THE AUDIT REPORT ON DONATION FUNDS OF THE KINGDOM OF DENMARK

Size: px
Start display at page:

Download "THE AUDIT REPORT ON DONATION FUNDS OF THE KINGDOM OF DENMARK"

Transcription

1 SAI No: /20 Podgorica, MONTENEGRO STATE AUDIT INSTITUTION THE AUDIT REPORT ON DONATION FUNDS OF THE KINGDOM OF DENMARK Organic Agriculture Development Programme - OADP for the period from January 1st 2012 until May 31st 2013 (Final report) Podgorica, July 2013

2 State Audit Institution (hereinafter referred to as: Institution), pursuant to Article 4 of the Law on State Audit Institution and Decision of the competent Collegium for the audit No from January 15th 2013 and in accordance with the letter of the Office of the Denmark Government in Montenegro No from October 30th 2012, has performed the audit of donation funds of the Kingdom of Denmark for financing the Project Organic Agriculture Development Programme in Montenegro for the period from January 1st to May 31st The audit has been performed in accordance with the Rules of Procedure of the State Audit Institution and International Auditing Standards for the Public Sector (ISSAI and EUROSAI). Based on determined factual state and deliberation on the opinion of the Ministry of agriculture and rural development (No from July 12th 2013) on the preliminary audit report of the SAI (No /16 from July 1st 2013), the competent Collegium consisted of PhD Milan Dabović, head of the Collegium member of the Senate and PhD Branislav Radulović, member of the Collegium - member of the Senate, at its session held on July 23rd 2013 has adopted the FINAL AUDIT REPORT ON DONATION FUNDS OF THE KINGDOM OF DENMARK (PROJECT - "ORGANIC AGRICULTURE DEVELOPMENT PROGRAMME IN MONTENEGRO") for the period January 1st 2012 to May 31st 2013 and has passed the following: OPINION Based on determined factual state, it has been determined that in the period from January 1st 2012 to May 31st 2013, related to the Component 2 Component of competitiveness and Results 2.1. Establishment of Investment Grants for Organic Production, there have been no important material irregularities which would indicate significant violation of procedures, except in the part of delays of deadlines prescribed by the Instruction Manual for the Grant Scheme. Based on afore-mentioned irregularities, the competent Collegium of the Institution has given the QUALIFED OPINION on the audit in question. 1. The audit has determined that the four month deadline wasn t met after approval of the grant funds for realisation of the own participation - personal share in six cases or 37, 5% of applications chosen by the sample. Deadline for realisation of approved funds has been postponed on the base of approvals given by the Commission of Evaluation. The Grant scheme does not predict the possibility to postpone the deadlines or give approvals for postponing the deadlines. 2. The audit has determined that a part of the budget/ investments, after receiving contributions from the grant, has not been completed within the four month time limit in seven cases or 43,75% of the chosen sample. The Grant scheme does not predict the possibility of postponing the deadlines. 3. The audit has determined that one applicant from the chosen sample does not have the documentations on the base of which it can be determined the 2

3 investment state after receiving the funds from the grant, i.e. the level of investment realisation where the time limit for investment completion expired. Based on the Report given by the Ministry of Agriculture and Rural Development on realisation of the funds of the Project - Organic Agriculture Development Programme DANIDA for 2010, 2011 and 2012, according to the funds sources and users with established status from May 27th 2013, it has been determined as follows: Out of the 53 investments in total supported by the programme (paid out funds from donation and from the budget), six investments were not completed on May 27th 2013 and those include four investments paid out in 2011 and two investments paid out in The Grant scheme predicts that, after receiving the contribution from the grant, the rest part of the budget / investments has to be completed in four month deadline. The State Audit Institution received the minutes from the Management Board from May 13th 2013 (OADP- the eighth- the last meeting of the Management Board), by e- mail on June 20th We remind that the minutes were not verified and that it contained the three week deadline for remarks with a statement that if they were not delivered, the minutes would be considered adopted. Regarding delivered minutes, the State Audit Institution has paid attention to the comments regarding three projects in which the grant funds were not spent in accordance with application. Related to the above mentioned, we note: In the reports for 2010 and 2011, the State Audit Institution has stated that there were certain irregularities related to prolongation of the deadlines for realisation of the applicants own funds, as well as realisation of the funds approved by the Grant scheme (see the Audit report on donation funds of the Kingdom of Denmark for 2011, title- Commission for Evaluation, page 9). The State Audit Institution informed the Management Board on the issue of deadlines exceeding about the use of approved funds from the grant and at the same time, we could not convince, through minutes of the Management Board, that certain attention was paid to this issue until the last meeting of the Management Board on May 13th On the session held on May 13th 2013, the Management Board has reconsidered the problems about grant applications that were not used according to the Grant scheme so that closing of the project was brought into question by the Government of Denmark. Respecting the circumstances that the State Audit Institution had drawn attention on deadlines prolongation regarding the use of funds and that the members of the Management Board had been acquiainted with these issues in accordance with the Article 2 of the Memorandum of Understanding on implementation of Organic Agriculture Development Programme (OADP) between the Government of the Kingdom of Denmark and the Government of Montenegro, we propose that the Management Board holds another session dedicated to this issue and proposes a concrete conclusion in accordance with 3

4 positive legislature of Montenegro, Memorandum of Understanding between the Government of the Kingdom of Denmark and the Government of Montenegro on implementation of Organic Agriculture Development Programme (OADP) and Grant Scheme Manual. HEAD OF COLLEGIUM III PhD Milan Dabović Member of the Senate 4

5 TABLE OF CONTENTS PART I GENERAL PART INTRODUCTION Legal basis of the audit Type and aim of audit Subject to audit and scope of audit Organic Agriculture Development Programme in Montenegro...7 PART II - DETERMINED FACTUAL STATE Budget Planning and Execution Project Management Management Board Advisory Service Commission for Evaluation Ministry of Agriculture and Rural Development Organic Agriculture Department Financial Service of MARD Ministry of Finance Applications

6 PART I: GENERAL PART 1. INTRODUCTION Office of the Kingdom of Denmark in Montenegro, authorised for financing the Organic Agriculture Development Programme OADP in Montenegro, has sent a letter to the State Audit Institution No: from October 30th 2012 requiring from the Institution to perform an audit of donation funds for organic agriculture development in Montenegro in conclusion with the date of March 31st However, in accordance with the note of the Embassy of Denmark No 06/3-1270/2 from May 18th 2012 in which they inform the Ministry of Agriculture and Rural Development that the Danish part fully agrees with the proposal for prolongation of the Bilateral agreement on Organic Agriculture Development Programme until May 2013, the time period covered by the audit is from January 1st 2012 until May 31st Legal basis for the audit Legal basis for performing the audit on donation funds of the Kingdom of Denmark, approved for financing the Project Organic Agriculture Development Programme in Montenegro is contained in: the Law on State Audit Institution 1, the Annual Plan of Audits for 2013, adopted by the Senate of the State Audit Institution 2, and Decision on Performing the Audit of Donation Funds for the Organic Agriculture Development Programme (OADP) according to the Project of the Kingdom of Denmark 3. The audit procedure has been performed in accordance with the Rules of Procedure of the State Audit Institution 4, and the International Auditing Standards for the Public Sector (ISSAI/EUROSAI). The audit procedure has above all followed the standards that require audit planning and performing of audit in a way which shall provide a reasonable reassurance for expressing an opinion. 3. Type and aim of audit The Institution has performed regularity audit (compliance audit) of payments executed for the time period from January 1st 2012 until May 31st 2013 from the special open bank account for donation funds as well as from the account of the State Treasury in Montenegro. The Leader of the project is the Ministry of Agriculture and Rural Development (hereinafter referred to as: The Ministry). 1 'Official Gazzette of the Republic of Montenegro'', No 28/04, 27/06, 78/06,17/07, 73/10 and 40/11 2 SAI: No from December 24th SAI from January 15th 'Official Gazzette of the Republic of Montenegro'', No 50/07 6

7 The aim of the audit is to express an independent opinion on whether the financial state is accurate and objective and whether the activities were performed in accordance with the programme documentation and the Grant Manual 5. The State Audit Institution has performed the control of the funds received from the Ministry of Finance of Denmark, transfer of funds from the special bank account to the State Treasury and payment of funds from Danish and the state budget. Such an aim of the audit requires verification of the funds received from the Ministry of Foreign Affairs of the Kingdom of Denmark on the bank account of Montenegrin Commercial Bank AD Podgorica, Account No , which have been paid to users through the State Treasury, as well as verification of expenses paid from the state budget, i.e. paid by the Ministry in the time period from January 1st 2012 until May 31st Subject to audit and the scope of audit The subject to audit includes financial transactions of funds received from the Danish Government and transactions of the State Treasury of Montenegro, in accordance with the Organic Agriculture Development Programme and the Manual for Grant Scheme from December The scope of audit covers all expenditures / payments executed from the funds of the grant in the year of 2012 and Organic Agriculture Development Programme in Montenegro The Government of Denmark has allocated 15 million of DKK for the organic agriculture development in Montenegro for the period January December 2011 within its Neighbourhood Programme. Danish aid is realized through a development programme called Organic Agriculture Development Programme (OADP). The Programme aims to support the development of organic agriculture and consumption of organic products at the local market through the sector of tourism as well as the export of organic products. Budget of the Project amounts to ,00 out of which the amount of ,00 has been allocated by the Government of Denmark, while the Ministry of Agriculture and Rural Development has participated with ,00. The activities on the realization of the Organic Agriculture Development Programme started on June 2nd, The project Office was established, national consultant and Programme assistant were employed and the members of the Management Board were appointed. The Programme has been managed by Permanent Senior Expert for organic agriculture, appointed by the Ministry of Foreign Affairs of Denmark, and the Project Office is located at the Institute of Biotechnology. Permanent Senior Advisor is responsible for Programme management and its implementation. 5 Organic Agriculture Development Programme in Montenegro: External Audit-Project task 7

8 Management Board and the Ministry of Agriculture and Rural Development of Montenegro are responsible for the realization of the Programme. Memorandum of Understanding has been signed between the Government of the Kingdom of Denmark and the Government of Montenegro on the implementation of the Organic Agriculture Development Programme (OADP), which prescribes the conditions for all programme activities as well as for international staff and their families, i.e. those who do not have Montenegrin citizenship. Notes important for performing the audit, among others, and which are prescribed by the Memorandum of Understanding are the following: Interests accrued on the programme funds have to be paid out to Denmark. Montenegro must guarantee that the grant of Denmark is not used for payment of any import duties, allowances, national or other public duties on import of any part of the equipment, material, tools, services, vehicles and spare parts purchased for activities agreed within the scope of the OADP. All equipment, material, tools, services, vehicles and spare parts financed by the grant of Denmark will be value-added tax free by Montenegro for the activities agreed within the scope of the OADP. An Instruction Manual for the Grant Scheme was drafted, and made available to all who meet the criteria and who oblige to be certified organic producers. The investment arrangements are focused on crop production, processing and distribution, especially on the value chain of fruits and vegetables. The scheme is not intended for the purchase of inputs such as seeds and fertilizers, or for marketing promotion. The accounting records are kept on a cash basis and accounting documents are presented in euro currency. The procurement of assets and equipment made by the user, and which should be complied with the guidelines for procurement from the Instruction Manual for Grants, is not the subject to our audit. The audit has been planned and prepared in order to detect possible irregularities and examine the adequacy of the implementation of the rules of conduct determined by the Programme. Considering the above mentioned, CHECKLIST has been made for checking the compliance of procedures for obtaining a grant with the Grant Manual. 8

9 PART II: DETERMINED FACTUAL STATE Organic Agriculture Development Programme in Montenegro includes two separate procedures of financial management. The first procedure refers to the funds for the grants under component 2- Component of competitiveness (results 2.1- Establishing a program of investment grants for organic production and 2.2- Establishing a program of grants for the Biotechnology Institute 6 ), which is realized through the appropriate national system in Montenegro. The second procedure refers to financing other Programme activities and it is implemented through the appropriate account, managed by the Senior Expert. Account of the Programme, managed by the Senior Expert, was opened as a nonresidential account on June 23rd 2009 at Montenegrin Commercial Bank, No and intended for financing the results from the component 1- Component of institutional development and results and the component 2 - Component of competitiveness (2.3.- Placement and promotion of organic products). Transactions recorded at the above mentioned account were not the subject of checking in the audit procedure performed by the State Audit Institution. The fiscal year of the programme follows the fiscal year of the Budget in Montenegro, i.e. January - December. Budget of Programme Grants and planning cycle follow the cycle of planning the Budget of Montenegro. In the programme documents, time period for the support to the Programme has been planned from June 2009 until June The Ministry of Agriculture and Rural Development has sent a letter No. 320/ /11 from January 16th 2012 to the Ministry of Foreign Affairs and European Integrations requiring prolongation of duration of the Project Organic Agriculture Development Programme, which needs to be passed to the Ministry of Foreign Affairs of the Kingdom of Denmark. The Ministry of Foreign Affairs and European Integrations - General Directorate for Bilateral Affairs, in the letter No from May 18th 2012, has delivered the note of the Embassy of Denmark in which they inform that the Danish part agrees with proposal for prolongation of Bilateral programme on Organic Agriculture Development Programme until the end of May The programme started with grant support, investments in the organic production, processing and distribution in April 2010 and it was opened for applications until March Within the afore-mentioned time period, 53 investments were supported, which total value amounts to ,59, out of which donation funds of the Government of Denmark amounts to ,42 or 75% and paid out funds from the state budget in amount of ,17, or 25% as it can be seen from the following chart: 6 Component 2/ Result 2.2. Forming of programme grants for Biotechnology Institute-was not the subject to audit 9

10 Year Number of users Donation of the Government National funds User own participation Total Of Denmark (Budget) , , , , , , , , , , , ,67 Total , , , ,79 User own participation of grant funds amounted to ,20 or 50% of approved investment. Based on the Report given by the Ministry of Agriculture and Rural Development on realisation of the funds of the Project - Organic Agriculture Development Programme DANIDA for 2010, 2011 and 2012, according to the funds sources and users with established status from May 27th 2013, it has been determined as follows: Out of the 53 investments in total supported by the programme (paid out funds from donation and from the budget), six investments were not completed on May 27th 2013 and those include four investments paid out in 2011 and two investments paid out in The Grant scheme predicts that, after receiving the contribution from the grant, the rest part of the budget / investments has to be completed in four month deadline. The State Audit Institution received the minutes from the Management Board from May 13th 2013 (OADP- the eighth- the last meeting of the Management Board), by e- mail on June 20th We remind that the minutes were not verified and that it contained the three week deadline for remarks with a statement that if they were not delivered, the minutes would be considered adopted. Regarding delivered minutes, the State Audit Institution has paid attention to the comments regarding three projects in which the grant funds were not spent in accordance with application. Related to the above mentioned, we note: In the reports for 2010 and 2011, the State Audit Institution has stated that there were certain irregularities related to prolongation of the deadlines for realisation of the applicants own funds, as well as realisation of the funds approved by the Grant scheme (see the Audit report on donation funds of the Kingdom of Denmark for 2011, title- Commission for Evaluation, page 9). The State Audit Institution informed the Management Board on the issue of deadlines exceeding about the use of approved funds from the grant and at the same time, we could not convince, through minutes of the Management Board, that certain attention was paid to this issue until the last meeting of the Management Board on May 13th On the session held on May 13th 2013, the Management Board has reconsidered the problems about grant applications that were not used according to the Grant scheme so that closing of the project was brought into question by the Government of Denmark. 10

11 Respecting the circumstances that the State Audit Institution had drawn attention on deadlines prolongation regarding the use of funds and that the members of the Management Board had been acquiainted with these issues in accordance with the Article 2 of the Memorandum of Understanding on implementation of Organic Agriculture Development Programme (OADP) between the Government of the Kingdom of Denmark and the Government of Montenegro, we propose that the Management Board holds another session dedicated to this issue and proposes a concrete conclusion in accordance with positive legislature of Montenegro, Memorandum of Understanding between the Government of the Kingdom of Denmark and the Government of Montenegro on implementation of Organic Agriculture Development Programme (OADP) and Grant Scheme Manual. 1. Budget Planning and Execution In accordance with the Instruction on the Work of the State Treasury 7, and based on the Request of the Ministry of Agriculture and Rural Development of Montenegro (in that period it was the Ministry of Agriculture, forestry and water management), No. 320/ /7 from February 10th, 2010, the Ministry of Finance opened a bank account number: , at Montenegrin Commercial Bank a.d. Podgorica, entitled Organic Agriculture Development Programme (OADP). The funds at the account are handled by the Ministry, while the Ministry of Finance is responsible for the transfer of funds to the end user. Planned funds from donations of the Government of the Kingdom of Denmark, intended for realisation of the Organic Agriculture Development Programme, were included in the state budget for 2012 within the framework of Agrobudget, in amount of ,00 in the budget lines for expenditures Expenditures for contracted services. In the budget line for expenditures 4171 Subventions for production and service providing, the Ministry has planned expenditures based on its own participation at realisation of the Organic Agriculture Development Programme in amount of ,00, so that total planned funds for these purposes were ,00. After getting an insight into the commercial account at the bank, it has been determined that cash balance demand deposits on January 1st 2012 were ,12. Debit turnover of the account, i.e. flow of the funds were ,00. Credit turnover of the account, i.e. outflow of the funds was ,95, so that cash balance - demand deposits on May 16th 2013 was 1.404,17 as it can be seen in the following chart: No description debit turnover credit turnover 1 State of funds on January 1st ,12 2 Flow of funds (January 1st 2012 until May 16th 2013) ,00 3 Executed payments of funds (grant) ,17 4 Executed Payment of bank commission 619,78 5 State of funds on May 16th ,17 Total , ,12 7 ( 'Official Gazzette of the Republic of Montenegro'' No 80/08; 02/09; 45/10, 15/11 i 17/12) 11

12 Flow of the funds at the bank account, based on donations from the Government of Denmark, were realised: In amount of ,00 on January 13th 2012 In amount of ,00 on May 23rd 2012 In amount of ,00 on October 10th 2012 There were no flow or outflow of funds at the commercial account of the bank in Payments of funds from the account to the end user were executed on a request for payment delivered by the Ministry, which is ,17 in total, as the expenditures on behalf commission for bank service are expressed in amount of 619, Project Management The audit has included the work of the Management Board as a managing body of the Programme, as well as the work of the Advisory Service, the Commission for Evaluation and the Department for Organic Agriculture. The audit has also included financial service at the Ministry, where budget planning and payment processing are performed by the Ministry of Finance, as well as accounting records Management Board of the Program - comprises of the representatives of the partners responsible for Organic Agriculture Development Programme, according to the programme documentation. Based on the letter of the Ministry of Agriculture and Rural Development No. 320/ /5 from November 23rd 2012, appointment of new President of the Management Board was verified at the VII session of the Management Board. The Management Board was carrying out its tasks and decisions were made by consensus, which is in accordance with the programme document and other legal acts related to the Programme Advisory Service - Through the interview method and review of the Application Register (according to chosen sample) in audit procedure, it has been determined that the Advisory Service performed its tasks in accordance with the Grant Scheme, as follows: informed the target group about the possibilities for receiving donations, pre-conditions for application and evaluated the justification of investment requests (comment on the application form). The Advisory Service carried out continuous communication with all parties during the project cycle in accordance with the Grant Scheme (when the funds of personal financing were invested, but before executed payments of contributions from the grants and when the project was completed) Commission for Evaluation - carried out processing of applications in terms of accepting or rejecting the requests for grant funds in accordance with the Grant Scheme, with aim to make decision on awarding the grant. Reviewing the Register of Applications, according to chosen sample, it has been determined that there was an irregularity in the work of the Commission for Evaluation 12

13 regarding not meeting the deadline for realisation of own participation (four months after grant approval). Deadline for realisation of own participation personal share of funds, was postponed to 37,5 % of applications among chosen sample, based on approval given by the Commission for Evaluation. The Grant scheme does not predict the possibility to postpone the deadlines or give approvals for postponing the deadlines Ministry of Agriculture and Rural Development Since 2005, there has been an Unit for organic agriculture and legislative infrastructure for organic agriculture within the organizational structure of the Ministry of Agriculture and Rural Development Organic Agriculture Department is an implementing body within the Ministry of Agriculture and Rural Development which coordinates the work of all parties in Organic Agriculture Development Programme, in accordance with the programme documentation. Reviewing the Register of Applications, kept by the Organic Agriculture Department, it has been determined that on May 23 rd 2013, one application included in the sample, was not completed, i.e. there is no document based on which it can be determined that the investment was completed according to determined procedure in accordance with the Grant Scheme. The Grant Scheme predicts that, after receiving contributions from grant, the rest part of the budget/ investments has to be completed within four month deadline. There is a Report on realization of the second part of investment No 320/ /13 from April 29 th 2012 within the Register of Applications and it stated that the exact amount of designed spent funds can not be determined due to incomplete documentation Financial Service of the Ministry of Agriculture and Rural Development performed financial operations on the basis of orders received from the Department for Organic Agriculture. Having reviewed the Register of Applications, it has been determined that the Financial service, in one case from the chosen sample, did not submit a request for payment from the state budget funds to the Ministry of Finance as well as a request for payment from donation funds, which is not in accordance with the Grant Scheme. It has been determined by the control that the Ministry timely updated specimen signatures in cases when it came to the changes of responsible persons for authorization and approval of requests for payments and acted according to recommendation of the Institution given in the Audit Report for On the basis of specimen signature card, given to insight to the state auditors, financial funds approved by the budget were disposed by the following individuals: From April 20th 2011 to July 2nd 2012 Tarzan Milošević Authorising officer 13

14 Perović Vukica Authorising officer Lakić Đurđica Officer for verification In the time period from July 2nd 2012 Tarzan Milošević Authorising officer Perović Vukica - Authorising officer Lakić Đurđica Officer for verification Radoš Šućur approves Rosanda Vojinović - verifies The following chart contains the overview according to sources of realised funds on the project Organic Agriculture Development Programme in Montenegro from January 1st 2012 and in the year of 2013 (until the end of the project): Donation funds of Funds from the Budget Users own participation Total the Government of of Denmark Montenegro , , , ,67 In the afore-mentioned chart, realized funds from donation of the Government of Denmark were expressed in amount of ,17, while as the outflow on the currency account at the commercial bank on the basis of funds (grant) payments was expressed in amount of ,17. The difference in the amount of 3.000,00 refers to the funds that were mostly withdrawn by the Ministry of Finance in 2011 and paid out in 2012, which is explained in detail in the Audit Report on donation funds of the Kingdom of Denmark for Donation funds, planned in 2012, are included in the annual budget on the position Expenditure for contracted services in amount of ,00 and paid from the same position in amount of ,17. The funds from the state budget, intended for co-financing of the Organic Agriculture Development Programme, were planned for the position Subventions for production and providing service in amount of ,00 and paid out from the same account in amount of ,74, which is in accordance with planned funds. We remind that recommendation of the Institution from the Report for 2010 and 2011 was respected, regarding planning of expenditure and execution of budget according to economic classification The Ministry of Finance In accordance with the Grant Scheme, the Ministry of Finance properly carried out transfer of the funds from the currency account opened at Montenegrin Commercial Bank a.d. Podgorica, No: , which has been opened for monitoring donation funds of the Kingdom of Denmark, to the Capital account of the Treasury and to the end user. No irregularities have been determined by the audit. 14

15 2.6. Applications As previously stated, the audit has paid special attention to the following: Examine compliance of procedures for obtaining a grant with the Grant Manual, i.e. examine if procedures and criteria prescribed by the Instruction Manual for the Grant Scheme from December 2009 were followed and met regarding the approval of the grants to the users, Verification of the documentations for payments. In reported period (2012 and 2013), there were 37 applicants for receiving funds on the Organic Agriculture Development Programme in Montenegro. The Commission for Evaluation approved 21 applications and rejected 16 applications which did not meet the prescribed conditions. Out of approved 21 applications, 3 individuals gave up from the funds. In the time period that was the subject to the audit, the funds for 25 approved applications were paid out, 18 of which were approved in 2012 and 7 in the previous time period. By the method of random sample, the audit controlled sixteen applications that were paid out to the users in It was determined that controlled applications were approved in accordance with the procedure predicted by the Grant Scheme and other documents made with the aim of realization of the Project Organic Agriculture Development Programme in Montenegro. It has been also determined that the grant funds users, who were paid out the funds according to approved applications, respected the prescribed procedure. We consider that we should specify some minor irregularities referring to the following: 1. The audit has determined that the four month deadline was not met after approval of the grant funds for realisation of own participation - personal share in six cases or 37,5% applications chosen by the sample. Deadline for realisation of approved funds has been prolonged on the basis of approvals given by the Commission for Evaluation. The Grant Scheme does not predict the possibility to prolong the deadlines or give approvals for prolongation of the deadlines. 2. The audit has determined that a part of the budget /investments, after receiving contributions from the grant, was not completed within a four month period in seven cases or 43,75% of the chosen sample. The Grant scheme does not predict the possibility to prolong the deadlines. 3. After having reviewed the Register of Applications, it has been determined that in one case from the chosen sample, the Financial Service submitted a request to the Ministry of Finance for payment from the state budget funds, as well as the request for payment from donation funds in the deadline longer than the deadline predicted by the Grant Scheme (two week deadline). 15

16 4. The audit has determined that for one applicant from the chosen sample there was no documentation on the base of which state of investments after receiving funds from the grant can be determined, i.e. the level of investment realisation where the deadline for investment completion expired. In the Report given by the Ministry of Agriculture and Rural Development, on realisation of the funds of the Organic Agriculture Development Programme DANIDA for 2010, 2011 and 2012, according to fund sources and users with established status from May 27th 2013, status of this applicant is INCOMPLETED, i.e. the Application was not completed by the procedure in accordance to the Grant Scheme. * * * The audit process was fully supported by the Programme Office and employees in the Ministry of Agriculture and Rural Development who provided the major part of required data and adequate conditions for the work of the audit team. We are thankful for fair and professional cooperation, which enabled preparation of the Preliminary Report. HEAD OF COLLEGIUM III PhD Milan Dabović Member of the Senate 16

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation

General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation Danida Fellowship Centre December 2012 General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation Contents: 1. Introduction... 4 2. Anti-corruption

More information

FMO External Monitoring Manual

FMO External Monitoring Manual FMO External Monitoring Manual The EEA Financial Mechanism & The Norwegian Financial Mechanism Page 1 of 28 Table of contents 1 Introduction...4 2 Objective...4 3 The monitoring plan...4 4 The monitoring

More information

Sub-granting. 1. Background

Sub-granting. 1. Background Sub-granting 1. Background The European Commission (EC) re-introduced in May 2007 the option of sub-granting in its grant contracts 1. Sub-granting is an indirect financial contribution through an EC grant

More information

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012 COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012 CONCERNING SUPPORT FOR FEASIBILITY IN PARTIAL CONSTRUCTION EXPENSES IN COOPERATION PROJECTS BETWEEN THE GOVERNMENT

More information

NOTE BY THE TECHNICAL SECRETARIAT

NOTE BY THE TECHNICAL SECRETARIAT OPCW Technical Secretariat International Cooperation and Assistance Division S/551/2006 27 February 2006 Original: ENGLISH Introduction NOTE BY THE TECHNICAL SECRETARIAT INVITATION TO NATIONAL AUTHORITIES

More information

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY 1 Scope of the Project Contract The Grant to the Project Promoter is offered on the terms and conditions laid down in the Grant Offer

More information

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy.

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. 1. Overview of the scheme The application for a grant is made

More information

PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS

PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS TABLE OF CONTENTS 1 IMPLEMENTATION PLAN AND BUDGET... 2 2 PROGRESS REPORT... 2 3 FINANCIAL REPORT... 2 4

More information

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research EEA Financial Mechanism and Norwegian Financial Mechanisms 2014

More information

ITALY SLOVENIA JOINT SCIENCE AND TECHNOLOGY COOPERATION CALL FOR JOINT PROJECT PROPOSALS. CLOSING DATE: 15 th February 2018

ITALY SLOVENIA JOINT SCIENCE AND TECHNOLOGY COOPERATION CALL FOR JOINT PROJECT PROPOSALS. CLOSING DATE: 15 th February 2018 ITALY SLOVENIA JOINT SCIENCE AND TECHNOLOGY COOPERATION CALL FOR JOINT PROJECT PROPOSALS CLOSING DATE: 15 th February 2018 BACKGROUND In the framework of the Scientific and Technological Cooperation Agreement

More information

Policy Rules for the ORIO Grant Facility

Policy Rules for the ORIO Grant Facility Policy Rules for the ORIO Grant Facility Policy Rules grant facility ORIO 2012 1. What is ORIO?... 3 2. Definitions... 3 3. The role of infrastructure... 4 4. Implementation... 5 5. Target group... 5 6.

More information

THE EIFFEL PROGRAM VADE MECUM 2018

THE EIFFEL PROGRAM VADE MECUM 2018 THE EIFFEL PROGRAM VADE MECUM 2018 The scholarship program includes two parts: - the masters' part allows the financing of a diploma course at masters' level, and lasts 12 to 36 months; - the PhD ( Doctorat

More information

Forum Syd s General Conditions Programme Support

Forum Syd s General Conditions Programme Support Forum Syd s General Conditions Programme Support Decided by: Claudia, Head of Impact and Quality Assurance Decided on: 2018-03-08 Updated: 2018-04-20 Period of validity: Until further notice 1 Contents

More information

Danida Fellowship Centre (DFC) January 2018

Danida Fellowship Centre (DFC) January 2018 Danida Fellowship Centre (DFC) January 2018 General Conditions for Grants to Research Collaboration Projects Supported through Denmark s International Development Cooperation Projects in Danida Priority

More information

Checklist of requirements for licensing under Section 31 of the Trade Regulation Code (GewO)

Checklist of requirements for licensing under Section 31 of the Trade Regulation Code (GewO) Checklist of requirements for licensing under Section 31 of the Trade Regulation Code (GewO) I. Operational framework 1. Senior executive 1.1 Company management has selected a senior executive as designated

More information

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia 2011 Call for proposals Non-State Actors in Development Delegation of the European Union to Russia Generally: to promote inclusive and empowered society in partner countries by supporting actions of local

More information

Subsidy contract for the project. Click here to enter text.

Subsidy contract for the project. Click here to enter text. Subsidy contract for the project Click here to enter text. Version 02 as of 14.06.2016 The following contract between the Land of Salzburg acting as managing authority (hereinafter MA ) of the European

More information

Grant Agreement. The. - hereinafter referred to as "the Recipient" and

Grant Agreement. The. - hereinafter referred to as the Recipient and The - hereinafter referred to as "the Recipient" and Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1-5 65760 Eschborn Federal Republic of Germany - hereinafter

More information

CHAPTER 10 Grant Management

CHAPTER 10 Grant Management CHAPTER 10 Grant Management Table of Contents Page GRANT MANAGEMENT 1 Introduction... 1 Financial Management of Grants... 1 Planning and Budgeting... 1 Application and Implementation... 2 Monitoring...

More information

Incentive Guidelines Start-Up Finance

Incentive Guidelines Start-Up Finance Incentive Guidelines Start-Up Finance 2017-2020 Issue Date: 31 st May 2017 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to understand the objectives

More information

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations CALL FOR PROPOSALS Application Deadline: 22 September, 2009 This Call for Proposals is designed to pursue

More information

International Visegrad Fund Development of Methodology for Audits of Projects Supported by IVF Grant Schemes

International Visegrad Fund Development of Methodology for Audits of Projects Supported by IVF Grant Schemes International Visegrad Fund Development of Methodology for Audits of Projects Supported by IVF Grant Schemes Final 9 May 2017 Content PART A - SELECTION CRITERIA - SELECTION OF AN AUDITOR... 3 PART B -

More information

Obligations for OKP fellowship holders

Obligations for OKP fellowship holders Obligations for OKP fellowship holders Orange Knowledge Programme (OKP) The overall aim of OKP is to aid the development of the capacity, knowledge and quality of individuals as well as institutions in

More information

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016 Republic of Latvia Cabinet Regulation No. 50 Adopted 19 January 2016 Regulations Regarding Implementation of Activity 1.1.1.2 Post-doctoral Research Aid of the Specific Aid Objective 1.1.1 To increase

More information

Law on Medical Devices

Law on Medical Devices Law on Medical Devices The Law is published in the Official Gazette of the Republic of Montenegro, no. 79/2004 on 23.12.2004. I GENERAL PROVISIONS Article 1 Manufacturing and distribution of medical devices

More information

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr Education, Audiovisual and Culture Executive Agency Creative Europe: Culture GRANT DECISION FOR AN ACTION Decision Nr of the Education, Audiovisual and Culture Executive Agency on the award of a grant

More information

CALL FOR PROPOSALS OF THE JOINT RESEARCH PROJECTS WITHIN THE EXECUTIVE PROGRAMME OF COOPERATION IN THE FIELD OF SCIENCE AND TECHNOLOGY

CALL FOR PROPOSALS OF THE JOINT RESEARCH PROJECTS WITHIN THE EXECUTIVE PROGRAMME OF COOPERATION IN THE FIELD OF SCIENCE AND TECHNOLOGY CALL FOR PROPOSALS OF THE JOINT RESEARCH PROJECTS WITHIN THE EXECUTIVE PROGRAMME OF COOPERATION IN THE FIELD OF SCIENCE AND TECHNOLOGY BETWEEN THE ITALIAN REPUBLIC AND THE REPUBLIC OF SERBIA FOR THE YEARS

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576)

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576) Public Disclosure Authorized CONFORMED COPY June 27, 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jukka Valtasaari Ambassador Embassy of Finland 3301

More information

Regulation of the Cabinet of Ministers regulating implementation of the measure of specific support objective

Regulation of the Cabinet of Ministers regulating implementation of the measure of specific support objective Institute of Horticulture, Latvia University of Agriculture regulations of post-doctoral research applications for submission to the next round of research application selection in measure 1.1.1.2 Postdoctoral

More information

Version September 2014

Version September 2014 Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the

More information

Green Industry Innovation Programme Poland. Call for Project Proposals

Green Industry Innovation Programme Poland. Call for Project Proposals Norwegian Financial Mechanism 2009-2014 (Norway Grants) Green Industry Innovation Programme Poland Call for Project Proposals The Green Industry Innovation Programme Poland (later referred to as the Programme)

More information

Obligations for OKP fellowship holders

Obligations for OKP fellowship holders Obligations for OKP fellowship holders Knowledge Development Program (OKP) The overall aim of OKP is to aid the development of the capacity, knowledge and quality of individuals as well as institutions

More information

CALL FOR PROPOSALS. GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4

CALL FOR PROPOSALS. GRANT FOR ROMACT SUPPORT ORGANISATIONS IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4 CALL FOR PROPOSALS GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27 Project Joint EU/CoE Projects ROMACT3 and ROMACT4 Awarding entity Funding COUNCIL OF EUROPE Directorate General

More information

Grant Application Packet. Office of Sponsored Programs Seminole State College

Grant Application Packet. Office of Sponsored Programs Seminole State College Grant Application Packet Office of Sponsored Programs Seminole State College Table of Contents Office of Sponsored Programs... 3 What is a "sponsored" program?... 3 Grant Proposal Preparation Guidelines...

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross

More information

Incentive Guidelines Innovative Start-ups Scheme

Incentive Guidelines Innovative Start-ups Scheme Incentive Guidelines Innovative Start-ups Scheme Issue Date: 6 th May 2010 Updated: 10 th April 2014 Version: 1.2 http://support.maltaenterprise.com CONTENTS 1. Introduction 4 2. Eligibility 5 3. Incentive

More information

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Question 1: Does re-granting experience refer to direct experience

More information

REPUBLIC OF KENYA GOVERNMENT OF MAKUENI COUNTY COUNTY TREASURY P.O. BOX MAKUENI

REPUBLIC OF KENYA GOVERNMENT OF MAKUENI COUNTY COUNTY TREASURY P.O. BOX MAKUENI REPUBLIC OF KENYA GOVERNMENT OF MAKUENI COUNTY COUNTY TREASURY P.O. BOX 78-90300 MAKUENI REGISTRATION DOCUMENT FOR SUPPLY AND DELIVERY OF CERTIFIED SEEDS FOR FINANCIAL YEARS 2017-2018 AND 2018-2019 REFERENCE

More information

Elder Academy Development Foundation. Funding Guidelines Elder Academies in Primary and Secondary Schools

Elder Academy Development Foundation. Funding Guidelines Elder Academies in Primary and Secondary Schools Elder Academy Development Foundation Funding Guidelines Elder Academies in Primary and Secondary Schools 1. All school sponsoring bodies/schools and collaborating welfare organisations/bodies/parent-teacher

More information

PolyU Tech Launchpad Fund (TLF) Scheme Frequently Asked Questions

PolyU Tech Launchpad Fund (TLF) Scheme Frequently Asked Questions PolyU Tech Launchpad Fund (TLF) Scheme 2019-20 Frequently Asked Questions Application Eligibility 1. Is a PolyU staff member eligible to apply for this Fund? According to the Technology Start-up Support

More information

Joint Operational Programme Romania Republic of Moldova

Joint Operational Programme Romania Republic of Moldova Joint Operational Programme Romania Republic of Moldova 2014-2020 Procedure for the evaluation and approval of large infrastructure projects selected through direct award Abbreviations CBC Cross Border

More information

Proposal Preparation Package

Proposal Preparation Package Sino-Danish Renewable Energy Development Programme (RED) Proposal Preparation Package China National Renewable Energy Center (CNREC) March 1, 2012 Beijing 1 Call for Proposals Support to Danish-Chinese

More information

Welcome and Introductions

Welcome and Introductions Fiscal Matters: An Overview of Annual Head Start and Early Head Start Grant Requirements U.S. Department of Health and Human Services, Welcome and Introductions Staff Grantee Representatives 1 Goals for

More information

Statutes of the Copernicus Science Centre I. GENERAL PROVISIONS

Statutes of the Copernicus Science Centre I. GENERAL PROVISIONS Statutes of the Copernicus Science Centre I. GENERAL PROVISIONS 1 The cultural institution known as The Copernicus Science Centre, hereinafter the Science Centre, operates in particular on the basis of:

More information

REQUEST FOR PROPOSAL (RFP) AUDIT SERVICES. Ref: RFP/

REQUEST FOR PROPOSAL (RFP) AUDIT SERVICES. Ref: RFP/ REQUEST FOR PROPOSAL (RFP) AUDIT SERVICES Ref: RFP/2018-01 Section 1 Letter of invitation January 26, 2018 Dear Sir/Madam, The Economy and Environment Partnership for Southeast Asia (EEPSEA) kindly invites

More information

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3

ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Ambasciata d Italia Il Cairo Ministry of International Cooperation ITALIAN EGYPTIAN DEBT FOR DEVELOPMENT SWAP PROGRAMME PHASE 3 Civil Society Component CALL FOR PROPOSALS Projects implemented by Egyptian

More information

Incentive Guidelines Knowledge Transfer

Incentive Guidelines Knowledge Transfer Incentive Guidelines Knowledge Transfer Issue Date: March 2016 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides interested applicants with support to facilitate the understanding

More information

Call for Proposals Guidelines for the Programme: Wehubit BEL

Call for Proposals Guidelines for the Programme: Wehubit BEL Contracting authority: Enabel Call for Proposals Guidelines for the Programme: Wehubit BEL1707111 Call for Proposals on Women and Young people s Rights, Inclusion and Empowerment Reference: BEL1707111-AP-01

More information

Obligations for NFP and MSP fellowship holders

Obligations for NFP and MSP fellowship holders Obligations for NFP and MSP fellowship holders Netherlands Fellowship Programmes (NFP) The Netherlands Fellowship Programmes (NFP) is a scheme initiated and fully funded by the Dutch Ministry of Foreign

More information

Introduction to Call for FFU Proposals, Information meetings for applicants April-May 2014 Dar es Salaam, Kathmandu, Accra and Copenhagen

Introduction to Call for FFU Proposals, Information meetings for applicants April-May 2014 Dar es Salaam, Kathmandu, Accra and Copenhagen Introduction to Call for FFU Proposals, 2015 Information meetings for applicants April-May 2014 Dar es Salaam, Kathmandu, Accra and Copenhagen Nr. 1 Programme 1. Introduction to the Call and to South-driven

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE PROGRAMMING PERIOD

FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE PROGRAMMING PERIOD Regional Development Unit Guidance Note: REV 1 13.8.2010 3357/570/2008 FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE 2007-2013 PROGRAMMING PERIOD 1. Background

More information

CEI Cooperation Fund Call for Proposals CEI Cooperation Fund _ Call for Proposals 2018

CEI Cooperation Fund Call for Proposals CEI Cooperation Fund _ Call for Proposals 2018 CEI Cooperation Fund Call for Proposals 2018 Date of publication on www.cei.int : Thursday, 8 March 2018 Deadline for application submission: Tuesday, 8 May 2018, 17:00 Trieste time Applicants need to

More information

Incentive Guidelines Start-Up Finance

Incentive Guidelines Start-Up Finance Incentive Guidelines Start-Up Finance Issue Date: 24 th February 2016 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to understand the objectives

More information

Terms and conditions for agreement on Danske Mobile Banking consumers

Terms and conditions for agreement on Danske Mobile Banking consumers Terms and conditions for agreement on Danske Mobile Banking consumers Effective from 1 January 2018 Danske Mobile Banking is Danske Bank s digital banking solution for mobile devices such as mobile phones.

More information

Terms and Conditions for Custody Accounts Applicable from 1 March 2018

Terms and Conditions for Custody Accounts Applicable from 1 March 2018 This is a translation of a document in the Danish language (Betingelser for depoter). In case of discrepancies, the Danish version prevails. Terms and Conditions for Custody Accounts Applicable from 1

More information

REQUEST FOR PROPOSALS FOR FEE ACCOUNTING SERVICES ALL PROPOSALS MUST BE ADDRESSED AND SUBMITTED TO:

REQUEST FOR PROPOSALS FOR FEE ACCOUNTING SERVICES ALL PROPOSALS MUST BE ADDRESSED AND SUBMITTED TO: REQUEST FOR PROPOSALS FOR FEE ACCOUNTING SERVICES ALL PROPOSALS MUST BE ADDRESSED AND SUBMITTED TO: ROBERT DICKE, EXECUTIVE DIRECTOR 2001 W. BROADWAY, SUITE 1 MONONA, WI 53713-3707 PROPOSALS MUST BE RECEIVED

More information

LICENSINGAPPLICATION GUIDELINES, 2016

LICENSINGAPPLICATION GUIDELINES, 2016 LICENSINGAPPLICATION GUIDELINES, 2016 1.0 INTRODUCTION In exercise of the powers conferred by the Communications Act, Cap 68:01 of the Laws of Malawi, Malawi Communications Regulatory Authority (hereinafter

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4322-MOT. (Sustainable Tourism Development Project) between REPUBLIC OF MONTENEGRO.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4322-MOT. (Sustainable Tourism Development Project) between REPUBLIC OF MONTENEGRO. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4322-MOT Public Disclosure Authorized Financing Agreement Public Disclosure Authorized (Sustainable Tourism Development Project) between REPUBLIC

More information

Statement of responsibilities for grants certification Wales Audit Office

Statement of responsibilities for grants certification Wales Audit Office Statement of responsibilities for grants certification Wales Audit Office Date issued: December 2016 Document reference: 707A2016 This document has been prepared as part of work performed in accordance

More information

EIFFEL PROGRAMME VADE MECUM 2016

EIFFEL PROGRAMME VADE MECUM 2016 EIFFEL PROGRAMME VADE MECUM 2016 The Eiffel Excellence Scholarship Programme has two branches: - a master s branch, which funds master s courses lasting between 12 and 36 months; - a PhD branch, which

More information

DoD Financial Management Regulation Volume 14, Chapter 3 April 2003

DoD Financial Management Regulation Volume 14, Chapter 3 April 2003 SUMMARY OF MAJOR CHANGES TO VOLUME 14, CHAPTER 3 PRELIMINARY REVIEWS OF POTENTIAL VIOLATIONS Substantive revisions are denoted by a preceding the section or paragraph with the substantive change or revision.

More information

Masaryk University Scholarship and Bursary Regulations

Masaryk University Scholarship and Bursary Regulations In accordance with section 36, subsection 2 of Act No. 111/1998 Coll., on Higher Education Institutions and on the Modification and Amendment of Other Acts (the Higher Education Act), the Ministry of Education,

More information

Call for applications for 3 Greenland-related PhD or postdoc scholarships

Call for applications for 3 Greenland-related PhD or postdoc scholarships Call for applications for 3 Greenland-related PhD or postdoc scholarships with instructions and specification of application requirements Content The scholarships... 2 Purpose and prioritised fields...

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

Department of Defense DIRECTIVE. SUBJECT: Under Secretary of Defense (Comptroller) (USD(C))/Chief Financial Officer (CFO), Department of Defense

Department of Defense DIRECTIVE. SUBJECT: Under Secretary of Defense (Comptroller) (USD(C))/Chief Financial Officer (CFO), Department of Defense Department of Defense DIRECTIVE NUMBER 5118.3 January 6, 1997 SUBJECT: Under Secretary of Defense (Comptroller) (USD(C))/Chief Financial Officer (CFO), Department of Defense DA&M References: (a) Title

More information

General terms and conditions of Tempo funding

General terms and conditions of Tempo funding 1 June 2017 1 (6) General terms and conditions of Tempo funding Contents 1 Scope of application and publicity of the funding decision... 2 2 Monitoring of costs... 2 3 Eligible costs... 2 3.1 Principles...

More information

The internal quality assurance system of the Foundation for the Accreditation of Study Programmes in Germany

The internal quality assurance system of the Foundation for the Accreditation of Study Programmes in Germany Printed Matter AR 87/2012 The internal quality assurance system of the Foundation for the Accreditation of Study Programmes in Germany Resolution of the Accreditation Council of 18.06.2007, amended on

More information

Pre-Qualification Document External Audit Services

Pre-Qualification Document External Audit Services Pre-Qualification Document External Audit Services Audit of the annual accounts of the European Financial Stability Facility for the financial years 2017-2019 26/01/2017 Introduction The European Financial

More information

Alberta Greenhouse Rebate Program (AGRP) Terms and Conditions

Alberta Greenhouse Rebate Program (AGRP) Terms and Conditions 1. Purpose (AGRP) Terms and Conditions The is a discretionary non-entitlement Program to facilitate the transition to greater efficiencies in the Alberta greenhouse industry. This program provides eligible

More information

REQUEST FOR PROPOSAL TO AUDIT

REQUEST FOR PROPOSAL TO AUDIT REQUEST FOR PROPOSAL TO AUDIT Technical College of the Lowcountry State Board for Technical and Comprehensive Education Last Revised Date: November 2, 2012 T A B L E O F C O N T E N T S I. INFORMATION

More information

Grant Agreement. The. - hereinafter referred to as "the Recipient" and

Grant Agreement. The. - hereinafter referred to as the Recipient and The - hereinafter referred to as "the Recipient" and Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Dag-Hammarskjöld-Weg 1-5 65760 Eschborn Federal Republic of Germany - hereinafter

More information

STUDENT ACTIVITY FUNDS

STUDENT ACTIVITY FUNDS STUDENT ACTIVITY FUNDS INTRODUCTION: Student activities are defined as school clubs, classes or other related activities which organize to raise money and/or promote a particular program, project or subject

More information

Bank of Uganda REPUBLIC OF UGANDA ADDENDUM TO THE BIDDING DOCUMENT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF A DISK TO

Bank of Uganda REPUBLIC OF UGANDA ADDENDUM TO THE BIDDING DOCUMENT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF A DISK TO Bank of Uganda REPUBLIC OF UGANDA ADDENDUM TO THE BIDDING DOCUMENT FOR SUPPLY, INSTALLATION AND COMMISSIONING OF A DISK TO DISK TO TAPE BACKUP AND RECOVERY SOLUTION AUGUST 08, 2017 Part 1: Section 2 Bid

More information

GRANT CONTRACT - EXTERNAL ACTIONS OF THE EUROPEAN UNION -

GRANT CONTRACT - EXTERNAL ACTIONS OF THE EUROPEAN UNION - GRANT CONTRACT - EXTERNAL ACTIONS OF THE EUROPEAN UNION - (the Contract ) [The European Union, represented by the European Commission or [

More information

Application for Enrolment YOUNG ADULT STUDENT Student Name

Application for Enrolment YOUNG ADULT STUDENT Student Name Application for Enrolment YOUNG ADULT STUDENT Student Name Please complete all sections. An incomplete application will result in a delay in processing and your form may be returned to you to complete.

More information

Office of the Inspector General Department of Defense

Office of the Inspector General Department of Defense DEFENSE DEPARTMENTAL REPORTING SYSTEMS - AUDITED FINANCIAL STATEMENTS Report No. D-2001-165 August 3, 2001 Office of the Inspector General Department of Defense Report Documentation Page Report Date 03Aug2001

More information

Consolato d Italia. Cape Town

Consolato d Italia. Cape Town Consolato d Italia Cape Town SPECIFICATIONS SELECTION PROCEDURE FOR AN EXTERNAL SERVICE PROVIDER TO SUPPORT THE ITALIAN CONSULAR/DIPLOMATIC MISSION IN THE PROCESSING OF VISA APPLICATION DEFINITIONS For

More information

5. returning the medication container to proper secured storage; and

5. returning the medication container to proper secured storage; and 111-8-63-.20 Medications. (1) Self-Administration of Medications. Residents who have the cognitive and functional capacities to engage in the self-administration of medications safely and independently

More information

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014 UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA Report No. 1130 Issue Date: 15 January 2014 Table of Contents

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM-006-2018 Date Issued: 11/20/2017 TABLE OF CONTENTS SECTION 1 RFP INFORMATION AND INSTRUCTIONS SECTION

More information

Priority Axis 1: Promoting Research and Innovation

Priority Axis 1: Promoting Research and Innovation 2014 to 2020 European Structural and Investment Funds Growth Programme Call for Proposals European Regional Development Fund Priority Axis 1: Promoting Research and Innovation Managing Authority: Fund:

More information

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

THE BOARD OF THE EURASIAN ECONOMIC COMMISSION RESOLUTION. dated December 22, 2015 N 174

THE BOARD OF THE EURASIAN ECONOMIC COMMISSION RESOLUTION. dated December 22, 2015 N 174 THE BOARD OF THE EURASIAN ECONOMIC COMMISSION RESOLUTION Dated December 22, 2015, N 174 ON APPROVAL OF REGULATIONS OF MEDICAL DEVICE SAFETY, QUALITY AND EFFECTIVENESS MONITORING In accordance with paragraph

More information

EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF OPELIP

EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF OPELIP ODISHA PVTG EMPOWERMENT & LIVELIHOODS IMPROVEMENT PROGRAMME ST & SC DEVELOPMENT DEPARTMENT 2 nd floor, TDCCOL Building, Rupali Square, Bhubaneswar 751022 EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF

More information

GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II)

GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II) Approved by the Head of the Managing Authority Sandis Cakuls on 19.06.2017. GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II) INTERREG V A LATVIA LITHUANIA PROGRAMME

More information

Directive for the Austrian JI/CDM Programme

Directive for the Austrian JI/CDM Programme Directive for the Austrian JI/CDM Programme Based on paragraphs 13 and 43 of the Austrian Environmental Support Act (ESA) (Umweltförderungsgesetz UFG), Federal Law Gazette No. 185/1993 as amended, the

More information

FREQUENTLY ASKED QUESTIONS FOR SPECIAL CALL FOR PROPOSAL FOOD SAFETY

FREQUENTLY ASKED QUESTIONS FOR SPECIAL CALL FOR PROPOSAL FOOD SAFETY FREQUENTLY ASKED QUESTIONS FOR SPECIAL CALL FOR PROPOSAL FOOD SAFETY Q1: How does one apply for funds under the Special call for Proposal Food Safety? A1: Applications are available from Caribbean Export

More information

PACIFIC SHORT TERM TRAINING SCHOLARSHIPS

PACIFIC SHORT TERM TRAINING SCHOLARSHIPS Application form for PACIFIC SHORT TERM TRAINING SCHOLARSHIPS OFFICE USE ONLY Applicant name: Country: Date: SHORT TERM TRAINING SCHOLARSHIPS (STTS) Short Term Training Scholarships assist people in the

More information

Call for Project Proposals & Criteria

Call for Project Proposals & Criteria Funds for Local Cooperation in Lebanon: Call for Project Proposals & Criteria Embassy of Finland, Beirut, 2016 What are the Funds for Local Cooperation? Funds for Local Cooperation (FLCs) of the Mission

More information

Guidelines for InnoBooster

Guidelines for InnoBooster Please note: This document is an unofficial translation of the InnoBooster guidelines and not a legally binding document. In case of conflict between the Danish and English version of the InnoBooster guidelines,

More information

GRANT ASSISTANCE FOR GRASSROOTS HUMAN SECURITY PROJECTS (GGP) GUIDELINES

GRANT ASSISTANCE FOR GRASSROOTS HUMAN SECURITY PROJECTS (GGP) GUIDELINES GRANT ASSISTANCE FOR GRASSROOTS HUMAN SECURITY PROJECTS (GGP) GUIDELINES 2012 Edition *1. These Guidelines should be detached and retained by the applicant before submitting the application form. *2. Application

More information

O L A. Perpich Center for Arts Education Fiscal Years 2001 through 2003 OFFICE OF THE LEGISLATIVE AUDITOR STATE OF MINNESOTA

O L A. Perpich Center for Arts Education Fiscal Years 2001 through 2003 OFFICE OF THE LEGISLATIVE AUDITOR STATE OF MINNESOTA O L A OFFICE OF THE LEGISLATIVE AUDITOR STATE OF MINNESOTA Financial Audit Division Report Perpich Center for Arts Education Fiscal Years 2001 through 2003 JUNE 10, 2004 04-23 Financial Audit Division

More information

CALL FOR PROPOSALS. Supporting rehabilitation programmes for prisoners at the Institute for the Execution of Criminal Sanctions

CALL FOR PROPOSALS. Supporting rehabilitation programmes for prisoners at the Institute for the Execution of Criminal Sanctions CALL FOR PROPOSALS Supporting rehabilitation programmes for prisoners at the Institute for the Execution of Criminal Sanctions HFMNEPrisons_grant reintegration 2018 Project Horizontal Facility - Joint

More information

Terms and Conditions for agreement on Danske Mobile Banking - Consumers

Terms and Conditions for agreement on Danske Mobile Banking - Consumers Terms and Conditions for agreement on Danske Mobile Banking - Consumers Applicable from 27 September 2017 Danske Mobile Banking is Danske Bank s electronic banking solution for mobile devices such as mobile

More information

Department of Health and Mental Hygiene Alcohol and Drug Abuse Administration

Department of Health and Mental Hygiene Alcohol and Drug Abuse Administration Audit Report Department of Health and Mental Hygiene Alcohol and Drug Abuse Administration December 2006 OFFICE OF LEGISLATIVE AUDITS DEPARTMENT OF LEGISLATIVE SERVICES MARYLAND GENERAL ASSEMBLY This report

More information

On Charitable Donation and Sponsorship Activity (in abridged form)

On Charitable Donation and Sponsorship Activity (in abridged form) Appendix to Order No. 77 dated 23.09.2013 On Charitable Donation and Sponsorship Activity (in abridged form) 1. GENERAL PROVISIONS 1.1. Purpose and Objectives 1.1.1. The Charitable Donation and Sponsorship

More information

Friends of the Military Museum Historical Association of Southern Florida, Inc. St. Augustine Lighthouse and Museum

Friends of the Military Museum Historical Association of Southern Florida, Inc. St. Augustine Lighthouse and Museum Contract/Grant Management Verification of Expenditures The Department did not provide evidence the expenditures were verified as required by Comptroller Memorandum No. 01 (1997-98) and the Reference Guide

More information