1 Deliverable 1.1. Quality Assurance Plan

2 Document Information Grant Agreement Nº 30-CE /00-50 Acronym CfH Full Title Project URL Connected for Health EU Project Officer Name Adina Ratoi Deliverable No 1.1. Title Quality Assurance Plan Work package No 1 Title Management and administration Date of delivery Contractual Actual Status Version X.Y Final Nature Prototype Report X Dissemination Other Dissemination level Consortium+EU Public x Target Group (If Public) Society (in general) Specialised research communities Health care enterprises Health care professionals Citizens and Public Authorities Responsible Author Name Elina Koivisto Partner RCSO elina.koivisto@etela-pohjanmaa.fi Version Log Issue Date Version Author (Name) Partner Elina Koivisto RCSO Minna Luhtanen EPTEK Marco Forzati Acreo Minna Zechner (final review) SeAMK CfH2015 Page 2 of 30

3 Executive Summary Keywords This document addresses the Quality Assurance Plan, including also the Risk Management Plan. The aim of this deliverable report is to describe the mechanisms used during the project duration, in order to ensure high quality and ethically sound level of project deliverables and the project activities. quality assurance, quality control, risk management Contents 1 Introduction Quality Approach General project management and roles Quality assurance responsibilities Quality Control Deliverable Descriptions Deliverable Production Process Deliverable Quality Indicators Work Package Progress Indicators Quality Recording and Evaluation Financial Reporting Eligible costs Financial reports Timesheets Interim report Final report Templates Audits Project Meetings Voting Project Communication Publication Tools Risk Management Risk Management Strategy Identified Risks CfH2015 Page 3 of 30

4 1 Introduction This document addresses the Quality Assurance Plan, including also the Risk Management Plan. The aim of this deliverable is to describe the mechanisms used during the project duration, in order to ensure high quality and ethically sound of project deliverables and the project activities. Quality in this project is a result of, amongst others, detailed planning of the activities, continuous communication between partners when making decisions, promptly followed timetables, accurate following of plans made and punctual delivery of deliverables. This document also serves as a guide to all of the project partners, in order to ensure that quality reviews occur at certain points through the project lifecycle. Mutual understanding the responsibilities of project deliverables and activities acts as a base of this document too. This document will also serve as a detailed guide to the Connected for Health project partners in order to establish effective cooperation within the consortium and ensure the highest level of project documentation. The last chapter of the document includes the Risk Management Plan, which lists potential risks that may occur during the project lifecycle. Early identification of these potential risks to the project will help project management team to help to elaborate appropriate solutions and adjustments in time. Therefore management procedures follow each risk listed in the table, which will be applied to either avoid the risk or minimize its negative impact. Quality Assurance Plan complements existing agreements, such as the Connected for Health description of action (DoA), Consortium Agreement (CA), and Grant Agreement (GA). This document should be used as a reference by the all project partners. 2 Quality Approach Quality assurance provides control to the project direction, ensures that the management is of a high quality with respect to the nature of the project and that the project complies with the Description of Action (DoA) and with relevant management standards and policies. The purpose of quality planning is to provide a secure basis for: Executive Steering Group (ESG) agreements on the overall quality expectations, the means by which quality will be achieved and assessed, and ultimately, the acceptance criteria by which the project output will be judged Communicating these agreements unambiguously so all project Partners have a common understanding of what the project is setting out to achieve Control, i.e. establishing an effective baseline for the projects quality controls and a secure means of achieving deliverables that are fit for purpose This plan forms a guide for the project coordinator to follow in order to ensure that the quality reviews occur at appropriate points in the project, and a reference for all project partners in order to understand their responsibilities, thus delivering high quality deliverables and outcomes to help Connected for Health achieve its goals. 2.1 General project management and roles The project is carried out by a consortium of project partners. Work is organized in Work Packages (WP), each responsible to carry out specific tasks. Each WP is led by a WP leader. Each WP leader is responsible for the proper and timely execution of the tasks assigned to the WP. WP leaders in turn report to the Lead Partner (RCSO), who is ultimately responsible for the overall project execution. The actual coordination of the project work is the responsibility of the Executive Steering Group (ESG). The ESG is composed of representatives of each project partner country (Denmark, Czech Republic, 2 CfH2015 Page 4 of 30

5 from Finland, 2 from Sweden). The ESG is responsible for making decisions and solving differences that may arise among during the work done in the work packages, such as different points of view in the implementation or other topics. The ESG will meet four times during the project in order to make a follow up of activities, approve changes and supervise the overall execution of the project. The chairman of the ESG (currently Marco Forzati from Acreo) will be responsible for all final decisions, in case of disagreement and uneven situation of votes. 2.2 Quality assurance responsibilities Each partner is responsible for quality of the work in the pilots and in reporting activities. The WP Leaders will be responsible for the appropriate execution of the activities, quality control and the timely delivery of reports. Any change in planning that may imply delays to other packages will have to be approved by the lead partner. The Lead Partner (LP) is in charge of quality procedures, administrative procedures, the control of expenses and the appropriate documentation to be submitted to the European Commission. The Ethics manager is responsible to develop an ethics issue management plan and to reinforce that all partners are following the relevant regulations. 3 Quality Control The Connected for Health -project work plan is broken down into four work packages (WPs). Each of the work packages contains a collection of deliverables and milestones, following common project objectives. The WPs have their own timelines, partner collaborations and contributions to the project. The work packages are organized thematically, following a certain structure which will be introduced later. The design of the WP1 and WP2 follows a typical EU project structure in which WP1 is for project administration and management and WP2 for project dissemination and communication. Project management and communication are cross-cutting tasks throughout the whole project. Activities of the WP1 and WP2 are necessary to all parts of the project partners and WPs to achieve the project objectives. Each of the partners has indicated resources to WP1 and WP2. The Regional Council of South Ostrobothnia will coordinate work packages 1 and 2. There are four pilots in the project. For timing reasons and resemblance, it was a mutual will of the project partners to collect the pilots under one work package, which in this project is WP3. The vision of the WP3 is to test ehealth systems and services, for providing more accessible and effective health care over FTTH and other networks. The idea of the four pilots is to find the most suitable, user friendly and cost-effective combinations of systems and products for the needs of the health care patients and clients. For the successful accomplishment of the project vision, all of the four pilots test different methods, systems and products. The pilots share the similarobjectives but each has a unique perspective, which helps to achieve wider review of such ehealth applications. The solutions tested and reviewed will be collected in a report indicating the most suitable models for ehealth services. Piloting is core activity of the project. All of the partners will secure within its own roles and tasks successful collaboration and implementation. The project functions in liaison with the social and health care services. The objective of the project is to identify, test and evaluate new and existing systems and services, and bring those in concrete work for health care. The idea is to find most suitable, user friendly and cost-efficient combinations of systems for individual needs of patients and clients, that will increase the efficiency of health care and bring innovations to daily health care actions. CfH2015 Page 5 of 30

6 3.1 Deliverable Descriptions Beneficiary number and short name WP1 WP2 WP3 WP4 Total person months 1. RCSO 5,95 3, ,5 2. EPTEK 2,95 2 8, ,3 3. SOHCD 1,3 0,7 12,5 1, SeAMK 2, ,4 11,5 5. Alavus 0,4 0,45 8,95 0 9,8 6. 6tk 0,4 0,45 3,4 0 4,25 7. PU 0,4 0,7 0 5, Acreo 2,3 1,4 2,5 4, Hudiksvall 0,5 0,8 6,9 0, Alleato 0,3 0,4 9, nwise 0,3 0,4 9, SICS 0,3 0,6 1, RSD 0,7 0,4 4,2 1,6 6,9 TOTAL 17,9 12,85 70, ,25 CfH2015 Page 6 of 30

7 Del. No. Deliverable title WP No. Lead beneficiary Estimated indicative personmonths Nature Dissemination level Delivery date D1.1 Quality assurance plan 1 1 3,15 R PU 2 Periodical progress D R CO 6 report 4,5 D1.3 Final report ,25 R PP 12 Total 17,9 D1.1) Quality assurance plan: A quality assurance plan will be developed by integrating international quality assurance standards per activity type (medical, systems testing, etc.). This deliverable will also include the risk management plan. [month 2] D1.2) Periodical progress report: This report will describe the work progress per work package and deviations from the work plan. [month 6] D1.3) Final report: [month 12] D2.1) Project website and first press release: The project website will be set up with initial news, abstract summaries of each partner profile and involvement in the project. This will be continuously updated with news items, public deliverables, articles and material from participation at different scientific/educational/professional events. A first press release will be also arranged. [month 2] D2.2) Communication and dissemination plan: A report of the communication and dissemination activities for the duration of the project, including the achievements of the project and the communication means to reach. [month 6] D2.3) Exploitation plan: This report includes information on the sustainable use of project results in further research activities, including innovation issues conducted in the pilots. [month 10]. D2.4) Final press release and project related short YouTube video: Final press release and project related YouTube video will be published at the end of the project. [month 12] Estimated indicative personmonths Del. No. Deliverable title WP No. Lead beneficiary Nature Dissemination level D2.1 Project website and 2 1 first press release 2,9 R PU 2 D2.2 Communication and 2 1 dissemination plan 6,3 R PU 6 D2.3 Exploitation plan 2 1 2,5 R PU 9 D2.4 Final press release and project related short Youtube video 2 1 1,15 Total 12,85 Delivery date R PU 12 CfH2015 Page 7 of 30

8 D3.1) Design of the pilots: This report will describe the design process of the pilots including selection and recruitment of pilot participants and number of participants. Also the use of FTTH per pilot will be considered. [month 2] D3.2) Results of Pilot 1: This report will describe the results for pilot 1. The report will include information on the pilot participants involvement and how the participants were trained. Moreover, the report will describe how the SCAIP platform was developed and tested, and how the sustainable business model is integrated into the use of Hudiksvall health care sector. [month 10] D3.3) Results of Pilot 2: This report will describe the results for pilot 2. Day- and night time monitoring will be reviewed. The report will include information on how the home care personnel s daily administrative work is reduced and the patient appointment time has increased due to virtual connections in piloting city Alavus. [month 10] D3.4) Results of Pilot 3: This report will describe the results for the pilot 3. The report will include the results of the testing of an electronic health care service portal in South Ostrobothnia, offering several ehealth services under a single platform. The report will explain how preventive care in the form of informative consultation to elderly citizens and home care professionals from a specialist in secondary health care institution have increased the level of knowledge of elderly citizens on their own health issues. [month 10] D3.5) Results of Pilot 4: This report will describe the results for pilot 4. Investigation results from South Denmark of technical infrastructure and measures will be included. Additionally, the pilot participants' ability to use different types of technical solutions for video conference will be reviewed in the test results. [month 10] Estimated indicative personmonths Del. WP Lead Dissemination No. Deliverable title No. beneficiary Nature level D3.1 Design of the pilots 3 2 6,0 S CO 2 Delivery date D3.2 Results of Pilot ,8 R CO 10 D3.3 Results of Pilot ,2 R CO 10 D3.4 Results of Pilot ,0 R CO 10 D3.5 Results of Pilot ,5 R CO 10 Total 70,5 D4.1) Evaluation of the pilots: The report will evaluate the pilots by using light version of MAST methodology. Odense University Hospital (part of RSD) will contribute to the project with regards to the supervision of the light MAST evaluation. [month 10] D4.2) Business model: A report on business models is developed by the results of cost-benefit analysis and final socio-economic assessment of the pilots. [month 11] D4.3) Recommendations report: This report will review the external and project studies in FTTH home care. The Recommendations report combines the findings of the pilots with current knowledge and proposes recommendations to European stakeholders. [month 12] D4.4) Ethical and legal aspects: This is an internal report indicating the legal and ethical aspects that have been identified by the Ethics Manager from Seinäjoki University of Applied Sciences (SeAMK) and CfH2015 Page 8 of 30

9 should be followed as guidelines during the lifecycle of the project, especially during the conduction of the pilots. Legal and Ethical Considerations will be updated at month 10. [months 2, 10] Del. No. D4.1 Deliverable title Evaluation of the pilots WP No. Lead beneficiary Estimated indicative personmonths Nature Dissemination level Delivery date 4 8 8,2 R CO 11 D4.2 Business model 4 8 4,5 R PU 11 D4.3 D4.4 Recommendations report Ethical and legal aspects 4 8 7,5 R PU ,8 R RE 2, 10 Total Deliverable Production Process CfH2015 Page 9 of 30

10 3.3 Deliverable Quality Indicators Each deliverable reports on a specific task grouping, or activity. For instance, tasks 3.1.1, 3.1.2, and 3.1.4, are all reported in deliverable D3.1 and so on. The WP leader is the ultimate responsible for the deliverable, and delegates the production of parts of the deliverable to relevant partners. Typically the partners carrying out a specific part of the work, will also be reporting on that. The WP leader may also delegate the whole editing responsibility of the deliverable to a partner in case all the tasks reported in that deliverable are led by that partner. Deliverables are prepared throughout the time of execution of the activity that they are reporting. Typically, a table of contents is prepared at the inset of the activity, in order to structure the reporting and informally guide the work itself. The table of contents also serves to ease the assignment of work and report writing. Typically each chapter in the deliverable covers a specific part of work, which is assigned to one partner or a group of partners (the contributors to the chapter). For each chapter, a chapter editor will also be identified, who will be responsible for collecting the material needed in that chapter from the relevant contributors. The chapter editor also has the responsibility to ensure the quality of the chapter (according to the indicators specified below), and to liaise with the deliverable editor in order to ensure consistency throughout the deliverable. Chapter editors are identified following this process and principles: Partners volunteer for the chapters they feel more comfortable with In case of uncovered chapters, the deliverable editor makes a proposal The amount of work for each partner shall reflect the amount of person months declared in the DoA and reported in Section 3.1 of this plan Chapter editors shall be reached by consensus If consensus is not reached, the deliverable editor proposes a solution, which is to be voted by simple majority If no majority decision is reached the question is escalated to the WP leader, who makes a decision and notifies the LP. The indicators of deliverable quality are defined as follow: Timeliness: the deliverables will be delivered latest on the date specified in the DoA and reported in Section 3.1 of this plan Completeness: the deliverables should cover all the points described in the DoA and reported in Section 3.1 of this plan Correctness: the information contained in the deliverable shall be corrected and verifiable; any information coming from outside the activities being reported shall be properly backed by a reference Readability: the documents should be concise and focus on the issues specified in the DoA (and reported in Section 3.1 of this plan). Any extra material that is deemed relevant to aid the understanding of the document itself shall be included as annex. As a guideline, the deliverables should aim at being below 50 pages. Deliverable above 100 pages shall contain a detailed executive summary between 5 and 10 pages long. 3.4 Work Package Progress Indicators WP1 Management and administration The process All of the partners are involved in the WP1 with different person-months dedication: CfH2015 Page 10 of 30

11 Participant number Participant short name Person-months per participant 1 RCSO 5,95 2 EPTEK 2,95 3 SOHCD 1,3 4 SeAMK 2,1 5 Alavus 0,4 6 6tk 0,4 7 PU 0,4 8 Acreo 2,3 9 Hudiksvall 0,5 10 Alleato 0,3 11 nwise 0,3 12 SICS 0,3 13 RSD 0,7 TOTAL 17,9 The project coordinator (RCSO) will be directly responsible for overall coordination and management, providing all communication related aspects among the consortium partners and will act as an interface with the European Commission. This covers the contacts with the Commission, within the scope of the grant agreement, for appropriate reporting, clarifications, exchanges of information. RCSO ensure the effective and efficient progress of the work by the timely and quality delivery of all project technical reports and administrative: financial reports to the Commission. The arrangement of all project management and technical meetings will be carried out under this task. The aims The overall objective of this work package is to assure an efficient project management through the following specific objectives: Ensure an efficient administrative and financial coordination of the project; Ensure that the project objectives are met within the planned resources of time and effort; Apply quality control measures to reports and deliverables; Liaise with the EC for appropriate reporting. The responsibilities CfH2015 Page 11 of 30

12 WP coordinator Monitoring the overall project management Monitoring financial reporting and quality control Communication with the European Commission WP partners Coordination and management of own partner responsibilities Apply quality control in deliverable and WP progresses Financial reporting and auditing The indicators WP1 indicators are following: Number of Executive Steering Group meetings Quantitative Number of successfully completed deliverables Quantitative Number of delayed deliverables Quantitative Number of raised disputes Quantitative WP2 Communication and dissemination The process All of the partners are involved in the WP2 with different person-months dedication: Participant number Participant short name 1 RCSO 3,55 2 EPTEK 2 3 SOHCD 0,7 4 SeAMK 1 5 Alavus 0,45 6 6tk 0,45 7 PU 0,7 8 Acreo 1,4 9 Hudiksvall 0,8 10 Alleato 0,4 11 nwise 0,4 12 SICS 0,6 Person-months per participant CfH2015 Page 12 of 30

13 13 RSD 0,4 TOTAL 12,85 The consortium will develop a communication and dissemination plan to include the appropriate targeted events, professional organizations, policy makers and the general public. Each of the partners will participate to at least one national or international conference related to the subject and disseminate the project results. Three open ehealth seminars will be held during the course of the project in Sweden, Denmark and in Finland. A final conference will be held at the end of the project in Brussels. In addition, the results of the project will be presented to relevant national stakeholders, MEPs and the Action Group B3 and Action Group C2 of the European Innovation Partnership on Active and Healthy Ageing (EIPAHA). Internet dissemination including the development of a website and the distribution of 2 electronic newsletters will allow a broad community of stakeholders, including the general public, to access the project and be informed about its objectives, achievements and progress. The project website will be updated regularly with news items, public deliverables, articles and other material from participation at events. Also a YouTube short video will be produced and published. The Project Officer will be kept informed of the Communications and Dissemination activities in due time (press releases, website launch, articles, etc.) to enable an even wider relay of these activities through the European Commission communication channels. A clear acknowledgement of EC funding is compulsory for all dissemination activities on any media or event (e.g. website, presentations, articles, etc.). The consortium will also develop an exploitation plan that considers the sustainable use of project results in further research activities. Innovation issues are included in this plan, in particular from the perspective of the pilots to be conducted. However, given the nature of the project, it is unlikely that IPR matters will occur. The aims This work package covers the communication, dissemination and networking activities of the project. The objective is to broadly disseminate the project and its results in an innovative and effective manner to the target groups. Special focus is to create awareness and interest towards the relevant stakeholders, national and European policy makers. Our particular goals are to: Disseminate the knowledge and research created in the project in related scientific journals and events (conferences, workshops, seminars, etc.); Create and raise awareness of the project to different categories of stakeholders; Ensure an appropriate exploitation of the project results (beyond the project). The responsibilities CfH2015 Page 13 of 30

14 WP coordinator Monitoring the overall progress of the WP Monitoring objective achievement within the WP Monitoring the schedule within the WP WP partners Developing communication and exploitation plan Participation to the project meetings Active dissemination of project activities The indicators WP3 indicators are following: Number of external participants to project seminars Quantitative Quantity of communication and dissemination material produced Quantitative Number of newsletter recipients Quantitative Number of National/ International conferences attended Quantitative Number of websites maintained by the project Quantitative WP3 Pilots The process Following partners are involved in the WP3: Participant number Participant short name Person months per participant Role 2 EPTEK 8,35 WP leader 3 SOHCD 12,5 Pilot 3 coordinator 4 SeAMK 4 Pilot 2, 3 partner 5 Alavus 8,95 Pilot 2 coordinator 6 6tk 3,4 Pilot 2 partner 8 Acreo 2,5 Pilot 1 coordinator 9 Hudiksvall 6,9 Pilot 1 coordinator 10 Alleato 9,3 Pilot 1 partner 11 nwise 9,3 Pilot 1 partner 12 SICS 1,1 Pilot 1 partner 13 RSD 4,2 Pilot 4 coordinator TOTAL 70,5 Four pilots are implemented during the project; one in Denmark, one in Sweden, and two in Finland. Each of the pilots will have a specific domain: PILOT 1 in Hudiksvall, Sweden Testing and developing a technical platform where the Social Care Alarm (SCAIP) is implemented (pilot 1 in Hudiksvall, Sweden) CfH2015 Page 14 of 30

15 PILOT 2 in Alavus, Finland Testing different variations of distance monitoring and video connections with selected home care customers; including day and night time monitoring, distance consultation, and electronic home care record (pilot 2 in Alavus, Finland) PILOT 3 in South Ostrobothnia Health Care District, Finland Testing electronic health care service portal and informative consultation to citizens as a form of preventive care (pilot 3 in South Ostrobothnia Health Care District, Finland) PILOT 4 in Region of Southern Denmark Testing and developing infrastructure for telemedicine; including informative consultation and active video communication with the patients, with the support of knowledge from the experiences of other three pilot (pilot 4 in the Region of South Denmark, Denmark) The aims The aim of the WP3 piloting activities is to test and assess ehealth solutions which have potential to support home health care services. Through gathering experiences in using a combination of different technologies for home care, WP3 aims in creating new opportunities for home care professionals and for citizens using home health care services. The following specific objectives have been defined: Design the four pilots Ensure an effective and efficient implementation of the four pilots Ensure an efficient coordination and monitoring of the four pilots Ensure that the piloting activities are in line with the planned pilot project objectives Each pilot has also their own, pilot specific objectives: PILOT 1 in Hudiksvall, Sweden Demonstrate the viability of an e-health platform that is open both downwards (working as besteffort over the top, in combination with an Internet service from any provider) and upwards (delivering e-health solutions from third-party vendors) Further develop ehealth services in direct contact with the final users, e.g. the patients or service users and the health providers and staff. PILOT 2 in Alavus, Finland Enhance knowledge on individual patient s health related needs to provide better access to health care services through distance monitoring Increase interaction between home care customers and personnel, creating also new possibilities for communication with family and relatives Bring added security to customers through night time monitoring PILOT 3 in South Ostrobothnia Health Care District, Finland Shorten the reaction time of health care personnel to the health related self-monitoring done by citizens. This will be enabled through a new FTTH supported electronic service portal Provide better opportunities for citizens to reach the health care services virtually, enabling more regular communication with health care personnel Utilize a preventive care method through which patients receive more information on relevant health issues and home care professionals receive more information on acute issues, thus having a better possibility to react to them in advance. PILOT 4 in Region of Southern Denmark Describe, specify, test and assess the impact of solutions, which have to make the handling/administration of video solutions more profitable and financially sustainable, faster and easier, so that the use of tele-medical solutions may become a real possibility for the health professional personnel, where it creates value for the patient. CfH2015 Page 15 of 30

16 Develop a concept for supporting the use of video consultations for example technical support for the patients, logistics support, statistical data on the use of video consultations pared with other statistical data on e-health/healthcare Cover, specify and test possibilities to use the same technical solution for both health and social care. Specify and test standards and interface, which make possible to use the technology (e.g. smartphone, PC, TV, tablet) that the patients have already invested in. A part of the framework for the tele-medical work in the Region of Southern Denmark also has to ensure the possibilities to use a less effective technology level (LET). The responsibilities WP coordinator Monitoring the overall progress of the WP Monitoring objective achievement within the WP Monitoring the schedule within the WP WP partners Implementation of pilot actions Monitoring the pilot specific actions and objectives Providing data and information to deliverables The indicators WP3 indicators are following: Number of health care personnel involved by the project Quantitative Number of patients participating to pilots Quantitative Results of the pilot 1 Qualitative Report Results of the pilot 2 Qualitative Report Results of the pilot 3 Qualitative Report Results of the pilot 4 Qualitative Report WP4 Research and analysis The process Following partners are involved in the WP4: Participant number Participant short name Person months per participant Role 1 RCSO 0 2 EPTEK 0 3 SOHCD 1,5 contributor 4 SeAMK 4,4 Lead of task Alavus 0 6 6tk 0 CfH2015 Page 16 of 30

17 7 PU 5,9 contributor 8 Acreo WP leader, lead of all tasks 4,8 except Hudiksvall 0,8 contributor 10 Alleato 1 contributor 11 nwise 1 contributor 12 SICS 1 contributor 13 RSD 1,6 contributor TOTAL 22 Four task groupings are foreseen: 1. Evaluation of pilots 2. Cost-benefit analysis and socio-economic analysis 3. FTTH studies review 4. Ethical and legal issues The aims The aim of the WP4 is is to support the implementation of the 4 pilots, gather background information related to the FTTH and ehealth application, to conduct interviews and analyses in the pilots, and to evaluate the pilots. WP4 partners will create a policy report for FTTH in home care and a report indicating the most suitable models for ehealth services based on FTTH with open access. Ensure an efficient support and coordination of the pilots Gather background data related to the FTTH and ehealth applications and create recommendations report for the Commission Conduct interviews and analyses in the pilots Ensure that all ethical and legal issues related to the project are addressed. The responsibilities WP coordinator Monitoring the overall progress of the WP Monitoring objective achievement within the WP Monitoring the schedule within the WP Liaise with WP3 for the collection of data from the pilots Ensure that ethical guidelines are being followed WP partners Definition of relevant indicators Preparation of questionnaires and ohter data collection tools Execute and monitoring the data collection on indicators in each pilot, in collaboration with WP3 Providing data and information to deliverables The indicators The following indicators are defined, for work package WP4 Number of evaluated pilots 4 Successful business models identified At least 1 (Qualitative Report) Recommendations formulated Qualitative Report Research and pilots implemented ethically Qualitative Report CfH2015 Page 17 of 30

18 3.5 Quality Recording and Evaluation Milestones are set to monitor the progress of work and identified potential problems. Each WP leader is responsible to ensure that milestones are reached timely and the results are achieved satisfactorily. Any delay or other issue shall be timely reported to the LP. All meetings shall be properly documented by meetings to be circulated by the keeper of the minutes within one 24h from the end of the meeting and approved by all participants within 7 days from the meeting circulation. Decisions that necessitate consensus or majority approval, shall be taken and documented either by or in minutes of meeting. 3.6 Financial Reporting Eligible costs The eligible costs are defined in Article II.19 of the GA (Eligible costs, Annex II General Conditions) and EC FP7 Guide to Financial Issues relating to FP7 Indirect Actions (pages 30 to 42). "Eligible costs" of the action are costs actually incurred by the beneficiary which meet the following criteria: (a) incurred during the project period (b) indicated in the estimated budget of the action (c) incurred in connection with the action and are necessary for its implementation (d) are identifiable and verifiable, in particular being recorded in the accounting records of the beneficiary (e) comply with the requirements of applicable tax and social legislation and (f) are reasonable, justified, and comply with the principle of sound financial management, in particular regarding economy and efficiency. Eligible direct costs shall comply with the conditions of eligibility. (a) the costs of personnel working under an employment contract with the beneficiary (b) costs of travel and related subsistence allowances, provided that these costs are in line with the beneficiary's usual practices on travel (c) depreciation costs of equipment or other assets (new or second-hand) as recorded in the accounting statements of the beneficiary (d) costs of consumables and supplies directly assigned to the action (e)costs arising directly from requirements imposed by the Agreement (f) costs entailed by subcontracts (g) costs of financial support to third parties (h) duties, taxes and charges paid by the beneficiary, notably value added tax (VAT) Financial reports The Coordinator collects, reviews to verify consistency, and submits reports and other deliverables (including financial statements and related certifications) to the European Commission The project-specific financial manual for the project Connected for Health is a collection of the financial guidelines of the Grant Agreement, first of all, and of the financial guidelines of Framework Programme seven (FP7). In the manual it is stated that the Grant Agreement is the most important official document between the project partners and the Commission. The manual will be updated throughout the whole project period. The updated versions will be informed both via and downloaded in the project Extranet. CfH2015 Page 18 of 30

19 The costs will be monitored with the help of regular reports and communication. The Coordinator asks quarterly financial reports. The partners fill in three budget monitoring templates with the actually incurred costs. In the middle of the project the financial interim report will also consist of a financial statement. The financial statement consists of all the eligible costs incurred by the beneficiary at the end of the reporting period. The official financial reports for the Commission will be attached to the final report. Also an audit will be conducted in the end of the project. Audit certificates will be prepared in accordance with the European Commission guidelines and to the standards and formats set out in this document. The following dates of submission of the progress reports apply to each Party: (The deadlines for submissions may subject to change.) Start date End date Deadline for submission 1. Progress Report 05/06/ /09/ /09/ Progress Report / Interim Report 07/09/ /12/ /12/ Progress Report 07/12/ /03/ /03/ Progress Report / Final Report 07/03/ /06/ /06/2016 To avoid risks the Coordinator pays the Consortium according to the results delivered. Payments are delivered at the end of each reporting period and after evaluation and approval of the project reports and Deliverables. The prepayment, 25 % of the funding, will be paid as soon as possible in the beginning of the project after receipt from the Funding Authority. The next 25 % will be paid on receipt of Interim Report. The results of the work and the financial statements of the project partner will be analyzed carefully before the interim payment. In the end the Commission will evaluate the entire project before the payment of the balance. 25 % on receipt of Advance Payment 25 % on receipt of Interim Report 50 % on receipt of the Final Report Funding for costs accepted by the Funding Authority will be paid to the Party concerned Timesheets Working time for the project is recorded throughout the duration of the project by timesheets. The Coordinator provides the templates for the timesheets. The timesheet templates have been delivered to each project partner in the beginning of the project. The financial manager gives technical support for using the time sheet templates correctly. The employees record their time on a daily basis using an Excel-based template. The time-records will be authorized by the project manager or other superior. According to the financial guidelines of the FP7, the timesheets must meet the requirements indicated below: full name of beneficiary, full name and signature of the employee, title of the project: Pilot project Connected for Health: Well-Being and Healthcare Solutions in Open Access FTTH Networks, project account number: 30-CE /00-50, periodicity of filling in according to the beneficiary's normal practice, amount of hours claimed on the project. All hours claimed must be able to be verified in a reliable manner, full name and a signature of a supervisor (person in charge of the project). CfH2015 Page 19 of 30

20 The timesheets will be reconcilable with the absences for holidays, illness, travels or others. In the time recording system there is also a reference to the tasks or WP included in the Description of Work, allowing an easy reconciliation of the work done with the work assigned Interim report The interim report will be delivered in the middle of the project. The Commission will send a template for the report. The Coordinator collects also internally a financial interim report with the budget monitoring template and a printed-out financial statement. The budget monitoring report will consist of actually incurred costs specified according to the budget lines and compared with the current estimated budget of the action Final report The final report will present all the results of the project. The Commission will give templates for the project. After the end of the project there will be one month time to complete the final report. The final report will also include the financial reports of the project and of each project partner Templates The Coordinator provides all the relevant templates for the partners. There are and will be templates for deliverable reports, timesheets, budget monitoring, interim report, financial report, and the final report Audits The beneficiaries are aware that the European Commission is within its rights to request an audit from any beneficiary, and the beneficiaries should retain all records for five years after the project end. Audits are an eligible cost as external services. Certificates on the financial statements to be provided by the beneficiaries may be established by regular internal or external auditor, in accordance with their internal financial regulations and procedures. The Beneficiaries will make available to the competent bodies of the Union, upon request, all relevant financial information, including statements of accounts concerning the action, where they implement the action or where their affiliated entities or a subcontractor takes part in the action. 3.7 Project Meetings The Connected for Health project general strategy for meetings of the Consortium Bodies is described and agreed upon in the Consortium Agreement. The necessity of meetings is also addressed in the Description of Action. The General Assembly, meaning the ultimate decision-making body of the consortium, will meet at least four times a year. Also the Executive Steering Group will meet at least quarterly. The chairpersons of the Consortium Bodies will convene the meetings. All the members of a Consortium body will be represented at any meeting of such consortium body, and they will have the right to vote and to appoint a substitute. Meetings of each Consortium Body may also be held by teleconference or other telecommunication means to avoid costs and emissions. Whenever possible, the meetings and workshops will be grouped together in order to work more efficiently. In every partnership meeting there will also be an open seminar where new ehealth applications will be demonstrated and the project results presented. Open invitation to healthcare and welfare staff will be made. Each pilot work group will carry out regular meetings. In addition, there will be regular meetings with the home and health care organizations to exchange ideas and results. A final conference will be organized at the end of the pilots for relevant national and international stakeholders to hear the project findings and recommendations. CfH2015 Page 20 of 30

21 The participants of the GA and the ESG will be reminded of the meetings not later than 14 calendar days before an ordinary meeting. The GA will be reminded of an extraordinary meeting not later than 10 calendar days before the meeting and the ESG not later than 7 days before an extraordinary meeting. A written agenda will be sent to each GA member not later than 14 days before an ordinary meeting and 10 days before an extraordinary meeting. To ESG members the agendas for both kinds of meetings will be sent not later than 7 days before the meeting. The GA members may add agenda items 10 days before an ordinary meeting and 7 days before an extraordinary meeting. The ESG members may add items on the agenda 2 days before the meeting. During a meeting the Members of a Consortium Body present or represented can unanimously agree to add a new item to the original agenda. The project coordinator is responsible for the preparation of minutes for all project meetings. The draft minutes of the meetings will be circulated to the Partners no later than 10 calendar days after the meeting. Minutes shall be deemed to be approved if no objection has been sent to the Coordinator within 15 days of the sending of the minutes. The necessary working documents, such as agendas and minutes of the meetings, will be uploaded in the project Extranet Voting Each Consortium Body shall not deliberate and decide validly unless two-thirds (2/3) of its Members are present or represented (quorum). If the quorum is not reached, the chairperson of the Consortium Body shall convene another ordinary meeting within 10 calendar days. If in this meeting the quorum is not reached once more, the chairperson shall convene an extraordinary meeting which shall be entitled to decide even if less than the quorum of Members are present or represented. Each Member of a Consortium Body present or represented in the meeting shall have one vote. Defaulting Parties may not vote. Decisions shall be taken by a majority of two-thirds (2/3) of the votes cast. 4 Project Communication The Connected for Health -project partners will produce a separate, profound, communication plan for the project. The plan defines the internal and external project communication, aims of planned dissemination activities, target groups and provides information about financing issues of communication and information dissemination. The responsibilities of project s information and dissemination activities are divided among several structural layers. The Project Executive Steering Group (ESG) is generally responsible for the final decisions on release of different communication tools, e.g. project messages, logo, corporate graphics, publications, etc. The ESG will be responsible for supervising the overall execution of the project, for making decisions and solving differences that may arise with respect to the implementation phase. In addition to WP2 Communication and Information team all WP s have delegated a person (WP coordinator or responsible WP member) who is to provide most up-to-date information about WP activities and achieved results. The Communication coordinator provides technical assistance in developing dissemination material, website and graphics as well as strongly supports ongoing communication and information dissemination activities. All project members are required to provide support for communication activities: to organize that each partner organization links their organisation s and project s website; to be responsible for their relations to regional and national media; CfH2015 Page 21 of 30

22 to represent the project during presentations at professional events on regional, national and international level. After the conference, a short message should be submitted to the project management including name, date and venue of the conference and a copy of the presentation. Internal communication describes the ways of information exchange among project partners and generally ensures the successful implementation of overall project objectives. It creates optimal common understanding of the project partners about the ongoing activities within different working packages as well as fosters the involvement and identification of all project partners because they all are important multipliers of the project and its results. External communication allows delivering the project messages to the selected project target groups. It also includes communication with media relevant to the project s subject. The general purpose of the external communication is: To disseminate information about the project and its results to target groups through different activities, To raise the awareness of the opportunities for professional networking, continuing medical education and career development for younger and experienced doctors and health workers in remote areas. To inform policy and decision makers about the possibilities of tele-consulting and tele-mentoring in order to get them interested in the project and get support for the implementation of the project and for the sustainable use of the project outputs. More information on project communication activities will be found from the communication plan (deliverable 2.2. Communication and dissemination plan), which will be published latest during project month Publication Tools Tool Function Content Frequency / Use Dissemination level Short project description /ppt presentation Provide brief information to interested people A summary of project background, structure, objectives and benefits Can be downloaded on project s extranet and the website and it is public for partners to use. PU Logo Create an project identity and increase the public and internal recognition of the project Project name and project graphics The logo has to be integrated in all project publications and dissemination material PU Project templates Facilitate the project management and strengthen project s corporate identity Uniform templates for project meetings agenda, outputs, minutes and presentations as well as press releases During the whole project period PP Project website Provide easily accessible and well structured information about Public area: information about project, partners, activities and Regular update during the project duration. After finalising the PU CfH2015 Page 22 of 30

23 Tool Function Content Frequency / Use Dissemination level Project Extranet Press release open ehealth seminars Final project report Final project conference Social media (LinkedIn account) Youtube video the project, its aims, activities, and results Provide management and administration templates, deliverables, tasks and other key information to partners Inform stakeholders about projectrelated activities and results via e- mails as an attached document. Regional, national and international distribution. Present the project in Sweden, Finland and in Denmark. Discuss widely with external stakeholders on FTTH and ehealth innovations used in social and health care Present the results of the project, summarize the good practises Indicate the official end of the project. Gather project partners and other stakeholders. Present and celebrate the success of the project Provide easily accessible and information via social media Short Youtube video providing information of the results. section restricted to project partners and containing working documents as well as documents for project monitoring Brief description of the project, activities and results achieved, up-to-date information Description of the project activities and results achieved, external speakers, stakeholder participation, panel discussions, interactive discussions Presentation of project results, challenges, strategies and patient analyses Presentation of project results, challenges, strategies and forthcoming activities News of the project Presentation of project activities and results project the website will also be available Regular update during the project duration. Twice during the project duration. three seminars: in Sweden, Finland and in Denmark Towards the end of the project duration Single event at the end of the project. Invitation to stakeholders, project partner organisations Regular update during the project duration one PP PU PU PP PU PU PU CfH2015 Page 23 of 30

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan ICT, FET Open LIFT ICT-FP7-255951 Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan Contractual Date of Delivery: 31.03.2011 Actual Date of Delivery:

More information

EUROPEAN COMMISSION. Proposal template. Pilot Project Call PP

EUROPEAN COMMISSION. Proposal template. Pilot Project Call PP EUROPEAN COMMISSION Proposal template Pilot Project Call PP-2-2016 Please follow the structure of this template when preparing your proposal. It has been designed to ensure that the important aspects of

More information

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots DG COMMUNICATIONS NETWORKS, CONTENT & TECHNOLOGY ICT Policy Support Programme Competitiveness and Innovation Framework Programme ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E Guidance Notes

More information

Standard Proposal Templates: Project proposal (Part B)

Standard Proposal Templates: Project proposal (Part B) 3rd Health Programme Standard Proposal Templates: Project proposal (Part B) Project Grants (HP-PJ-2018) Version 1.0 24 January 2018 Disclaimer This guide aims to facilitate potential applicants. It is

More information

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE WORK PROGRAMME 2012-2013 CAPACITIES PART 3 REGIONS OF KNOWLEDGE (European Commission C (2011) 5023 of 19 July 2011) Capacities Work Programme: Regions of Knowledge The work programme presented here provides

More information

D6.3 Communication management routines and infrastructure implemented

D6.3 Communication management routines and infrastructure implemented D63 Communication management routines and infrastructure implemented Project title: Healthy minds from 0 to 100 years: Optimising the use of Due date of deliverable: 30 th June, 2017 Submission date of

More information

Jean Monnet support to associations

Jean Monnet support to associations Jean Monnet support to associations Jean Monnet supports associations that have as their explicit purpose to contribute to the study of the European integration process. Such associations should be interdisciplinary

More information

Erasmus+ Application Form. Call: 2014 KA2 Cooperation and Innovation for Good Practices. A. General Information. B. Context

Erasmus+ Application Form. Call: 2014 KA2 Cooperation and Innovation for Good Practices. A. General Information. B. Context A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

Negotiation Guidance Notes

Negotiation Guidance Notes Negotiation Guidance Notes FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions, Research for the benefit of Specific Groups (in particular SMEs) Version 31/7/2007 Disclaimer

More information

REPORTING and PAYMENT (in practice)

REPORTING and PAYMENT (in practice) REPORTING and PAYMENT (in practice) v. January 2017 Research and Innovation Outline Monitoring project implementation Reporting obligations IT Continuous reporting module IT Periodic reporting module 'How

More information

H2020 Work Programme : Spreading Excellence and Widening Participation Call: H2020-TWINN-2015: Twinning Frequently Asked Questions (FAQ)

H2020 Work Programme : Spreading Excellence and Widening Participation Call: H2020-TWINN-2015: Twinning Frequently Asked Questions (FAQ) H2020 Work Programme 2014-15: Spreading Excellence and Widening Participation Call: H2020-TWINN-2015: Twinning Frequently Asked Questions (FAQ) Version: 15 January 2015 IMPORTANT NOTICE: This document

More information

2017 Key Action 2 Handbook

2017 Key Action 2 Handbook 2017 Key Action 2 Handbook For KA2 Strategic Partnerships in VET and Adult Education Version 2.0 My project officer:.. E-mail address:. Number:. My reporting dates Progress report due: / /.. Interim report

More information

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES PROVISIONAL 1 WORK PROGRAMME 2007 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES (European Commission C(2006) 6849) 1 This provisional work programme is subject to formal confirmation following the

More information

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 Version 1.00.00 7 December 2016 EDITION [01.00.00] Authoring & Approval Authors of the document Name

More information

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

KONNECT 1 st PERIODIC REPORT

KONNECT 1 st PERIODIC REPORT KONNECT 1 st PERIODIC REPORT Grant Agreement number: 603564 Project acronym: KONNECT Project title: Strengthening STI Cooperation between the EU and Korea, Promoting Innovation and the Enhancement of Communication

More information

Frequently Asked Questions

Frequently Asked Questions Fast Track to Innovation Pilot (2015) Call opening: January 6, 2015 First Cut-off Date: April 29, 2015 Frequently Asked Questions Official European Commission document December 2014 Contents A. Eligibility

More information

Guide for Applicants. COSME calls for proposals 2017

Guide for Applicants. COSME calls for proposals 2017 Guide for Applicants COSME calls for proposals 2017 Version 1.0 May 2017 CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1 Relevant documents... 3 II.2 Participants... 3 Consortium

More information

Key Action 2 (KA2) Guide for Applicants

Key Action 2 (KA2) Guide for Applicants Key Action 2 (KA2) Guide for Applicants Strategic Partnerships for Schools (School-only Partnerships) Deadline: 11am (UK time) on Wednesday 30 April 2014 Version 1: Published 28 March 2014 Introduction

More information

Erasmus+ General Information. Context. Application Form Call: KA2 Cooperation and Innovation for Good Practices

Erasmus+ General Information. Context. Application Form Call: KA2 Cooperation and Innovation for Good Practices General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

SPECIFIC PRIVACY STATEMENT ERCEA ERC- Proposals Evaluation, Grants Management and Follow-up

SPECIFIC PRIVACY STATEMENT ERCEA ERC- Proposals Evaluation, Grants Management and Follow-up Brussels, March 2014 ERCEA SPECIFIC PRIVACY STATEMENT ERCEA ERC- Proposals Evaluation, Grants Management and Follow-up This statement concerns the processing operation called "ERC - Proposals Evaluation

More information

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating

More information

4.Horizon 2020: Rules and procedures! Participant Portal and Documentation

4.Horizon 2020: Rules and procedures! Participant Portal and Documentation Management and knowledge of European research model and promotion of research results 4.Horizon 2020: Rules and procedures! Participant Portal and Documentation Alessia D Orazio Scientific Officer - Ufficio

More information

Horizon 2020 Legal Documents

Horizon 2020 Legal Documents TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/0740.14-2/SER/005 Legal & Financial Issues in H2020 Understanding the Legal background of your proposal Model Grant Agreement Odysseas Spyroglou IPR, Legal & Financial

More information

Key Action 2 (KA2) Guide for Applicants

Key Action 2 (KA2) Guide for Applicants Key Action 2 (KA2) Guide for Applicants Strategic Partnerships for Local / Regional Authorities (region-to-region partnerships) Deadline: 11am (UK time) on Wednesday 30 April 2014 Version 1: Published

More information

WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES. (European Commission C (2011)5023 of 19 July)

WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES. (European Commission C (2011)5023 of 19 July) WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES (European Commission C (2011)5023 of 19 July) Capacities Work Programme: Research for the Benefit of SMEs The available budget for

More information

Restricted Call for proposals addressed to National Authorities for Higher Education in Erasmus+ programme countries

Restricted Call for proposals addressed to National Authorities for Higher Education in Erasmus+ programme countries Annex 6 Instructions for completing the application package Erasmus+ Programme KA3 Support for Policy Reform Support to the implementation of EHEA reforms EACEA/49/2015 Restricted Call for proposals addressed

More information

Preparatory Action on Defence Research. Proposal Template for Action Grants

Preparatory Action on Defence Research. Proposal Template for Action Grants Preparatory Action on Defence Research Proposal Template for Action Grants Version 1.0 6 June 2017 European Commission Research & Innovation - Participant Portal Proposal Submission Forms Table of contents

More information

IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL & SINGLE STAGE PROPOSAL COORDINATION AND SUPPORT ACTIONS IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX)

IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL & SINGLE STAGE PROPOSAL COORDINATION AND SUPPORT ACTIONS IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX) IMI2 PROPOSAL TEMPLATE SECOND STAGE PROPOSAL IN TWO-STAGE PROCEDURE & SINGLE STAGE PROPOSAL (TECHNICAL ANNEX) COORDINATION AND SUPPORT ACTIONS Please follow the structure of this template when preparing

More information

Deliverable Corporate identity and design guide

Deliverable Corporate identity and design guide Project Acronym: IRIS Project Full Name: Integrated and Replicable Solutions for Co-Creation in Sustainable Cities Grant Agreement: No 774199 Project Duration: 5 years (starting 1 st October 2017) Deliverable

More information

ERASMUS+ Capacity Building in the Field of Youth. Project Handbook. Selection 2016

ERASMUS+ Capacity Building in the Field of Youth. Project Handbook. Selection 2016 ERASMUS+ Capacity Building in the Field of Youth Project Handbook Selection 2016 Version of August 2016 1 Table of Contents Introduction Overview Project Life Cycle 1) Monitoring of the Project by the

More information

Jean Monnet Networks (policy debate with the academic world)

Jean Monnet Networks (policy debate with the academic world) Jean Monnet Networks (policy debate with the academic world) What is a Jean Monnet Network? Jean Monnet Networks foster the creation and development of consortia of international players (HEIs, Centres

More information

GUIDE FOR ACTION GRANTS 2015

GUIDE FOR ACTION GRANTS 2015 Guide for Action Grants 2015 Version: June 2015 EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE and CONSUMERS Directorate A Unit A4: Programme management GUIDE FOR ACTION GRANTS 2015 *** Justice Programme

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross

More information

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT Disclaimer : H2020 Regulations are not yet adopted by the legislator. Any information contained in this presentation is legally

More information

TRANSNATIONAL YOUTH INITIATIVES 90

TRANSNATIONAL YOUTH INITIATIVES 90 Part B Strategic partnerships in the field of education, training, and youth TRANSNATIONAL YOUTH INITIATIVES 90 These Strategic Partnerships in the field of youth aim to foster social commitment and entrepreneurial

More information

"ERA-NET Plus Actions"

ERA-NET Plus Actions "ERA-NET Plus Actions" PROVISIONS FOR THE PREPARATION OF ERA-NET PLUS ACTIONS AND THEIR PRACTICAL IMPLEMENTATION A draft issue paper serving as background document 1 RTD B.1 Coordination of national research

More information

Participating in the 7th Community RTD Framework Programme. Athens 28/2/07 SSH Information Day

Participating in the 7th Community RTD Framework Programme. Athens 28/2/07 SSH Information Day Participating in the 7th Community RTD Framework Programme Athens 28/2/07 SSH Information Day 1 2 Overview How proposals are submitted: the EPSS system What happens next Who can participate Funding schemes

More information

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr Education, Audiovisual and Culture Executive Agency Creative Europe: Culture GRANT DECISION FOR AN ACTION Decision Nr of the Education, Audiovisual and Culture Executive Agency on the award of a grant

More information

Go through stages of the project lifecycle. Understand rules and requirements of the Erasmus+ Key Action 2 Programme

Go through stages of the project lifecycle. Understand rules and requirements of the Erasmus+ Key Action 2 Programme Go through stages of the project lifecycle Understand rules and requirements of the Erasmus+ Key Action 2 Programme Opportunity to network with other delegates Ask questions of the National Agency / Project

More information

EDUCATION, SCHOLARSHIPS, APPRENTICESHIPS AND YOUTH ENTREPRENEURSHIP PROGRAMME IN ROMANIA FINANCED THROUGH THE EEA GRANTS

EDUCATION, SCHOLARSHIPS, APPRENTICESHIPS AND YOUTH ENTREPRENEURSHIP PROGRAMME IN ROMANIA FINANCED THROUGH THE EEA GRANTS EDUCATION, SCHOLARSHIPS, APPRENTICESHIPS AND YOUTH ENTREPRENEURSHIP PROGRAMME IN ROMANIA FINANCED THROUGH THE EEA GRANTS 2014-2021 2018 GUIDELINE FOR APPLICANTS COOPERATION PROJECTS IN THE HIGHER EDUCATION

More information

Guidelines for Full Proposal Submission. Maritime and Marine Technologies for a new Era

Guidelines for Full Proposal Submission. Maritime and Marine Technologies for a new Era Guidelines for Full Proposal Submission Maritime and Marine Technologies for a new Era 28.08.2017 1 CONTENT 1. Background... 1 2. Process overview... 1 3. Template full proposal... 3 1. Background The

More information

EIT RawMaterials Call for KAVA Up-scaling projects Instructions and process description

EIT RawMaterials Call for KAVA Up-scaling projects Instructions and process description EIT RawMaterials Call for KAVA Up-scaling projects Instructions and process description September 2017 1. Purpose and scope of this document This document describes the process for preparation, submission,

More information

H2020 FOF Innovation Action GUIDE FOR APPLICANTS. HORSE Application Experiments

H2020 FOF Innovation Action GUIDE FOR APPLICANTS. HORSE Application Experiments H2020 FOF 09 2015 Innovation Action GUIDE FOR APPLICANTS Table of contents 1 GENERAL INFORMATION... 2 2 EXPECTED CONTRIBUTIONS AND IMPACT... 3 3 ACTIVITIES, ELIGIBILITY AND FUNDING... 3 4 PROPOSAL SUBMISSION...

More information

Fact Sheet How to manage IP in FP7 during and after the project

Fact Sheet How to manage IP in FP7 during and after the project European IPR Helpdesk Fact Sheet How to manage IP in FP7 during and after the project April 2014 1 Introduction... 1 1. Implementation stage... 2 1.1 Knowledge management bodies... 2 1.2 Results ownership...

More information

The European Research Council. Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014

The European Research Council. Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014 The European Research Council Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014 Overview H2020 ERC Grant Agreement The ERC Grant Agreement and the Annexes New Specificities

More information

Jean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures. Seminar for on-going Erasmus+ Jean Monnet Projects

Jean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures. Seminar for on-going Erasmus+ Jean Monnet Projects Jean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures Seminar for on-going Erasmus+ Jean Monnet Projects Reference Documents Jean Monnet Programme Guide Grant Agreement Jean

More information

Jean Monnet activities within the Erasmus+ Programme

Jean Monnet activities within the Erasmus+ Programme Jean Monnet activities within the Erasmus+ Programme Context Management of projects Snejina Nikolova Unit A2, EACEA Europe week video-conference Voronezh, 18 May 2017 Erasmus + Programme - How is it managed

More information

Guide for BONUS applicants

Guide for BONUS applicants Guide for BONUS applicants Specific to the BONUS call 2017: Synthesis Opening on 9 August 2017 Preregistrations by 9 October 2017, 17.00 CEST Submissions of proposals by 9 November 2017, 17.00 CET Please

More information

Factsheet n. 5 Project Selection

Factsheet n. 5 Project Selection INTERREG V A Italy Croatia CBC Programme Factsheet n. 5 Project Selection Version N 1 of 20 th February 2017 Programme co-financed by the European Regional Development Fund (ERDF) TABLE OF CONTENTS A.

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 16.10.2014 C(2014) 7489 final COMMISSION IMPLEMENTING DECISION of 16.10.2014 laying down rules for the implementation of Decision No 1313/2013/EU of the European Parliament

More information

FULL PROJECT PROPOSAL

FULL PROJECT PROPOSAL FULL PROJECT PROPOSAL Guidance Notes for Submission and Preparation Contents Guidelines for Coordinators How to Prepare the Full Project Proposal submission... 1 Guidelines for Completing the Administrative

More information

Communication Strategy

Communication Strategy ANNEX III. INFORMATION AND COMMUNICATION STRATEGY AND ANNUAL INFORMATION AND COMMUNICATION PLAN FOR 2016 Managing Authority Ministry of Regional Development and Public Administration Communication Strategy

More information

D5.1 Dissemination plan WP5 Dissemination and networking

D5.1 Dissemination plan WP5 Dissemination and networking D5.1 Dissemination plan WP5 Dissemination and networking This project has received funding from the European Union s Horizon 2020 research and innovation programme under grant agreement No 692276. DISCLAIMER

More information

Dissemination Plan. Dissemination strategy for

Dissemination Plan. Dissemination strategy for Dissemination Plan Dissemination strategy for KA2 ERASMUS+ CAPACITY BUILDING IN THE FIELD OF HIGHER EDUCATION PROGRAMME 1 Document Information Project Title Project n. Refugees Education Support in Mena

More information

Grants to Institutions

Grants to Institutions Grants to Institutions A Guide to Administrative Procedures Grant Administration Division Introduction IDRC accountability Management philosophy Recipient accountability Technical reporting Financial reporting

More information

Proposal template European Strategic Cluster Partnerships for smart specialisation investments

Proposal template European Strategic Cluster Partnerships for smart specialisation investments COSME Programme Proposal template European Strategic Cluster Partnerships for smart specialisation investments Administrative forms (Part A) Description of the Action (Part B) Detailed Budget template

More information

IMI2 Rules and Procedures 10 July 2014

IMI2 Rules and Procedures 10 July 2014 IMI2 Rules and Procedures 10 July 2014 Magali Poinot, Legal Manager Outline I. Participation rules II. Funding rules III. Intellectual Property rules IV. From Call to grant award V. Writing a successful

More information

DISCLAIMER. This document represents a template of an application form. It must not be used for real applications to a National Agency.

DISCLAIMER. This document represents a template of an application form. It must not be used for real applications to a National Agency. DISCLAIMER This document represents a template of an application form. It must not be used for real applications to a National Agency. Please also note that the sections and questions presented below may

More information

NEGOTIATION GUIDANCE NOTES

NEGOTIATION GUIDANCE NOTES NEGOTIATION GUIDANCE NOTES FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions, Research for the benefit of Specific Groups (in particular SMEs) Version 27/01/2009 Disclaimer

More information

Guidelines. Application template Call 2018 KA2 - Cooperation for Innovation and the Exchange of Good Practices KA229 - School Exchange Partnerships

Guidelines. Application template Call 2018 KA2 - Cooperation for Innovation and the Exchange of Good Practices KA229 - School Exchange Partnerships DISCLAIMER This document represents a template of an application form. It must not be used for real applications to a National Agency. Please also note that the sections and questions presented below may

More information

The Dialogue Facility THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support

The Dialogue Facility THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support www.dialoguefacility.org THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support 1 This publication has been produced with the assistance of the European Union. The contents of this publication

More information

EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME)

EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME) EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME) Unit A1 COSME Call for proposals 2016 Erasmus for Young Entrepreneurs COS-EYE-FPA-2016-4-01 Recurrent Questions and Answers

More information

Electric Mobility Europe Call 2016

Electric Mobility Europe Call 2016 Electric Mobility Europe Call 2016 Evaluation Manual EMEurope - full proposals Quality assessment by peer review Call launch: 2 November 2016 Deadline submission EMEurope full proposals: 9 June 2017, 17:00

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2B Implementation Networks Table of contents Fact Sheet 2B 1. Main objectives and expected results... 1 2. Network s development... 3 3. Partnership... 4 4. Activities

More information

UDLnet - Universal Design for Learning: A Framework for Addressing Learner Variability

UDLnet - Universal Design for Learning: A Framework for Addressing Learner Variability UDLnet - Universal Design for Learning: A Framework for Addressing Learner Variability D6.5 Dissemination Report year 1 Project: Work package: Lead Participant: Authors: Document Type: Distribution: Status:

More information

EU Aid Volunteers initiative. Deployment. Instructions for Project Management. Selection 2017

EU Aid Volunteers initiative. Deployment. Instructions for Project Management. Selection 2017 EU Aid Volunteers initiative Deployment Instructions for Project Management Selection 2017 Version of February 2018 1 Table of Contents Introduction Overview Project Life Cycle 1. Support and monitoring

More information

EMPIR Reporting Guidelines

EMPIR Reporting Guidelines Part 0 Guide to the parts EMPIR Reporting Guidelines Part 0 Guide to the parts EURAMET MSU, Hampton Road, Teddington, Middlesex, TW11 0LW, UK Phone: +44 20 8943 6666 Email: msu@npl.co.uk msu.euramet.org

More information

Capacity Building in the field of youth

Capacity Building in the field of youth Capacity Building in the field of youth What are the aims of a Capacity-building project? Youth Capacity-building projects aim to: foster cooperation and exchanges in the field of youth between Programme

More information

Efficiency Research Programme

Efficiency Research Programme Efficiency Research Programme A Health Foundation call for innovative research on system efficiency and sustainability in health and social care Frequently asked questions April 2016 Table of contents

More information

Guidelines for Project Progress Report

Guidelines for Project Progress Report Guidelines for Project Progress Report Version 2.1 October 2017 A stream of cooperation Programme co-funded by the European Union Content List of abbreviations... 5 Introduction... 6 PART I TECHNICAL GUIDELINES...

More information

Application template Call 2018 Guidelines National Agency Context: Participating Organisations:

Application template Call 2018 Guidelines National Agency Context: Participating Organisations: DISCLAIMER This document represents a template of an application form. It must not be used for real applications to a National Agency. Please also note that the sections and questions presented below may

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

Horizon 2020 Proposal Development Training Course

Horizon 2020 Proposal Development Training Course Horizon 2020 Proposal Development Training Course Focus: Impact Research Council of Norway Horizon 2020 Proposal Development Training Course Focus: Impact AGENDA DAY 1 08:30 09:00 Registration 09:00 09:15

More information

GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II)

GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II) Approved by the Head of the Managing Authority Sandis Cakuls on 19.06.2017. GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II) INTERREG V A LATVIA LITHUANIA PROGRAMME

More information

EUROPEAN FEDERATION OF NURSES ASSOCIATIONS (EFN) CONSTITUTION

EUROPEAN FEDERATION OF NURSES ASSOCIATIONS (EFN) CONSTITUTION PREAMBLE EUROPEAN FEDERATION OF NURSES ASSOCIATIONS (EFN) CONSTITUTION Whereas in 1971, the Standing Committee of Nurses in association with the EEC was established in Bern in accordance with the Constitution

More information

Application template Call 2018 Guidelines National Agency Context: Participating Organisations:

Application template Call 2018 Guidelines National Agency Context: Participating Organisations: DISCLAIMER This document represents a template of an application form. It must not be used for real applications to a National Agency. Please also note that the sections and questions presented below may

More information

Preparation of the final technical report

Preparation of the final technical report Preparation of the final technical report Jurgita Kaminskaite, project officer Consumers, health, agriculture and food executive agency (Chafea), European Commission 7 December 2015 Final report 2 Outline

More information

PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects

PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects Collegio Carlo Alberto, Torino (Moncalieri) 4 February 2011 Domenico ROSSETTI Commission européenne, DG de la Recherche

More information

ALICE Policy for Publications and Presentations

ALICE Policy for Publications and Presentations ALICE Policy for Publications and Presentations The Conference Committee can be contacted at alice-cc@cern.ch. The Editorial Board can be contacted at alice-editorial-board@cern.ch. The Physics Board can

More information

1. Introduction. 2. Definitions. 3. Description of the evaluation procedure

1. Introduction. 2. Definitions. 3. Description of the evaluation procedure 1. Introduction The purpose of this is to provide information to potential applicants regarding the evaluation and selection procedure for the ARIES Proofof-Concept fund. 2. Definitions Evaluation Panel

More information

Lifelong Learning Programme Leonardo da Vinci

Lifelong Learning Programme Leonardo da Vinci Lifelong Learning Programme 2007-2013 Leonardo da Vinci TRANSFER OF INNOVATION Project Handbook (Annex III Guidelines for Administrative and Financial Management and Reporting) IMPORTANT! Before using

More information

HORIZON 2020 WORK PROGRAMME

HORIZON 2020 WORK PROGRAMME 2014 are required to conclude a consortium agreement, prior to the grant agreement. For WIDESPREAD 2-2014 the action is aimed at supporting individual institutions. To ensure that selected institutions

More information

ESTTP European Solar Thermal Technology Panel

ESTTP European Solar Thermal Technology Panel RHC-Platform European Technology Platform on Renewable Heating & Cooling ESTTP European Solar Thermal Technology Panel Call for proposals for the elaboration of the Solar Thermal Technology Roadmap Open

More information

HORIZON 2020 PROPOSAL EVALUATION

HORIZON 2020 PROPOSAL EVALUATION PROPOSAL EVALUATION Standard briefing Content Horizon 2020: a new type of EU R&I programme New type of calls and proposals More emphasis on innovation Cross-cutting issues Impact of time to grant on evaluation

More information

Communication & Dissemination in FP7 projects. Stéphane Hogan Head of Unit Horizontal Aspects and Coordination Health Directorate DG Research

Communication & Dissemination in FP7 projects. Stéphane Hogan Head of Unit Horizontal Aspects and Coordination Health Directorate DG Research Communication & Dissemination in FP7 projects Stéphane Hogan Head of Unit Horizontal Aspects and Coordination Health Directorate DG Research Information 1 meeting 4 May 2009 2 Dissemination is an obligation

More information

H2020 Programme. Guidelines on Open Access to Scientific Publications and Research Data in Horizon 2020

H2020 Programme. Guidelines on Open Access to Scientific Publications and Research Data in Horizon 2020 EUROPEAN COMMISSION Directorate-General for Research & Innovation H2020 Programme Guidelines on Open Access to Scientific Publications and Research Data in Horizon 2020 Version 3.1 25 August 2016 History

More information

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME 2001-2002 EUROPEAN AGENCY FOR SAFETY AND HEALTH AT WORK EXECUTIVE SUMMARY IDOM Ingeniería y Consultoría S.A.

More information

Belmont Forum Collaborative Research Action:

Belmont Forum Collaborative Research Action: Belmont Forum Collaborative Research Action: SCIENCE-DRIVEN E-INFRASTRUCTURES INNOVATION (SEI) FOR THE ENHANCEMENT OF TRANSNATIONAL, INTERDISCIPLINARY, AND TRANSDISCIPLINARY DATA USE IN ENVIRONMENTAL CHANGE

More information

NOTE TO THE HEADS OF NATIONAL AGENCIES

NOTE TO THE HEADS OF NATIONAL AGENCIES * 4 ** * ír ťr ** it* EUROPEAN COMMISSION Directorate-General for Education and Culture Youth, Sport And Citizenship "Youth in action" Brussels, 11-12- 2009 D2/GGM/VR/PLE/SF Ares(2009)^49// NOTE TO THE

More information

GRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s)

GRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s) Grant Agreement number «NO_REF» MONO BENEFICIARY GRANT AGREEMENT MARCH 2013 Education, Audiovisual and Culture Executive Agency Erasmus Mundus and External Cooperation GRANT AGREEMENT FOR AN ACTION ACTION

More information

Deliverable N.: 7.4 & 7.5

Deliverable N.: 7.4 & 7.5 THEME [INCO.2012-1.3] INCONET Mediterranean Partner Countries Deliverable N.: 7.4 & 7.5 Title: Project plan for support to NCPs and Thematic Contact Points Network & Project plan for cooperation with INCONTACT

More information

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research EEA Financial Mechanism and Norwegian Financial Mechanisms 2014

More information

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants Share. Care. Cure. ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants An initiative of the Version 1.1 April 2016 1 History of changes Version Date Change Page 1.0 16.03.2016 Initial

More information

STUDENT AFFAIRS SUBCOMMITTEE

STUDENT AFFAIRS SUBCOMMITTEE Terms of Reference Approved: July 2017 STUDENT AFFAIRS SUBCOMMITTEE 1. Authority The Student Affairs Subcommittee is a subcommittee of the Membership Committee, which is a standing committee of the Canadian

More information

Terms of reference for the external evaluation of the LINKS project

Terms of reference for the external evaluation of the LINKS project Terms of reference for the external evaluation of the LINKS project Paris, the 23 rd of February 2017 1. Introduction The Foundation La main à la pâte aims at improving the quality of science and technology

More information

Call title: Science in Society 2013

Call title: Science in Society 2013 Call title: Science in Society 2013 Call identifier: FP7-SCIENCE-IN-SOCIETY-2013-1 Date of publication: 10 July 2012 Deadline 1 : 16 January 2013 at 17.00, Brussels local time. Indicative budget: 51.7

More information

Version September 2014

Version September 2014 Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the

More information

Powered by TCPDF (

Powered by TCPDF ( Powered by TCPDF (www.tcpdf.org) Erasmus+ Porgrame Capacity Building in Higher Education Management and Monitoring Plan BEEHIVE: Building Entrepreneurial Ecosystems to Enhance Higher Education Value-Added

More information

Proposal template (Technical annex) Research and Innovation actions. Future and Emerging Technologies: Call FETPROACT adn FETOPEN

Proposal template (Technical annex) Research and Innovation actions. Future and Emerging Technologies: Call FETPROACT adn FETOPEN Proposal template (Technical annex) Research and Innovation actions Future and Emerging Technologies: Call FETPROACT adn FETOPEN Please follow the structure of this template when preparing your proposal.

More information