GREEN BUILDING PROGRAM. Technical Update: Variance Application. Technical Update Variance Application Guideline 1

Similar documents
INFORMATION BULLETIN OPERATING PERMITS

LEED Canada Certification Process

INTRODUCTION. Organization Description

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Transposition of Aviation Directive. Aviation in EU ETS Workshop 30 June 2009

Use of External Consultants

Alberta Indigenous Energy Efficiency (Retrofit) Program Guidelines

APPLICATION PROCEDURE TO OPERATE A COMMERCIAL CANNABIS BUSINESS IN CULVER CITY

MUNICIPAL LEADERS FORUM WORKING GROUP TEMPLATE FOR THE SUBMISSION OF BEST PRACTICES TOOLKIT FOR THE GTA CONTEXT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO

Child Care Program (Licensed Daycare)

Owner s Project Manager Selection

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico

BROWNFIELDS TAX ASSISTANCE / REHABILITATION GRANT PROGRAM GUIDE

ONE ID Alternative Registry Standard. Version: 1.0 Document ID: 1807 Owner: Senior Director, Integrated Solutions & Services

GREEN BUILDING PROGRAM UPDATE

Alberta Indigenous Climate Capacity Program Guidelines

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

Fair Registration Practices Report

BRITISH VIRGIN ISLANDS FINANCIAL SERVICES COMMISSION

Mayor s Matching Grant Application for Neighborhood Organizations

Disabled & Elderly Health Programs Group. August 9, 2016

THE. BUILDING STANDARD Certification Guidebook January 2017

TAX ABATEMENT FOR INDUSTRIAL REAL AND PERSONAL PROPERTY, OWNED OR LEASED CITY OF WACO GUIDELINES AND POLICY STATEMENT

EXHIBIT A CITY OF DENTON POLICY FOR TAX ABATEMENT AND INCENTIVES

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

Alberta Greenhouse Rebate Program (AGRP) Terms and Conditions

Attention Design Firms

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects

REMOVING LICENSURE IMPEDIMENTS FOR MILITARY SPOUSES BEST PRACTICES

Low-Carbon Building Skills Training Fund for Ontario Non-College Training Delivery Agents

Joint Operational Programme Romania Republic of Moldova

Applicant Information Booklet

Attention Design Firms

Practice Review Guide

MINISTRY OF HEALTH AND LONG-TERM CARE. Summary of Transfer Payments for the Operation of Public Hospitals. Type of Funding

New York Main Street Program (NYMS) 2014 NYS Consolidated Funding Application. Housing Trust Fund Corporation Office of Community Renewal

PEER REVIEW (AN OVERVIEW)

INDUSTRIAL ENERGY OPTIMIZATION PROGRAM

REQUEST FOR PROPOSALS FOR PENSION ADMINISTRATION AND FINANCIAL SYSTEMS CONSULTING SERVICES

REQUIRED DOCUMENT FROM HIRING UNIT

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL)

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS

HANDBOOK FOR THE INDIGENOUS ECONOMIC DEVELOPMENT FUND. January 2018

CITY OF WACO GUIDELINES AND POLICY STATEMENT TAX ABATEMENT FOR REAL AND PERSONAL PROPERTY

Proposal Submission Guidelines

Agricultural Energy Program Grant

Draft Health Practitioner Regulation National Law Amendment Paramedic specific clauses

Chester County Vision Partnership Grant Program January 2017

PROGRAMMES IMPLEMENTATION PLATFORM (PIP)

Okla. Admin. Code 340: : Purpose. Okla. Admin. Code 340: : Definitions [REVOKED] Okla. Admin.

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

COUNTY OF LOS ANGELES INTERNAL SERVICES DEPARTMENT OPEN COMPETITIVE JOB OPPORTUNITY

Request for Proposals

Capital Plan Instructions: Five-Year Capital Plan Submission for 2019/20

4.07. Infrastructure Stimulus Spending. Chapter 4 Section. Background. Follow-up to VFM Section 3.07, 2010 Annual Report. Ministry of Infrastructure

Draft Community Outreach Plan for the Climate Action Plan Update

Application for Registration Information Sheet

REQUEST FOR PROPOSALS WASHINGTON STATE MICROENTERPRISE ASSOCIATION. Microenterprise Project Grants. Notification: December 2, 2009

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

GLOBAL CARBON TRUST VERIFICATION MANUAL. v Global Carbon Trust - All rights reserved

REQUEST FOR PROPOSALDevelopment of a Local

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

BULLETIN NO. 2. Planning Department Priority Application Processing Guidelines PLANNING DIRECTOR.

ACCREDITATION OPERATING PROCEDURES

Local Government Energy Audit (LGEA) Program Program Guide. Fiscal Year 2018 (7/1/2017 through 6/30/2018)

School Counselor Corps Grant 2014 Pursuant to: through C.R.S. Colorado Department of Education

Commercial & Industrial (C&I) Local Government Energy Audit (LGEA) Program Program Guide. Fiscal Year 2017 (7/1/2016 through 6/30/2017)

Southface LEED for Homes 2017 Quality Assurance Plan

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

Forest Enhancement Society of BC Guide to submitting a proposal in the FESIMS.

Thomas McGuire, TSS Program Administrator

LOW-CARBON INNOVATION FUND (LCIF) Program Guidelines

REQUEST FOR PROPOSAL AUDITING SERVICES. Chicago Infrastructure Trust

FINAL SECTION 501(r) REGULATIONS FOR CHARITABLE HOSPITALS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

1. Text in red are additions. 2. Text high-lighted in yellow with strikeout are deletions.

Request for Proposals. Housing Study Consulting Services. Proposals DUE: January 6, City of Grandview. Economic Development Department

microfit FAQ Version 4.1

Hospital Energy Efficiency Program Program (HEEP) Overview for Presentation to LHINs and Health Service Providers

Local Energy Challenge Fund

Issued: Thursday, October 15, City of Grand Blanc, 203 E. Grand Blanc Road, Grand Blanc, MI 48439, Attn: Bethany Smith, City Clerk

CASE-BY-CASE REVIEW PROGRAM (CBCRP) CASE-BY-CASE REVIEW POLICY FOR CANCER DRUGS

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

Practice Review Guide April 2015

Request for Proposal for: Financial Audit Services

ADDENDUM IV APPLICATION EXHIBIT CHECKLIST FOR MULTI-FAMILY HOUSING MSHDA DIRECT LENDING PROGRAMS

CREDENTIALING PROCEDURES MANUAL MEMORIAL HOSPITAL OF SOUTH BEND, INC. SOUTH BEND, INDIANA

UCF SOLAR FARM-UCF 584 Solar Developer Project Fact Sheet

Discretionary Grants: Call for Applications for Non-Governmental Organisation (NGOs) to upskill their employees in short skills programmes

25/02/18 THE SOCIAL CARE WALES (REGISTRATION) RULES 2018

Questions and Answers

Generator Replacement at the Garden River Power Plant

TOWN AUDITING SERVICES

efficiencypei 31 Gordon Drive PO Box 2000, Charlottetown Prince Edward Island C1A 7N8 Toll free:

Scheme of ICT Pilot Projects for Rural Areas

Directive for the Austrian JI/CDM Programme

CLASS 6B APPLICATION AND REQUIREMENTS

Transcription:

GREEN BUILDING PROGRAM Technical Update: 2017-07-11 Variance Application Technical Update 2017-07-11 Variance Application Guideline 1

GREEN BUILDING PROGRAM GUIDELINES The Green Building Program (GBP) Guideline for Variance Application was developed by the Green Building Co-ordination Team (GBCT). The guideline is intended to assist building owners, government organizations and project teams interpret and apply the green building program criteria. The guideline supplements other resources and should not be considered the primary source of information on the subject. Information in the guideline is only intended to provide background, resource and guidance to support implementation of the Green Building Program criteria. Technical Update 2017-07-11 Variance Application Guideline 2

VARIANCE APPLICATION GUIDELINE How to Complete the Variance for Commercial & Institutional Building Projects There may be circumstances when the full scope of the Green Building Program (GBP) cannot be practically applied to a project. In those cases a Variance should be requested. The GBP form titled Variance for Commercial & Institutional Buildings must be submitted prior to the start of design development in order to be considered by the Green Building Coordination Team (GBCT). The GBCT reserves the right to deny variances that are requested past this point. In order for a Variance to be reviewed by the GBCT, the following information must be provided for all requests: 1. Complete Green Building Program Form: Variance for Commercial & Institutional Buildings. a. If requesting a Variance for Energy Efficient Design, refer to: Section 1 How to Request a Variance for Energy Efficient Design, provided below. b. If requesting a Variance for Environmental Impacts, refer to: Section 2: How to Request a Variance for Environmental Impacts, provided below. c. If requesting a Variance for Commissioning, refer to: Section 3: How to Request a Variance for Commissioning, provided below. 2. Provide a clear and detailed explanation of why the GBP verification requirement cannot be satisfied. 3. Propose an alternative compliance path that meets the intent of the GBP verification requirement. Section 1: How to Request a Variance for Energy Efficient Design When preparing your variance request narrative, consider the following questions: 1. What is the the unique nature of the building that makes the energy target difficult to achieve? Include specific details relating to building envelope, mechanical or electrical requirements of building type that reduce potential for energy savings. 2. What basic energy saving strategies are included in the design? For example, how does the design meet all the Manitoba Energy Code for Buildings (MECB) and what has it done to go above and beyond the MECB. 3. Is the proposed energy target meeting the intent of the Green Building Program criteria and M.R. 38/2013? Provincially owned and funded buildings are required to achieve the GBP energy efficient target of 10% more efficient than the MECB in order to lower utility bills and reduce greenhouse gases throughout the building s service life. Designs that only comply with the MECB and do not provide additional energy savings do not meet the GBP criteria. Technical Update 2017-07-11 Variance Application Guideline 3

4. If the project is not able to achieve Power Smart Designation what is the alternate means identified to verify the proposed energy savings? Please note that since energy efficiency verification is required by Manitoba Green Building Regulation M.R. 38/2013, any variance for energy efficiency that is not at least 10% better than the MECB will require exemption from the Minister responsible for the Manitoba Climate Change and Emissions Reductions Act. The request will be forwarded to the Minister by the GBCT and no response can be given regarding the variance until the Minister has ruled on the issue. Section 2: How to Request a Variance for Environmental Impacts For projects requesting a variance to LEED Silver Certification, a detailed narrative is required outlining why certification is not possible. The narrative should identify clear reasons why LEED is not appropriate. The following situations individually are not enough to qualify for a variance. However, if two or more situations are combined the project may have a valid case for not pursuing LEED certification. Please identify in your narrative which of the following challenges the project faces and provide details as described: Cost the project budget is less than $4,000,000. o Provide a breakdown of costs for any fees that would be additional to achieve LEED (registration, documentation, certification, etc.) Size the project size is close to the 600 m2 threshold o Explain why the size limits LEED credit achievement and specify which credits are unattainable. Location the project is located in a rural area o Identify each credit that cannot be achieved and provide supporting rationale. Refer to Credit Interpretation Rulings from the CaGBC to ensure there has not been a precedent that overcomes this specific barrier. Building type unique nature of building type o Identify each credit that cannot be achieved and provide supporting rationale. Other the project is facing extraordinary circumstances that will impede successful LEED certification. Note that a tight project timeline is not considered to be an extraordinary circumstance. For All: Provide a summary of the LEED review (including a draft scorecard) which demonstrates how the project team reached the conclusion that variance would be required. The summary should be provided for all variance requests including those seeking variance to Green Globes or alternate reporting systems. Technical Update 2017-07-11 Variance Application Guideline 4

In addition, provide the following: If you propose to achieve LEED Certified Provide a detailed breakdown of the anticipated LEED credits. For credits not being pursued, provide rationale to explain why particular credits are not achievable or appropriate for the project. If you propose Green Globes Certification A case must be made clearly illustrating why Green Globes is the more appropriate certification program for the project. Note that Green Globes is not an automatic equivalent to LEED certification and still requires variance approval. A preliminary Green Globes Assessment is required with the submission indicating how the three globes will be achieved. If you propose Green Building Reporting Provide a detailed outline illustrating the types and timing of reporting that will be provided in lieu of LEED certification. Key information that should be included in narrative includes: Identification of a key person on the project team who will review all environmental measures during design and construction. This individual will be required to complete a declaration stating the information submitted to the GBCT is complete and meets the intent of the Green Building Program. Confirmation that all mandatory Green Building Program Criteria and any recommended criteria identified on GBP Form 1 will be incorporated into design and will be verified through Green Building Reporting. Procedures for verification of Green Building Program Criteria throughout design and construction. This should include timing of any review and inspections as well as describe what reporting is required at each stage and who it will be distributed to. Description of what will be included in the Final Green Building Report to be submitted to the GBCT. Section 3: How to Request a Variance for Commissioning Provide detailed explanation of why hiring an independent commissioning professional is not appropriate for the project. Identify the alternate commissioning professional and their qualifications. Detail the scope of work to be performed and ensure it satisfies the activities required by Guideline 3.5. Technical Update 2017-07-11 Variance Application Guideline 5

Was Green Building Form: Variance for Commercial & Institutional Buildings submitted prior to Design Development? NO YES Have you provided evidence of an extraordinary circumstance explaining why the Variance could not be requested earlier? YES Does the submission include a clearly laid out an explanation of why the Green Building Program verification requirement cannot be met? NO Provide additional information on why Variance is required NO YES Information Included Variance is Denied Does the submission propose an alternative compliance route that meets the intent of the GBP Verification Requirement? NO Provide additional information on how intent of GBP Verification Requirement will be met YES Information Included Which GBP Verification Requirement is Variance Request for? Energy Efficient Design Environmental Impacts Commissioning Does unique nature of building make energy targets difficult to achieve? See Next Page Does the budget not allow for an independent commissioning professional? Have basic energy savings strategies been included in the design? Are there no commissioning professionals available due to remote location? Has a clear energy target been proposed and does it meet the intent of the GBP Criteria? Is there a valid reason why using a member of the design team for commissioning is the best course for the project? Has an alternate energy verification method been identified? If GBCT confirms yes to all questions, Variance Request will proceed. If the proposed Energy Target is not as efficient as 10% better than MECB Variance will move to Ministerial Exemption If not, Variance is Denied If GBCT agrees that case has been made based on the above criteria then Variance Request will proceed. Technical Update 2017-07-11 Variance Application Guideline 6

Environmental Impacts Is there a valid reason why LEED is not appropriate choice (2 or more criteria are needed see page 3-35) Project has provided narrative outlining why LEED Silver Certification is not possible Project has provided LEED review including scorecard demonstrating how requirements for Variance Request was determined. Lower LEED Level Green Globes Green Building Reporting Project has provided detailed LEED Scorecard providing explanation for credits not being targeted for project Project has provided summary of targeted Green Globes points Identify key person for verification of green measures during design and construction Narrative provided detailing comparison of LEED Review and Green Globes review Identify types and timing or reporting through design and construction Clear rationale provided indicating why Green Globes is more appropriate choice for project Summary outline of GBP Final Report that will be provided to GBCT If GBCT agrees with case has been made based on the above criteria then Variance Request will proceed If not, Variance is Denied Technical Update 2017-07-11 Variance Application Guideline 7

GBCT Response to Variance The GBCT may request further information if your submission is deemed incomplete. If the requested information is not provided within 30 days the GBCT may deny the Variance request. Once a complete Request for Variance is received from a project team, the GBCT will review the information and provide a response. If the proposed Variance is accepted the Director will sign the Variance Form and specify the reporting requirements for the project in a Variance Response Letter. If the Variance is not accepted the project can reapply for an alternate variance or move to full compliance. If a non-approved variance path is pursued, the project will be deemed to be noncompliant with the Green Building Program and your provincial funding authority will be notified. Frequently Asked Questions: 1. What assistance can I request from the GBCT? The GBCT is available by email, phone or in person to discuss project details, challenges, and variance options. We are also available to attend IDP sessions, site meetings, and site visits to support the project. 2. We are in schematic design and anticipate receiving provincial funding but it hasn t been confirmed yet, can we apply for a variance? GBCT cannot provide a binding variance response on an unfunded project at this time, however if the project team wishes to provide the information required to request a variance GBCT will provide an interim opinion on whether the variance would be accepted. Once funding is confirmed, the GBP Variance Form would be required and the GBCT would review it along with the interim opinion. If the scope of the project is the same the variance ruling will be in line with the interim opinion. However, if the project has undergone significant changes of scope, design, budget, etc. the interim opinion is not valid and GBCT will conduct a new variance review and provide a response accordingly. Technical Update 2017-07-11 Variance Application Guideline 8