Secure LVC Advanced Training Environment (SLATE)
|
|
- Eustace Johnston
- 6 years ago
- Views:
Transcription
1 Secure LVC Advanced Training Environment (SLATE) Advanced Technology Demonstration (ATD) 9 May 17 Integrity Service Excellence Mr. Dave Moses Noah SLATE Program Manager 711 HPW/RHA (AFRL) Distribution D. Distribution authorized to Department of Defense and U.S. DoD Contractors only. (Critical Technology) (3 Sep 14). Refer other requests for this document to 711 HPW/RH, Wright-Patterson AFB OH Cleared for Public Release 05 May 17 (88ABW )
2 SLATE ATD Background SLATE program specifics What & How Questions/Discussion Overview
3 Live, Virtual, and Constructive Training Enterprise Defined Seamlessly blending Live, Virtual, and Constructive (LVC) assets Live: Real People in Real Ops Systems Virtual: Real People in Simulated Systems Constructive: Computer Generated LVC Enterprise: An Open, Secure, Persistent Infrastructure for Training and Ops 3
4 Secure LVC Advanced Training Environment (SLATE) Background Builds on ACC/AFRL LVC Pilot Project, 2012 SAF/AQ, COMACC and AFMC/CC determined add l tech maturation and risk reduction required prior to LVC Program of Record (ACC ASR), Apr 2014 AFRL (711 HPW/RHA) tasked to execute Advanced Technology Demonstration (ATD) for tech maturation/risk reduction Fully funded FY14 FY17 by AFRL ($40M) and SAF/AQ ($7M) Commissioned as Advanced Technology Demonstration (ATD) at ACC Applied Technology Council, Feb 2015
5 Fifth Gen JORD Requirement (U) Training Environments. The fifth gen Training System must provide for individualized, group and team training 1 environments. The Training system must be capable of incorporating live, virtual, and constructive environments, including local and distributed training 2, throughout the training continuum 3. The training System must be interoperable with USAF, USMC, USN, and UK 4 distributed mission training capability implementation. The Training System must provide a continuous learning 5 environment for aircrew and maintainers including briefing, debriefing, mission planning, and mission/maintenance task rehearsal. Fifth gen training must integrate selfassessment tools that provide feedback to the user and input to the training management system 6. 1 = Multi-MDS 4 = Multi Level Security 2 = Live/Sim connectivity (DMO/NCTE) 3 = Tethered/UnTethered Ops 5 = Learning Management System 6 = Proficiency Based Training MILS, although the only validated requirement, is not the most important 5
6 CAF ADAIR Req't (Sorties) USAF Adversary Air Training Needs Today Capacity 2020 Capacity 2030 Capacity Live + V+C Live: T-X ADAIR Live: Contract ADAIR Live: T-38 ADAIR Live: AGRS Live: Self-Gen USAFWC Rqmt 5th Gen Rqmt 4th Gen Rqmt 80,000 VC sorties in % of live adversary training LVC must be 5 th Gen CAF-wide capable (commonality), to include adversary air (T-X) Aggressors must be able to materially participate There are zero solutions on the table that satisfy this requirement besides ATD 6
7 SLATE ATD Charter 1. Validate LVC infrastructure, interface control and data standards with a government owned, non-proprietary focus 2. Demonstrate Multiple Independent Levels of Security (MILS) encryption technology and rule sets 3. Evaluate throughput of MILS encryptor, radio and 5G-ATW waveform 4. Demonstrate both Pod and LRU form factors 5. Develop select weapon system OFP changes with vendors aligned with CAF training priorities (Direct risk reduction and leave behind for PoR) 6. Document training benefits and opportunities resulting from integration of LVC Every effort being made for exportability across infrastructure 7
8 NOT SLATE ATD Charter 1. Fly 5 th Gen (F-35) Aircraft (time and funding for LM) 2. Fly NSA accredited MILS 3. F-15E test beyond SLATE basic implementation (weapons) 4. DMON certification of any range (not an appropriate SLATE effort) 5. Cyber certification efforts 6. Everything else (a long list) 8
9 LVC Enterprise Systems Engineering Ground Interface No Changes at this time Airborne Interface Datalink Virtual/Constructive Network (DMO) Range Infrastructure & Data Link Un-tethered Datalink, OFP Translate, Encryptor, Secure data Transmitter, CDS, Waveform, Simulation Models / Processing,, Msn Planning Aircraft OFP Vendors (4 th /5 th Gen) Aircraft Simulated Model Vendors (Radar, RWR, IFF, NCTR, IRST, WPNS) Hardware vendors (Targeting Pod/EOTS, HTS Pod, RWR, DAS, Radars, IFF,) OFP Mod 4 th /5 th Gen Multiple Enterprises = huge systems engineering challenge (reason for ATD) 9
10 Capstone Scenario = Pods (18) NTTR is the only range with combination of size, resident live threats, flight test organization, and infrastructure to facilitate the SLATE flight tests in the ATD timeframe
11 C V L L L C L V C L L
12 Dave Moses Noah SLATE Program Manager 711 HPW/RHA Phone (937) (DSN 798) Questions / Discussion
13 Thank You 13
14 LVC Connections for 4 th and 5 th Gen A/C with LVC and P5 (tethered) One step to LVC Security Levels 2,3,4 CAF DMO DIS LVC Ground Station P5 JSF DL/ 5G-ATW 2-Way C-DIS over ATW P5-JSF LVC Pod LVC Pod (ACMI to CDIS) 5 th Gen Un-Mod / Modified 4 th Gen Modified 4 th Gen Unmodified (Aggressors) CAF DMO CDS Security Level 1 DIS/ACMI Gateway Unclass One Way TSPI P5 Ground Station P5 Pod 4 th Gen Unmodified DIS ACMI 14
15 SLATE 4 Security Enclaves - Tethered PDU List: Entity State: Chaff/Flare Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal 5 th Gen SLATE A PDU List: Entity State: Chaff/Flare Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal Modified OFP with SLATE Pod B PDU List: Entity State: Chaff/Flare Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal Unmodified OFP with SLATE Pod C P5 Pod P5ACMI Pod P5 TSPI data Ground Transceiver P5 A B C A CDS B CDS CGF Server Debrief Performance Measures Virtual Sims Battle Space Viewer/Control ACMI to DIS One way data flow into Red enclave Unclassified. See distribution statement on title slide 15
16 SLATE - 3 Security Enclaves - Orange & Purple Sharing Data - Untethered PDU List: Entity State: Chaff/Flare Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal 5 th Gen SLATE PDU List: Modified OFP Entity State: Chaff/Flarewith SLATE Pod A CDS B CDS C Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal B CDS C PDU List: Entity State: Chaff/Flare Fire Detonate Start Stop Remove Entity Set Data (weapons allocate) Data (Radar) Emitter IFF Designator : Transmitter Signal Unmodified OFP with SLATE Pod C Looks easy and boring (no V or C) but extremely important and complex this event will happen as much as tethered! Airborne interface must perform the duties of CDS, Server, and RTKN All data collated for same level of detail in debrief as tethered
17 Infrastructure Diagram (SLE, Tethered Example) HUD/Helmet EA/EP A/C TSPI Live Sim Link Receiver / Ground Station DIS/HLA Interface Equipment Standard Entity State Fire, Detonate Aircraft UAV AWACS V Sensors / MODELS Combat Datalink L Live Simulation Link All information not on a tactical data link or voice radio that is required to interact fully with the network. May include multiple simultaneous security levels/channels Datalink Receiver Ground Station DIS/HLA Interface Equipment Standard Link16, MADL, IFDL etc. JTAC Monitor and Control Performance Measurement Brief / Debrief Cockpit Voice Radio Link16, MADL, IFDL etc. UHF/VHF Voice Radio DIS/HLA Interface Equipment Voice Radio Server(s) Computer Generated Forces C UHF/VHF Xmit/Recv DMO LAN/WAN
IHS. In many examples of training today, virtual. Virtual construct: LVC strides toward reality. TECHNOLOGY REPORT LVC training
TECHNOLOGY REPORT LVC training A USAF F-15C takes off on one of the first Northern Edge 2015 LVC training missions. F/A- 18s sit on the ramp and aircrew in the simulator. Northrop Grumman: 1635569 Virtual
More informationRequest for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype
1.0 Purpose Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype This Request for Solutions is seeking a demonstratable system that balances computer processing for modeling and
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207445F PE TITLE: FIGHTER TACTICAL DATA Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationJoint Terminal Control Training & Rehearsal System (JTC TRS)
Joint Terminal Control Training & Rehearsal System (JTC TRS) Lt Col Dan Hodgkiss 677 AESG/TO 937 255 3801 daniel.hodgkiss@wpafb.af.mil Date: 15 May 2007 Government disclaimer: all information is provided
More informationLessons Learned from the MSG- 128 Study on Incremental Implementation of NATO Mission Training through Distributed Simulation Operations
Lessons Learned from the MSG- 128 Study on Incremental Implementation of NATO Mission Training through Distributed Simulation Operations Jean-Pierre FAYE (Behalf the MSG-128 TG) MSG-143 Symposium, Bucharest,
More informationUNCLASSIFIED FY Quantity of RDT&E Articles
COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207701F PE TITLE: Full Combat Mission Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.
More informationDistributed Mission Operations Air National Guard Update
Distributed Mission Operations Air National Guard Update Colonel Dan Bader Chief, Requirements Division Presented by LtCol Alan Huey ANG DTOC 515-974-8800 www.airdmt.net Briefing Overview ANG DMO Vision
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 1.604 1.584 1.536-1.536 1.626
More informationF-35 Lightning II A New Generation of Fighter
F-35 Lightning II A New Generation of Fighter 1 The Next Generation in Fighter Aircraft A Quantum Leap in Capability LO Treatments Advanced Avionics Guided Weapons First Jets Supersonic First Radar Multirole
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 48 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2010 Mr.
More informationFuture force philosophy: Operators grapple with the art of fifth-generation pilot training
Future force philosophy: Operators grapple with the art of fifth-generation pilot training [Content preview Subscribe to Jane s International Defence Review for full article] With fifth-generation aircraft
More informationAeronautical Systems Center
Aeronautical Systems Center Engineering for War Fighter Integration of Net- Centric Systems Presentation to the 13 th Annual Systems Engineering Conference 27 October 2010 Ms. Eileen Bjorkman SAF/A6W Pentagon,
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 22.113 15.501 10.448-10.448 19.601 18.851
More informationForeign Military Sales (FMS) Checklist for Preparing a Letter of Request (LOR) for Air Combat Maneuvering Instrumentation (ACMI)
Foreign Military Sales (FMS) Checklist for Preparing a Letter of Request (LOR) for Air Combat Maneuvering Instrumentation (ACMI) The P5 Combat Training System (P5CTS) is the latest ACMI System. Its superior
More informationAir Education and Training Command
Air Education and Training Command Education & Training Technology Application (ETTAP) Program AETC/A5TT 15 May 07 Larry Clemons I n t e g r i t y S e r v i c e E x c e l l e n c e Overview Education Training
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY
More informationFIGHTER DATA LINK (FDL)
FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average
More informationCapability Integration
SoS/Interoperability IPT Integrating Lockheed Martin Strengths Realizing Military Value Integration Framework for Developing C4ISTAR Solutions Dr David Sundstrom Director, Network Centric 21 September
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 6 R-1 Line #162 Cost To Complete Total Cost Total Program Element 5.829 5.779 5.699-5.699 5.762 5.881 6.046 6.124 Continuing
More informationF-35 Weapon System Overview
F-35 Weapon System Overview Doug Hayward Deputy Director F-35 Vehicle Systems Lockheed Martin Aeronautics 2010 Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A: A. Approved for public release;
More informationExhibit R-2, RDT&E Budget Item Justification February 2007
PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationAir Education and Training Command
Air Education and Training Command TSPG ADVANCED PLANNING BRIEFING TO INDUSTRY AETC Larry Clemons 23 May 06 I n t e g r i t y - S e r v i c e - E x c e l l e n c e Overview HQ AETC Plans, Requirements,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost
More informationNGAUS Legislative Workshop. Col Kevin Stubby Campbell Director, Plans & Requirements NGB/A5/8/9 13 Feb 2018
NGAUS Legislative Workshop Col Kevin Stubby Campbell Director, Plans & Requirements NGB/A5/8/9 13 Feb 2018 NGB/A5 Mission Customer = The field / Engineers = Aircraft Program Offices NGB/A5 Mission Rapidly
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207133F F-16 SQUADRONS Cost ($ in Millions)
More informationOgden Air Logistics Center
Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Sherel L. Hardy, Squadron Director 507 ACSS, Hill AFB UT DSN 777-7823, 801-777-7823 sherel.hardy@hill.af.mil Training
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145
More informationOPERATIONAL ALIGNMENT IN PREDATOR TRAINING RESEARCH
OPERATIONAL ALIGNMENT IN PREDATOR TRAINING RESEARCH Noah P. Schill *, Leah J. Rowe, Brian L. Gyovai, DeForest Q. Joralmon, Andrew J. Schneck **, Darrin A. Woudstra The sixteen year old USAF RPA program
More informationF-35 Lightning II Program
F-35 Lightning II Program Public Release 2018 02 06 5 th Generation Comms: What s being done to ensure the F-22 and F-35 can talk to each other... and the rest of the Air Force? By Brian W. Everstine,
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16
More informationJoint Staff J7 Cyberspace Environment Division / Joint Information Operations Range (JIOR) Overview
Joint Staff J7 Cyberspace Environment Division / Joint Information Operations Range (JIOR) Overview Approved for Public Release by Joint Staff Public Affairs - Hampton Roads 18 Dec 15 JIOR Background DoD
More informationISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training
Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission
More informationUNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15
Exhibit R-2, RDT&E Project Justification May 2009 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY 6 (RDT&E MANAGEMENT SUPPORT) OPERATIONAL TEST ACTIVITIES AND ANALYSES (OT&A) PROGRAM ELEMENT
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total
More informationCOMMON AVIATION COMMAND AND CONTROL SYSTEM
Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation
More informationBottom Line Up Front
The Changing Air-Ground Tactical Data Link Environment Small Link 16 Terminals are Changing Air Support New Classes of User Terminals Changing Air Support Operations Pete Camana and Mike Kocin Advanced
More informationTechnological Advances in TDL Training. Mike Smith - BAE Systems AeI
Technological Advances in TDL Training Mike Smith - BAE Systems AeI Overview Plan a Complete Training Package Training DLOD RN Handbook As NEC concepts develop collective, joint and combined training will
More informationAir-Ground Integrated Layer Exploration (AGILE) Fire Phase II
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air-Ground Integrated Layer Exploration (AGILE) Fire Phase II Success and Challenges of Distributed Testing Mr. Timothy Menke Technical Director
More informationAGENCY: Defense Security Cooperation Agency, Department of Defense.
This document is scheduled to be published in the Federal Register on 11/14/2017 and available online at https://federalregister.gov/d/2017-24622, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE
More informationBattle Lab Simulation Collaboration Environment (BLSCE): Multipurpose Platform for Simulation C2
Battle Lab Simulation Collaboration Environment (BLSCE): Multipurpose Platform for Simulation C2 BCBL (Gordon) Mission FY03 & Beyond BCBL (GORDON) MISSION TASKS Support all TRADOC battle labs and proponents
More informationM-346 ITS ETTS and LVC filling the gap towards New Generation Combat Aircraft Training
M-346 ITS ETTS and LVC filling the gap towards New Generation Combat Aircraft Training Abu Dhabi, 26/27 February 2014 AGENDA Top Level TNA results M-346 ITS Concept M-346 ETTS characteristics and capabilities
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationPROVIDING THE WARFIGHTER S
AFLCMC HOT TOPICS Lt Gen JT Thompson Commander, AFLCMC PROVIDING THE WARFIGHTER S EDGE Overview AFLCMC mission Product Support (PS) & hot topics Where We re Headed Aircraft Structural Integrity Program
More informationOgden Air Logistics Center
Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Linda Y. Gay, Deputy Director 508 MASSG/GFMM, Hill AFB UT DSN 777-7823, 801-777-7823 Linda.Gay@hill.af.mil Training
More informationImpact of the War on Terrorism on the USAF
Headquarters U.S. Air Force Impact of the War on Terrorism on the USAF Brig Gen Dutch Holland Director of Current Operations & Training DCS, Air, Space, & Information Operations, Plans, & Requirements
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014
More informationNAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17
NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 Distribution Statement A Approved for public release, distribution is unlimited. File: NAVAIR Brief 1 Weapons Systems Integration and
More informationWARFIGHTER READINESS RESEARCH OVERVIEW
WARFIGHTER READINESS RESEARCH OVERVIEW Mr Mark Sturgell 711 HPW/XPT Human Effectiveness Directorate 711 th Human Performance Wing Air Force Research Laboratory Air Force Materiel Command 1 Report Documentation
More informationAir Force intelligence, surveillance, and reconnaissance (ISR)
Airmen Delivering Decision Advantage Lt Gen Larry D. James, USAF Air Force intelligence, surveillance, and reconnaissance (ISR) provides global vigilance our hedge against strategic uncertainty and risk
More informationEILEEN A. BJORKMAN, PhD CURRICULUM VITAE
EILEEN A. BJORKMAN, PhD CURRICULUM VITAE SUMMARY More than 33 years experience leading diverse personnel in complex, high technology acquisition, research, development, test and analysis organizations
More informationRC-135U Combat Sent. Headquarters U.S. Air Force. I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e RC-135U Combat Sent Capt Logan Schrank 45 RS/DOF-C 8 Sep 17 Version 1 RC-135U Combat Sent 2 History 17 Apr 1970: COMBAT
More informationThe Air National Guard Guarding America Defending Freedom NGAUS Industry Day Michael Bonzo Regan Chief Strategy and Plans Division, NGB/A5 Dec 2015
The Air National Guard Guarding America Defending Freedom NGAUS Industry Day Michael Bonzo Regan Chief Strategy and Plans Division, NGB/A5 Dec 2015 A5 Objective Right capability in the hands of the warfighter
More informationAir Force Flight Test Center
Air Force Flight Test Center We conduct and support the research, development, test and evaluation of aerospace systems from concept to combat Making DT&E and Modeling & Simulation Better Partners Dr.
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2013 FY
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO
COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationDISTRIBUTION STATEMENT A
IFPC Inc 2-I DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 31 IFPC Inc 2-I Mission Mission: Primary Indirect Fire Protection Capability Increment 2 Intercept (IFPC Inc
More informationOUR MISSION PARTNERS DISA S BUDGET. TOTAL DOD COMPONENT/AGENCY ORDERS FOR DISA DWCF FY16 (in thousands)
OUR MISSION PARTNERS Military Services DISA S BUDGET Appropriated (Based on FY17 President s Budget- Not Enacted) Total Appropriated: Defense Working Capital Fund (DWCF) (Based on FY17 President s Budget-
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY
More informationI n t e g r i t y - S e r v i c e - E x c e l l e n c e
Air Armament Center Air Force Precision Strike Weapons Development Status Richard D. Justice, Colonel, USAF Commander, 918 th Armament Systems Group Air Armament Center, Eglin AFB, FL I n t e g r i t y
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014
More informationNaval Unmanned Combat Air Vehicle
Naval Unmanned Combat Air Vehicle Advanced Technology Program TTO Tactical Technology Office Dr. William Scheuren DARPA/TTO wscheuren@darpa.mil (703) 696-2321 UCAV-N Vision ❶ Revolutionary New Ship-based
More informationNAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION
NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION PRESENTED TO: NAVAIR SMALL BUSINESS AVIATION TECHNOLOGY CONFERENCE 1 RDML STEVE EASTBURG ASSISTANT
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 1322.18 January 13, 2009 Incorporating Change 1, Effective February 23, 2017 USD(P&R) SUBJECT: Military Training References: (a) DoD Directive 1322.18, subject as
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0101113F PE TITLE: B-52 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0101113F B-52 SQUADRONS ($ in Millions) FY
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationAir Force Cyber Operations Command
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e This Briefing is: UNCLASSIFIED Air Force Cyber Operations Command Mission: Warfighting Lt Gen Bob Elder Commander, 8AF
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #136
COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 11 R-1 Line #136 Cost To Complete Total Program Element - 155.152
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62
COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 0.051-3.926-3.926 4.036 4.155 4.236 4.316 Continuing Continuing
More informationAWACS Mission Training Center (MTC)
AWACS Mission Training Center (MTC) Kelly Morris 677 AESG/SYCB (937) 255 8655 Kelly.Morris@wpafb.af.mil 25 May 10 All information contained in this presentation represents the Government s understanding
More informationCombat Identification
C.04 Advanced Air and Surface Target Identification ATD C.05 Precision Targeting Identification ACTD C.07 Link 16 ACTD C.08 Advanced Combat Identification Capability C.09 Advanced Cooperative Air Target
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #147 Cost To Complete Total
More informationBY ORDER OF THE 442D FIGHTER WING INSTRUCTION COMMANDER 442D FIGHTER WING COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE 442D FIGHTER WING INSTRUCTION 10-703 COMMANDER 442D FIGHTER WING 13 FEBRUARY 2009 Certified Current 4 June 2014 Operations ELECTRONIC WARFARE INTEGRATED REPROGRAMMING PROCEDURES COMPLIANCE
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0401132F PE TITLE: C-130J PROGRAM Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401132F C-130J PROGRAM Cost ($ in Millions)
More informationBilling Code:
This document is scheduled to be published in the Federal Register on 01/08/2016 and available online at http://federalregister.gov/a/2016-00148, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY
More informationSystem Simulation, Software & Integration Directorate Realignment
Presented to: Huntsville Area Marketing Association System Simulation, Software & Integration Directorate Realignment DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 20
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844
More informationJoint Coordinated Implementation of Digitally-Aided CAS Capability
Joint Coordinated Implementation of Digitally-Aided CAS Capability International Data Link Symposium 2009 DISTRIBUTION A - Approved for public release; distribution is unlimited. Marsha Mullins J89 Capability
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More information