UNCLASSIFIED FY 2018 OCO. FY 2018 Base

Size: px
Start display at page:

Download "UNCLASSIFIED FY 2018 OCO. FY 2018 Base"

Transcription

1 Exhibit R-2, RDT&E Budget Item Justification: Air Force : May : Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To Program Element 2, Continuing Continuing : SAR- GPS Continuing Continuing 67A011: Space Analysis and Application Development Continuing Continuing 67A019: GPS III 2, , Program MDAP/MAIS Code: 292 Note This program, BA 07 PE F, project 67A011, M-Code Hosted Payload, is a new start. In FY2018, PE F, GPS III Space Segment efforts were transferred to PE F, GPS III Space Segment, due to the creation of a new Major Force Program for Space. FY2016 and FY2017 funding is now documented in the exhibits for PE F. A. Mission Description and Budget Item Justification The Global Positioning System (GPS) is a space-based navigation system that fills validated Joint Service requirements for worldwide, accurate, common grid three dimensional positioning/navigation for military aircraft, ships, and ground personnel. The consistent accuracy, unaffected by location or weather and available in real time, significantly improves effectiveness of reconnaissance, weapons delivery, mine countermeasures and rapid deployment for all services. GPS must comply with Title 10 United States Code (USC) Sec which requires that the Secretary of Defense ensures that continued sustainment and operations of GPS for military and civilian purposes and 51 USC Sec which requires that GPS complies with certain standards and facilitates international cooperation. The system is composed of three segments: User Equipment (funded under PE F), Space (funded under this PE and PE F) and a Control Network (funded under PE F and PE F). The satellites broadcast high accuracy data using precisely synchronized signals which are received and processed by user equipment installed in military platforms. This equipment computes the platform position and velocity and provides steering vectors to target locations or navigation waypoints. The control segment provides daily updates to the navigation messages broadcast from the satellites to maintain system precision in three dimensions to 16 meters spherical error probable worldwide. Additionally, GPS supports the United States Nuclear Detonation (NUDET) Detection System (NDS) mission and provides strategic and tactical support to the following Department of Defense (DoD) missions: Joint Operations by providing capabilities for Positioning, Navigation, and Timing (PNT); Command, Control, Communications, and Intelligence (C3I); Special Operations; Military Operations in Urban Terrain (MOUT); Defense-Wide Mission Support; Air Mobility; and Space Launch Orbital Support. GPS III is the next generation Space Vehicle (SV) to join the GPS constellation. GPS III SVs will deliver significant enhancements, including a new civil (L1C) Galileocompatible signal, and enhanced anti-jam power. Two auxiliary payloads, Search and Rescue/GPS (SAR/GPS) and Laser Retro-reflector Array (LRA) will be added no earlier than SV11. The SAR/GPS payload provided by Canada will fill a validated National Search and Rescue Committee requirement to provide enduring, space-based Air Force Page 1 of 24 R-1 Line #310 Volume 3b - 609

2 Exhibit R-2, RDT&E Budget Item Justification: Air Force : May : Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development distress alerting capability to detect, locate, and relay distress alerts to fulfill its responsibilities under international agreements for Search and Rescue. LRA, built by the Naval Research Lab (NRL), is a passive reflector that will improve accuracy and provide better ephemeris data. National Geospatial-Intelligence Agency (NGA) funds the integration costs of the LRA. This program funds GPS III and supports research, development, test and evaluation (RDT&E) of GPS III SV01-02 and risk-reducing simulators through a systems engineering approach that matures and delivers SVs for launch. This PE includes SV01-02 engineering studies and analyses, trade studies, system development, test and evaluation efforts, integrated logistics support products, on-orbit support, and mission operations support for civil and military applications that protect U.S. military and Allied use of GPS. The program also includes Contingency Operations (COps) as risk mitigation to late Next Generation Operational Control System (OCX) delivery. COps will fly GPS III SVs to be brought into the operational constellation, sustaining current levels of performance and avoiding degradation. The current acquisition schedule of OCX Block 1 (capability to operate GPS III satellites) puts GPS constellation sustainment at risk since the current control segment cannot operate GPS III satellites. GPS III COps is a modification to the current control segment to operate GPS III satellites' PNT and NUDET Detection System (NDS) and maintain limited test M-Code capability until OCX Block 1 is delivered. On 3 July 2015, USD(AT&L) approved the first phase of a two-phased GPS III SV acquisition strategy starting no earlier than SV11. Phase 1 is a Production Readiness Feasibility Assessment which will provide data and insight into contractors' GPS III Production Design with emphasis on a mature navigation payload to include a regional M-Code capability that is consistent with the GPS Enterprise Analysis of Alternatives (AOA). Phase 1 utilizes FY RDTE funding for up to three contractors' GPS production designs. Phase 2 has not been approved and options continue to be explored. Notionally, Phase 2 will be a full and open competition for up to 22 GPS III SVs with an expected decision no earlier than SV11. Phase 2 is funded via Space Procurement Air Force (SPAF) in PE F, BPAC: 23GPS3. Space Modernization Initiative (SMI) focuses on space vehicle affordability and capability, addresses obsolescence, future requirements and resiliency needs, and expands the industrial base to enhance future competition. Phase 1 will address GPS Enterprise AoA recommendations to increase GPS signal strength from space by maturing navigation payload technologies that include a new regional M-Code capability. The Air Force is using its research laboratories to mature an On-Orbit Reprogrammable Digital Waveform Generator which will provide signal flexibility (to change the signal form while the satellite is on-orbit). This effort will be funded with Air Force Research Lab s Science & Technology (S&T) funding and PE F to increase the number of alternate navigation payload awards. Mission Readiness Campaign (MRC) activities include launch preparation, planning, mission readiness testing to validate space-ground-user interfaces, mission crew exercises and rehearsals, launch vehicle integration, and On-Orbit Checkout activities to validate performance prior to launch. Newly certified launch vehicles must be incorporated into the GPS III launch baseline. Integration requires the development of plans and procedures, and procurement of special support equipment. The Global Positioning System (GPS) supports the early deployment of Global M-Code to meet congressional mandate limiting user equipment purchase to M-Code capable receivers starting in FY17. The funds will cover the M-Code Early Use (MCEU) program and support development costs associated with updating the legacy GPS control segment software to provide core M-Code capabilities to the warfighter, as well as the ability to command and control, process, and monitor the M-Code Air Force Page 2 of 24 R-1 Line #310 Volume 3b - 610

3 Exhibit R-2, RDT&E Budget Item Justification: Air Force : May : Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development signal. MCEU mitigates delays with the Next Generation Operational Control Segment (OCX), supports Military Global Positioning System User Equipment (MGUE) testing, and allows for early M-Code operations. M-Code provides greater security to protect navigation and timing in electronically contested environments. Impacts of the M-Code deployment include: - Compliance with AFSPC/CC mandate to provide global monitoring necessary for Early M-Code Operational Use and verification of Navigation Warfare (NAVWAR)effects. - Direction to improve the resiliency of the GPS capability. - Confirmation that Enterprise modernization efforts are integrated and deployed properly. - Testing and Verification of M-Code capability on MGUE/GPS III solution and early M-Code use tied to MGUE fielding The funding request was reduced by $ million to account for the availability of prior year execution balances. In, BPAC 67A011, Space Analysis Application Development M-Code Hosted Payload includes new start efforts. This program is a Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full-rate production and anticipate production funding in the current or subsequent fiscal year. B. Program Change Summary ($ in Millions) FY 2016 FY 2017 Previous President's Budget Current President's Budget Adjustments Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Other Adjustments Change Summary Explanation FY16: -$32.961M Transfer to fund OCX to cost estimate FY17: +$26.300M FY17 Request for Additional Appropriation - Fund GPS Mission Readiness Campaign FY17: +$11.000M FY17 Request for Additional Appropriation - Fund M-Code Early Use (MCEU) FY18: +$36.000M to fund GPS III Mission Readiness Campaign FY18: +$67.800M realignment for GPS III 11+ FY18: -$35.000M reduction due to availability of prior year execution balances Air Force Page 3 of 24 R-1 Line #310 Volume 3b - 611

4 Exhibit R-2, RDT&E Budget Item Justification: Air Force : May : Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development FY18: +$53.229M to fund M-Code Early Use FY18: +$10.000M increase for M-Code Hosted Payload FY18: +$0.575M inflation adjustment Air Force Page 4 of 24 R-1 Line #310 Volume 3b - 612

5 Exhibit R-2A, RDT&E Project Justification: Air Force : May 2017 COST ($ in Millions) Years FY 2016 FY / SAR- GPS FY 2019 FY 2020 FY 2021 FY 2022 To : SAR- GPS Continuing Continuing Quantity of RDT&E Articles A. Mission Description and Budget Item Justification Search and Rescue GPS (SAR/GPS) is an approved auxiliary payload on GPS III beginning no earlier than SV11. SAR/GPS fills validated National Search and Rescue Committee requirements to provide enduring, space-based distress alerting capability to detect, locate, and relay distress alerts to fulfill its responsibilities under international agreements for Search and Rescue. In addition, the USAF has on-going requirements to rescue US Military personnel in harm's way per Air Force Doctrine Document The implementation of a US Medium Earth Orbiting (MEO) Search and Rescue Space Segment is via a Canadian-provided 406 MHz SAR repeater on GPS III SVs. This system presents a cost effective, low-risk opportunity that accommodates existing and planned 406 MHz beacons across the globe. Per National Security Presidential Directive (NSPD)-39, USAF and USCG, the US operators of the civil Cosmicheskaya Sistyema Poiska Avariynich Sudov-Search and Rescue Satellite-Aided Tracking (COSPAS/SARSAT) system and the international search and rescue system will integrate the Canadian-provided SAR repeater into GPS III beginning no earlier than SV11. B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 Title: SAR/GPS Description: Nonrecurring costs for systems engineering activities to integrate the payload onto the GPS III SVs starting no earlier than SV11. FY 2016 Accomplishments: Continued to design and develop SAR/GPS antennas, associated hardware and cabling, and space vehicle software; systems engineering associated with integrating SAR payload onto the GPS III SVs; enterprise-level System Engineering, Integration, Test and Program Management (SEIT/PM). s do not include development and production of Canadian payload unit. FY 2017 Plans: Continue to complete the design and development of SAR/GPS antennas, associated hardware and cabling, and space vehicle software; systems engineering associated with integrating SAR payload onto the GPS III SVs; enterprise-level SEIT/PM, and award contract. s do not include development and production of Canadian payload unit. Plans: Continue to complete the design and development of SAR/GPS antennas, associated hardware and cabling, and space vehicle software; systems engineering associated with integrating SAR payload onto the GPS III SVs; enterprise-level SEIT/PM. Continue Air Force Page 5 of 24 R-1 Line #310 Volume 3b - 613

6 Exhibit R-2A, RDT&E Project Justification: Air Force : May / SAR- GPS B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 program office and other related support activities that may include, but are not limited to studies, technical analysis, etc. s do not include development and production of Canadian payload unit. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To SPAF: BA01: Line Item # GPSIII: GPS III , , , NGA: National Geospatial Intelligence Agency Remarks D. Acquisition Strategy SAR/GPS and Laser Retroreflector Array (LRA) will be integrated as part of the GPS III program no earlier than SV11. E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 6 of 24 R-1 Line #310 Volume 3b - 614

7 Exhibit R-3, RDT&E Project Analysis: Air Force : May 2017 Product Development ($ in Millions) Category Item Search and Rescue SAR/ GPS Method & Type C/CPIF Performing Activity & Location Lockheed Martin : Littleton, CO Years FY 2016 FY / SAR- GPS To Jul Dec Dec Continuing Continuing Subtotal Support ($ in Millions) Category Item Method & Type Performing Activity & Location Years FY 2016 FY 2017 To Subtotal Test and Evaluation ($ in Millions) Category Item Method & Type Management Services ($ in Millions) Category Item Remarks Search and Rescue/SAR Method & Type Performing Activity & Location Performing Activity & Location Years FY 2016 FY 2017 To Subtotal Years FY 2016 FY 2017 To Subtotal Years FY 2016 FY 2017 To Project s Air Force Page 7 of 24 R-1 Line #310 Volume 3b - 615

8 Exhibit R-4, RDT&E Schedule Profile: Air Force : May / SAR- GPS Planned SAR/GPS RFP Release Planned SAR/GPS Planned SAR/GPS Payload Critical Design Review (CDR) Planned SAR/GPS Engineering Design Unit (EDU) Planned SAR/GPS Flight 1 (First Article) Payload FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY Air Force Page 8 of 24 R-1 Line #310 Volume 3b - 616

9 Exhibit R-4A, RDT&E Schedule Details: Air Force : May 2017 Schedule Details / SAR- GPS Start End Events Quarter Year Quarter Year Planned SAR/GPS RFP Release Planned SAR/GPS Planned SAR/GPS Payload Critical Design Review (CDR) Planned SAR/GPS Engineering Design Unit (EDU) Planned SAR/GPS Flight 1 (First Article) Payload Air Force Page 9 of 24 R-1 Line #310 Volume 3b - 617

10 Exhibit R-2A, RDT&E Project Justification: Air Force : May 2017 COST ($ in Millions) 67A011: Space Analysis and Application Development Years FY 2016 FY A011 / Space Analysis and Application Development FY 2019 FY 2020 FY 2021 FY 2022 To Continuing Continuing Quantity of RDT&E Articles Note This program, BA 07 PE F, project 67A011, M-Code Hosted Payload, is a new start. A. Mission Description and Budget Item Justification Space Analysis and Application Development M-Code Hosted Payload is an FY2018 New Start effort that will provide additional mission assurance through redundant systems not directly connected with the current US GPS satellite constellation. The feasibility studies and preliminary engineering analyses funded in this project will determine whether an initiative to host Global Positioning System (GPS) M-Code augmentation payloads on other satellite systems is practical and beneficial. B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 Title: M-Code Hosted Payload Description: The initial studies will explore size, weight, and power (SWAP) requirements of potential payloads, the level of broadcast power as received on the ground, the needed modifications that will allow current and future GPS ground control systems to communicate with these payloads, and how best to upgrade GPS user equipment with minimal impact on cost and downtime to existing GPS users. The current program under investigation has both a challenging SWAP requirement and launch schedule, requiring immediate action by the US if it is to deliver a payload in time for integration into the host vehicles. Plans: Begin and/or continue initial feasibility study and preliminary engineering analysis, with the goal of a PDR-level design NLT 1QFY2019. Continue program office and other related support activities that may include, but are not limited to studies, technical analysis, etc Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To N/A: N/A Remarks Air Force Page 10 of 24 R-1 Line #310 Volume 3b - 618

11 Exhibit R-2A, RDT&E Project Justification: Air Force : May A011 / Space Analysis and Application Development D. Acquisition Strategy Hosted payload studies and engineering analysis to be conducted by GPS satellite vendors, as well as those involved with Increment 1 of the Military GPS User Equipment (MGUE) contract E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 11 of 24 R-1 Line #310 Volume 3b - 619

12 Exhibit R-3, RDT&E Project Analysis: Air Force : May 2017 Product Development ($ in Millions) Category Item M-Code Hosted Payload Method & Type TBD Performing Activity & Location TBD : El Segundo, CA Years FY 2016 FY A011 / Space Analysis and Application Development To Subtotal Support ($ in Millions) Category Item Method & Type Performing Activity & Location Years FY 2016 FY 2017 To Subtotal Test and Evaluation ($ in Millions) Category Item Method & Type Management Services ($ in Millions) Category Item Method & Type Performing Activity & Location Performing Activity & Location Years FY 2016 FY 2017 To Subtotal Years FY 2016 FY 2017 To FFRDC TBD Various : Various Remarks Subtotal Years FY 2016 FY 2017 To Project s Air Force Page 12 of 24 R-1 Line #310 Volume 3b - 620

13 Exhibit R-4, RDT&E Schedule Profile: Air Force : May A011 / Space Analysis and Application Development Hosted Payload PDR-level design FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY Air Force Page 13 of 24 R-1 Line #310 Volume 3b - 621

14 Exhibit R-4A, RDT&E Schedule Details: Air Force : May 2017 Schedule Details 67A011 / Space Analysis and Application Development Start End Events Quarter Year Quarter Year Hosted Payload PDR-level design Air Force Page 14 of 24 R-1 Line #310 Volume 3b - 622

15 Exhibit R-2A, RDT&E Project Justification: Air Force : May 2017 COST ($ in Millions) Years FY 2016 FY A019 / GPS III FY 2019 FY 2020 FY 2021 FY 2022 To 67A019: GPS III 2, , Quantity of RDT&E Articles A. Mission Description and Budget Item Justification GPS III is the next generation Space Vehicle (SV) supporting the GPS constellation and is funded in PE F. GPS III SVs will deliver significant enhancements, including a new civil (L1C) Galileo-compatible signal, enhanced anti-jam power, and a growth path to full warfighter capabilities. GPS III SV03-10 is in the Production & Deployment Phase. RDT&E, AF PE F funds GPS III and supports research, development, test and evaluation of GPS III SV01-02 and risk-reducing simulators through a systems engineering approach that matures and delivers SVs for launch. This PE includes SV01-02 engineering studies and analyses, trade studies, system development, test and evaluation efforts, integrated logistics support products, on-orbit support, and mission operations support for civil and military applications that protect U.S. military and allied use of GPS. The program also includes Contingency Operations (COps) as a bridge capability to fly GPS III SVs until the Next Generation Operational Control System (OCX) delivery. Space Modernization Initiative (SMI) focuses on space vehicle affordability and capability, addresses future requirements and resiliency needs, and expands the industrial base to enhance future competition. Phase 1 will address GPS Enterprise Analysis of Alternative (AoA) recommendations to increase GPS signal strength from space by maturing navigation payload technologies that include a new regional M-Code capability. The Air Force is using its research laboratories to mature an On-Orbit Reprogrammable Digital Waveform Generator (ORDWG) which will provide signal flexibility (to change the signal form while the satellite is on-orbit). This effort will be funded with Air Force Research Lab s Science & Technology (S&T) funding and PE F to increase the number of alternate navigation payloads. Mission Readiness Campaign (MRC) activities include launch preparation, planning, mission readiness testing to validate space-ground-user interfaces, mission crew exercises and rehearsals, launch vehicle integration, and On-Orbit Checkout activities to validate performance prior to launch. Newly certified launch vehicles must be incorporated into the GPS III launch baseline. Integration requires the development of plans and procedures, and procurement of special support equipment. The Global Positioning System (GPS) supports the early deployment of Global M-Code to meet congressional mandate limiting user equipment purchase to M-Code capable receivers starting in FY17. The funds will cover the M-Code Early Use (MCEU) program and support development costs associated with the GPS control segment software to provide core M-Code capabilities to the warfighter, as well as the ability to command and control, process, and monitor the M-Code signal. MCEU mitigates delays with the Next Generation Operational Control Segment (OCX), supports Military Global Positioning System User Equipment (MGUE) testing, and allows for early M-Code operations. M-Code provides greater security to protect navigation and timing in electronically contested environments. Impacts of the M-Code deployment include: - Compliance with AFSPC/CC mandate to provide global monitoring necessary for Early M-Code Operational Use and verification of Navigation Warfare (NAVWAR)effects. - Direction to improve the resiliency of the GPS capability. - Confirmation that Enterprise modernization efforts are integrated and deployed properly. Air Force Page 15 of 24 R-1 Line #310 Volume 3b - 623

16 Exhibit R-2A, RDT&E Project Justification: Air Force : May Testing and Verification of M-Code capability on MGUE/GPS III solution and early M-Code use tied to MGUE fielding 67A019 / GPS III The feasibility studies and preliminary engineering analyses that are funded by this budget item will determine whether or not an initiative to host Global Positioning System (GPS) M-Code augmentation payloads on other satellite systems is practical and beneficial. The primary goal is to provide additional mission assurance through redundant systems not directly connected with the current US GPS satellite constellation. B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 Title: GPS III SV01-02 Description: Development, test and evaluation of two GPS III space vehicles and associated simulators, engineering studies and analyses, trade studies, system development, test and evaluation efforts, and integrated logistics support products. FY 2016 Accomplishments: Continued GPS III space vehicle development, SE&I, technical and program support. d SV01 post-environmental final system performance testing. Delivered SV02 Navigation Payload. FY 2017 Plans: Continue GPS III space vehicle development, SE&I, technical and program support. Begin SV02 Thermal Vacuum (TVAC) testing and perform qualification testing. SV01 Available For Launch (AFL) activities. Begin Mission Readiness Campaign (MRC) for GPS III SV01. MRC events will initiate GPS III SV01-SV02 MRC activities which include launch preparation, planning, mission readiness testing to validate space-ground-user interfaces, mission crew exercises and rehearsals, launch vehicle integration, and On-Orbit Checkout activities to validate performance prior to launch. In addition, newly certified launch vehicles must be incorporated into the GPS III launch baseline. Integration requires the development of plans and procedures, and procurement of special support equipment. Plans: Continue GPS III space vehicle development, SE&I, systems engineering, integration support, EELV early and detailed integration, mission unique items to support launch activities, technical and program support of SV SV02 Thermal Vacuum (TVAC) testing and all qualification testing. SV02 Available For Launch (AFL) activities. Finalize MRC for GPS III SV01 and initiate MRC activities for SV02. MRC events will continue and complete GPS III SV01 and begin SV02 MRC activities which include launch preparation, planning, mission readiness testing to validate space-ground-user interfaces, mission crew exercises and rehearsals, launch vehicle integration, and On-Orbit Checkout activities to validate performance prior to launch. In addition, newly certified launch vehicles must continue incorporation into the GPS III launch baseline. Integration requires the development and refinement of plans and procedures, and procurement of special support equipment. Continue technical support for the launch processing facility at CCAFS. Continue program office and other related support activities that may include, but are not limited to studies, technical analysis, etc Title: GPS III SV11+ (Production Readiness) Air Force Page 16 of 24 R-1 Line #310 Volume 3b - 624

17 Exhibit R-2A, RDT&E Project Justification: Air Force : May A019 / GPS III B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 Description: USD(AT&L) approved the first phase of a two-phased GPS III SV acquisition strategy starting no earlier than SV11. The strategy utilizes FY RDTE funding for the Phase 1 effort to mature three contractors' GPS III production designs. The Phase 1 Production Readiness Feasibility Assessment is providing data and insight into contractors GPS III Production Design with emphasis on a mature navigation payload and production-ready designs. Phase 1 requires contractors to provide a GPS III space vehicle and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware). FY 2016 Accomplishments: Released Phase 1 RFP in January 2016 and awarded three Phase 1 contracts in May Delivered Phase 1 navigation payload and initial production design and manufacturing plans (Preliminary Design Review (PDR)-level). ed On Orbit Reprogrammable Digital Waveform Generator (ORDWG) maturation contracts via AFRL to support SMI activities. FY 2017 Plans: Deliver Phase 1 space vehicle initial production design (PDR-level), navigation payload production design (Critical Design Review (CDR)-level) and engineering brass board (hardware) results. Exercise Phase 1 contract options, to continue navigation payload maturity. Continue ORDWG maturation via AFRL to support SMI activities. Explore further Phase 1 risk reduction opportunities to ensure a viable, production-ready, GPS III Follow-On competition in. Release Phase 2 Request for Proposal (RFP). Plans: Source Selection activities to award Phase 2 in FY2018, initiating design turn documentation efforts preparing for delta Critical Design Review (CDR) in FY Continue ORDWG maturation via AFRL to support SMI activities. Continue program office and other related support activities that may include, but are not limited to studies, technical analysis, etc. Title: Contingency Operations (COps) Description: COps is a risk reduction activity to maintain constellation sustainment as prescribed by the GPS III Space Vehicle Acquisition Strategy the Next Generation GPS Operational Control System (OCX) will not deliver in time to support initial GPS III operations. COps adds to the existing Operational Control System (OCS) Architecture Evolution Plan (AEP) command, control, maneuver planning, re-programmability, navigation functionality, NDS support, and external interfaces for the GPS III Space Vehicle (SV). COps includes integrating GPS III SV simulation modules to the GPS System Simulator (GSS) and updates to the Positional Training Emulator (PTE) FY 2016 Accomplishments: Air Force Page 17 of 24 R-1 Line #310 Volume 3b - 625

18 Exhibit R-2A, RDT&E Project Justification: Air Force : May A019 / GPS III B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 Negotiated and awarded COps contract vehicle (2QFY 2016). d COps PDR, and began activities for CDR. d development laboratory set-up; began component integration Test planning; began GSS development and integration planning; completed GSS drawings. Obtained Milestone B approval (4QFY 2016). FY 2017 Plans: Critical Design Review; begin code and unit testing; obtain initial Defense Security Service (DSS) certifications for the development laboratory; complete integration test planning, begin and complete 1 AEP sustainment software baseline merge; begin Factory Qualification Test (FQT) planning; begin TT&C, Navigation, and Software Infrastructure integration test; complete GSS hardware purchase, installation, and integration planning; start PTE development. Plans: code and unit testing; complete Software integration testing: obtain final DSS certifications for the development laboratory; complete 2 AEP sustainment software baseline merges; complete Factory Qualification Test (FQT) risk reduction activities; complete GSS hardware purchase, installation, and integration; Start Development Test and Evaluation activities; continue PTE development and testing. Continue program office and other related support activities that may include, but are not limited to studies, technical analysis, etc. Title: Enterprise Ground Services (EGS) Description: Enterprise Ground Services (EGS) will provide a robust enterprise ground architecture for Air Force space systems, which leverages mission commonality and automation to reduce sustainment costs and re-focus manpower on warfighting capabilities. In addition, EGS will enable a near-real-time common operating picture of enterprise-wide tactical health, status, indications, and warnings for Air Force satellites. The end-state will be a modern technical infrastructure which is cybersecure and resilient against the Advanced Persistent Threat and employs streamlined architecting, acquisition, and operational processes. Through early architecture studies and prototyping, the government will establish clear ownership of the technical baseline to meet Better Buying Power principles as the EGS effort evolves through development. This effort provides focus and expertise for the development, test, certification and enforcement of standards and interfaces for all AFSPC satellite ground systems to enable transition planning for legacy ground systems, new capability demonstrations, and systems acquisition leading to an enterprise ground architecture for Air Force space systems. In FY2018, this effort transfers to Space and Missile Test and Evaluation Center, PE F. FY 2016 Accomplishments: N/A FY 2017 Plans: Conduct developmental planning, mature technologies, and develop initial small-scale prototype capability for the enterprise ground architecture. Efforts in 2017 will include, but are not limited to, systems engineering, special studies, cybersecurity planning and implementation, standards and interface development and codification, integration and test efforts in support of Air Force Page 18 of 24 R-1 Line #310 Volume 3b - 626

19 Exhibit R-2A, RDT&E Project Justification: Air Force : May A019 / GPS III B. Accomplishments/Planned Programs ($ in Millions) FY 2016 FY 2017 demonstrations, and operational architecture planning. In addition, this effort will build the technical and programmatic roadmap to enable a phased enterprise transition in the future. Plans: N/A Title: AEP M-Code Monitoring Description: The M-Code Early Use (MCEU) program initiative will cover the development costs associated with updating the legacy control segment software, AEP (Architectural Evolution Program), with additional capabilities needed to provide M-Code operations. MCEU will provide the Joint Space Operations Center (JSpOC) with command and control (C2), processing, and integrity monitoring for the M-Code signal. The development will also include the integration of modernized Monitor Station Technology Improvement Capability (MSTIC) receivers, which are being procured separately using O&M as a Form-Fit-Functional replacement for the legacy Monitor Station Receiver Element (MSRE) Y-Code receivers. MCEU will take those MSTIC receivers and add a software upgrade to allow it to process M-Code signals. FY 2017 Plans: Efforts in 2017 will include, but are not limited to: contract award, development planning, systems engineering, standards and interface development, and architectural planning. Plans: and deliver Modernized Monitoring Station Technology Improvement and Capability (M-MSTIC) receiver upgrade and begin integrating the receivers into the GPS enterprise. Continue program office operations and other related support activities that may include, but are not limited to studies, technical analysis, etc Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY 2022 To SPAF: BA01: Line , , , Item # GPS III: GPS III Remarks D. Acquisition Strategy The GPS III next generation space segment rapidly and affordably responds to warfighter capability requirements. The acquisition approach utilizes a disciplined systems engineering approach which focuses on mitigating cost and schedule risk through a lower risk incremental delivery of mature technologies. This approach focuses on mission success and on time delivery. The GPS III SVs will have GPS IIF capabilities plus up to a 3x-8x increase in anti-jam signal power, 3x improved Air Force Page 19 of 24 R-1 Line #310 Volume 3b - 627

20 Exhibit R-2A, RDT&E Project Justification: Air Force : May A019 / GPS III accuracy, 3+ year increased design life, a new civil (L1C) signal compatible with the European Galileo system and a satellite bus capable of supporting future SV capability additions. On 3 Jul 2015 USD(AT&L) approved the first phase of a two-phased GPS III SV acquisition strategy starting no earlier than SV11. The strategy utilizes FY RDTE funding for the Phase 1 effort to mature three contractors' GPS III production designs. The Phase 1 Production Readiness Feasibility Assessment is providing data and insight into contractors GPS III Production Design with emphasis on a mature navigation payload and production-ready designs. Phase 1 requires contractors to provide GPS III space vehicle and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware). The Air Force is using its research laboratories to mature an On-Orbit Reprogrammable Digital Waveform Generator which will provide signal flexibility (to change the signal form while the satellite is on-orbit). This effort will be funded with Air Force Research Lab s Science & Technology (S&T) funding and PE F to increase the number of alternate navigation payload awards. On 19 Jul 2016 the PEO approved the Acquisition Strategy Document (ASD) for the COps effort. The strategy utilizes contingency constellation sustainment capability for GPS III Positioning, Navigation, and Timing (PNT). GPS III COps is needed because the GPS Next Generation Operational Control System (OCX) will not deliver in time to support initial GPS III Space Vehicle operations. COps operates (post-launch and check-out) GPS III SVs at the capability level of GPS IIR-M or GPS IIF using the existing Architecture Evolution Plan (AEP) control segment. On 21 Jan 2017, the PEO approved the ASD for the M-Code Early Use (MCEU) program. The MCEU acquisition strategy, when executed, will enable the GPS Enterprise to provide core M-Code capabilities to the warfighter prior to OCX delivery. MCEU will also support the scheduled operational testing of Military GPS User Equipment (MGUE). MCEU will update the GPS control segment software, AEP, to allow for command and control, processing, and integrity monitoring of the M-Code signal. MCEU will acquire this capability by using the existing GPS III prime contract vehicle to modify the operational AEP software. HQ USAF/A5R approved reinstatement of a previously deferred KSA on 10 Feb The MSTIC receivers currently under development will get a software upgrade to process M-Code data. This $7.96M project to procure the M-MSTIC receivers is being funded through 3400 funds in FY16-FY18. Performance monitoring, integration and test will be conducted by M-Code Early Use program and sustained under the GPL Lockheed Martin. Funding is sent through a Form-9 from DoD to Lockheed Martin. E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 20 of 24 R-1 Line #310 Volume 3b - 628

21 Exhibit R-3, RDT&E Project Analysis: Air Force : May 2017 Product Development ($ in Millions) Category Item GPS III Development GPS III Development _ 11+ GPS III Development_ COps GPS III Development_MCEU GPS III Technical Mission Analysis Method & Type C/CPIF Performing Activity & Location Lockheed Martin : Denver, CO Years FY 2016 FY A019 / GPS III To 2, Dec Dec Dec , , TBD TBD : TBD, CA May May May C/CPIF C/CPIF GPS III Enterprise SE&I C/CPAF GPS III Launch Support GPS III Production Readiness/SMI GPS III Enterprise Ground Service Lockheed Martin : Denver, CO Lockheed Martin : Denver, CO Feb Feb Feb Jun Oct MIPR Various : Various Oct Oct Oct RO TASC : El Segundo, CA 45th : Cape Canaveral, FL Nov Nov Nov Mar Mar Mar C/CPAF TBD : TBD Feb Feb Feb C/CPAF TBD : TBD Jan Subtotal 2, , Remarks GPS III SV11+ Phase 1 Production Readiness Feasibility Assessment contracts awarded to Lockheed Martin Space Systems Corp (Littleton, CO), Northrop Grumman Aerospace Systems Corp (Redondo Beach, CA), and Boeing Aerospace Corp (El Segundo, CA). Air Force Research Laboratory (AFRL) contracts for On-Orbit Reprogrammable Digital Waveform Generator (ORDWG) supporting GPS III SMI activities awarded to Northrop Grumman Aerospace Systems Corp (Redondo Beach, CA), Boeing Aerospace Corp (El Segundo, CA), and General Dynamics Mission Systems Corp (Scottsdale, AZ). Support ($ in Millions) Category Item Method & Type Performing Activity & Location Years FY 2016 FY 2017 To Subtotal Air Force Page 21 of 24 R-1 Line #310 Volume 3b - 629

22 Exhibit R-3, RDT&E Project Analysis: Air Force : May 2017 Test and Evaluation ($ in Millions) Category Item Method & Type Performing Activity & Location Years FY 2016 FY A019 / GPS III To GPS III T&E Various Various : TBD May May Management Services ($ in Millions) Category Item GPS III FFRDC Method & Type MIPR Performing Activity & Location Aerospace : El Segundo, CA Subtotal Years FY 2016 FY 2017 To Dec Dec Dec GPS III A&AS Various Various : Various Apr Apr Apr GPS III Other Support Various Various : Various Oct Oct Oct Remarks Subtotal Years FY 2016 FY 2017 To Project s 2, , Air Force Page 22 of 24 R-1 Line #310 Volume 3b - 630

23 Exhibit R-4, RDT&E Schedule Profile: Air Force : May A019 / GPS III GPS III SV01 Available for Launch GPS III SV02 Available for Launch GPS III SV11+ Phase 2 Acquisition Decision GPS III SV11+ Phase 2 Request for Proposal Release GPS III SV11+ Phase 2 GPS III SV11+ Phase 2 Delta CDR (If required) COps Pre-Milestone B COps Critical Design Review (CDR) COps Formal Qualification Test Readiness Review (FQT TRR) COps Milestone C COps Ready to Operate Automated M-Code Test Core M-Code on OCX Deployment of full M-Code on OCX FY 2016 FY 2017 FY 2019 FY 2020 FY 2021 FY Air Force Page 23 of 24 R-1 Line #310 Volume 3b - 631

24 Exhibit R-4A, RDT&E Schedule Details: Air Force : May 2017 Schedule Details 67A019 / GPS III Start End Events Quarter Year Quarter Year GPS III SV01 Available for Launch GPS III SV02 Available for Launch GPS III SV11+ Phase 2 Acquisition Decision GPS III SV11+ Phase 2 Request for Proposal Release GPS III SV11+ Phase GPS III SV11+ Phase 2 Delta CDR (If required) COps Pre-Milestone B COps Critical Design Review (CDR) COps Formal Qualification Test Readiness Review (FQT TRR) COps Milestone C COps Ready to Operate Automated M-Code Test Core M-Code on OCX Deployment of full M-Code on OCX Air Force Page 24 of 24 R-1 Line #310 Volume 3b - 632

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #216 To Program Element

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 0.000 63.687 127.172 156.659-156.659

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603421F PE TITLE: GLOBAL POSITIONING Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603421F GLOBAL

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+) #

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #188

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #188 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System (User Equipment) (SPACE)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System (User Equipment) (SPACE) Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # PE 0305164F: NAVSTAR Global Positioning ## FY 2015 FY 2016 FY 2017 FY 2018

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603421F PE TITLE: GLOBAL POSITIONING Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: Development & Demonstration (SDD) COST ($ in Millions) # FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY 2020 To Program Element 65.370 76.553 59.826 142.551-142.551 190.973 180.205

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Air Force Page 1 of 9 R-1 Line #85 To Program

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years PE 0605230F / Ground d Strategic Deterrent FY 2018 FY 2019 FY 2020 FY 2021 To Program Element

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 25 R-1 Line #70 To Program Element 8,347.364

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Space Based Infrared System (SBIRS) High EMD. Prior Years (+) FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Space Based Infrared System (SBIRS) High EMD. Prior Years (+) FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # PE 0604853F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD ## FY 2015 FY 2016 FY 2017 FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 13.610 13.355 12.874-12.874

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 24.963 76.760 30.948 0.000 30.948 20.563

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Space & Missile Test & Evaluation Center FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Space & Missile Test & Evaluation Center FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 3.578 4.572 196.254-196.254 218.131

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - - 93.867-93.867 158.218 315.238 397.880

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 242.669 68.656 70.614 82.195-82.195

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 147.268 6.751 61.163-61.163 94.537 369.826

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED Exhibit R2, RDT&E Budget Item Justification: PB 2017 0400: Research, Development, Test & Evaluation, DefenseWide / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual Air Force Page 1 of 23 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 18.688

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 138.051 101.348 120.676-120.676 124.805

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603860F PE TITLE: Joint Precision Approach Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 3.288 8.653 7.029-7.029

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 49.457 65.370 118.411 59.826-59.826

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 0.051-3.926-3.926 4.036 4.155 4.236 4.316 Continuing Continuing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM. Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) FY 2017 FY 2018 FY 2019

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 45.918 33.291 32.373 0.000

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 2: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 United States Special Operations Command : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force KC-46A Tanker DoD Budget FY2013-FY2017 RDT&E U.S. Air Force Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 FY 2013 FY 2013 FY 2013 Cost To COST ($ in Millions) FY 2011

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Complete Program Element 20.405 43.300 91.866-91.866 90.598 129.201

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 6.321 5.000 0.400-0.400 66.100 69.800 11.800

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001 COST ($ in Thousands) Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 2808 Nuc Detonation Det Sys (sensors) 13,497 11,977 18,823 20,002 24,878 23,406 24,413 25,166 Continuing TBD Quantity

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 10.630 - - - - - - - Continuing Continuing

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 4.208 2.245 5.830 0.000 5.830 17.932 35.734

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Polar-Orbiting Op Env Satellite. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Polar-Orbiting Op Env Satellite. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 287.532 386.611

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #147 Cost To Complete Total

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0604261F PE TITLE: Personnel Recovery Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency : February 2015 0400: Research, Development, Test & Evaluation, DefenseWide / BA 4: Advanced Component Development & Prototypes

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 11.589 20.727 63.853-63.853 60.995 19.248 19.291 15.230 Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February Exhibit R, RDT&E Budget Item Justification: PB 119: Research, Development, Test & Evaluation, / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY R1 Program Element

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information