1 Marginal Field Incentive by Benny Lubiantara Evaluation & Dev. Plan Division, The Executive Agency for Upstream Oil & Gas Activities DEFINITION A marginal field is an oil field located within a producing block that, under the current PSC terms and conditions, is not economics to be developed. Old Definition in PSC Contract: Marginal Field is the first field of the Contract Area proposed by Contractor for development and approved, capable of Crude Oil production not exceeding 10,000 Barrels daily average projected for the initial two (2) production years (24 production months). 2 1

2 Conditions for Marginal Field Located within a producing block. Its main product is oil. The exploration costs for that field has been fully recovered, i.e. no more sunk costs considered. If calculate based on the current PSC terms and conditions and other incentive packages that may be applied for that field in accordance with laws and regulations, the Internal Rate of Return (IRR) is estimated less than 15%. 3 Marginal Field Candidates Working Area / Block Undeveloped Field Field "A" (producing) Field "B" (producing) 4 2

3 Type of Incentive 20% Operating Cost*) recovery up-lift. Other incentive packages that may be applied for that field in accordance with the prevailing PSC, laws and regulations. *) Under Definition of the PSC, the Operating Cost consist of: 1. Current Year s Non Capital Costs 2. Current Year s Depreciation for Capital Costs 5 Marginal Field Incentive The Mechanism Incentive is not permanently given and will be evaluated on yearly basis. The new incentive package is issued in order to improve the economics of the field, after receiving the incentive, the IRR of the field is expected at least 15%. (The Incentive is ON ) The Incentive will be removed if the actual cumulative IRR has reached 30% (The Incentive is OFF ). The Incentive will be re- apllied if the actual cumulative IRR in the followong year has dropped below 15%. 6 3

4 The Concept of 10,000 5,000 Net Cash Flow US$ (000) - (5,000) (10,000) IRR = 18.5% (15,000) Year 7 20% 10% 0% -10% % -30% IRR = 18.5% -40% 10,000 5,000 Net Cash Flow - (5,000) (10,000) 8 (15,000) 4

5 Incentive OFF 50% 40% if Incentive not OFF 30% 20% 10% 0% -10% % -30% 9 Most Likely Case "On - Off" Mechanism Expected Trend if the Incentive is NOT Removed 30% Incentive "On" Incentive "Off" 15% Year 10 5

6 Extreme - Case "On - Off" Mechanism Expected Trend if Incentive is NOT Removed 30% Incentive "On" Incentive "Off" 15% Incentive "On" Incentive "Off" Year 11 Illutration Marginal Field ( Realization) Field "A" (producing) Marginal Field ( Initial Condition ) Field "B" (producing) 12 6

7 Always On - Case "On - Off" Mechanism 30% Incentive always "On" 15% Year 13 Procedure Registration & Submission 1. PSC could register the candidates for marginal field by submitting the summary of POD. will response by sending the written answer no longer than 10 working days. 2. No longer than 6 months following the registration, PSC should submit complete POD (in order to speed-up the process, the draft of AFE proposal need also to be attached). 3. Registration period is 12 months (25 April April 2006) 14 7

8 Procedure Evaluation, Approval & Implementation 1. When submitting the POD, the assumption for oil price is US$ 25 per barrel. 2. will approve or not approve the POD proposal by sending the written answer to the PSC no longer than 30 days after receiving the POD proposal. 3. PSC should commence the activities no longer than one year after POD approved. 15 Procedure Evaluation, Approval & Implementation 4. The commencement of the activies is declared if: Tender Plan is appoved; or Tender Announced; or Execution of the Field Development 16 8

9 Procedure Implementing and Reporting 1. PSC should make the special book account for marginal field. 2. The marginal field insentive is taxable. 17 9

Ontario Ethanol Growth Fund:

Ontario Ethanol Growth Fund: Ontario Ethanol Growth Fund: Invitation to Proponents Issue date: October 7, 2005 Receiving address: Ontario Ethanol Growth Fund Secretariat Policy and Programs Division Ontario Ministry of Agriculture,

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 5010.36 August 14, 1991 ASD(FM&P) SUBJECT: Productivity Enhancing Capital Investment (PECI) References: (a) DoD Instruction 5010.36, Subject as above, December

More information

Instructions on Completing the Capital Analysis & Planning Template

Instructions on Completing the Capital Analysis & Planning Template Instructions on Completing the Capital Analysis & Planning Template (CAPT V7) Ministry of Education 2016-17 Year-End Submission Contents Overall Purpose... 2 Changes for 2016-17 Reporting... 3 Changes

More information

2017 Custom Energy Efficiency Program Colorado Instructions and Guidelines

2017 Custom Energy Efficiency Program Colorado Instructions and Guidelines Instructions and Guidelines The Custom Energy Efficiency Program (Custom Program) offers financial incentives to promote the installation of energy efficiency measures for Atmos Energy customers. Any measure

More information

GUIDELINES ON PRODUCTIVITY IMPROVEMENT PROJECT (PIP) Scheme

GUIDELINES ON PRODUCTIVITY IMPROVEMENT PROJECT (PIP) Scheme GUIDELINES ON PRODUCTIVITY IMPROVEMENT PROJECT (PIP) Scheme Part of the Construction Productivity and Capability Fund (CPCF) Guidelines on Productivity Improvement Project (PIP) Scheme 1. OBJECTIVE The

More information

Sri Lanka Accounting Standard LKAS 20. Accounting for Government Grants and Disclosure of Government Assistance

Sri Lanka Accounting Standard LKAS 20. Accounting for Government Grants and Disclosure of Government Assistance Sri Lanka Accounting Standard LKAS 20 Accounting for Government Grants and Disclosure of Government Assistance CONTENTS paragraphs SRI LANKA ACCOUNTING STANDARD LKAS 20 ACCOUNTING FOR GOVERNMENT GRANTS

More information

Incentive Guidelines Business START

Incentive Guidelines Business START Incentive Guidelines Business START Issue Date: 1 st June 2015 Update: 1 st July 2016 Version: 3 http://support.maltaenterprise.com Malta Enterprise staff may support interested applicants to understand

More information

Offshore Decommissioning Programme

Offshore Decommissioning Programme Offshore Decommissioning Programme Andy Clucas Programme Development Agenda - ONE Overview - Decom Programme Goals Benefits Process CHALLENGE Oil & Gas and regional challenge 1.7m 1.2m Cumulative production

More information

Accounting for Government Grants and Disclosure of Government Assistance

Accounting for Government Grants and Disclosure of Government Assistance IAS Standard 20 Accounting for Government Grants and Disclosure of Government Assistance In April 2001 the International Accounting Standards Board adopted IAS 20 Accounting for Government Grants and Disclosure

More information

India Event Showcasing E&P Opportunities. A Preview into India Policy & E&P Opportunities - Open Acreage Licensing Blocks, Bidding Process and DSF

India Event Showcasing E&P Opportunities. A Preview into India Policy & E&P Opportunities - Open Acreage Licensing Blocks, Bidding Process and DSF DGH India Event Showcasing E&P Opportunities A Preview into India Policy & E&P Opportunities - Open Acreage Licensing Blocks, Bidding Process and DSF Ranajit Banerjee November 15, 2017 Head (HELP), Directorate

More information

Appendix B: Formulae Used for Calculation of Hospital Performance Measures

Appendix B: Formulae Used for Calculation of Hospital Performance Measures Appendix B: Formulae Used for Calculation of Hospital Performance Measures ADJUSTMENTS Adjustment Factor Case Mix Adjustment Wage Index Adjustment Gross Patient Revenue / Gross Inpatient Acute Care Revenue

More information

What is the Research & Development (R&D) Tax Incentive?

What is the Research & Development (R&D) Tax Incentive? R&D TAX INCENTIVE What is the Research & Development (R&D) Tax Incentive? The R&D Tax Incentive program is the Australian Government s principle measure to enhance and increase the amount of research and

More information

Accounting for Government Grants and Disclosure of Government Assistance

Accounting for Government Grants and Disclosure of Government Assistance International Accounting Standard 20 Accounting for Government Grants and Disclosure of Government Assistance This version includes amendments resulting from IFRSs issued up to 31 December 2010. IAS 20

More information

SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME

SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME SCOTTISH ENTERPRISE REGIONAL AND SME INVESTMENT AID SCHEME 2014-2020 SCHEME REFERENCE NUMBER: SA.39217 LEGAL BASIS The Scottish Enterprise Regional and SME Investment Aid Scheme 2014 2020 (the Scheme )

More information

ENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM

ENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM This form is only for nominations in the Sustainability Innovations category This award category was created to recognize sustainability projects that do not fit into any of the other award categories.

More information

CORPORATION FOR PUBLIC BROADCASTING OFFICE OF INSPECTOR GENERAL

CORPORATION FOR PUBLIC BROADCASTING OFFICE OF INSPECTOR GENERAL CORPORATION FOR PUBLIC BROADCASTING OFFICE OF INSPECTOR GENERAL AUDIT OF COMMUNITY SERVICE AND OTHER SELECTED GRANTS AT KENTUCKY AUTHORITY FOR EDUCATIONAL TELEVISION, INC., KET-TV, LEXINGTON, KENTUCKY

More information

Sri Lanka Accounting Standard-LKAS 20. Accounting for Government Grants and Disclosure of Government Assistance

Sri Lanka Accounting Standard-LKAS 20. Accounting for Government Grants and Disclosure of Government Assistance Sri Lanka Accounting Standard-LKAS 20 Accounting for Government Grants and Disclosure of Government Assistance -609- Accounting -610- Definitions 3 The following terms are used in this Standard with the

More information

Teacher training incentives in Wales PGCE (FE) 2010/11

Teacher training incentives in Wales PGCE (FE) 2010/11 Teacher training incentives in Wales PGCE (FE) 2010/11 Post Graduate Certificate of Education (Further Education) Teacher Training Incentive Grant in Wales 2010/11 guidance notes Guidance Welsh Assembly

More information

The Future of the African Upstream Sector: EMERGENCE OF INDIGENOUS INDEPENDENTS. Presentation by Wale Tinubu Group Chief Executive 3 rd November 2010

The Future of the African Upstream Sector: EMERGENCE OF INDIGENOUS INDEPENDENTS. Presentation by Wale Tinubu Group Chief Executive 3 rd November 2010 The Future of the African Upstream Sector: EMERGENCE OF INDIGENOUS INDEPENDENTS Presentation by Wale Tinubu Group Chief Executive 3 rd November 2010 Agenda I. Introduction II Regional Disparity III. Spotlight

More information

Instructions for completing the CFC Application Form

Instructions for completing the CFC Application Form THE COMMON FUND FOR COMMODITIES 8 TH OPEN CALL FOR PROPOSALS Instructions for completing the CFC Application Form CFC does not charge any fees during the application procedure. However, on approval of

More information

East Harlem Commercial Opportunity RFP

East Harlem Commercial Opportunity RFP East Harlem Commercial Opportunity RFP Site Description 2321-2325 3rd Avenue (MN Block 1791 Lot 46) Convenient access via subway, Metro North, bus, and highway Located in a fast growing neighborhood Component

More information

Implementing Subsidy Reforms: lessons from international experience Maria Vagliasindi, Program Leader, GCC, World Bank SUBSIDY REFORM 11 1

Implementing Subsidy Reforms: lessons from international experience Maria Vagliasindi, Program Leader, GCC, World Bank SUBSIDY REFORM 11 1 Implementing Subsidy Reforms: lessons from international experience Maria Vagliasindi, Program Leader, GCC, World Bank SUBSIDY REFORM 11 1 Energy subsidy cost are extremely high Energy subsidies in selected

More information

Agricultural Energy Program Grant

Agricultural Energy Program Grant The RI RC&D Area Council, Inc. HELPING PEOPLE HELP THE LAND SINCE 1973 2283 Hartford Ave. Johnston, RI 02919 401-500-0399 Contact Paul Dolan, Area Director mailto: RI RC&D2283@gmail.com Agricultural Energy

More information

Health programme Call New ways for supporting your plans

Health programme Call New ways for supporting your plans Health programme Call 2008 New ways for supporting your plans Call offers financial support for part of the costs Your projects - 60% - total budget 28,5 M Your operational expenses - 60% over 1 financial

More information

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY RIGHTS COSTS (FOR SMALL AND MEDIUM-SIZED ENTERPRISES).

More information

Frequently Asked Questions for Round 2 BIP Applicants

Frequently Asked Questions for Round 2 BIP Applicants UPDATED 1/22/2010 Frequently Asked Questions for Round 2 BIP Applicants Table of Contents Important Application Changes from the First Round... 3 Choosing Between BIP and BTOP... 5 How to Apply for Round

More information

EVALUATION AND STATUS REPORT

EVALUATION AND STATUS REPORT NEW YORK S SYSTEM BENEFITS CHARGE PROGRAMS EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION QUARTER ENDING SEPTEMBER 30, 2009 FINAL REPORT NOVEMBER 2009 NEW YORK STATE ENERGY

More information

SSAP 35 STATEMENT OF STANDARD ACCOUNTING PRACTICE 35 ACCOUNTING FOR GOVERNMENT GRANTS AND DISCLOSURE OF GOVERNMENT ASSISTANCE

SSAP 35 STATEMENT OF STANDARD ACCOUNTING PRACTICE 35 ACCOUNTING FOR GOVERNMENT GRANTS AND DISCLOSURE OF GOVERNMENT ASSISTANCE SSAP 35 STATEMENT OF STANDARD ACCOUNTING PRACTICE 35 ACCOUNTING FOR GOVERNMENT GRANTS AND DISCLOSURE OF GOVERNMENT ASSISTANCE (Issued March 2002) The standards, which have been set in bold italic type,

More information

New Jersey Energy Resilience Bank

New Jersey Energy Resilience Bank New Jersey Energy Resilience Bank Overview SECTION 1 Introduction to the ERB The State of New Jersey 1 New Jersey Energy Resilience Bank (ERB) Overview The extensive damage and outages caused by Superstorm

More information

Maintenance Outsourcing - Critical Issues

Maintenance Outsourcing - Critical Issues Maintenance Outsourcing - Critical Issues By Sandy Dunn, Director, Assetivity Please request permission from the author before copying or distributing this article There are a number of issues facing organisations

More information

GENERAL NOTICE. DRAFT WASTE INFORMATION REGULATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT No.

GENERAL NOTICE. DRAFT WASTE INFORMATION REGULATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT No. STAATSKOERANT, 8 MEl 2009 3 GENERAL NOTICE NOTICE 430 OF 2009 DEPARTMENT OF ENVIRONMENTAL AFFAIRS AND TOURISM DRAFT WASTE INFORMATION REGULATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE

More information

Terra Nova Development

Terra Nova Development Canada-Newfoundland and Labrador Industrial Benefits Public Quarterly Report April 01, 2016 June 30, 2016 Table of Contents Section 1.0 Introduction... 3 Section 2.0 Terra Nova Development... 4 Section

More information

Table of Contents INTERPRETATIONS OF TOPIC 840, ACCOUNTING FOR LEASES. Paragraph : General...Subtopic

Table of Contents INTERPRETATIONS OF TOPIC 840, ACCOUNTING FOR LEASES. Paragraph : General...Subtopic Preface... Preface i Recent Developments...Developments i INTERPRETATIONS OF TOPIC 840, ACCOUNTING FOR LEASES Leases Overall (840-10) Status Paragraph 845-10-00-1: General...Subtopic 840-10 1 Overview

More information

New York s system BeNefits Charge Programs evaluation and status report

New York s system BeNefits Charge Programs evaluation and status report New York s system BeNefits Charge Programs evaluation and status report QuarterlY report to the PuBliC service CommissioN Quarter ending september 30, 2010 final report NovemBer 2010 New York state energy

More information

Incentive Guidelines Innovation Clusters

Incentive Guidelines Innovation Clusters Incentive Guidelines Innovation Clusters Issue Date: 1 st June 2009 (updated 04/02/2014) Version: 1.1 http://support.maltaenterprise.com This incentive forms part of a group of R&D&I incentives under the

More information

EQUATORIAL GUINEA 2014 LICENSING ROUND APPLICATION PROCEDURES

EQUATORIAL GUINEA 2014 LICENSING ROUND APPLICATION PROCEDURES EQUATORIAL GUINEA 2014 LICENSING ROUND APPLICATION PROCEDURES EQUATORIAL GUINEA 2014 LICENSING ROUND APPLICATION PROCEDURES 1 INTRODUCTION 2 LEGAL & FISCAL DOCUMENTS 2.1 Hydrocarbons Law 2.2 Model Petroleum

More information

Annual Review of HSE Performance

Annual Review of HSE Performance 28 Annual Review of HSE Performance Message from the CEO Gulf Marine Services is currently the largest Elevating Support Vessel operator in the Middle East supplying a modern fleet of self propelled barges

More information

Incentive Guidelines. ERDF Research and Development Grant Scheme

Incentive Guidelines. ERDF Research and Development Grant Scheme Incentive Guidelines ERDF Research and Development Grant Scheme Issue Date: 3 rd February 2012 Version: 4.0 www.20millionforindustry.com http://support.maltaenterprise.com Contents 1. Introduction 2 1.1

More information

Exposure Draft of. Amendments to Ind AS 20, Accounting for Government Grants and Disclosure of Government Assistance

Exposure Draft of. Amendments to Ind AS 20, Accounting for Government Grants and Disclosure of Government Assistance Exposure Draft of ED/Ind AS/2018/01 Amendments to Ind AS 20, Accounting for Government Grants and Disclosure of Government Assistance (Last date for Comments: January 24, 2018) Issued by Accounting Standards

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM-010-2018 Date Issued: April 19, 2018 Closing Date: July 12, 2018, 3:00 pm

More information

2016 Energy Efficiency Program Annual Report

2016 Energy Efficiency Program Annual Report 2016 Energy Efficiency Program Annual Report June 26, 2017 TABLE OF CONTENTS Introduction... 3 Executive Summary... 4 Tariff Collections... 6 Regulatory Proceedings... 7 Summary of M&V Report Findings...

More information

MASB Standard 31. Accounting for Government Grants and Disclosure of Government Assistance

MASB Standard 31. Accounting for Government Grants and Disclosure of Government Assistance LEMBAGA PIAWAIAN PERAKAUNAN MALAYSIA MALAYSIAN ACCOUNTING STANDARDS BOARD MASB Standard 31 Accounting for Government Grants and Disclosure of Government Assistance Any correspondence regarding this Standard

More information

2013 Photovoltaic Solar White Paper. Geography: Tennessee, Mississippi and Alabama TVA Footprint

2013 Photovoltaic Solar White Paper. Geography: Tennessee, Mississippi and Alabama TVA Footprint 2013 Photovoltaic Solar White Paper Geography: Tennessee, Mississippi and Alabama TVA Footprint Asset Types: Commercial, Medical Office Buildings, Retail, and Industrial Prepared by: Jeff O Connor, Inman

More information

TOPIC 9 - IAS 20 Government Grants

TOPIC 9 - IAS 20 Government Grants TOPIC 9 - IAS 20 Government Grants Introduction: Government provides financial assistance to industry. Grant is usually in the form of cash 1. Grants related to Assets purchase or construction of long

More information

The Financial Returns from Oil and Natural Gas Company Stocks Held by American College and University Endowments. Robert J.

The Financial Returns from Oil and Natural Gas Company Stocks Held by American College and University Endowments. Robert J. The Financial Returns from Oil and Natural Gas Company Stocks Held by American College and University Endowments Robert J. Shapiro September 2015 Table of Contents I. Introduction and Executive Summary.....

More information

Public Safety and Security

Public Safety and Security Public Safety and Security ESF #13 GRAYSON COLLEGE EMERGENCY MANAGEMENT Table of Contents Table of contents..1 Approval and Implementation.3 Recorded of Change.4 Emergency Support Function 13- Public Safety..5

More information

NIGERIAN NATIONAL PETROLEUM CORPORATION NNPC Towers, Herbert Macaulay Way, Central Business District, P.M.B. 190, Garki, Abuja Nigeria.

NIGERIAN NATIONAL PETROLEUM CORPORATION NNPC Towers, Herbert Macaulay Way, Central Business District, P.M.B. 190, Garki, Abuja Nigeria. NIGERIAN NATIONAL PETROLEUM CORPORATION NNPC Towers, Herbert Macaulay Way, Central Business District, P.M.B. 190, Garki, Abuja Nigeria. INVITATION TO TENDER FOR THE DIGITIZATION OF LEGACY DOCUMENTS AT

More information

THE INTERNET INCUBATOR: STRUCTURES AND ISSUES

THE INTERNET INCUBATOR: STRUCTURES AND ISSUES P A U L, W E I S S, R I F K I N D, W H A R T O N & G A R R I S O N THE INTERNET INCUBATOR: STRUCTURES AND ISSUES DOUGLAS A. CIFU - MARCO V. MASOTTI MAY 2000 I. WHAT ARE INCUBATORS? 1/ In recent years,

More information

Chapter 7 Reporting, Audit and Assurance

Chapter 7 Reporting, Audit and Assurance Chapter 7 Reporting, Audit and Assurance Reporting Financial Statements 7.1 Institutions are required to keep proper accounting records. In preparing statements of its income and expenditure and of its

More information

OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015

OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015 OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia Jakarta, 3 rd February 2015 Disclaimer This presentation is to facilitate the Q&A by providing an overview

More information

Sam Houston State University Academic Policy Statement Distribution of Recovered Indirect Cost Policy Page 1 of 5 Revised March 19, 2012

Sam Houston State University Academic Policy Statement Distribution of Recovered Indirect Cost Policy Page 1 of 5 Revised March 19, 2012 Page 1 of 5 1. PURPOSE The Texas Education Code, Chapter 145 provides that recovered indirect (IDC) can be retained by State universities. In accordance with The Texas State University System Rules and

More information

REQUEST FOR PROPOSAL AND STATEMENT OF QUALIFICATIONS FOR AUDIT SERVICES PART 1: PROCUREMENT INFORMATION

REQUEST FOR PROPOSAL AND STATEMENT OF QUALIFICATIONS FOR AUDIT SERVICES PART 1: PROCUREMENT INFORMATION REQUEST FOR PROPOSAL AND STATEMENT OF QUALIFICATIONS FOR AUDIT SERVICES PART 1: PROCUREMENT INFORMATION The West Palm Beach Housing Authority, Florida (WPBHA) will accept proposals with Statements of Qualifications

More information

Five Steps to Better ICD-lO Clinical Documentation

Five Steps to Better ICD-lO Clinical Documentation Five Steps to Better ICD-lO Clinical Documentation (And why your software depends on it.) Table of... 2 : Evaluate Current Documentation... 3 : Train Physicians...4 : Build a Safe Testing Ground... 5 :

More information

8 / 1 9 / 2. Factors Supporting Critical Access Hospital Turnaround. Muskie School of Public Service

8 / 1 9 / 2. Factors Supporting Critical Access Hospital Turnaround. Muskie School of Public Service Factors Supporting Critical Access Hospital Turnaround NOSORH Region C Grantee Meeting Omaha, NE August, Maine Rural Health Research Center Flex Monitoring Team Contact Information John A. Gale Maine Rural

More information

Term of Contract 15-year term, from 1 October 2018 to 31 December 2033

Term of Contract 15-year term, from 1 October 2018 to 31 December 2033 CLP Power Hong Kong Ltd Overview of the Scheme of Control Agreement (SCA) for 2018-2033 Overview Permitted Rate of 8% on Average Net Fixed Assets Return Term of Contract 15-year term, from 1 October 2018

More information

NYISO Draft ICAP Demand Curve Recommendations for Capability Years 2017/ /2021. Randy Wyatt New York Independent System Operator

NYISO Draft ICAP Demand Curve Recommendations for Capability Years 2017/ /2021. Randy Wyatt New York Independent System Operator NYISO Draft ICAP Demand Curve Recommendations for Capability Years 2017/2018-2020/2021 Randy Wyatt New York Independent System Operator ICAPWG August 19, 2016 Rensselaer, NY 2000-2016 New York Independent

More information

MICHAEL N. FEUER CITY ATTORNEY REPORT RE:

MICHAEL N. FEUER CITY ATTORNEY REPORT RE: MICHAEL N. FEUER CITY ATTORNEY REPORT RE: R13-0351 REPORTNO.~~ ~ DEC 0 9 2013 DRAFT ORDINANCE FOR THE HAIWEE POWER PLANT PENSTOCK REPLACEMENT PROJECT REQUESTING THE LOS ANGELES CITY COUNCIL TO ESTABLISH

More information

Investor Presentation: Q Results Update

Investor Presentation: Q Results Update Investor Presentation: Q4 2014 Results Update Important Disclaimer This presentation is intended to provide a general outline only and is not intended to be a definitive statement on the subject matter.

More information

DRAFT PROPOSAL REQUIREMENTS

DRAFT PROPOSAL REQUIREMENTS DRAFT PROPOSAL REQUIREMENTS 1. Purpose The is expected to be issued on June 28, 2017. The present document provides an overview of the Proposal submission process and draft Proposal requirements. These

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL RFP EM-007-2018 Date Issued: January 31,2017 Closing Date: February 16, 2018-3:00 pm local time TABLE OF

More information

The Evolution of a Successful Efficiency Program: Energy Savings Bid

The Evolution of a Successful Efficiency Program: Energy Savings Bid The Evolution of a Successful Efficiency Program: Energy Savings Bid Carrie Webber, KEMA, Inc. ABSTRACT San Diego Gas and Electric s Energy Savings Bid Program is a highly successful commercial energy-efficiency

More information

GRANTS AND CONTRACTS (FINANCIAL GRANTS MANAGEMENT)

GRANTS AND CONTRACTS (FINANCIAL GRANTS MANAGEMENT) GRANTS AND CONTRACTS (FINANCIAL GRANTS MANAGEMENT) Policies & Procedures UPDATED: February 25, 2015 (04/21/16) 2 TABLE OF CONTENTS Definitions... 3-7 DRFR 8.00 Policy Statement... 8 DRFR 8.02 Employee

More information

DISASTER RECOVERY PROGRAM REVIEW

DISASTER RECOVERY PROGRAM REVIEW DISASTER RECOVERY PROGRAM REVIEW Recommendation and Actions Taken RECOMMENDATION ACTIONS TAKEN A. Program Efficiency and Effectiveness A.1 Develop a performance management framework A.2 Implement a technology

More information

Energy Financing Opportunities in the Stimulus and Bailout Acts

Energy Financing Opportunities in the Stimulus and Bailout Acts presents Energy Financing Opportunities in the Stimulus and Bailout Acts Leveraging New Grants, Loans and Tax Incentives for Renewable Energy and Energy Efficiency A Live 90-Minute Audio Conference with

More information

CHAPTER 4: Income from Employment

CHAPTER 4: Income from Employment CHAPTER 4: Income from Employment Prepared by Nathalie Johnstone University of Saskatchewan Electronic Presentations in Microsoft PowerPoint Copyright 2015 McGraw-Hill Ryerson, Limited. All rights reserved.

More information

Reactivation of the South Brooklyn Marine Terminal. RFP Information Sessions Monday, December 14, 2015 Wednesday, January 20, 2016

Reactivation of the South Brooklyn Marine Terminal. RFP Information Sessions Monday, December 14, 2015 Wednesday, January 20, 2016 Reactivation of the South Brooklyn Marine Terminal RFP Information Sessions Monday, December 14, 2015 Wednesday, January 20, 2016 Agenda RFP Schedule Site Information Site Location RFP Development Goals

More information

Application for Registration Information Sheet

Application for Registration Information Sheet We encourage you to submit your application electronically via Tarion.com, where you can complete, pay and submit your application online. Once you have submitted your application online, you can sign-up

More information

Job Development Investment Grant (JDIG) N.C. Gen. Stat. 143B to 143B

Job Development Investment Grant (JDIG) N.C. Gen. Stat. 143B to 143B Job Development Investment Grant (JDIG) N.C. Gen. Stat. 143B 437.50 to 143B 437.63 PURPOSE/ DESCRIPTION Seeks to stimulate economic activity and create new jobs by providing a discretionary incentive that

More information

Accounting for Government Grants and Disclosure of Government Assistance

Accounting for Government Grants and Disclosure of Government Assistance Indian Accounting Standard (Ind AS) 20 Accounting for Government Grants and Disclosure of Government Assistance (This Indian Accounting Standard includes paragraphs set in bold type and plain type, which

More information

FEDERAL GAS TAX FUND (FGTF)

FEDERAL GAS TAX FUND (FGTF) ADMINISTRATIVE PROCEDURES FOR THE FEDERAL GAS TAX FUND (Formerly New Deal for Cities and Communities) (FGTF) Revised: November 28, 2013 FEDERAL GAS TAX FUND - Administrative Procedures 1. Definitions Within

More information

Accounting for Government Grants

Accounting for Government Grants 175 Accounting Standard (AS) 12 (issued 1991) Accounting for Government Grants Contents INTRODUCTION Paragraphs 1-3 Definitions 3 EXPLANATION 4-12 Accounting Treatment of Government Grants 5-11 Capital

More information

As Introduced. Regular Session H. B. No

As Introduced. Regular Session H. B. No 132nd General Assembly Regular Session H. B. No. 281 2017-2018 Representative Carfagna Cosponsors: Representatives Brenner, Hill, LaTourette, Lipps, Seitz, Smith, R., Thompson, Lepore-Hagan A B I L L To

More information

OFFICE OF GREEN INDUSTRIES SA / ZERO WASTE SA

OFFICE OF GREEN INDUSTRIES SA / ZERO WASTE SA OFFICE OF GREEN INDUSTRIES SA / ZERO WASTE SA KERBSIDE PERFORMANCE PLUS FOOD ORGANICS INCENTIVES PROGRAM 2017-18 GUIDELINES AND APPLICATION FORM 1 CONTENTS Foreword... 3 About Green Industries SA... 3

More information

Corporate Presentation

Corporate Presentation Corporate Presentation May 2014 Corporate Presentation Amongst the world s 12 largest offshore service providers May 2014 Disclaimer This presentation does not constitute a prospectus, offering circular

More information

(1) Kaduna (2) Kano. System 2D (Product Line) (1) Kaduna-Zaria-Kano (224.7km) (3) Gusau. (4) Suleja. (2) Zaria-Gusau (177.

(1) Kaduna (2) Kano. System 2D (Product Line) (1) Kaduna-Zaria-Kano (224.7km) (3) Gusau. (4) Suleja. (2) Zaria-Gusau (177. Nigerian National Petroleum Corporation Nigerian Pipelines and Storage Company (NPSC) Block C, NNPC Towers, Herbert Macaulay Way, Central Business District, P.M.B, 459, Garki Abuja Pre-Qualification of

More information

OSC Readiness Training November Navigating the USCG s NPFC Policies on Accessing the OSLTF

OSC Readiness Training November Navigating the USCG s NPFC Policies on Accessing the OSLTF OSC Readiness Training November 2004 Navigating the USCG s NPFC Policies on Accessing the OSLTF Course Overview Oil Spill Response Process Federal Oil Spill Response NCP Operational Response Phases for

More information

A SUBSIDIARY OF NIGERIAN NATIONAL PETROLEUM CORPORATION.

A SUBSIDIARY OF NIGERIAN NATIONAL PETROLEUM CORPORATION. PETROLEUM PRODUCTS MARKETING COMPANY LIMITED A SUBSIDIARY OF NIGERIAN NATIONAL PETROLEUM CORPORATION. EXPRESSION OF INTEREST FOR THE PROVISION OF CARGO SUPERINTENDENCE SERVICES OF ITS PETROLEUM CARGOES

More information

ENOVA Promotion of energy from renewable sources Scheme

ENOVA Promotion of energy from renewable sources Scheme ENOVA Promotion of energy from renewable sources Scheme State aid Reference no.: 25/2016/ENV 1. State Norway 2. Title of aid scheme Promotion of energy from renewable sources Scheme (The Scheme). 3. National

More information

Mississippi Financial Management Support Annex

Mississippi Financial Management Support Annex Mississippi Financial Management Support Annex Coordinating Agency Mississippi Department of Finance and Administration Mississippi Emergency Management Agency Support Agencies Mississippi State Auditor

More information

Financial Highlights for the Third Quarter of FY2006

Financial Highlights for the Third Quarter of FY2006 Financial Highlights for the Third Quarter of FY2006 (April 1, 2006 - December 31, 2006) February 6, 2007 Idemitsu Kosan Co.,Ltd. Contents 1. Business Results for the Third Quarter of FY2006 2 (1) Outline

More information

CLEAN ENERGY DEVELOPMENT FUND

CLEAN ENERGY DEVELOPMENT FUND CLEAN ENERGY DEVELOPMENT FUND Annual Report to the Vermont Legislature Fiscal Year 2012 Submitted to the House and Senate Committees on Natural Resources and Energy, the Senate Committee on Finance, and

More information

EMERGENCY MANAGEMENT ACT 2007

EMERGENCY MANAGEMENT ACT 2007 C T EMERGENCY MANAGEMENT ACT 2007 Emergency Management Act 2007 Arrangement of Sections C T EMERGENCY MANAGEMENT ACT 2007 Arrangement of Sections Section PART I - PRELIMINARY 5 1 Short title and commencement...

More information

Partial Action Plan for New York Business Recovery and Economic Revitalization

Partial Action Plan for New York Business Recovery and Economic Revitalization LOWER MANHATTAN DEVELOPMENT CORPORATION in partnership with EMPIRE STATE DEVELOPMENT and NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION Partial Action Plan for New York Business Recovery and Economic Revitalization

More information

Recommendations and Best Practices for Revising Incentive Structure May 2014

Recommendations and Best Practices for Revising Incentive Structure May 2014 Recommendations and Best Practices for Revising Incentive Structure May 2014 Opportunities and Challenges for Multifamily Incentive Restructuring In the fall of 2013, ACEEE completed a report identifying

More information

CALL FOR TENDERS ATHENS 30 MAY 2003

CALL FOR TENDERS ATHENS 30 MAY 2003 CALL FOR TENDERS INTERNATIONAL CALL FOR TENDERS UNDER THE OPEN PROCEDURE, WITH SEALED PROPOSALS AND AWARD CRITERION THE ECONOMICALLY ADVANTAGEOUS OFFER FOR THE SELECTION OF THE CONSULTANT FOR THE PROJECT:

More information

Implementing the Pilot Program for Debris Removal

Implementing the Pilot Program for Debris Removal Implementing the Pilot Program for Debris Removal Albert Ashwood Director Oklahoma Emergency Management Greg Eaton Director FEMA Region 6, Recovery Division DR-4117-OK Update Declaration the day of the

More information

SERVICE PROCUREMENT NOTICE Comprehensive strengthening of the capacities of the Agency for Vocational Education and Training Republic of Croatia

SERVICE PROCUREMENT NOTICE Comprehensive strengthening of the capacities of the Agency for Vocational Education and Training Republic of Croatia SERVICE PROCUREMENT NOTICE Comprehensive strengthening of the capacities of the Agency for Vocational Education and Training Republic of Croatia 1. Publication reference EuropeAid/127476/D/SER/HR 2. Procedure

More information

Energy Trust Background

Energy Trust Background REQUEST FOR QUALIFICATIONS (RFQ) FOR PLANNING AND EVALUATION TASKS Energy Trust of Oregon, Inc. (Energy Trust), an Oregon non-profit, 501(c)(3) corporation, seeks qualifications from energy efficiency

More information

New Zealand Equivalent to International Accounting Standard 20 Accounting for Government Grants and Disclosure of Government Assistance (NZ IAS 20)

New Zealand Equivalent to International Accounting Standard 20 Accounting for Government Grants and Disclosure of Government Assistance (NZ IAS 20) New Zealand Equivalent to International Accounting Standard 20 Accounting for Government Grants and Disclosure of Government Assistance (NZ IAS 20) Issued November 2004 and incorporates amendments to 31

More information

ED 2259/18. 4 January 2018 Original: English. Common Fund for Commodities. 12 th Open Call for Proposals

ED 2259/18. 4 January 2018 Original: English. Common Fund for Commodities. 12 th Open Call for Proposals ED 2259/18 4 January 2018 Original: English E Common Fund for Commodities 12 th Open Call for Proposals 1. The Executive Director presents his compliments and, for the information of Members, attaches

More information

Generosity of R&D Tax Incentives

Generosity of R&D Tax Incentives Generosity of R&D Tax Incentives Presentation by Jacek Warda TIP Workshop on R&D Tax Treatment in OECD Countries: Comparisons and Evaluations Paris, December 10, 2007 1 Agenda Introduction Measuring R&D

More information

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM-006-2018 Date Issued: 11/20/2017 TABLE OF CONTENTS SECTION 1 RFP INFORMATION AND INSTRUCTIONS SECTION

More information

If a 20% Match Is Required:

If a 20% Match Is Required: NON-FEDERAL SHARE: A Programmatic & Fiscal Approach If a 20% Match Is Required: (a) Divide the total Federal funds by 80% to determine total project costs; (b) Subtract the Federal portion from the total

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS LOW INCOME WEATHERIZATION PROGRAM FREQUENTLY ASKED QUESTIONS Contents GENERAL QUESTIONS... 1 PROGRAM ELIGIBILITY... 2 PROGRAM PROCESS... 3 PROJECT MEASURES, TIMELINE, AND CONSTRUCTION... 4 ENERGY EFFICENCY

More information

July 1, 2006 Revision 2

July 1, 2006 Revision 2 Self-Generation Incentive Program Modification Guideline (PMG) July 1, 2006 Revision 2 TABLE OF CONTENTS TABLE OF CONTENTS...i 1. GUIDELINE BACKGROUND & PURPOSE...1 1.1. Background...1 1.2. Purpose...1

More information

Innovation Village, Cal Poly Pomona Economic Benefits Analysis City of Pomona

Innovation Village, Cal Poly Pomona Economic Benefits Analysis City of Pomona City of Pomona Executive Summary Prepared for: Cal Poly Pomona Foundation, Inc. 3801 W. Temple Avenue, Building #55 Pomona, CA 91768-4038 SRHA Job #1231 11661 San Vicente Blvd. Suite 306 Los Angeles, California

More information

49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST)

49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST) Invitation for Bids Date: 18 April 2018 Loan No. and Title: Contract No. and Title: Deadline for Submission of Bids: 49469-IND: Mumbai Metro Rail Investment Project MRS1: Design, Manufacture, Supply, Testing,

More information

New 3-Year Plan ( )

New 3-Year Plan ( ) New 3-Year Plan (2005-2007) May 19, 2005 President and CEO: Naozumi Furukawa Agenda Summary of PZ-2 (Plan 2003-2005) PZ-3 New 3-Year Plan PZ-3 Concept Industrial Forecast for 2010 Market Size for Target

More information

Foreign Direct Investment

Foreign Direct Investment Foreign Direct Investment O NEAL // FOREIGN DIRECT INVESTMENT // 1 O NEAL KEEPS A PULSE ON MANUFACTURING TRENDS IN THE UNITED STATES PARTICULARLY THE MANUFACTURING BOOM THAT IS OCCURRING IN THE SOUTHEAST.

More information

The Nonprofit Academy PRESENTS!

The Nonprofit Academy PRESENTS! The Nonprofit Academy PRESENTS! PRESENTS HOW TO TURN SMALL DONORS INTO MONTHLY DONORS TO GENERATE REVENUE FOR YOUR NONPROFIT with Erica Waasdorp #npapresents You can have virtually anything you want if

More information