Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 13
|
|
- Grant Tyler
- 5 years ago
- Views:
Transcription
1 1 AGENDA Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 13 Date: 5:00 p.m., Tuesday, October 27 th, 2009 Location: 100 Van Ness Avenue, 26 th Floor 5:00 1. Committee Meeting Call to Order 5:05 2. Adoption of Minutes of the September 8 th, 2009 Meeting ACTION* 5:10 3. Project Status and Schedule INFORMATION The purpose of this item is to update the Committee on the Van Ness Avenue BRT EIR/EIS schedule and status. 5:20 4. Federal Transit Administration Annual Small Starts Report -- INFORMATION* The Federal Transit Administration (FTA) administers a number of grant programs to support transit capital expansion as authorized by Federal transportation legislation, SAFETEA-LU, which was signed into law in August SAFETEA-LU established a new transit capital investment program, Small Starts, which is intended to fund relatively inexpensive, cost-effective transit capital projects. The Authority was awarded entry into the Small Starts pipeline of projects in 2007, receiving a high rating for project cost effectiveness. The project team provides required annual reports to FTA on project progress towards construction. For this year s annual report, the project team re-estimated the project costs based on revised engineering designs, station platform designs, and other new information developed in support of the EIR/EIS. The 2009 annual report includes no significant updates to the proposed project funding plan; Van Ness Avenue BRT is eligible for up to $75M in Small Starts funds, to be matched by up to $20M in Proposition K sales tax funds. Also updated this year was the Project Management Plan (PMP), which provides information on the project implementation timeframe (including the timetable for vehicles procurement), and progress towards final design and construction activities. We are seeking input and feedback from the Committee. 6:20 5. BRT Vehicle Procurement and Funding Update INFORMATION In support of the Van Ness Avenue BRT Annual Small Starts report, SFMTA updated the plan for procuring, funding, and testing BRT vehicles for Van Ness Avenue. SFMTA plans to replace existing 60 trolley coaches with a combination of 60 BRT trolley and diesel hybrid motorcoaches to operate Van Ness Avenue BRT. The vehicle purchase will be funded by FTA formula funds for vehicle replacement and Small Starts, matched by Proposition K sales tax funds. The purpose of this item is for SFMTA to update the committee the current plans for designing, procuring, and funding Van Ness Avenue BRT vehicles. We are seeking input and feedback from the Committee. 6. Public Comment 7:00 7. Adjourn * - Materials Attached O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Meeting 13 Agenda.doc
2 2 DRAFT MINUTES Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 11 Date: 5:00 p.m., Tuesday, July 14 th, 2009 Location: 100 Van Ness Avenue, 26 th Floor 1. Committee Meeting Call to Order The committee was called to order by Committee member Marla Taylor at 5:10 p.m. Van Ness CAC members present were Marla Taylor (moderator), Michelle Brant, Dave Goggin, Jason Henderson, Steve Kendrick, Lawrence Li, Henry Pan, and Howard Strassner. Authority and City staff members and consultants present were Rachel Hiatt and Margaret Cortes of the Authority; Paul Bignardi of SFMTA; Frank Sylvester of SFDPW; Sue Black and Raul Mosuela of SFPUC; and Kim Franchi of Parsons Transportation Group. 2. Adoption of Minutes of the July 14 th, 2009 Meeting ACTION * Howard Strassner moved to approve the minutes. Henry Pan seconded. There was no public comment. The item was approved unanimously. 3. Project Status and Schedule INFORMATION Rachel Hiatt, Senior Transportation Planner, presented the item overview. There was no public comment. Henry Pan suggested that a future outreach event should include presenting the project to an assembly of Galileo High School students. Ms. Hiatt stated that this activity could be incorporated in the outreach plan supporting the circulation of the Draft EIR/EIS. 4. Schedule Remaining Van Ness CAC Meeting Dates for 2009 ACTION* Rachel Hiatt presented the item, per the staff memorandum. Henry Pan moved to adopt the meeting schedule. Dave Goggin seconded. There was no public comment. The item was approved unanimously. 5. Lighting Technologies Follow-up for Trolley/Light Poles Replacement Project INFORMATION Frank Sylvester of SFDPW presented the item. Howard Strassner asked wither LED and High Pressure Sodium (HPS) light technologies provide the same light levels at the street level with the same number of publics. Mr. Sylvester stated that LED technology requires more fixtures to provide the same level of light as HPS. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Meeting 12 Minutes - Draft.doc
3 VN CAC Meeting #12 Meeting Minutes, Page 2 3 Dave Goggin asked whether the esplanade fixture depicted in the presentation was proposed for Van Ness Avenue. Mr. Sylvester responded that this fixture is an example of a decorative fixture. Howard Strassner asked about the energy efficiency comparison of LED vs. HPS, noting that the presentation implied that LED would not necessarily consume less energy to light Van Ness Avenue. Mr. Sylvester responded that using lumens per watt as the evaluation measure, LED would not necessarily perform more efficiently. Howard Strassner asked about pedestrian lighting levels and whether intersection crossings were adequately lit in the proposals. Mr. Sylvester stated that pedestrian coverage could be adjusted on a pole by pole basis by adjusting the fixture cutoffs. Rachel Hiatt, Senior Transportation Planner, added that the proposed pole design is to include a pedestrian-level fixture on the pole. Dave Goggin stated a preference for full cutoff and minimizing glare. Howard Strassner asked why cities are implementing LED lights if they are not necessarily more energy efficient. Mr. Sylvester clarified that LEDs do use less wattage (consume less power), but that they don t provide the same lighting levels. Dave Goggin added that current lighting criteria don t recognize color temperature; the broader spectrum LEDs seem brighter than the criteria recognize. Sue Black described the PUC s Tenderloin LED project as showing good results in third party testing, and stated that a report would be available in January that would also include results from the City of San Jose. She also added that current standards ( RP- 8 ) are likely going to be updated to address light temperature issues, but that this update may take 3 years. Currently, PUC must meet RP-8 standards. Steve Kendrick asked whether PUC is working with manufacturers to field test LEDs. Ms. Black responded that they have. She added that combined OCS support / light poles have vibration issues that may pose a problem for LEDs. She stated that a PUC master plan is being developed over the next year to address LED issues. 6. Year 2015 and 2035 No Project and With Project Scenario Travel Demand Forecasting Results INFORMATION* Marge Cortes presented the item per the staff memorandum. Jason Henderson suggested that a map shown better highlight / clarify the full corridor extents. Dave Goggin asked why BART to Warm Springs was included as a baseline project. Rachel Hiatt explained that projects included in the Regional Transportation Plan (RTP) are included in the assumptions for future transportation networks. Jason Henderson asked whether the TEP was included in the assumed future network. Marge Cortes clarified that the TEP is not included. Howard Strassner suggested that transit and automobile person-trips be shown separately. Steve Kendrick asked for clarification on the CPMC assumptions. Rachel Hiatt explained that the project team is developing a scenario that will include traffic expected along with CPMC. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Meeting 12 Minutes - Draft.doc Page 2 of 4
4 VN CAC Meeting #12 Meeting Minutes, Page 3 4 Jason Henderson asked about future transit crowding levels, noting that the increase in transit trips seemed low to him and whether crowding was constraining ridership. Rachel Hiatt explained that CHAMP does not estimate crowding levels, and that crowding would be analyzed over the coming months. During public comment, Eric P Scott asked whether person trip data is available for Franklin / Gough / Polk streets. Howard Strassner reminded staff hat the Committee had called for a scenario test that tested the effects of rising fuel prices. Michelle Brant suggested that a 2010 future year would be more useful than a future 2035 year. Rachel Hiatt responded that NEPA requires that a long range horizon year be analyzed, and that Steve Kendrick asked what causes the shift towards proportionally more regional trips in year 2035 than today. Marge Cortes responded that she would investigate the cause of this trend. Marla Taylor stated that the results seemed to make sense. Jason Henderson noted that the SFMTA has presented mode split goals for the year 2035 to have a 30% transit mode share, and asked how the study team has taken that into account. Paul Bignardi of SFMTA clarified that the 30% figure is a goal but is not binding. Mel Lee asked how the proposed CPMC is taken into account. Rachel Hiatt explained that the study team is also preparing a scenario test that would include CPMC-related traffic.. 7. Caltrans Design Exceptions INFORMATION Kim Franchi presented the item. Steve Kendrick asked what the allowed minimum grade is on Van Ness Avenue. Rachel Hiatt responded that grades of 9% and over are not permitted in Caltrans standards. Howard Strassner asked whether the team would be able to obtain a design exception for lane width. Kim Franchi explained that the project is perpetuating an existing nonstandard condition, and not narrowing lane widths relative to today, and this was one of the bases for the exception justification. Steve Kendrick asked which alternative was being used as the basis for the design exceptions. Kim Franchi and Rachel Hiatt explained that the team took a calculated risk in beginning the design exception process with one alternative rather than all three to save costs, and that many of the exceptions, such as lane width and grades, are common to all alternatives. Jason Henderson asked whether Caltrans would be willing to relinquish ownership of Van Ness Avenue. Rachel Hiatt explained that the City and the Authority pursued the option of relinquishment during the Feasibility Study stage, and that the City was concerned about being able to obtain maintenance funding from Caltrans. There was no public comment. 8. Public Comment There was no public comment. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Meeting 12 Minutes - Draft.doc Page 3 of 4
5 VN CAC Meeting #12 Meeting Minutes, Page Adjourn The meeting adjourned at 7:10 PM. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Meeting 12 Minutes - Draft.doc Page 4 of 4
6 6 Memorandum Date: RE: Van Ness BRT Citizens Advisory Committee October 27, 2009 To: From: Subject: Summary Van Ness Avenue BRT Citizens Advisory Committee Rachel Hiatt Senior Transportation Planner Federal Transit Administration Annual Small Starts Report INFORMATION The Federal Transit Administration (FTA) administers a number of grant programs to support transit capital expansion as authorized by Federal transportation legislation, SAFETEA-LU, which was signed into law in August SAFETEA- LU established a new transit capital investment program, Small Starts, which is intended to fund relatively inexpensive, cost-effective transit capital projects. The Authority was awarded entry into the Small Starts pipeline of projects in 2007, receiving a high rating for project cost effectiveness. The project team provides required annual reports to FTA on project progress towards construction. For this year s annual report, the project team re-estimated the project costs based on revised engineering designs, station platform designs, and other new information developed in support of the EIR/EIS. The 2009 annual report includes no significant updates to the proposed project funding plan; Van Ness Avenue BRT is eligible for up to $75M in Small Starts funds, to be matched by up to $20M in Proposition K sales tax funds. Also updated this year was the Project Management Plan (PMP), which provides information on the project implementation timeframe (including the timetable for vehicles procurement), and progress towards final design and construction activities. We are seeking input and feedback from the Committee. BACKGROUND The Federal Transit Administration (FTA) administers a number of grant programs to support transit capital expansion as authorized by Federal transportation legislation, SAFETEA-LU, which was signed into law in August SAFETEA-LU established a new transit capital investment program, Small Starts, which began funding projects in FTA states that the purpose of the Small Starts program is to seek out those projects that address significant transportation problems or opportunities and provide significant mobility and economic development benefits in a cost-effective manner. Each year Congress appropriates funds for each program and FTA awards grants to eligible recipients to meet the goals of that program. The Authority was awarded entry into the Small Starts pipeline of projects in 2007, receiving a high rating for project cost effectiveness. The project team provides required annual reports to FTA on project progress towards construction. The purpose of this memo is to update the Committee on the 2009 Van Ness Avenue BRT Small Starts Annual Report. Eligibility: Small Starts projects are defined as projects with total costs of less than $250M in year of expenditure dollars. A Small Starts Bus Rapid Transit project must be a new corridor-based bus project with all of the following minimum elements: Substantial transit stations, Traffic signal priority/pre-emption Low-floor vehicles or level boarding, Branding of the proposed service, and O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Item 4 Memo - FTA Small Starts Annual Report.doc Page 1 of 4
7 7 At least 10 minute peak/15 minute off peak headways or better while operating at least 14 hours per weekday. The proposed features of the Van Ness Avenue BRT alternatives meet Small Starts eligibility criteria. Local and Regional Prioritization: FTA seeks evidence of local and regional commitment to a proposed Small Starts project. Projects are required to be included in the Metropolitan Planning Organizations (MPOs) Regional Transportation Plan (RTP). MTC, the transportation arm of the 9-county Bay Area MPO, has adopted Van Ness Avenue BRT within the RTP as a Small Starts priority project. Locally, the Board of Supervisors has passed a Resolution declaring Van Ness and Geary BRT to be San Francisco s Small Starts priority projects. Project Evaluation Criteria and Rating: The FTA rates prospective Small Starts projects, with a designation of High, Medium, or Low, on the basis of Project Justification and local financial commitment. The Project Justification criterion considers the project s cost effectiveness, as well as other factors such as land use context and economic development potential. The Local Financial Commitment criterion encompasses the financial capability of the project sponsor to construct and operate the proposed investments. To receive a High rating for Local Financial Commitment, a project must by funded by at least 50% of non-small Starts funds. FTA recommends proposed Small Starts projects for funding after they have been approved to enter into project development, are ready to implement their proposed project, and continue to be rated at least medium for both project justification and local financial commitment. Projects that meet these conditions may be recommended for funding in the Annual Report on Funding Recommendations. In both 2007 and 2008, the Van Ness Avenue BRT project was rated High for Project Justification the only Small Starts project in the nation to receive a High rating in this category and Medium for Local Financial Commitment, resulting in an overall Medium-High project rating. Project Reporting and Monitoring: In the Small Starts program, all preliminary engineering and final design work is combined into one phase, referred to as Project Development. Projects must seek FTA authorization to enter Project Development and receive a project rating. (FTA does not distinguish between preliminary engineering (up to 35% engineering level) and final design (beyond 35%) of Small Starts projects; however, this distinction is important locally as a tool for defining the transition of project lead agency from the Authority to SFMTA). After completion of Project Development, a project sponsor seeks to enter into a Project Construction Grant Agreement (PCGA) with FTA. FTA monitors project status and progress quarterly through its Region 9 Office, which includes California. The Small Starts Annual Report is also reviewed the FTA Headquarters office. COST ESTIMATES AND FUNDING PLAN For this year s annual report, the project team re-estimated the project costs based on revised engineering designs, station platform designs, and other new information developed in support of the EIR/EIS. Alternative 2 Side BRT Lanes Alternative 3 Center BRT Lanes with Right Side Loading / Dual Medians Alternative 4 Center BRT Lanes with Left Side Loading / Center Median Project Capital Cost $89,403,000 $132,424,000 $118,608,000 O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Item 4 Memo - FTA Small Starts Annual Report.doc Page 2 of 4
8 8 ($2014) The differences in cost among alternatives relate primarily to: median reconstruction utility impacts and requirements incremental vehicle costs Alternative 2 requires less median reconstruction. Alternative 3 has the greatest utility conflicts and requirements. Alternative 4 has a greater incremental cost to provide dual-side door vehicles. Cost Effectiveness: The FTA basis its Project Justification rating in part on a project s cost effectiveness, measured by the incremental annualized project cost per annualized hour of user benefit. According to the FTA formula, the Van Ness BRT project would cost about $5.00 per hour of user benefit, a result that places the project in the high category for cost-effectiveness. Funding Plan: The 2009 Annual Report includes no significant updates to the proposed project funding plan. Van Ness Avenue BRT is eligible for up to $75M in Small Starts funds, to be matched by up to $20M in Proposition K sales tax funds. Cost Funding Summary Federal 5309 Small Starts Prop K Sales Tax Local Other Alternative 2 $89,403,000 $71,522,000 (80%) Alternative 3 $132,424,000 $75,000,000 (57%) Alternative 4 $118,608,000 $75,000,000 (63%) $17,881,000 (20%) $20,000,000 (15%) $20,000,000 (17%) $0 $37,424,000 (28%) $23,608,000 (20%) Alternative 2 could be fully funded by a combination of Small Starts and Prop K sales tax funds. Alternatives 3 and 4 would require additional local funding sources; potential sources include regional greenhouse gas emission reduction grants; state SHOPP funds; and revenues from the Market / Octavia development impact fee. PROJECT MANAGEMENT PLAN A Project Management Plan (PMP) provides the FTA with information on a project sponsor s technical capacity and readiness to implement the project. With each annual submittal, the project team seeks to show evidence of progress in advancing the level of design and in preparing to construct the project. The information provided in the PMP includes updates on the project schedule and status; project team staffing; procurement and contracting; and engineering. For 2009, key updates in the Van Ness BRT PMP include: Revised Implementation Plan, outlining the timeline for each project phase through construction. The Implementation Plan is based on the new construction plan and engineering designs, and includes more detailed breakdown of implementation tasks than past Plans. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Item 4 Memo - FTA Small Starts Annual Report.doc Page 3 of 4
9 9 Vehicles procurement timeline. SFMTA provided a more detailed breakdown of the steps involved in obtaining and testing new BRT vehicles in time for the start of Van Ness BRT revenue service. Construction Staging and Phasing plan. The approach to Van Ness BRT construction staging and phasing, presented to the VN CAC at a previous meeting, was incorporated into the PMP update. We will present more information on the FTA Small Starts Annual Report for the Van Ness Avenue BRT project at the VN CAC meeting. We are seeking input and feedback from the Committee. O:\Active Studies\Van Ness BRT Environmental & PE\CAC\Meetings\Meeting 13\Item 4 Memo - FTA Small Starts Annual Report.doc Page 4 of 4
SFTP Technical Advisory Committee September 19, 2012
09.19.12 SFTP Technical Advisory Committee September 19, 2012 SFTP Community Advisory Committee Rachel Hiatt Senior Transportation Planner Draft SFTP Project Performance Evaluation Results The SFTP Project
More informationSTATUS AND KEY ACTIVITIES
Memorandum Date: January 24, 2014 To: Authority Board: Commissioners Avalos (Chair), Wiener (Vice Chair), Breed, Campos, Chiu, Cohen, Farrell, Kim, Mar, Tang and Yee From: Chester Fung Principal Transportation
More informationSan Francisco Transportation Plan (SFTP) and Early Action Plan
San Francisco Transportation Plan (SFTP) and Early Action Plan October 2013 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Purpose of the San Francisco Transportation Plan (SFTP) Regional Transportation
More informationMemorandum. Date: RE: Plans and Programs Committee March 19, 2013
Memorandum Date: 03.14.13 RE: Plans and Programs Committee March 19, 2013 To: From: Through: Subject: Plans and Programs Committee: Commissioners Mar (Chair), Kim (Vice Chair), Breed, Campos, Yee and Avalos
More informationShaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update Provide world-class infrastructure and
More informationMemorandum. P:\Lifeline Program\2014 Lifeline Program\Call for Projects\LTP Cycle 4 Call - Memo.doc Page 1 of 7
Memorandum Date: 10.29.14 To: Prospective Project Sponsors From: Seon Joo Kim Senior Transportation Planner Through: Amber Crabbe Assistant Deputy Director Subject: Cycle 4 Lifeline Transportation Program
More informationMemorandum. Date: RE: Plans and Programs Committee
Memorandum Date: 02.05.09 RE: Plans and Programs Committee February 10, 2009 To: From: Through: Subject: Summary Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd,
More informationSan Francisco Transportation Task Force 2045
San Francisco Transportation Task Force 2045 June 5, 2017 Meeting Welcome from the Chairs Welcome and thank you for joining this effort Why we are here Process outline and role of task force members Summary
More informationCHAPTER 8 CAPITAL IMPROVEMENT PROGRAM. Key Topics: Legislative Requirements. 2. Legislative Intent and Application to San Francisco
CHAPTER 8 CAPITAL IMPROVEMENT PROGRAM Key Topics: Legislative Requirements Legislative Intent and Application to San Francisco Transportation Investment and System Performance CIP Components Relationship
More informationDate: To: From: Subject: ACTION Summary
Memorandum Date: To: From: Subject: 01.23.15 Citizens Advisory Committee RE: C Amber Crabbe Assistant Deputy Director forr Policy and Programming Citizens Advisory Committee January 28, 2015 ACTION Adopt
More informationDate: To: From: Subject: Guidelines. Summary BACKGROUND. and equity public and. blueprint. The Transportation. tailored. sources.
Memorandum Date: To: From: Subject: 08.28.14 Citizens Advisory Committee Maria Lombardo Chief Deputy Director David Uniman Deputy Director for Planningg RE: Citizens Advisory Committee September 3, 2014
More informationPeninsula Corridor Joint Powers Board Legislative Program
Peninsula Corridor Joint Powers Board 2018 Legislative Program Purpose Legislative and regulatory actions have the potential to significantly benefit Peninsula Corridor Joint Powers Board (JPB) programs
More informationRESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3
BD050917 RESOLUTION NO. 17-XX RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 WHEREAS, The Transportation Authority annually approves
More informationCitizens Advisory Committee May 23, 2012
05.18.12 Citizens Advisory Committee May 23, 2012 Citizens Advisory Committee Maria Lombardo Chief Deputy Director for Policy and Programming OneBayArea Grant Program Strategy, Schedule and Prioritization
More informationRe: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program
December 10, 2014 Bruce Roberts, Chief Division of Rail and Mass Transportation California Department of Transportation P.O. Box 942873 Sacramento, CA 94273-0001 Re: Comments on the Draft Guidelines for
More informationSan Francisco Municipal Transportation Agency Legislative Priorities
San Francisco Municipal Transportation Agency 2017 Legislative Priorities State Legislative Priorities 1. Transportation Funding New Statewide Transportation Funding: As a follow up to the 2016 Special
More informationAppendix E: Grant Funding Sources
Appendix E: Grant Funding Sources Federal Programs The majority of public funds for bicycle, pedestrian, and trails projects are derived through a core group of federal and state programs. Federal funding
More informationPublic-Private Partnership Program May 2015 Transit Coalition Update
Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.7 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Resolution authorizing the San Francisco Municipal
More informationMemorandum. Date: To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject:
Memorandum Date: 02.14.18 To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject: Amber Crabbe Assistant Deputy Director for Policy and Programming Cycle 5 Lifeline
More informationPUBLIC HEARING FY 2017 AND FY 2018 OPERATING AND CAPITAL BUDGET. February 16, 2016 SFMTA Board of Directors
PUBLIC HEARING FY 2017 AND FY 2018 OPERATING AND CAPITAL BUDGET February 16, 2016 SFMTA Board of Directors 1 Who We Are The SFMTA plans, designs, builds, operates, regulates and maintains one of the most
More informationProgram Management Plan
Program Management Plan Section 5310 ENHANCED MOBILITY OF SENIORS AND INDIVIDUALS WITH DISABILITIES PROGRAM Table of Contents GOALS AND OBJECTIVES... 3 ROLES AND RESPONSIBILITIES OF VIA... 3 ALAMO AREA
More informationAuthority Board March 26, 2013
Memorandum 03.26.13 Authority Board March 26, 2013 Authority Board: Commissioners Avalos (Chair), Wiener (Vice Chair), Breed, Campos, Chiu, Cohen, Farrell, Kim, Mar, Tang and Yee Maria Lombardo Interim
More informationADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS
ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: DEVELOPMENT/PLANNING/ZONING TITLE: TRANSPORTATION PROPORTIONATE SHARE CALCULATIONS FOR NEW DEVELOPMENT PROJECTS CODE NUMBER: AC-13-16 ADOPTED:
More informationSAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal
CITY OF 7 S3 SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL STUDY SESSION: 3/30/2017 Memorandum FROM: Kim Walesh Jim Ortbal SUBJECT: DIRIDON STATION PLAN AND REGIONAL RAIL PROJECTS
More informationRESOLUTION NO. 18-XX RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE COOPERATIVE AGREEMENT NO WITH THE CALIFORNIA DEPARTMENT OF
BD041018 RESOLUTION NO. 18-XX RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE COOPERATIVE AGREEMENT NO. 04-2647 WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR THE U.S. 101/I-280 MANAGED
More information2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS
2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..
More informationRegional Measure 3. Citizens Advisory Committee Agenda Item 12. SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY February 14, 2017
Regional Measure 3 Citizens Advisory Committee Agenda Item 12 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY February 14, 2017 Regional Measure 3 Update REGIONAL MEASURE 3 UPDATE Bridge Tolls Background
More informationAppendix B Meeting Presentation. PowerPoint Presentation Informational Boards
Appendix B Meeting Presentation PowerPoint Presentation Informational Boards PowerPoint Presentation VTA s BART Silicon Valley Program VTA s BART Silicon Valley Phase II Extension Project Environmental
More informationSILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES
SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING Wednesday, April 25, 2007 MINUTES 1. The Regular Meeting of the Silicon Valley Rapid
More informationTransit Operations Funding Sources
Chapter 7. Funding Operations Funding Funding has increased about 56% in absolute terms between 1999 and 2008. There have been major variations in individual funding sources over this time, including the
More informationchapter 5 Action Plan
5 Action Plan Critical to the CBTP process is bridging the gap between planning and action. Implementation of the CBTP relies on multiple jurisdictions and agencies, each responsible for different strategies
More information2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017
2040 Transportation Policy Plan Update Council Committee of the Whole December 6, 2017 What is the Transportation Policy Plan (TPP)? Long-range transportation plan for the region Required under state and
More informationLong Range Transportation Plan
Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision
More informationAlameda County Transportation Commission. A New Direction. Deliver. Plan Fund. ALAMEDA County Transportation Commission 1
Alameda County Transportation Commission A New Direction Plan Fund Deliver Commission 1 A New Direction Presentation Overview Alameda CTC Overview Agency merger, new mission and direction Key factors affecting
More informationFinance Committee October 18, 2011
10.13.11 Finance Committee October 18, 2011 Finance Committee: Commissioners Mar (Chair), Elsbernd (Vice Chair), Cohen, Farrell, Kim and Mirkarimi (Ex Officio) Leroy Saage Deputy Director for Capital Projects
More informationMetro. Board Report. File #: , File Type:Informational Report
Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #:2015-1743, File Type:Informational Report Agenda Number:56. PLANNING
More informationBALBOA RESERVOIR PROJECT Recap: Project History & January CAC Meeting
BALBOA RESERVOIR PROJECT Recap: Project History & January CAC Meeting Balboa Reservoir Community Advisory Committee OVERVIEW 1. Project History & Next Steps 2. Recap of January CAC Meeting (Topic: Housing)
More informationITEM 12 - Information March 18, 2015
ITEM 12 - Information March 18, 2015 Briefing on the Implementation of the TPB Regional Priority Bus Project under the Transportation Investments Generating Economic Recovery (TIGER) Program Staff Recommendation:
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CAENDAR ITEM NO. : 11 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Authorizing one or more of the following items: 1)
More informationNAPA COUNTY GRAND JURY
NAPA COUNTY GRAND JURY 2016-2017 June 22, 2017 FINAL REPORT NAPA VALLEY TRANSPORTATION AGENCY VISION 2040 PLAN County Traffic Problems Need a Comprehensive Plan with Measurable Results 2 NAPA VALLEY TRANSPORTATION
More informationSolano County Transit (SolTrans) Overall Disadvantaged Business Enterprise (DBE) Goal FFY through FFY
Solano County Transit (SolTrans) Overall Disadvantaged Business Enterprise (DBE) Goal FFY 2016 17 through FFY 2018 19 Summary In accordance with the requirements of 49 C.F.R. Part 26 (Participation by
More information$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads
1400 K Street, Suite 400 Sacramento, California 95814 Phone: (916) 658-8200 Fax: (916) 658-8240 www.cacities.org $5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets
More informationSAN MATEO COUNTY TRANSPORTATION AUTHORITY (TA) 1250 SAN CARLOS AVENUE, SAN CARLOS, CA MINUTES OF SEPTEMBER 1, 2016
SAN MATEO COUNTY TRANSPORTATION AUTHORITY (TA) 1250 SAN CARLOS AVENUE, SAN CARLOS, CA 94070 MINUTES OF SEPTEMBER 1, 2016 MEMBERS PRESENT: STAFF PRESENT: M. Freschet, C. Groom (Chair), D. Horsley, K. Ibarra,
More informationMeasure A Strategic Plan Update Citizens Advisory Committee July 1, 2014
Measure A Strategic Plan Update 2014-2018 Citizens Advisory Committee July 1, 2014 Presentation Outline Review Program Elements & Past Performance Discuss County Demographics and Travel Trends Review Program
More information1 Introduction SFTP OUTREACH SUMMARY. Appendix E. 1.1 Overview
Appendix E SFTP OUTREACH SUMMARY KEY TOPICS Summary of SFTP outreach activities Key outreach findings How key findings influenced the plan 1 Introduction 1.1 Overview To ensure that the 2040 San Francisco
More information2016 Measure B Program Areas
2016 Measure B Program Areas 2016 Measure B Programwide Topics 2 Program Areas 3 2016 Measure B Program Areas Program Category BART Phase II Bicycle/Pedestrian Caltrain Corridor Capacity Improvements Caltrain
More informationMULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS. Executive Summary
MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS Executive Summary February 2015 Executive Summary 1. Define the Problem This Alternatives Analysis report is submitted as a deliverable for the
More informationMemorandum Plans and Programs Committee February 12, 2013
Memorandum 02.06.13 Plans and Programs Committee February 12, 2013 Plans and Programs Committee: Commissioners Mar (Chair), Kim (Vice Chair), Breed, Campos, Yee and Avalos (Ex Officio) Lee Saage Deputy
More informationMemorandum. Date: RE: Plans and Programs Committee
Memorandum Date: 09.16.09 RE: Plans and Programs Committee September 22, 2009 To: From: Through: Subject: Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd, Maxwell
More informationMAP-21: An Analysis. The Trust Fund
MAP-21: An Analysis On Friday, July 6, President Obama signed into law HR 4348 (http://www.govtrack.us/congress/bills/112/hr4348) Moving Ahead for Progress in the 21 st Century (MAP-21). The President
More informationMOBILITY PARTNERSHIP AGENDA
1. CALL TO ORDER/ROLL CALL MOBILITY PARTNERSHIP Wednesday, October 11, 2017 9:00 a.m. to 10:30 a.m. Gilroy City Council Chambers 7351 Rosanna Street, Gilroy, CA AGENDA 2. PUBLIC PRESENTATIONS: This portion
More informationPlanning Committee STAFF REPORT October 7, 2015 Page 2 of 6 Changes from Committee Background MTC began preparing its 2017 RTP Update earlier this yea
Planning Committee STAFF REPORT Meeting Date: October 7, 2015 Subject Summary of Issues Approval of Resolution 15-4-G and Transmittal of Recommended Project Lists to the Metropolitan Transportation Commission
More informationGUESTS Kevin Wallace, SRTC Eve Nelson, SRTC. Chair Waldref called the meeting to order at 1:32 p.m. Introductions were made.
Spokane Transit Authority 1230 West Boone Avenue Spokane, Washington 99201-2686 (509) 325-6000 PERFORMANCE MONITORING AND EXTERNAL RELATIONS COMMITTEE Minutes of the, Meeting Southside Conference Room
More information2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds
2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds INTRODUCTION As described in the adopted 2018 Policy Framework for PSRC s Federal Funds, the policy focus for the 2018 project selection
More informationWESTERN SLOPE CIP AND TIM FEE UPDATE
WESTERN SLOPE CIP AND TIM FEE UPDATE 12/6/16 BOARD OF SUPERVISORS STUDY SESSION B O A R D S T U D Y S E S S I O N # 8 2015 14-0245 Revised 22M 1 of 53 AGENDA 1. Background 2. Programmatic EIR 3. General
More informationJ:\2006\Memo Items\7 - July 2006\Lifeline Transportation Program FY0607.doc Page 2 of 5
address gaps or barriers identified through community-based transportation plans, welfare-towork plans, or other community-based documentation of need; and improve a range of transportation choices for
More informationAlameda County Transportation. Commission. A New Direction. Deliver. Plan Fund ALAMEDA. County Transportation. Commission
Alameda County Transportation A New Direction Plan Fund Deliver A New Direction Presentation Overview Alameda CTC Overview Agency merger, new mission and direction Key factors affecting transportation
More informationINDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION
2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration
More informationCAPITAL PROGRAMS & CONSTRUCTION
Van Ness BRT Community Advisory Committee & Van Ness Business Advisory Committee Thursday, November 17, 2016 6:00-7:30 p.m. One South Van Ness, 7 th floor, Union Square Conference Room MINUTES 1. Call
More informationMEMORANDUM. July 7, 2016
MEMORANDUM July 7, 2016 TO: FROM: MEMBERS, PORT COMMISSION Hon. Willie Adams, President Hon. Kimberly Brandon, Vice President Hon. Leslie Katz Hon. Eleni Kounalakis Hon. Doreen Woo Ho Elaine Forbes Interim
More informationAPPENDIX B BUS RAPID TRANSIT
APPENDIX B BUS RAPID TRANSIT Table of Contents TABLE OF CONTENTS What is Bus Rapid Transit?... 2 BRT Features... 2 BRT Variations... 3 Where is BRT Currently Located?... 4 How Much Does BRT Cost?... 4
More informationPresident Darryl Honda San Francisco Board of Appeals 1650 Mission Street, Room 304 San Francisco, CA 94103 RE: Appeal No. 16-057: Delbridge vs. DPW-BUF Response of the San Francisco Municipal Transportation
More informationClimate Initiatives Program. Competitive Grants Guidelines METROPOLITAN TRANSPORTATION COMMISSION
Climate Initiatives Program Competitive Grants Guidelines METROPOLITAN TRANSPORTATION COMMISSION Climate Change: A Serious Issue for the Bay Area Climate change refers to changes in the Earth s weather
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Approving a fund transfer agreement for $292,149
More informationProgram Management Plan
Los Angeles County Metropolitan Transportation Authority Program Management Plan Job Access and Reverse Commute Program and New Freedom Program FINAL December 2009 Los Angeles County Metropolitan Transportation
More informationRE: Plans and Programs Committee May 15, 2012
05.09.12 RE: Plans and Programs Committee May 15, 2012 Plans and Programs Committee: Commissioners Avalos (Chair), Kim (Vice Chair), Cohen, Farrell, Olague and Campos (Ex Officio) Anna LaForte Deputy Director
More informationCITY COUNCIL STUDY SESSION MEMORANDUM
City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared By: Mayor and City Council George Di Ciero, City and County Manager Debra Baskett, Transportation Manager
More informationTransportation Planning in the Denver Region
The Prospectus Transportation Planning in the Denver Region TAC Draft (as of June 16, 2011) Approved December 2004 Revised November 2006 Revised August 2007 Revised March 2009 Revised 2011 Key revisions
More informationAPPLICATION INSTRUCTIONS
APPLICATION INSTRUCTIONS Federal Transit Administration (FTA) Job Access Reverse Commute Grant Funding (JARC, Section 5307) Enhanced Mobility of Seniors and Individuals with Disabilities Grant Funding
More informationCorridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY
Corridor Advisory Committee Meeting #52 February 16, 2017 6:00 PM - 8:00 PM Progress Park 15500 Downey Ave, Paramount, CA 90723 INTRODUCTION On Thursday, February 16, 2017, the Corridor Advisory Committee
More informationDraft Community Outreach Plan for the Climate Action Plan Update
Draft Community Outreach Plan for the Climate Action Plan Update PREPARED FOR 201 North Broadway Escondido, CA 92025 Project Contact Mike Strong, Assistant Planning Director (760) 839-4556 mstrong@escondido.org
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Town of Hope Mills Multi-Modal Congestion Management Plan September 19, 2016 Fayetteville Area Metropolitan Planning Organization Proposal Due Date: 3:00 PM Eastern Time, 28 th October,
More informationRegional Transit System Plan. Regional Task Force Meeting No. 1
Regional Transit System Plan Regional Task Force Meeting No. 1 Thursday, December 2, 2010 James Wagner Welcome! Introductions Venue Packet Displays Opening Session 1 Agenda (5 mins) (20 mins) What is a
More informationCalifornia Pacific Medical Center Hospital Rebuild
California Pacific Medical Center Hospital Rebuild Planning Commission Term Sheet Presentation Staff Presentation to Commission April 11, 2013 Presentation Outline Introduction Project Status Revised Project
More informationSTAFF REPORT. MEETING DATE: August 21, 2008 AGENDA ITEM: 9
STAFF REPORT SUBJECT: Draft Regional Transportation Plan MEETING DATE: August 21, 2008 AGENDA ITEM: 9 STAFF CONTACT: Aubrey Spilde, Michael Powers RECOMMENDATION: Hold public hearing to receive public
More informationCorridor Advisory Committee Meeting #30. September 20, :00-8:00 p.m. Progress Park Downey Blvd., Paramount MEETING SUMMARY
Corridor Advisory Committee Meeting #30 September 20, 2012 6:00-8:00 p.m. Progress Park 15500 Downey Blvd., Paramount INTRODUCTION On September 20, 2012 the Corridor Advisory Committee met at Progress
More informationREPORT TO MAYOR AND COUNCIL
AGENDA ITEM NO..d REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July, SUBJECT: ADOPT RESOLUTION NOS. -, -, -, - AND -0 OF LOCAL SUPPORT AUTHORIZING THE FILING OF APPLICATIONS FOR
More informationPRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY
PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY Meeting Overview Sign-In Sheets: Be sure to sign in. Sign-In sheets will be available on
More informationCaltrans Sustainable Transportation Planning Grant Program
Caltrans Sustainable Transportation Planning Grant Program FY 2017-18 Strategic Partnerships & Sustainable Communities Presented by California Department of Transportation (Caltrans) FY 2017-18 Update
More informationMPO Staff Report MPO Technical Advisory Committee: February 14, 2018 MPO Executive Board: February 21, 2018
MPO Staff Report MPO Technical Advisory Committee: February 14, 2018 MPO Executive Board: February 21, 2018 RECOMMENDED ACTION: Make a Recommendation on the Urban Grant, Regional and Urban Program Candidate
More informationSan Mateo County Measure A Grade Separation Program
San Mateo County Measure A Grade Separation Program August 4, 2016 Board of Directors Agenda Item #12 a Presentation Overview Overview of Grade Separation Program 2009 Grade Separation Planning Footprint
More informationPlans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio)
10.14.11 Plans and Programs Committee October 18, 2011 Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio) Maria Lombardo Chief
More informationCentral City Line Steering Committee
Central City Line Steering Committee Meeting #1 Thursday, Spokane Intermodal Center Great Northern Room, #310 221 W. First Ave. Spokane, WA 1 Agenda Welcome, Introductions and Agenda Review Review of Steering
More informationItem 8 Enclosure A Plans and Programs Committee June 17, 2014 DRAFT 2014 PR. Station BART. Prepared for the
Item 8 Enclosure A Plans and Programs Committee June 17, 2014 DRAFT 2014 PR OPOSITIOO N K 5 YEAR PRIORITIZATT ION PROGRAM 1 BART Station Access, Safety, & Capacity Approved: [DATE] Prepared for the San
More informationFEDERAL FISCAL YEAR TOLEDO OH - MI URBANIZED AREA JOB ACCESS AND REVERSE COMMUTE PROGRAM & NEW FREEDOM PROGRAM REQUEST FOR PROPOSALS
FEDERAL FISCAL YEAR 2010-11 TOLEDO OH - MI URBANIZED AREA JOB ACCESS AND REVERSE COMMUTE PROGRAM & NEW FREEDOM PROGRAM REQUEST FOR PROPOSALS Section 5316 - Job Access and Reverse Commute Program Section
More information2016 REGIONAL TRANSPORTATION PLAN. Technical Appendix L: Title VI/ Nondiscrimination Program
2016 REGIONAL TRANSPORTATION PLAN Technical Appendix L: Title VI/ Nondiscrimination Program Draft June 15, 2015 INTENTIONAL BLANK PAGE Table of Contents Title VI... 1 Environmental Justice... 2 Public
More informationCapital Investment Program
Capital Investment Program FY08-FY13 DRAFT Massachusetts Bay Transportation Authority Draft FY08 FY13 Capital Investment Program Slide 1 Profile of the MBTA Fifth largest transit agency in America 4.5
More informationUpdate on Transportation Funding and Potential Sources for Additional Revenue. June 19, 2017
Update on Transportation Funding and Potential Sources for Additional Revenue June 19, 2017 Existing Transportation Challenges in GWRC (PDC 16) Severe Reoccurring Congestion along I-95 Corridor I-95 &
More informationCalifornia Pacific Medical Center
California Pacific Medical Center Joint Hearing of Planning and Health Commissions CPMC's 2014 Annual Compliance Statement and the City's Report December 3, 2015 Presentation Contents Project Status Compliance
More information2007 Annual List of Obligated Projects
This document is available in accessible formats when requested five days in advance. This document was prepared and published by the Memphis Metropolitan Planning Organization and is prepared in cooperation
More informationFEDERAL TRANSIT ADMINISTRATION
FEDERAL TRANSIT ADMINISTRATION JOB ACCESS & REVERSE COMMUTE PROGRAM AND NEW FREEDOM PROGRAM Competitive Grant Application for the Tampa Bay Metropolitan Area, including the urbanized areas of Pasco, Pinellas,
More informationFederal Actions to Reduce Energy Use in Transportation
Federal Actions to Reduce Energy Use in Transportation Table of Contents: Federal Actions to Reduce Energy Use in Transportation Executive Summary I. Introduction: the Potential for Transportation Energy
More informationSubject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue
DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»
More informationCentral City Line Kick-off and Tour
Central City Line Kick-off and Tour Phase C Preliminary Engineering, Environmental Documentation and Small Starts Submittal Kickoff Meeting Agenda Time Item 1:00 PM Welcome, Introductions and Agenda Review
More informationSAN MATEO COUNTY TRANSIT DISTRICT (DISTRICT) 1250 SAN CARLOS AVENUE, SAN CARLOS, CALIFORNIA
SAN MATEO COUNTY TRANSIT DISTRICT (DISTRICT) 1250 SAN CARLOS AVENUE, SAN CARLOS, CALIFORNIA CITIZENS ADVISORY COMMITTEE (CAC) MINUTES OF MEETING APRIL 26, 2017 COMMITTEE MEMBERS PRESENT: A. Barnes, A.
More informationAGENDA INTERCITY TRANSIT AUTHORITY January 17, :30 P.M. 1) APPROVAL OF AGENDA 1 min.
AGENDA INTERCITY TRANSIT AUTHORITY January 17, 2018 5:30 P.M. CALL TO ORDER 1) APPROVAL OF AGENDA 1 min. 2) INTRODUCTIONS 15 min. A. Introduce Kevin Karkoski, Temporary DAL Manager (Emily Bergkamp) B.
More informationKEY TAKEAWAYS THE STIMULUS BREAKDOWN
S T I M U L U S F O R G R E A T E R P H I L A D E L P H I A : W H A T I T M E A N S F O R T R A N S P O R T A T I O N I N V E S T M E N T I N T H E R E G I O N KEY TAKEAWAYS Greater Philadelphia will likely
More informationSubject: Lifeline Cycle 4 Grant Funding
Agenda Item # 4.b. To: Board of Directors Date: May 11, 2015 From: Laramie Bowron, Manager of Planning Reviewed by: Subject: Lifeline Cycle 4 Grant Funding Summary: As part of County Connection s Lifeline
More informationAugust 9, Re: DBE Program Triennial Goal Concurrence - Recipient ID #1674. Dear Mr. Smith:
U.S. Department of Transportation Federal Transit Administration REGION IX Arizona, California, Hawaii, Nevada, Guam American Samoa, Northern Mariana Islands 201 Mission Street Suite 1650 San Francisco,
More information