Brighton and Sussex University Hospitals NHS Trust Board of Directors

Similar documents
Urgent & Emergency Care Strategy Update

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee

Plans for urgent care in west Kent:

Urgent Care Short Term Actions to Improve Performance

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST BOARD OF DIRECTORS. Emergency Department Progress Report

Redesign of Front Door

Introducing a 7-day service: the benefits of increased consultant presence

Future Hospital Programme: - a Partner perspective

Strategic Risk Report 4 July 2016

Seven day hospital services: case study. South Warwickshire NHS Foundation Trust

FT Keogh Plans. Medway NHS Foundation Trust

Safer Nursing and Midwifery Staffing Recommendation The Board is asked to: NOTE the report

Nottingham University Hospitals Emergency Department Quality Issues Related to Performance

Winter/Surge Capacity Plan 1 st December 2013 to 31 st March Position as at September 2013

Author: Kelvin Grabham, Associate Director of Performance & Information

DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES

Emergency admissions to hospital: managing the demand

Kingston Hospital NHS Foundation Trust Length of stay case study. October 2014

We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.

BSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Royal College of Paediatrics and Child Health Service Review Action Plan and Progress Report 26 th May 2016

NHS performance statistics

Worcestershire Acute Hospitals NHS Trust

NHS England (South) Surge Management Framework

Performance Improvement Bulletin

BOARD OF DIRECTORS. Sue Watkinson Chief Operating Officer

November NHS Rushcliffe CCG Assurance Framework

This SLA covers an enhanced service for care homes for older people and not any other care category of home.

NHS Performance Statistics

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY AND URGENT CARE BOARD UPDATE

Strategic Risk Report 1 March 2018

Board Briefing. Board Briefing of Nursing and Midwifery Staffing Levels. Date of Briefing January 2018 (December 2017 data)

Appendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations

21 March NHS Providers ON THE DAY BRIEFING Page 1

Our community nursing roles

WAITING TIMES AND ACCESS TARGETS

NHS performance statistics

Tele Stroke ( Telemedicine in Practice)

Paper 5.0 SHAPING A HEALTHIER FUTURE PAEDIATRIC TRANSITION: ANTICIPATED BENEFITS OF THE TRANSITION AND PROPOSED MODEL OF CARE.

Portsmouth Hospitals NHS Trust Winter/Surg Plan 2013/14. pg. 1

EMERGENCY PRESSURES ESCALATION PROCEDURES

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018

Reducing emergency admissions

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY: BOARD OF DIRECTORS 22 FEBRUARY 2012

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010

Ayrshire and Arran NHS Board

Northumberland Frail Elderly Pathway. Dr David Shovlin Fiona Brown

BRIEFING PAPER FOR THE HEALTH, SOCIAL CARE AND SPORT SELECT COMMITTEE OF WELSH GOVERNMENT 19 JULY 2018 WINTER REVIEW 2017/18 AND PREPAREDNESS 2018/19

is asked to NOTE the update provided on fragile services.

Overall rating for this trust Good. Inspection report. Ratings. Are services safe? Requires improvement. Are services effective?

OPERATIONAL PERFORMANCE REPORT: March Swindon Community Health Services Overview

Report to the Board of Directors 2016/17

Utilisation Management

PERSPECTIVES. High Performing Emergency Pathways PERFORMANCE IMPROVEMENT

Title Open and Honest Staffing Report April 2016

Strategic Risk Report 12 September 2016

Influence of Patient Flow on Quality Care

Newham Borough Summary report

Item E1 - Bart s Health Quality Indicators

Mental Health Services - Delayed Discharges: Update

Luton Borough Council: Reducing DTOC rates attributable to Social Care

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

Facing the Future Audit 2017: Facing the Future: Standards for acute general paediatric services Facing the Future: Together for child health

Stewart Mason, Emergency Planning and Resilience Officer Tom Jones, Clinical Programme Manager

Report of the Care Quality Commission. May 2017

Safe Nurse Staffing Levels. June 2017

Mental health crisis care models

Influence of Patient Flow on Quality Care

: Geraint Davies, Director of Commercial Services

The Role of The Consultant, The Doctor and The Nurse Mr Gary Kitching Consultant in Emergency Medicine Foundation Training Programme Director

DIVISION OF EMERGENCY MEDICINE DEPARTMENT OF ACUTE MEDICINE

Final Version Simple Guide to the Care Act and Delayed Transfers of Care (DTOC) SIMPLE GUIDE TO THE CARE ACT AND DELAYED TRANSFERS OF CARE (DTOC)

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

Addressing ambulance handover delays: actions for local accident and emergency delivery boards

WAITING TIMES 1. PURPOSE

Quality Report. Royal Liverpool University Hospital Prescot Street, Liverpool, Merseyside L7 8XP Tel: Website:

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Surrey Downs Clinical Commissioning Group Governing Body Part 1 Paper Acute Sustainability at Epsom & St Helier University Hospitals NHS Trust

Hard Truths Public Board 29th September, 2016

Integrated Care in North Central London

Northern Adelaide Local Health Network. Proposal for the Establishment of a NALHN Central Flow Unit: 11 September B. MacFarlan & C.

Implementing NHS Services Seven Days a Week

Winter Planning 2017/18. Marc Hopkinson - NGCCG Barbara Goodfellow - NuTH Nichola Fairless GHFT Simon Swallow - NEAS

HOME TREATMENT SERVICE OPERATIONAL PROTOCOL

Discharge to Assess Standards for Greater Manchester

Hospital Discharge and Transfer Guidance. Choice, Responsiveness, Integration & Shared Care

Strategic KPI Report Performance to December 2017

A Whole System Approach to Emergency Care Improvement. The Ipswich Hospital NHS Trust

Appendix 1: Integrated Urgent Care Service Update. 1. Purpose

TAMESIDE & GLOSSOP INTEGRATED CARE NHS FOUNDATION TRUST

NHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016.

Under pressure. Safely managing increased demand in emergency departments

NHS England South Escalation Framework

Report to the Board of Directors 2015/16

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:

Newham Borough Summary report

Learning from Deaths Policy A Framework for Identifying, Reporting, Investigating and Learning from Deaths in Care.

Standard of Care for MTC inpatients

Transcription:

Meeting: Brighton and Sussex University Hospitals NHS Trust Board of Directors Date: 25 January 2016 Board Sponsor: Paper Author: Subject: Chief Operating Officer Chief Operating Officer Urgent Care Transformation Executive summary This report updates the Board on progress within the Emergency Care pathway, describing progress in the Level 5 Plan, and Right Care, Right Place, Each Time programme; together with the introduction of a single clerking process on the Acute Floor, and changes to the configuration of wards within the Barry Building, which are designed to improve patient flow and the standard of patient care. The report further describes performance against the four hour Accident and Emergency standard since the last Board meeting and the challenges to performance on both the Royal Sussex County Hospital (RSCH) and Princess Royal Hospital (PRH) sites. Links to corporate objectives Identified risks and risk management actions Report history Securing sustained improvements in emergency and unscheduled care is critical to the delivery of the corporate objectives of excellent outcomes; and great experience. Patient safety and experience; performance against the 4-hour A&E standard; organisational reputation. Previous reports on Emergency and Unscheduled Care have been made to the Board of Directors monthly in 2014 and 2015. Action required by the Board The Board is asked to note the report and the on-going work to make sustained improvements to the urgent care pathway; performance against the four hour Accident and Emergency standard; and the challenges and risks to performance Page 1 of 9

Report to the Board of Directors, 25 January 2016 Urgent Care Transformation 1. Introduction Emergency Care performance is under significant external scrutiny allied to the absolute priority given to it by the Trust as seen in previous board reports and the annual plan for 2015/16. After inviting the national Emergency Care Intensive Support Team (ECIST) to review its emergency care pathway, there was also an unannounced 48-hour visit and review of emergency care by the Care Quality Commission (CQC). In addition to these forensic visits, the Trust has also reviewed its performance and recovery plan with the NHS Trust Development Authority (TDA) at our regular Integrated Delivery Meeting (IDM). The broad message is that whilst there are areas of good practice and care for patients across the emergency care pathway, the Trust still has to improve to secure the levels of performance that patients should expect. 2. Progress of Level 5 Plan Work is continuing to make significant and sustained changes and improvements to the whole unscheduled care pathway to ensure that patients are seen promptly, safely and efficiently. In December, a new standard operating procedure was agreed between BSUH and SECAmb for ambulance handovers at the RSCH in Brighton. This was reviewed two-weeks after implementation and to date a significant improvement in handover times between SECAMB and ED at RSCH has been seen. In February, it is proposed that medically expected patients and patients assumed to be destined for medical admission will be streamed from the front door to Zone 2b, which will facilitate review and ward rounds by the medical team; the time that a patient spends in Page 2 of 9

Zone 2b will be measured against the national 4-hour standard. Majors patients will be streamed to Zone 2a. The Surgical Assessment Unit (SAU) is functioning seven-days-a-week but is not yet operational on a 24/7 basis. A revised design for SAU has been developed, however an alternative location has yet to be found for the Rapid Assessment Clinic for Older People (RACOP) which is currently located within the SAU. Work has continued on the re-design of the Urgent Care Centre (UCC) to significantly improve both patient flow and patient experience; a final design for the UCC is close to being agreed and it is anticipated that works will commence in early 2016. Work will also shortly be starting on the re-design of the ambulance entrance at RSCH to establish additional assessment cubicles. A new daily acute floor meeting is being introduced in February at which senior clinicians and nurses from all the acute floor specialties will meet to discuss a plan for the day and highlight any particular problems, issues or challenges. This will also facilitate more collaborative cross-speciality team working on the acute floor. 3. Right Care, Right Place, Each Time The multidisciplinary project team - led by Dr Sarah Doffman, Clinical Director for Specialist Medicine - continues to rollout Right Care, Right Place, Each Time across the Trust and by December roll out of the programme has extended to 21-wards across the organisation. The remaining wards and directorates will be completed by the end of January. At the end of December 2015, there was a significant improvement in the number of early patient discharges, which created better patient flow with most wards having empty beds on a daily-basis. This has had a positive impact on the national four-hour performance standard. Average length of stay has also fallen across all clinical areas and this was accompanied by an improvement in the stranded patient metrics; this has had an impact on community bed availability as patients have needed less rehabilitation as inpatients as a result of reduced deconditioning. Christmas proved to be a difficult period for sustaining the improvements in patient flow, however the on-going commitment, dedication and focus from all members of the MDT to undertake daily board rounds has enabled the Trust to recover sooner than in the same period in previous years. The project group continues to support innovative ways of working, for example the use of pharmacy technicians and prescribers in clinical areas. Work is underway on the implementation of a discharge planning tool and use of the whiteboards, which are due to go live in February. 4. Single-Clerking Process In early February, further changes will be introduced to the existing multiple-clerking process, which is inefficient and causes delays. A new single-clerking process will be implemented on the acute floor and this will have a number of benefits including a decision Page 3 of 9

to admit being made much sooner, a better experience for patients who are currently asked the same repeated questions during the current clerking process, and a better experience for junior doctors. A new standard operating procedure and associated documentation for single-clerking have been drafted and agreed by senior representatives of the key specialties and successfully piloted over the Christmas period. It is proposed to implement this new way of working in February to coincide with the change-over of junior doctors. 5. Specialty Medicine Site Reconfiguration In January changes were made to the configuration of wards within the Barry Building to improve the standard of care given to patients, to help improve patient flow, and strengthen the clinical directorate leadership structure and capacity. Baily Ward relocated to Bristol Ward to become the Diabetes, Endocrine, General Medicine Ward (19 beds) Bristol Ward relocated to Bailey Ward to become Care of the Elderly Ward, Acute Complex Discharge ward (14 beds) Baily ward will become the new complex discharge ward taking over this function from Overton ward once works have been completed on Overton to enable acutely unwell patients to be cared for there. 6. Emergency Care Improvement Programme (ECIP) The Emergency Care Improvement Programme (ECIP) is a clinically led programme that offers practical help and support to the 27 urgent and emergency care systems across England that are under the most pressure. It supports rapid and sustained improvements in quality, safety and patient flow. The programme focuses on improving care for patients, with a particular focus on improving system performance across the winter months, when emergency departments are working under additional pressure. The success of ECIP will be measured against better patient outcomes and experience as well as improvements to the emergency care 4-hour waiting time standard. ECIP is providing additional clinical support in ED whereby an ED Consultant and an Acute Physician from the ECIP team are reviewing some of the Trusts ED and acute pathways. Also a member of the ECIP team is working with the Trust to help develop our escalation trigger tool and escalation policy. Senior clinical staff have received a presentation showing the approach to escalation taken by another Trust. This used readily available real-time information to identify points at which action was required to avoid deterioration in the smooth flow of patients through the organisation. In effect this simple tool provides an early warning and triggers specific actions by identified individuals. As a result of this presentation BSUH is receiving support to develop its own version; working with its Clinical and Managerial team. An initial version will be launched in February with an expectation of further development during the year. Page 4 of 9

6. ED Performance & Challenges 6.1 Revised 4-hour Standard Trajectory Please refer to Appendix 1. 6.2 12-hour Breach Position The validated 12-hour breach position for the period 1 May to 31 December 2015 is as follows: Month May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct -15 Nov-15 Dec-15 12-hour breaches (validated) 13 4 3 10 2 34 2 0 6.3 12-hour Breach Analysis (November - December 2015) There were two 12-hour breaches for the month of November with both occurring at the RSCH. The validation of the breaches was undertaken by the Matron for the ED and an ED Consultant. The review of the patient s notes post breach identified that one was as a result of no capacity in the Trust to accommodate the patient and the second patient breach was for clinical reasons i.e. a patient whose condition was deteriorating and required further resuscitation. There were no reported 12 hour breaches for December. 6.4 New 12-hour Breach Policy The Trust is a significant outlier nationally in the numbers of patients who wait in the Emergency Department for more than 12-hours after a decision that they should be admitted. Whilst significant effort has historically been applied to avoid such excessive delays, there has not been a systematic approach to notify senior staff of delays for specific patients, nor of mobilising external resources. As a result, the Trust has put into place a new process from 13 January, whereby Directorate Clinicians and Managers will be notified of patient delays well before the patient has been delayed by 12-hours. If the Directorate is unable to resolve the issue causing the delays, then further escalation takes place to senior management with regular updates. At 10-hours CCG senior staff are informed, who will escalate to NHS England. All will receive regular updates until the issue is resolved. All 12-hour delays are subject to a Root Cause Analysis and are reported to NHS England through established procedures. 6.5 SECAmb Handover Trajectory Performance against the Ambulance Handover Standards deteriorated over the Bank Holiday period as a result of poor flow in the Hospital. This results in patients being held in the cohort area managed by Ambulance Staff. There remains in place an agreement regarding the supervision and management of these patients jointly by SECAmb and our own clinical staff such that safety can be maintained. In recent Page 5 of 9

days the Trust has begun recovering from the effect of the Bank Holidays with improved flow. As a result there have been fewer and shorter delays to ambulance handover. 6.6 RSCH ED Challenges Attendance at the front door of RSCH appears flat, and in keeping with expected seasonal variation: o o Average attendances in the UCC for December were 640 per week compared to 680 per week for November. Average attendances in the Main ED for December were 920 per week compared to 893 per week for November. The restrictions on using agency nursing staff have created additional challenges for the department i.e. managing high ED attendances and caring for those patients conveyed by ambulance. There have been times when the department has been up to 5-trained staff down, which has impacted on the service being able to cover all areas of the ED and in particular the area designated as the cohort. The flow out of the department continues to be a challenge, which is directly linked to the low number of daily discharges and discharges which happen later in the day. The Trust has invoked the Full Capacity Protocol at times of extremis. There are some specialty review time issues which the Acute Floor Directorate are addressing and the planned reconfiguration and pathway changes will facilitate a more timely response and review of patients. Overall, Trust 4-hour performance remains a challenge, and sits at 85 86%. Detailed analysis shows the major contributing factor for this admitted patients breaching in the early evening and then at 22.00 hours, when the hospital runs out of in-patient beds. The RSCH 4-hour performance as an average for December was 82%. The UCC maintained over 95% for December with achievements of over 99% as the average for some weeks. There are efficiencies that need to made within processes owned by ED, such as timely return of blood tests, and these form part of the work within the Acute Floor project to clarify these marginal gains and improve efficiency. There are middle grade medical staff issues within the ED resulting in gaps in rotas which are covered by ED Consultants and by increasing SHO cover using locum agencies. The middle grade issues are national and the ED and Acute Floor Directorate are working on new ways of working to cover the needs of the department. Page 6 of 9

The ED is down by 6 WTE Consultant posts. The Consultant rotas are covered until February and the service has advertised for vacant posts. To ensure core shifts are covered, the service has realigned Consultant shifts on Mondays and Fridays to support pre and post weekend demand challenges on both Trust sites. There has been some interest in the locum Consultant and substantive consultant adverts and the department is to interview for Clinical Leads for both the RSCH and PRH with applicants for both posts. 6.7 PRH ED Challenges PRH attendances are slowly increasing, both walk-in and ambulance attends. The average weekly attends in December were 683 per week. The performance for December was on average 92%. This is a drop from the performance which was sustained for November 2015. The 3 days post- Christmas saw 50 4-hour breaches due to acuity and bed availability for medicine. ED medical staffing is an issue with shift times and seniority with an ED Consultant led service from 09.00am to 05.00pm, Monday to Sunday. Detailed analysis has demonstrated the need for additional ED medical workforce presence to support the continued high attendances in the evenings. This has in part been addressed by the introduction of GPs into the department to support what is deemed to be primary care work in a similar model to that in the UCC at the RSCH. In addition, the department now has an ED SHO covering the period of 04.00pm until 02.00am. As detailed above in the RSCH challenges, the reduced ED Consultant numbers will have an impact on the ability to staff the ED at PRH with Consultants and plans/models are being worked through to ensure that there is appropriate support for the service. Medical reviews overnight are also an issue, yet to be fully resolved due to the difficulty in filling the Medical Registrar rota at PRH but there has been a slight improvement in December due to escalation. The service is working closely with the children s directorate to ensure a high standard of paediatric safety is maintained following new identification of potential risks. PRH attendances are slowly increasing, both walk in and ambulance attends. Staffing is an issue, both in terms of shift times and specialty. Detailed analysis has demonstrated the need for evening work, and also Primary Care presence. To that end the Rapid Access Medical Unit (RAMU) is being transformed into a minors service with Primary Care, Acute Medicine, ENP and HRDT function, all allied with streaming at the front door. Page 7 of 9

7. Junior Doctors Industrial Action All clinical directorates put in place plans to ensure they were able to continue to deliver their critical activities and maintain patients safety during the strike action on the 12 January. A command and control structure was put in place and the HICC (Control Room) was set up for the day. Because of this planning the Junior Doctor s Strike on the 12 January did not impact on patient safety and disruption to patients was kept to a minimum. The largest impact was on out-patient activity where patients had their appointments rescheduled for non-strike dates. The strike planned for 26 th to 28 th January has been suspended, however planning continues for the full walk-out on the 10 February. Command and control and the HICC (Control Room) will be instigated for the ensuing strike dates and the Communications Team will liaise with staff and the public regarding the strike. A debrief questionnaire has been sent out so that we can incorporate any learning from the strike on the 12 January into planning for subsequent strike dates. 8. Recommendation The Board is asked to note the report and the on-going work to make sustained improvements to the urgent care pathway; performance against the four hour Accident and Emergency standard; and the challenges and risks to performance. Dr Mark Smith Chief Operating Officer January 2016 Page 8 of 9

Appendix 1: Revised 4-hr Standard Trajectory Christmas week NYE week Red columns indicate last year s performance against the same period (Like for Like comparison) Page 9 of 9