SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs

Size: px
Start display at page:

Download "SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs"

Transcription

1 SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs December 2012

2 SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPS First published: 21 December

3 Contents 1. INTRODUCTION... 4 PART A THE FORMAL REQUIREMENT OF ALL CCGS CONTEXT OPERATIONAL ARRANGEMENTS THE 18-MONTH CYCLE PLANNING TIMETABLE CONTENT OF THE SUBMISSION ASSURANCE CONTRACTING... 8 PART B FOR CCGs WHERE THERE IS A NEED FOR GREATER SCRUTINY ADDITIONAL REQUIREMENTS... 8 ANNEX A NHS OUTCOMES FRAMEWORK MEASURES ANNEX B Expected rights and pledges from the NHS Constitution 2013/ ANNEX C Plan on a Page Examples ANNEX D FULL LIST OF ACTIVITY MEASURES ANNEX E CRITERIA TO SUPPORT ASSURANCE FOR CCGS WHERE MORE DETAILEDASSURANCE IS REQUIRED The following documents are also part of the Supporting Planning 2013/14 for Clinical commissioning groups suite of documents : Everyone Counts: Planning for Patients 2013/14 - Technical Definitions Clinical commissioning groups planning template for 2013/14 Clinical commissioning group and Provider Objectives for Reduction in CDifficile: 2013/14 3

4 1. INTRODUCTION This document describes the processes that will be used to support planning for 2013/14 for clinical commissioning groups (CCGs). It provides further information to Everyone Counts Planning for Patients 2013/14, published on 18 December Supporting Planning 2013/14 for CCGs is the document referred to in Everyone Counts as supporting information. A parallel document, focusing on the assurance of direct commissioning plans, is in preparation and will be available early in The approach for direct commissioning will mirror that for CCGs and will be based on the priorities and single operating model outlined in the publications entitled Securing Excellence : Primary Care published in July 2012 Specialised Commissioning published with commissioning intentions in November 2012 Military Health and Offender Health issued to area teams in draft in November 2012 due for publication in January 2013 Dental services due for publication in February 2013 This document is set out in two parts and the focus is on the assurance of CCG plans. Part A describes the formal submission that every CCG will make to the NHS Commissioning Board to support this. There are some CCGs where Area Teams (ATs) and regions will need to exercise greater scrutiny, such as where there are conditions of authorisation on planning and/or finances. Part B describes the more detailed submission that CCGs will make where this is the case. The aim is to support CCGs in ensuring that every plan is as strong as it can be by designing an approach that aims to strike a balance between local determination of priorities and the NHS CB responsibility for oversight to ensure that statutory requirements around improving quality and financial duties are being met. Area Teams will work with CCGs to understand the local improvement identified by CCGs against the measures set out in the planning framework so that together, the NHS CB and CCGs, can be jointly satisfied that the statutory duties to deliver the mandate and make sufficient contribution to quality improvement within allocated resources are being delivered. CCGs and ATs will share data and planning assumptions on a transparent basis so that both can be satisfied that their plans secure the best possible outcomes for patients within available resources. The assurance process for local plans, CCG plans, AT plans for direct commissioning and system-wide plans, will build on the authorisation process, which requires CCG to develop clear and credible plans. This will provide a strong base from which to develop 2013/14 plans. In the spirit of assumed liberty, the assurance of plans will be mainly intelligence and discussion based, with a minimal requirement for formal submission to the NHS CB. 4

5 PART A THE FORMAL REQUIREMENT OF ALL CCGS 2. CONTEXT Rather than imposing targets, the NHS CB expects CCGs to develop their own local priorities through their input into the Joint Health and Wellbeing Strategy. However, with assumed liberty comes public responsibility and CCGs are expected to set out real ambition in their plans. Everyone Counts Planning for Patients 2013/14 asks each CCG to identify three local priorities against which it will make progress during the year. These priorities will be taken into account when determining if the CCG should be rewarded through the Quality Premium. Plans should be built on the assumption that no indicator contained within the national NHS Outcomes Framework or the CCG Outcome Indicator Set deteriorates. The focus of planning should lie on maximising health gain for the population. For each of the five domains, we have identified the measures from the NHS Outcomes Framework best placed to provide assurance in planning and delivery, where CCG data exists and a baseline can be determined for 2013/14. These are set out in Annex A and will be used to inform CCGs and the NHS CB on whether progress is being made through the CCG assurance framework. Annex A also shows which measures will be used in-year as well as annually and which measures will be used in the Quality Premium. The national requirements, in terms of operational standards expected from the NHS Constitution, are shown in Annex B, including the additional measures as specified by the NHS CB for 2013/14 in Everyone Counts Planning for Patients 2013/14. The technical definitions for each of the measures are described in Everyone Counts: Planning for Patients 2013/14 - Technical Definitions. 3. OPERATIONAL ARRANGEMENTS THE 18-MONTH CYCLE Preparing plans for the year ahead is the first phase of an 18-month cycle. CCG assurance will match this 18-month cycle. The cycle starts with planning for the year ahead, and assurance of those plans. Alongside this runs the second phase on contracting. The third phase is in-year delivery and the final phase is year-end assurance and accountability. This takes place after the end of the year, once performance and delivery for the relevant year is known. This document relates to the first and second phases planning and contracting. There will be further guidance, to be agreed before the start of 2013/14, which is currently work in progress, involving Area Directors and CCGs, to describe CCG assurance and covering in-year monitoring and assurance, recovery and support and intervention and escalation. 5

6 4. PLANNING TIMETABLE Date Activity CCG Plans 18 Dec 12 Allocations published Planning guidance published 21 Dec 12 Supporting information published Draft NHS Standard Contract published w/c 7 January UNIFY2 1 Data collection available Jan 13 CCGs to share first draft of plans with Area Team Directors to include: Plan on a Page including key elements of transformational change; Template covering Self certification of delivery of the NHS Constitution, Mandate and Clostridium difficile objective; Self certification of assurance of provider CIPs; Trajectory for Dementia and IAPT; Trajectories for locally selected priorities; Activity trajectories for 4 key measures elective FFCEs, non-elective FFCEs, first outpatient attendances, A&E attendances; Financial information By 8 Feb 13 Area Directors to provide feedback to CCGs End Feb Re-submission of Finance Templates and update on contractual negotiations 11 Feb to Discussions to support Area Team Director assurance of plans 29 Mar Mar 13 CCG and NHS Commissioning Board contracts signed off 5 Apr 13 Final CCG plans shared with Area Team Director 8 Apr to Board analyses CCG plans and plans for direct commissioning with a 19 Apr 13 view to identifying risks to delivery 22 Apr to Board confirms that plans add up to a position that delivers the 10 May 13 By 31 May 2013 mandate and improves patient outcomes within allocated resources Each CCG publishes its prospectus for its local population 1 Unify2 is an online data collection portal used by the NHS to collect and share performance information, aggregate data and statutory returns. 6

7 5. CONTENT OF THE SUBMISSION To support assurance of CCG plans, every CCG will make a formal submission to the NHS CB, by sharing with their Area Team, covering : o Plan on a Page including key elements of transformational change; o Template covering : Self certification of commitment to delivery of the rights and pledges of the NHS Constitution, Mandate and Clostridium difficile objective; Self certification of assurance that provider cost improvement plans are deliverable without impacting on the quality and safety of patient care; Trajectory for dementia diagnosis rates and Improving Access to Psychological Therapies (IAPT) - proportion of people entering treatment; Trajectories for locally selected priorities; Activity trajectories for 4 key measures elective finished first consultant episodes(ffces), non-elective FFCEs, first outpatient attendances, A&E attendances; o Financial information, including a brief overview of financial position, underlying assumptions and associated risks. Examples of Plan on a Page are included at Annex C. The template covering the remaining content (excluding finance) is available in Clinical commissioning groups planning template for 2013/14. This template will be submitted via UNIFY2. CCGs will need a Unify2 account to submit this data and colleagues in regional and area teams will also need accounts to facilitate CCG account creation and view uploaded data. To request an account please go to: and click 'Request a Unify account'. The Clostridium difficile objectives for each organisation in 2013/14 are available in Clinical commissioning group and Provider Objectives for Reduction in CDifficile: 2013/14. The template requires CCGs to self certify that they will continue to reduce the incidence of Clostridium difficile so that the number of infections in 2013/14 will be equal to or less than their objective. In addition, CCGs are required to populate a financial planning template, including income and expenditure assumptions, QIPP plans and associated risks. These will be consolidated with the NHS CB financial plans to ensure that our combined financial duties are met. The NHS CB will not be collecting QIPP milestones or monitoring milestones centrally. The NHS CB will use a set of system sustainability measures, of which the activity trajectories listed above are a subset, to track progress in-year. 7

8 6. ASSURANCE Based on the assumed liberty principle, assurance for the majority of CCGs should be a minimal process, focused on a face-to-face discussion, supported by intelligence on current delivery and trends, and with additional interactions mainly being in relation to queries of clarification. It is recognised that across the country different approaches are being developed that bring together CCGs and ATs to consider commissioning and it is for local determination about the best way to operate this, however, it is recommended that there is at least one face to face meeting. This meeting would have the objective of sharing plans, how as co-commissioners, ATs and CCGs can work together to deliver integrated care and the health and well-being strategy, and also to discuss system risks and mitigation. 7. CONTRACTING As part of robust business processes it will be essential that plans and assumptions are underpinned by signed contracts for clinical services. The expectation remains that all contracts are signed by 31 March Area Teams will be responsible for tracking progress on the negotiation of contracts for CCG-commissioned services and regional offices will have oversight of contracts for the NHS CB s directly commissioned services. CCGs will be asked to confirm the status of their contract negotiations at the end of February, with area teams providing support where appropriate during the course of March. Parallel processes will apply to contracts held by the NHS CB. It is expected that disputes will be exceptional. Where they do occur the process for resolution is set out clearly in the standard contract. The NHS CB will work closely with Monitor and the NHS Trust Development Authority to ensure that consistent messages on contracting are received by commissioners and providers. PART B FOR CCGs WHERE THERE IS A NEED FOR GREATER SCRUTINY 8. ADDITIONAL REQUIREMENTS There are some CCGs where ATs and regions will need to exercise greater scrutiny : i) where there are conditions of authorisation on planning and or finances ii) there are significant financial or quality problems iii) there is to be a major service reconfiguration that requires multi-commissioner commitment iv) CCGs volunteer - say because they are not confident of producing a plan that resolves all the issues they face. It is recommended that, where this is the case, CCGs and ATs consider whether here are other elements of planning process and documentation that would be helpful to prepare for the 2013/14 planning round: 8

9 Narrative based on clear and credible plans Larger suite of activity measures and trajectories (as shown in Annex D) QIPP transformational milestones Quality indicators based on national dashboard On-going quality assurance of provider CIPs Other indicators including workforce Patient, public insight and experience 9. ADDITIONAL ASSURANCE For these CCGs there will be a more detailed assurance process. ATs will work with CCGs to assure the CCG plan and assurance will be based on updated criteria from the clear and credible plan domain of the CCG Authorisation framework. These are described in Annex E. Where an Area Team has concerns about a CCG s plan the Area Team will initially discuss those concerns with the CCG. A more formal meeting may be convened if the CCG and AT cannot agree next steps to resolve the issue. This may be brokered where appropriate by the relevant regional team. In the majority of cases these discussions will resolve issues and provide assurance that the plans are appropriate or will be revised. If concerns persist to the extent that the NHSCB believes that a CCG in agreeing the plan is at risk of failure to discharge, or discharge appropriately, its statutory functions, the NHS CB may formally request additional information from the CCG under the terms of sections 14Z17 and 14Z18 of the NHS Act 2006 (as amended). This section also allows the NHS CB to request such information from a CCG if it considers that the CCG in discharging its plan would be at risk of failing to deliver in the interests of the health service. At the point this request is made the NHS CB will define what information or documents will be required. The NHS CB may also use section 14Z19 of the same Act to require a written or oral explanation. 9

10 ANNEX A NHS Outcomes Framework measures which the NHS Commissioning Board and Clinical Commissioning Groups will use to track progress (ie data can be generated at clinical commissioning group level and a baseline can be determined against which progress can be considered). Domain Measures that are suitable for both in year and annual assessment Measures that are suitable for annual assessment only In Quality Premium Preventing people from dying prematurely None Potential years of life lost (PYLL) from causes considered amenable to healthcare Potential years of life lost (PYLL) from causes considered amenable to healthcare Under 75 mortality rate from cardiovascular disease Under 75 mortality rate from respiratory disease Under 75 mortality rate from liver disease Under 75 mortality rate from cancer Enhancing quality of life for people with long term conditions Combined measure of Unplanned hospitalisation for chronic ambulatory care sensitive conditions (adults) Unplanned hospitalisation for asthma, diabetes and epilepsy in under 19s and 2 measures from domain 3. Proportion of people feeling supported to manage their condition Health-related quality of life for people with long-term conditions Dementia Diagnosis Rates Helping people to Combined measure as above Patient Reported Outcomes 10 Combined measure of Unplanned hospitalisation for chronic ambulatory care sensitive conditions (adults) Unplanned hospitalisation for asthma, diabetes and epilepsy in under 19s Emergency admissions for acute conditions that should not

11 Domain Measures that are suitable for both in year and annual assessment Measures that are suitable for annual assessment only In Quality Premium recover from episodes of ill health or following injury with Emergency admissions for acute conditions that should not usually require hospital admission Measures (PROMs) for elective procedures: i)hip replacement, ii)knee replacement, iii)groin hernia, iv)varicose Veins usually require hospital admission Emergency admissions for children with lower respiratory tract infections (LRTI) Emergency admissions for children with LRTI Emergency readmissions within 30 days of discharge from hospital Ensuring that people have a positive experience of care Patient experience of i GP Services ii GP Out of Hours services Patient experience of hospital care (needs attribution to CCG ) Patient experience measure Friends and family test Treating and caring for people in a safe environment and protecting them from avoidable harm Incidence of healthcare associated infection: MRSA Incidence of healthcare associated infection: Clostridium difficile None Incidence of healthcare associated infection: MRSA and Clostridium difficile 11

12 ANNEX B Expected rights and pledges from the NHS Constitution 2013/14 (subject to current consultation) including the thresholds the NHS Commissioning Board will take when assessing organisational delivery Referral To Treatment waiting times for non-urgent consultant-led treatment Admitted patients to start treatment within a maximum of 18 weeks from referral 90% Non-admitted patients to start treatment within a maximum of 18 weeks from referral 95% Patients on incomplete non-emergency pathways (yet to start treatment) should have been waiting no more than 18 weeks from referral 92% Diagnostic test waiting times Patients waiting for a diagnostic test should have been waiting no more than 6 weeks from referral 99% A&E waits Patients should be admitted, transferred or discharged within 4hours of their arrival at an A&E department 95% Cancer waits 2week wait Maximum two-week wait for first outpatient appointment for patients referred urgently with suspected cancer by a GP 93% Maximum two-week wait for first outpatient appointment for patients referred urgently with breast symptoms (where cancer was not initially suspected) 93% Cancer waits 31 days Maximum one month (31-day) wait from diagnosis to first definitive treatment for all cancers 96% Maximum 31-day wait for subsequent treatment where that treatment is surgery 94% Maximum 31-day wait for subsequent treatment where that treatment is an anti-cancer drug regimen 98% Maximum 31-day wait for subsequent treatment where the treatment is a course of radiotherapy 94% Cancer waits 62 days Maximum two month (62-day) wait from urgent GP referral to first definitive treatment for cancer 85% Maximum 62-day wait from referral from an NHS screening service to first definitive treatment for all cancers 90% Maximum 62-day wait for first definitive treatment following a consultant s decision to upgrade the priority of the patient (all cancers) no operational standard set Category A ambulance calls Category A calls resulting in an emergency response arriving within 8minutes 75% (standard to be met for both Red 1 and Red 2 calls separately) Category A calls resulting in an ambulance arriving at the scene within 19 minutes 95% Mixed Sex Accommodation Breaches Minimise breaches 12

13 Cancelled Operations All patients who have operations cancelled, on or after the day of admission (including the day of surgery), for non-clinical reasons to be offered another binding date within 28 days, or the patient s treatment to be funded at the time and hospital of the patient s choice. Mental health Care Programme Approach (CPA): The proportion of people under adult mental illness specialties on CPA who were followed up within 7 days of discharge from psychiatric in-patient care during the period 95%. Additional measures NHS Commissioning Board has specified for 2013/14. Referral To Treatment waiting times for non-urgent consultant-led treatment Zero tolerance of over 52 week waiters A&E waits No waits from decision to admit to admission (trolley waits) over 12 hours Cancelled Operations No urgent operation to be cancelled for a 2 nd time Ambulance Handovers All handovers between ambulance and A & E must take place within 15 minutes and crews should be ready to accept new calls within a further 15 minutes. Financial penalties, in both cases, for delays over 30 minutes and over an hour. 13

14 ANNEX C Plan on a Page Examples 14

15 15

16 ANNEX D FULL LIST OF ACTIVITY MEASURES Measure Definition Frequency of Plan/Forecast Non elective FFCEs Non-elective FFCEs Monthly GP written referrals to hospital No of GP written referrals Monthly Other referrals for a first outpatient appointment First outpatient attendances following GP referral No of other referrals No 1st outpatient attendances after GP referral Monthly Monthly All first outpatient attendances No of first outpatient attendances Monthly Elective FFCEs No of elective FFCEs (ordinary adms & separately daycases) Monthly A&E attendances Number of attendances at A&E departments in a month (total and type 1) Monthly Ambulance Urgent & Emergency Journeys Number of urgent and emergency journeys via ambulance, monthly Monthly Diagnostic Activity 4 x Endoscopy-based tests Monthly Diagnostic Activity 11 x Non-endoscopy based tests Monthly Numbers waiting on an incomplete Referral to Treatment pathway Total numbers waiting at the end of the month on an incomplete RTT pathway Monthly 16

17 ANNEX E CRITERIA TO SUPPORT ASSURANCE FOR CCGS WHERE MORE DETAILEDASSURANCE IS REQUIRED Overarching 1. Is the plan clear on how the system will achieve sustainable service and financial performance alongside quality and productivity improvements? 2. Does the plan provide sufficient linkages between finance and activity, is there a clear link between commissioner and provider activity changes and financial planning and do these align with the planned transformational changes in 2013/14 and 2014/15? 3. Does the plan provide sufficient linkages between organisations within the health economy, e.g. TFA actions are consistent with other areas of the plan? 4. Are high level risks identified that represent the most significant threats to the system that would prevent successful delivery of the plan? 5. Does the plan give due regard to the public sector Equality Duty (PSED), and are equality objectives integrated into the plan? Clear and credible plans 1 that set out how CCCGs will take responsibility for service transformation 6. The plan includes a detailed financial plan that delivers financial balance, sets out how it will manage within its management allowance, and any other requirements set by the NHSCB and is integrated with the commissioning plan. 7. The plan sets out how savings and efficiencies will be delivered whilst improving quality and this is integral to the plan. There is a clear explanation of any changes to existing QIPP plans. 8. The plan supports delivery of JHWS and integrated commissioning, depending on local timeframe. 9. The plan sets out how it aligns with national frameworks and strategies, including the NHS Outcomes Framework. 1. Clear & credible plans :1. Does the plan clearly identify how the health system will be transformed and improved in from that in ? And is the plan clear on how the system will achieve this? 2. Does the plan articulate how the CCG will quantify, measure and monitor delivery of their share of the national savings challenge? 3. Are plans for savings appropriately phased and articulated for each year until (i.e. not too heavily front- or back- loaded) and do plans provide headroom (e.g. the savings for reinvestment are greater than the investment and challenge identified)? 17

18 Plan is understood by CCGs, members etc 10. The CCG can demonstrate that the process for developing its plans and priorities was inclusive and transparent. 11. The plan clearly demonstrates where and how the CCG is working with other CCGs to meet QIPP and other challenges. 12. The CCG can demonstrate that stakeholders are aware of and understand CCG priorities. 13. The CCG can demonstrate that member practices understand at least at a high level their local plan and priorities. 14. Member practices receive timely information to inform their involvement in CCG planning and monitoring delivery of those plans. Plan is evidence based and rooted in needs of population 15. The plan reflects JSNA and stakeholder engagement. 16. The plan makes good use of evidence and analysis to determine needs and priorities. The CCG can articulate the likely inherited issues and operating environment and set out a plan for resolution 17. Declaration that the inheritance from PCT is quantified, identified, understood and robust transition arrangements in place. 18. Where the area covered by the CCG is not on track to meet the plan for , there is a clear and time-limited resolution path to recover. Contracts in place to secure future delivery contracts with main providers agreed and signed off. 20. CCG has arrangements in place to manage all contracts. 21. CCG has systems in place to track performance of main providers. 22. CCG has arrangements in place to collaborate with neighbouring CCGs in areas such as lead commissioning where there is more than one CCG contracting with a provider. 18

19 19

20 Crown copyright Year 2012 First published 21 December 2012 Published to Name, in electronic format only. 20

Operational Focus: Performance

Operational Focus: Performance Operational Focus: Performance Sandra Iskander Changes for 2015/16 Change of focus of 18-weeks and A&E 4-hour wait targets as recommended by Sir Bruce Keogh, Medical Director, NHS England. 18-weeks to

More information

Sheet. Discussion. For: Decision. Noting. title: Author: Lead Director. Quality t Office. Director: and - 1 -

Sheet. Discussion. For: Decision. Noting. title: Author: Lead Director. Quality t Office. Director: and - 1 - Governing Body Paper Summary Sheet Date of Meeting: 23 April 2013 For: Decision Discussion Noting Agenda item and title: Author: GOV/13/04b/08 Operational Targets 2013/14 John Dudgeon Head of Information

More information

Quality and Leadership: Improving outcomes

Quality and Leadership: Improving outcomes Quality and Leadership: Improving outcomes Podiatry Managers/Allied Health Managers and Leaders 5 March 2014 Shelagh Morris OBE Acting Chief Allied Health Professions Officer 2 http://www.nhsemployers.org/aboutus/latest-news/pages/the-new-nhs-in-2013-infographic.aspx

More information

NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance

NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Fiona and Louise Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss

More information

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018 WEST HAMPSHIRE PERFORMANCE REPORT Based on performance data available as at 11 th January 2018 1 CCG Quality and Performance Executive Summary Introduction: The purpose of this report is to provide an

More information

National Clinical Audit programme

National Clinical Audit programme National Clinical Audit programme Danny Keenan Medical Director www.hqip.org.uk Who are HQIP? HQIP is a not-for profit, professional/patient partnership, aiming to change and improve health and social

More information

Outcomes benchmarking support packs: CCG level

Outcomes benchmarking support packs: CCG level Outcomes benchmarking support packs: CCG level NHS South Devon and Torbay CCG Produced with input from: Public Health England Forward and Introduction Local decision making is at the heart of the NHS,

More information

Report to the Merton Clinical Commissioning Group Governing Body

Report to the Merton Clinical Commissioning Group Governing Body MCCG GB 19.09.1 Pt1 Att 09 Report to the Merton Clinical oning Group Governing Body Date of Meeting: 16 th September 01 Agenda No: 8.1 Attachment: 09 Title of Document: Performance Framework and Balanced

More information

NHS Leeds West CCG Clinical Commissioning Strategy. 2013/14 to 2015/16

NHS Leeds West CCG Clinical Commissioning Strategy. 2013/14 to 2015/16 NHS Leeds West CCG Clinical Commissioning Strategy 2013/14 to 2015/16 Working together locally to achieve the best health and care in all our communities 1 Contents Section 1: Summary Page 3 Section 2:

More information

NHS Bradford Districts CCG Commissioning Intentions 2016/17

NHS Bradford Districts CCG Commissioning Intentions 2016/17 NHS Bradford Districts CCG Commissioning Intentions 2016/17 Introduction This document sets out the high level commissioning intentions of NHS Bradford Districts Clinical Commissioning Group (BDCCG) for

More information

Performance and Quality Report Sean Morgan Director of Performance and Delivery Mary Hopper Director of Quality Dino Pardhanani, Clinical Director

Performance and Quality Report Sean Morgan Director of Performance and Delivery Mary Hopper Director of Quality Dino Pardhanani, Clinical Director Sutton CCG Clinical Commissioning Group Governing Body Date Thursday, 06 September 2018 Document Title Lead Director (Name and Role) Clinical Sponsor (Name and Role) Performance and Quality Report Sean

More information

Governing Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012

Governing Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012 - Governing Body DATE OF MEETING: TITLE OF REPORT: Performance Report for period ending 31st December 2012 KEY MESSAGES: We are responsible for securing improvements in the quality of care and health outcomes.

More information

NHS Fylde and Wyre CCG Performance Dashboard

NHS Fylde and Wyre CCG Performance Dashboard Governing Body January 2016 NHS Fylde and Wyre CCG Performance Dashboard October 2015 (Month 7) Governing Body This report provides a high level summary of performance and activity and across Fylde and

More information

NHS Ashford Clinical Commissioning Group. Integrated Performance Report. November 2013

NHS Ashford Clinical Commissioning Group. Integrated Performance Report. November 2013 NHS Ashford Clinical Commissioning Group Integrated Performance Report November 2013 Page 1 Contents Executive Summary... 6 Assurance Framework Overview... 10 Are local people getting good quality care?...

More information

Quality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement

Quality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement Quality Accounts: Corroborative Statements from Commissioning Groups Quality Accounts are annual reports to the public from providers of NHS healthcare about the quality of services they deliver. The primary

More information

Figure 1: Domains of the Three Adult Outcomes Frameworks

Figure 1: Domains of the Three Adult Outcomes Frameworks Outcomes Frameworks across Public Health, Social Care and NHS Relevance to Ealing Health & Wellbeing Strategy 1. Overview For adults there are three outcomes frameworks, one each for public health, NHS

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 8 th February 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Developing Plans for the Better Care Fund

Developing Plans for the Better Care Fund Annex to the NHS England Planning Guidance Developing Plans for the Better Care Fund (formerly the Integration Transformation Fund) What is the Better Care Fund? 1. The Better Care Fund (previously referred

More information

Performance and Delivery/ Chief Nurse

Performance and Delivery/ Chief Nurse Governing Body 26th May 2017 Quality and Performance Report 22nd May 2017 Author: Other contributors: Executive Lead Audience Eileen Clark - Acting Director of Clinical Performance and Delivery/ Chief

More information

GOVERNING BODY REPORT

GOVERNING BODY REPORT GOVERNING BODY REPORT 1. Date of Governing Body Meeting: 2. Title of Report: Finance, Performance and Commissioning Committee Report 3. Key Messages: At the end of March 2017 the clinical commissioning

More information

Vision 3. The Strategy 6. Contracts 12. Governance and Reporting 12. Conclusion 14. BCCG 2020 Strategy 15

Vision 3. The Strategy 6. Contracts 12. Governance and Reporting 12. Conclusion 14. BCCG 2020 Strategy 15 Bedfordshire Clinical Commissioning Group Quality Strategy 2014-2016 Contents SECTION 1: Vision 3 1.1 Vision for Quality 3 1.2 What is Quality? 3 1.3 The NHS Outcomes Framework 3 1.4 Other National Drivers

More information

Draft Commissioning Intentions

Draft Commissioning Intentions The future for Luton s primary care services Draft Commissioning Intentions 2013-14 The NHS will have less money to spend over the next three years. Overall, it has to make 20 billion of efficiency savings

More information

NHS Performance Statistics

NHS Performance Statistics NHS Performance Statistics Published: 8 th March 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

21 March NHS Providers ON THE DAY BRIEFING Page 1

21 March NHS Providers ON THE DAY BRIEFING Page 1 21 March 2018 NHS Providers ON THE DAY BRIEFING Page 1 2016-17 (Revised) 2017-18 (Revised) 2018-19 2019-20 (Indicative budget) 2020-21 (Indicative budget) Total revenue budget ( m) 106,528 110,002 114,269

More information

Improvement and Assessment Framework Q1 performance and six clinical priority areas

Improvement and Assessment Framework Q1 performance and six clinical priority areas Governing Body 30 th September 2016 Improvement and Assessment Framework Q1 performance and six clinical priority areas Agenda item 16 Paper 10 Summariser: Authors and contributors: Executive Lead(s):

More information

Commissioning for Quality and Innovation (CQUIN) Schemes for 2015/16

Commissioning for Quality and Innovation (CQUIN) Schemes for 2015/16 Commissioning for Quality and Innovation (CQUIN) Schemes for 2015/16 Goal No. Indicator Name Contract 1 Acute Kidney Injury CWS CCG Contract - National CQUIN 2a Sepsis Screening CWS CCG Contract - National

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 14 th December 217 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Section 1 - Key Performance Indicators

Section 1 - Key Performance Indicators Clinical Quality Report Month 6 2016/17 period ending 30th September 2016 Section 1 - Key Performance Indicators 1.1 NHS Improvement; Risk Assessment Framework Clostridium difficile Indicator M6 2 YTD

More information

RTT Recovery Planning and Trajectory Development: A Cambridge Tale

RTT Recovery Planning and Trajectory Development: A Cambridge Tale RTT Recovery Planning and Trajectory Development: A Cambridge Tale Linda Clarke Head of Operational Performance Addenbrooke s Hospital I Rosie Hospital Apr 2014 May 2014 Jun 2014 Jul 2014 Aug 2014 Sep

More information

Direct Commissioning Assurance Framework. England

Direct Commissioning Assurance Framework. England Direct Commissioning Assurance Framework England NHS England INFORMATION READER BOX Directorate Medical Operations Patients and Information Nursing Policy Commissioning Development Finance Human Resources

More information

Whittington Health Quality Strategy

Whittington Health Quality Strategy Whittington Health Quality Strategy 2012-2017 Safe care Effective care Excellent patient experience...caring for you Quality Strategy for Whittington Health Introduction The purpose of this quality strategy

More information

Aintree University Hospital NHS Foundation Trust Corporate Strategy

Aintree University Hospital NHS Foundation Trust Corporate Strategy Aintree University Hospital NHS Foundation Trust Corporate Strategy 2015 2020 Aintree University Hospital NHS Foundation Trust 1 SECTION ONE: BACKGROUND AND CONTEXT 1 Introduction Aintree University Hospital

More information

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10. Date of Meeting:.24 th March 2017.

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10. Date of Meeting:.24 th March 2017. NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10 Date of Meeting:.24 th March 2017. TITLE OF REPORT: CCG Corporate Performance Report AUTHOR: Melissa Laskey Director of Service

More information

City and Hackney Clinical Commissioning Group Prospectus May 2013

City and Hackney Clinical Commissioning Group Prospectus May 2013 City and Hackney Clinical Commissioning Group Prospectus May 2013 Foreword We are excited to be finally live as a CCG, picking up our responsibilities as commissioners for the bulk of the NHS. The changeover

More information

Cambridgeshire and Peterborough Sustainability and Transformation Partnership

Cambridgeshire and Peterborough Sustainability and Transformation Partnership Cambridgeshire and Peterborough Sustainability and Transformation Partnership Governance Framework November 2017 Page 1 of 28 Contents 1. Introduction 2. Sustainability and Transformation Partnership 3.

More information

How CQC monitors, inspects and regulates NHS GP practices

How CQC monitors, inspects and regulates NHS GP practices How CQC monitors, inspects and regulates NHS GP practices March 2018 Updates to this guidance since October 2017: NEW annual provider information collection (for practices rated as good and outstanding)

More information

DELIVERING THE LEFT SHIFT IN ACUTE ACTIVITY THE COMMUNITY MODEL

DELIVERING THE LEFT SHIFT IN ACUTE ACTIVITY THE COMMUNITY MODEL DELIVERING THE LEFT SHIFT IN ACUTE ACTIVITY THE COMMUNITY MODEL 1. Introduction The Strategic Outline Case (SOC) and subsequent developing Outline Business Case (OBC) for the reconfiguration of acute hospital

More information

Report to Governing Body 19 September 2018

Report to Governing Body 19 September 2018 Report to Governing Body 19 September 2018 Report Title Author(s) Governing Body/Clinical Lead(s) Management Lead(s) CCG Programme Purpose of Report Summary NHS Lambeth Clinical Commissioning Group (CCG)

More information

Council of Members. 20 January 2016

Council of Members. 20 January 2016 Council of Members 20 January 2016 Feedback on election process: Council of Members Chair and Deputy Chair Malcolm Hines, Chief Financial Officer Minutes of last meeting: 14 October 2015 Dr. Richard Proctor,

More information

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 Subject: Supporting TEG Member: Authors: Status 1 Data Quality Baseline Assessment

More information

Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee

Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee EPB53/825 Title of Report: Prepared By: Sponsor: Action Required: Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee Gale Hart, Director

More information

Memorandum of understanding for shadow Accountable Care Systems

Memorandum of understanding for shadow Accountable Care Systems Since Previously Discussed by BLMK CEOs: Memorandum of understanding for shadow Accountable Care Systems Dear Richard, As described in Next Steps on the NHS Five Year Forward View, we intend to name a

More information

Implementation of the right to access services within maximum waiting times

Implementation of the right to access services within maximum waiting times Implementation of the right to access services within maximum waiting times Guidance for strategic health authorities, primary care trusts and providers DH INFORMATION READER BOX Policy HR / Workforce

More information

Integrated Performance Report

Integrated Performance Report ENC Bi Integrated Performance Report M1 2014/15 26 June 2014 Contents 1. Structure of the Document... 3 2. Southwark CCG and Providers Performance Summary Dashboard... 4 3. Southwark CCG Dashboard... 5

More information

Joint Technical Definitions for Performance and Activity 2017/ /19

Joint Technical Definitions for Performance and Activity 2017/ /19 Joint Technical Definitions for Performance and Activity 2017/18-2018/19 1 Joint Technical Definitions for Performance and Activity 2017/18-2018/19 Version number: 1.3 First publication: 12/10/2016 Second

More information

Newham Borough Summary report

Newham Borough Summary report Newham Borough Summary report April 2013 Prepared on 17/04/13 by Commissioning Support team Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 GREE N Finance and Activity

More information

Technical Guidance Refreshing NHS plans for 2018/19. Published by NHS England and NHS Improvement

Technical Guidance Refreshing NHS plans for 2018/19. Published by NHS England and NHS Improvement Technical Guidance Refreshing NHS plans for 2018/19 Published by NHS England and NHS Improvement Technical Guidance for Refreshing NHS plans for 2018/19 Version number: 1.1 First published: 23 February

More information

NHS Wales Delivery Framework 2011/12 1

NHS Wales Delivery Framework 2011/12 1 1. Introduction NHS Wales Delivery Framework for 2011/12 NHS Wales has made significant improvements in targeted performance areas over recent years. This must continue and be associated with a greater

More information

The operating framework for. the NHS in England 2009/10. Background

The operating framework for. the NHS in England 2009/10. Background the voice of NHS leadership briefing DECEMBER 2008 ISSUE 172 The operating framework for the NHS in England 2009/10 Key points No new national targets. National priorities are the same as last year. but

More information

Quality Framework Healthier, Happier, Longer

Quality Framework Healthier, Happier, Longer Quality Framework 2015-2016 Healthier, Happier, Longer Telford & Wrekin Clinical Commissioning Group (CCG) makes quality everyone s business. Our working processes are designed to ensure we all have the

More information

Milton Keynes CCG Strategic Plan

Milton Keynes CCG Strategic Plan Milton Keynes CCG Strategic Plan 2012-2015 Introduction Milton Keynes CCG is responsible for planning the delivery of health care for its population and this document sets out our goals over the next three

More information

NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY

NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY PLEASE NOTE POLICY IS UNDER REVIEW NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY Target Audience Brief Description (max 50 words) Action Required Providers, Commissioners

More information

Quality Strategy

Quality Strategy Governing Body Friday, 27 th May 2016 Quality Strategy 2016 2018 Agenda item 15 Paper 9 Author: Executive Lead: Relevant Committees or forums that have already reviewed this paper: Action required: Eileen

More information

Performance of the NHS provider. sector for the quarter ended 30. June 2018

Performance of the NHS provider. sector for the quarter ended 30. June 2018 Performance of the NHS provider sector for the quarter ended 30 June 2018 Contents Overview at Q1 2018/19 Performance comparisons 2.3 Income analysis 2.4 Employee expenses pay costs 1.0 Operational performance

More information

London CCG Neurology Profile

London CCG Neurology Profile CCG Neurology Profile November 214 Summary NHS Hammersmith And Fulham CCG Difference from Details Comments Admissions Neurology admissions per 1, 2,13 1,94 227 p.1 Emergency admissions per 1, 1,661 1,258

More information

Integrated Performance Report. NHS Rotherham Board 6 July 2011

Integrated Performance Report. NHS Rotherham Board 6 July 2011 Integrated Performance Report NHS Rotherham Board 6 July 2 CONTENTS Introduction Pg 2 Efficiency Pg 3-6 Rotherham Outcomes Pg 7- Contract Performance Pg -13 Finance Pg 14-15 1 INTRODUCTION Report format..

More information

Executive Summary: This report focuses on month 10 data of the 2017/18 financial year, January 2018, unless otherwise indicated.

Executive Summary: This report focuses on month 10 data of the 2017/18 financial year, January 2018, unless otherwise indicated. Agenda item: 3.1 Paper No: 8 Committee: Venue: Governing Body The Boardroom, Dominion House : 27/03/2018 Status: FOR REVIEW AND DISCUSSION Title of Report Performance Report: Month 10, January 2018 Presented

More information

Utilisation Management

Utilisation Management Utilisation Management The Utilisation Management team has developed a reputation over a number of years as an authentic and clinically credible support team assisting providers and commissioners in generating

More information

The Cumbria Local Health Economy Strategic Plan

The Cumbria Local Health Economy Strategic Plan The Cumbria Local Health Economy Strategic Plan 2014-2019 Executive Summary Executive Summary 1 Status of this Document This document sets out the collective five year plan for the Cumbria Local Health

More information

NHS Horsham and Mid Sussex Clinical Commissioning Group Annual Report and Accounts 2017/18

NHS Horsham and Mid Sussex Clinical Commissioning Group Annual Report and Accounts 2017/18 NHS Horsham and Mid Sussex Clinical Commissioning Group Annual Report and Accounts 2017/18 NHS Horsham and Mid Sussex Clinical Commissioning Group ANNUAL REPORT 2017/18 1 2 ANNUAL REPORT 2017/18 NHS Horsham

More information

Commissioning for Value insight pack

Commissioning for Value insight pack Commissioning for Value insight pack NHS England Gateway ref: 00525 Contents Introduction: the call to action The approach Where to look using indicative data Phase 2 & 3 Why act what benefits do the population

More information

2. This year the LDP has three elements, which are underpinned by finance and workforce planning.

2. This year the LDP has three elements, which are underpinned by finance and workforce planning. Directorate for Health Performance and Delivery NHSScotland Chief Operating Officer John Connaghan T: 0131-244 3480 E: john.connaghan@scotland.gsi.gov.uk John Burns Chief Executive NHS Ayrshire and Arran

More information

STP analysis Durham, Darlington, Teesside, Hambleton, Richmondshire and Whitby

STP analysis Durham, Darlington, Teesside, Hambleton, Richmondshire and Whitby STP analysis Durham, Darlington, Teesside, Hambleton, Richmondshire and Whitby http://nhsbetterhealth.org.uk/wp-content/uploads/2016/11/stp-draft-plan-on-page- Final-1.pdf The STP Process Q1. Version Control:

More information

Aligning the Publication of Performance Data: Outcome of Consultation

Aligning the Publication of Performance Data: Outcome of Consultation Aligning the Publication of Performance Data: Outcome of Consultation NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops.

More information

Integrated Performance Report

Integrated Performance Report Integrated Performance Report January 2015 1 Patient focused, Providing quality, improving outcomes Contents: Page: Executive Summary 3 Assurance Framework Scorecard 4 NHS Outcomes Domains are health outcomes

More information

Quality & Performance Report. Public Board

Quality & Performance Report. Public Board Agenda Item 12.1 Quality & Performance Report Public Board 27 th November 2014 Presented for: Presented by: Author: Previous Committees: Governance Professor Suzanne Hinchliffe CBE Chief Nurse / Interim

More information

NHS Cumbria Clinical Commissioning Group. Strategic & Operational Commissioning Plan

NHS Cumbria Clinical Commissioning Group. Strategic & Operational Commissioning Plan NHS Cumbria Clinical Commissioning Group Strategic & Operational Commissioning Plan 2012 2015 Document History Document Ref: Cumbria CCG Strategic Commissioning Plan 2012-2017 Version: Discussion draft

More information

BSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain

BSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain BSUH INTEGRATED PERFORMANCE REPORT 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well ed Domain RESPONSIVE DOMAIN RESPONSIVE DOMAIN Metric Defined by Standard Apr-16 May-16

More information

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019 Bristol CCG North Somerset CGG South Gloucestershire CCG Draft Commissioning Intentions for 2017/2018 and 2018/2019 Programme Area Key intention Primary and community care Sustainable primary care Implement

More information

Strategic Risk Report 4 July 2016

Strategic Risk Report 4 July 2016 Strategic Report 4 July 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Group s control over the delivery of

More information

OPERATIONAL PLANNING & CONTRACTING PLANNING GUIDANCE ON THE DAY BRIEFING

OPERATIONAL PLANNING & CONTRACTING PLANNING GUIDANCE ON THE DAY BRIEFING 22 September Month 2016 2017-2019 OPERATIONAL PLANNING & CONTRACTING PLANNING GUIDANCE ON THE DAY BRIEFING Today the national bodies NHS England (NHSE) and NHS Improvement (NHSI) have published their planning

More information

CCG authorisation: the role of medicines management

CCG authorisation: the role of medicines management May 2012 The NHS medicines bill for 2010 was 12.9 billion, of which secondary care costs accounted for 32%. Prescribing inflation in 2010 ran at 4.8% and it is estimated that around 14% of total CCG budgets

More information

SCHEDULE 2 THE SERVICES Service Specifications

SCHEDULE 2 THE SERVICES Service Specifications SCHEDULE 2 THE SERVICES Service Specifications Service Specification No Service ParaDoc Commissioner City and Hackney CCG Commissioner Lead Leah Herridge Provider CHUHSE Provider Lead Date of Review September

More information

Newham Borough Summary report

Newham Borough Summary report Newham Borough Summary report March 2013 Prepared on 18/03/13 by Commissioning Support team Finance and Activity Millions Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Newham Headlines March 2013 Feb-12 Apr-12 Jun-12

More information

WOLVERHAMPTON CCG. Governing Body Meeting 9 th September 2014

WOLVERHAMPTON CCG. Governing Body Meeting 9 th September 2014 WOLVERHAMPTON CCG Governing Body Meeting 9 th September 2014 ` Agenda item:12 TITLE OF REPORT: REPORT PRESENTED BY: Title of Report: Purpose of Report: Commissioning Committee Summary Kamran Ahmed Update

More information

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control Reference CL/CGP/026 Approving Body Senior Management

More information

Integrated Quality and Performance Report

Integrated Quality and Performance Report Item 6 Integrated Quality and Performance Report Herts Valleys CCG Board 1 st August 2013 Period of {MONTH HERE} 1 Introduction to the Integrated Performance Report 1. Purpose of this Report 1.1 This report

More information

2020 Objectives July 2016

2020 Objectives July 2016 ... 2020 Objectives July 2016 1 About NHS Improvement NHS Improvement is responsible for overseeing NHS foundation trusts, NHS trusts and independent providers. We offer the support these providers need

More information

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 Coventry and Warwickshire Emergency Care Network Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 This aim of this plan is to provide a high level

More information

End of Life Care. LONDON: The Stationery Office Ordered by the House of Commons to be printed on 24 November 2008

End of Life Care. LONDON: The Stationery Office Ordered by the House of Commons to be printed on 24 November 2008 End of Life Care LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 24 November 2008 REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1043 Session 2007-2008 26 November

More information

Agreement between: Care Quality Commission and NHS Commissioning Board

Agreement between: Care Quality Commission and NHS Commissioning Board Agreement between: Care Quality Commission and NHS Commissioning Board January 2013 1 Joint Statement This agreement sets out the strategic intent and commitment for the Care Quality Commission (CQC) and

More information

GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD

GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD GREATER MANCHESTER HEALTH AND SOCIAL CARE STRATEGIC PARTNERSHIP BOARD 10 Date: 28 October 2016 Subject: Report of: Assurance Framework (including Performance Dashboard) Jon Rouse and Nicky O Connor PURPOSE

More information

Review of Local Enhanced Services

Review of Local Enhanced Services Review of Local Enhanced Services 1. Background and context 1.1 CCGs are required to prepare for the phasing out of LESs by April 2014 by reviewing the existing LES portfolio and developing commissioning

More information

The Local Health Economy : Understanding Finance in the NHS

The Local Health Economy : Understanding Finance in the NHS The Local Health Economy : Understanding Finance in the NHS Connaught Hall, Attleborough 20 May 2015 Ann Donkin, Accountable Officer Introduction to NHS Finance Complex to describe, both internally and

More information

Commissioning Policy

Commissioning Policy Commissioning Policy Consultant to Consultant Referrals Version 6.0 December 2017 Name of Responsible Board / Committee for Ratification: North Staffordshire CCG Stoke on Trent CCG Date Issued: November

More information

Refreshing NHS Plans. for 2018/19. Published by NHS England and NHS Improvement

Refreshing NHS Plans. for 2018/19. Published by NHS England and NHS Improvement Refreshing NHS Plans for 2018/19 Published by NHS England and NHS Improvement Refreshing NHS plans for 2018/19 Version number: 1.0 First published: February 2018 Prepared by: NHS England and NHS Improvement

More information

The safety of every patient we care for is our number one priority

The safety of every patient we care for is our number one priority HUMBER NHS FOUNDATION TRUST INFECTION PREVENTION AND CONTROL STRATEGY 2015-2017 1. Introduction Healthcare associated infections (HCAI) continue to be a major cause of patient harm and although nationally

More information

Clinical Strategy

Clinical Strategy Clinical Strategy 2012-2017 www.hacw.nhs.uk CLINICAL STRATEGY 2012-2017 Our Clinical Strategy describes how we are going to deliver high quality care in response to patient and carer feedback and commissioner

More information

SCHEDULE 2 THE SERVICES

SCHEDULE 2 THE SERVICES SCHEDULE 2 THE SERVICES A. Service Specifications Service Specification No. 170008/S Service Atypical haemolytic uraemic syndrome (ahus) (all ages) Commissioner Lead Provider Lead Period Date of Review

More information

Commissioning for quality and innovation (CQUIN): 2014/15 guidance. February 2014

Commissioning for quality and innovation (CQUIN): 2014/15 guidance. February 2014 Commissioning for quality and innovation (CQUIN): 2014/15 guidance February 2014 1 NHS England INFORMATION READER BOX Directorate Medical Operations Patients and Information Nursing Policy Commissioning

More information

Quality Strategy. Cannock Chase Clinical Commissioning Group. Agreed at Governing Body. Signature: Designation: Chair of the Governing Body

Quality Strategy. Cannock Chase Clinical Commissioning Group. Agreed at Governing Body. Signature: Designation: Chair of the Governing Body Cannock Chase Clinical Commissioning Group Quality Strategy Agreed at Governing Body Signature: Designation: Chair of the Governing Body Date: 8 th November 2012 Review Date: March 2014 TABLE OF CONTENTS

More information

Summary two year operating plan 2017/18

Summary two year operating plan 2017/18 One Trust - serving our local communities Summary two year operating plan 2017/18 & 2018/19 www.lewishamandgreenwich.nhs.uk Summary two year operating plan: 2017/18 and 2018/19 1. Introduction This summary

More information

Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017

Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Background Theme 3 builds upon previous key strategic commissioning

More information

TERMS OF REFERENCE. Transformation and Sustainability Committee. One per month (Second Thursday) GP Board Member (Quality) Director of Commissioning

TERMS OF REFERENCE. Transformation and Sustainability Committee. One per month (Second Thursday) GP Board Member (Quality) Director of Commissioning TERMS OF REFERENCE Committee: Frequency Of Meetings: Committee Chair: Membership: Attendance: Lead Officer: Secretary: Transformation and Sustainability Committee One per month (Second Thursday) GP Board

More information

Waiting Times Report Strategic. Thematic Goals

Waiting Times Report Strategic. Thematic Goals Strategic Improved Quality of Care Transformation - Prevention & Wellbeing Thematic Goals Waiting Times Report 2016-17 Transformation through Integration Improved Access to Services Improved Value This

More information

INTEGRATION SCHEME (BODY CORPORATE) BETWEEN WEST DUNBARTONSHIRE COUNCIL AND GREATER GLASGOW HEALTH BOARD

INTEGRATION SCHEME (BODY CORPORATE) BETWEEN WEST DUNBARTONSHIRE COUNCIL AND GREATER GLASGOW HEALTH BOARD INTEGRATION SCHEME (BODY CORPORATE) BETWEEN WEST DUNBARTONSHIRE COUNCIL AND GREATER GLASGOW HEALTH BOARD This integration scheme is to be used in conjunction with the Public Bodies (Joint Working) (Integration

More information

Local Delivery Plan Guidance 2016/17

Local Delivery Plan Guidance 2016/17 The Scottish Government Directorate for Health Performance & Delivery Dear Colleague Local Delivery Plan Guidance 2016/17 Summary The LDP Guidance 2016-17 sets out the performance contract between the

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services

More information

Performance, Quality and Outcomes Report: Position Statement

Performance, Quality and Outcomes Report: Position Statement Performance, Quality and Outcomes Report: Position Statement Update to Governing Body 5 April 2018 Item 1 Author(s) Sponsor Directors Purpose of Paper Jane Howcroft Programme and Performance Assurance

More information

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within

More information