 Effective July 1, 2013, Florida s new public-private partnership statute introduces

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT JANUARY 2017 FINAL PROJECT STATUS DASHBOARD Scope Status* Reference concept includes

More information

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY MOVE LV Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY Services PLANNING DATA + ANALYSIS EDUCATION PROJECTS + LAWS FUNDING Federal Government State Government Regional

More information

Effects of the Federal Stimulus Package on Massachusetts Land Surveyors, Civil Engineers and Wetlands Scientists

Effects of the Federal Stimulus Package on Massachusetts Land Surveyors, Civil Engineers and Wetlands Scientists Effects of the Federal Stimulus Package on Massachusetts Land Surveyors, Civil Engineers and Wetlands Scientists Massachusetts Association of Land Surveyors and Civil Engineers (MALSCE) November 19, 2009

More information

Puerto Rico Highways and Transportation Authority

Puerto Rico Highways and Transportation Authority Puerto Rico Highways and Transportation Authority Rubén Hernández Gregorat, MEM, PE Executive Director February 26, 2010 Disclaimer Today s presentation includes certain statements that are not historical

More information

TEX Rail Corridor Memorandum of Agreement 1

TEX Rail Corridor Memorandum of Agreement 1 MEMORANDUM OF AGREEMENT AMONG THE FEDERAL TRANSIT ADMINISTRATION THE TEXAS STATE HISTORIC PRESERVATION OFFICER, AND THE FORT WORTH TRANSPORTATION AUTHORITY OF TARRANT COUNTY, TEXAS REGARDING THE TEX RAIL

More information

PUBLIC PARTICIPATION PLAN

PUBLIC PARTICIPATION PLAN 0 PUBLIC PARTICIPATION PLAN GENERAL The City of Tyler currently serves as the fiscal agent for the Tyler Area Metropolitan Planning Organization (MPO), which represents the Tyler Metropolitan Study Area.

More information

REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway

REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway Issue Date: November 21, 2008 Proposal Submission Deadline: December 31, 2008 Description of Work: The Bronx

More information

Commonwealth Transportation Board Briefing

Commonwealth Transportation Board Briefing Hampton Roads Crossing Study (HRCS) (SEIS) Commonwealth Transportation Board Briefing September 20, 2016 Angel Deem VDOT, Environmental Division Director HRCS History 1991: Federal funding allocated for

More information

6. HIGHWAY FUNDING Introduction Local Funding Sources Property Tax Revenues valuation County Transportation Excise Tax

6. HIGHWAY FUNDING Introduction Local Funding Sources Property Tax Revenues valuation County Transportation Excise Tax 6. HIGHWAY FUNDING Introduction This chapter discusses local, state and federal highway funding sources. Local Funding Sources Property Tax Revenues Once the Board of Supervisors has established a roadway,

More information

Update on HB2 Preparation. Presentation to FAMPO May, 2016

Update on HB2 Preparation. Presentation to FAMPO May, 2016 Update on HB2 Preparation Presentation to FAMPO May, 2016 Preparing for Next Round of HB2 and Next CLRP Positioning GWRC/FAMPO HB2 Projects to maximize project scores Candidate projects need to be in:

More information

Russell County Commission. Russell County, Alabama. Request for Proposal Comprehensive Plan Pages Notice of Intent to Respond

Russell County Commission. Russell County, Alabama. Request for Proposal Comprehensive Plan Pages Notice of Intent to Respond Russell County Commission Russell County, Alabama Request for Proposal Comprehensive Plan Pages 1-15 Notice of Intent to Respond Request for Proposal Due: February 8, 2010 Table of Contents I. Project

More information

National Transport Development Policy Committee (NTDPC)

National Transport Development Policy Committee (NTDPC) National Transport Development Policy Committee (NTDPC) Presentation on Urban Transport International Lessons: The Lagos Experience By Dr Dayo Mobereola MD/CEO Lagos Metropolitan Area Transport Authority

More information

VTA Project #

VTA Project # Request for Proposals (RFP) Technical Assistance for All Facets of Electric Bus Fleet Implementation Including infrastructure, in route charging, photovoltaic and energy storage VTA Project # 2017-05 From:

More information