DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC

Similar documents
DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC

Civil Works Process Overview

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Update on USACE Civil Works Program Authorities, Policies, and Guidance

Distribution Restriction Statement Approved for public release; distribution is unlimited.

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

Department of the Army U.S. Army Corps of Engineers Washington, DC

Pawleys Island Nourishment Project

NORTH ATLANTIC COAST COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT FIVE TO COOPERATIVE AGREEMENT. between

Regulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS

WIFIA 2014 Listening Session. Chicago, IL July 22, 2014

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

SENATE, No. 123 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Interagency and International Services Division

Sabine Pass to Galveston Bay, Texas

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN

MEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK

Department of Defense DIRECTIVE

DEPARTMENT OF THE ARMY. JAN -i '2018 MEMORANDUM FOR THE COMMANDING GENERAL OF THE U.S. ARMY CORPS OF ENGINEERS.

Report to Congress on Distribution of Department of Defense Depot Maintenance Workloads for Fiscal Years 2015 through 2017

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C

U.S. Army Corps of Engineers Navigation Program Update

DEPARTMENT OF THE ARMY ER U. S. Army Corps of Engineers CERM-B Washington, DC Regulation No November 2001

H. R. ll [Report No. 115 ll]

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

URBAN & COMMUNITY FORESTRY HURRICANE KATRINA FINANCIAL ASSISTANCE PROGRAM

Project Management Plan (PMP) Park Ranger Community of Practice

STATE OF NEW JERSEY. SENATE, No SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO. with committee amendments DATED: NOVEMBER 9, 2015

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET NW WASHINGTON, D.C

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

United States International Development Cooperation Agency

Department of Defense DIRECTIVE. Inspector General of the Department of Defense (IG DoD)

[Second Reprint] SENATE, No. 123 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

EXECUTIVE SUMMARY. OBJECTIVE: To award Bid No to for Naples Berm Restoration to Eastman Aggregate in the amount of $946,

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District

Mike Chard Paul Eller

SENATE, No. 876 STATE OF NEW JERSEY. 218th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2018 SESSION

THE BROOKINGS INSTITUTION

CITY OF LAREDO Environmental Services Department

Alabama Coastal Area Management Program Strategic Plan

Nursing Facility Policy Changes in 2009 Legislation

Engineer Troop Unit Construction in Connection with Training Activities

BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY

f. Methodology for Updating Benefit-to-Cost Ratios (BCR) for Budget Development (CWPM ) (draft);

REVIEW OF DECISION DOCUMENTS

MEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK

Hopper Dredge Recapitalization

CONTRACT FOR THE PROVISION OF MUNICIPAL ENGINEERING CONSULTING SERVICES TO THE CITY OF AVON, OHIO

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Engineering and Design CORPS-WIDE CENTERS OF EXPERTISE PROGRAM

MEMORANDUM FOR Staff Principals, HQUSACE, Commanders/Directors, USACE Commands

THE UNDER SECRETARY OF DEFENSE WASHINGTON, DC

New Orleans Hurricane and Storm Damage Risk Reduction System Update

COMMUNITY DEVELOPMENT BLOCK GRANT- DISASTER RECOVERY ORIENTATION WEBINAR PRESENTED BY: HEATHER MARTIN

SOUTHERN APPALACHIAN MOUNTAINS COOPERATIVE ECOSYSTEM STUDIES UNIT. AMENDMENT FOUR TO COOPERATIVE and JOINT VENTURE AGREEMENT.

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

IC "Disaster" Sec. 1. As used in this chapter, "disaster" has the meaning set forth in IC As added by P.L , SEC.5.

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Army Programs CIVIL WORKS EMERGENCY MANAGEMENT PROGRAMS FINANCIAL MANGEMENT PROCESS

DOD INSTRUCTION STATE PARTNERSHIP PROGRAM (SPP)

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Hancock County Long Term Recovery CDBG Disaster Recovery Program

CONVERSION OF CERTAIN FUNCTIONS FROM CONTRACTOR PERFORMANCE TO PERFORMANCE BY DEPARTMENT OF DEFENSE CIVILIAN EMPLOYEES (SEC. 938)

ASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

ALTERNATIVE SOURCES OF FUNDING FOR

Public Law th Congress An Act

CRS Report for Congress

Florida CDBG DR Action Plan Disaster Recovery. Stakeholder Session 3

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DIVISION, GREAT LAKES AND OHIO RIVER CORPS OF ENGINEERS 550 MAIN STREET CINCINNATI, OH

What is a Cooperative Agreement?

Department of Defense INSTRUCTION. Acquisition, Management, and Use of Non-Tactical Vehicles (NTVs)

INSPECTOR GENERAL DISTRICT FLORIDA MANAGEMENT WATER SOUTH. Invites your interest in the position of:

U.S. Army Corps of Engineers Navigation Program Update

CONTEXT FOR ANSWERING THE QUESTIONS: WHY DO WE HAVE TO DO VE? WHO HAS AUTHORITY OVER VE? THE CUSTOMER WON T PAY FOR VE!

The Louisiana Road Home Program: Federal Aid for State Disaster Housing Assistance Programs

Alteration of Bridges

Department of Defense INSTRUCTION

Disaster Relief in the US and Its Territories

Implementing the Water Resources Development Act of 2007

CHAPTER 20: DISASTER RECOVERY (CDBG-DR)

PACIFIC NORTHWEST COOPERATIVE ECOSYSTEM STUDIES UNIT. AMENDMENT FOUR TO COOPERATIVE and JOINT VENTURE AGREEMENT. between

Department of Defense DIRECTIVE. a. Establishes policy and assigns responsibilities for DSCA, also referred to as civil support.

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CEHR-E Washington, D. C

Department of Defense INSTRUCTION. DoD Policy for Congressional Authorization and Appropriations Reporting Requirements

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

HOUSE OF REPRESENTATIVES BUY AMERICAN AMENDMENTS TO THE FY 2004 DEFENSE AUTHORIZATION BILL

Company Profile Phillips & Jordan, Inc. Key Markets

NORTH AND WEST ALASKA COOPERATIVE ECOSYSTEM STUDIES UNIT. AMENDMENT TWO TO COOPERATIVE and JOINT VENTURE AGREEMENT. between

Mississippi Development Authority. Katrina Disaster Assistance Program. Modification # 17 Program Funding Allocation. CDBG Disaster Recovery Program

REVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study

Subj: DEPARTMENT OF THE NAVY COUNTER-NARCOTICS CENTRAL TRANSFER ACCOUNT SPENDING POLICY

BOCC POLICY: SECTION NUMBER COUNTY COASTAL CANAL GRANT PROGRAM EFFECTIVE DATE: February 15, 2017 SUPERSEDES:

DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON, DC

Department of Defense DIRECTIVE

November 20, 2017 PUBLIC NOTICE

Hurricane Phoenix A Storm Recovery Tabletop Exercise Situation Manual Disaster Housing

Transcription:

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC 20310-0108 MAY t 1 201S MEMORANDUM FOR THE DEPUTY COMMANDING GENERAL FOR CIVIL AND EMERGENCY OPERATIONS SUBJECT: Transmittal of Bipartisan Budget Act of 2018 (Public Law 115-123) Policy Guidance Memorandum - Flood Control and Coastal Emergencies (FCCE) Enclosed is subject guidance which defines full project profile for authorized Coastal Storm Risk Management Projects, as directed by Public Law 115-123, and provides clarifying instructions regarding subsequent Public Law 84-99 eligibility determinations. Assistant Secretary of the Army Civil Works Enclosure Pnnted on Recycled Paper

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC 20310-0108 SUBJECT: Bipartisan Budget Act of 2018 (Public Law 115-123) Policy Guidance Memorandum - Flood Control and Coastal Emergencies (FCCE) 1. References: a. Bipartisan Budget Act of 2018 (Public Law 115-123), Division B, Subdivision 1, Title IV. b. Engineer Regulation 500-1-1, 30 September 2001, Civil Emergency Management Program. c. Engineer Pamphlet 500-1-1, 30 September 2001, Civil Emergency Management Program - Procedures. d. CECW-HS Memorandum, May 30, 2017, Subject: Implementation Guidance for Section 3029(a)(2) of the Water Resources Reform and Development Act (WRRDA) of 2014, Emergency Response to Natural Disasters; Repair or Restoration of Coastal Storm Risk Management Projects to Design Level of Protection. 2. General Direction: a. The Bipartisan Budget Act of 2018 (Public Law 115-123) (Reference 1.a.) provides supplemental funding for the U.S. Army Corps of Engineers in the Flood Control and Coastal Emergencies appropriation. It appropriates $810,000,000 in FCCE funds to implement certain USACE-wide activities. Public Law 115-123 further directs that authorized shore protection projects, hereinafter referred to as Coastal Storm Risk Management projects (CSRM), that are funded with Public Law 115-123 funds, be restored to the full project profile at full Federal expense. b. The standard requirements in References 1.b., 1.c., and 1.d will be followed except as noted in this guidance. c. Rehabilitation of eligible CSRM projects, using Public Law 115-123 FCCE funds, will be restored to the full project profile at full federal expense. Full project profile is defined as the authorized beach profile of the project in a fully renourished state. d. Additional Procedures. For the CSRM projects funded with Public Law 115-123 funds, the following procedures will be applied:

SUBJECT: Bipartisan Budget Act of 2018 (Public Law 115-123) Policy Guidance Memorandum - Flood Control and Coastal Emergencies (FCCE) (1) For CSRM projects with previously approved Project Information Reports (PIR) prepared in accordance with references 1.b., 1.c. and 1.d., the district will prepare a PIR addendum. The addendum will document the additional work necessary to bring a project from its design profile (defined in Reference 1.d.), to the full project profile (defined in Paragraph 2.c.), the cost requirements thereof, and the adjusted construction schedule. The addendum will also address any other items or conditions that have changed since submission of the original PIR. In addition, the economic analysis from the PIR will be reviewed to confirm that the Benefit to Cost Ratio for all work is greater than 1.0, and a statement of confirmation will be included in the MSC approval memorandum for the addendum. PIR addendums will be coordinated with district and division counsel for legal sufficiency and with CECW-HS prior to approval. Based on current delegation, the approval authority is the division commander. (2) For a CSRM project without a previously approved PIR, the district will prepare a PIR for transmittal through the division to HQUSACE (CECW-HS) for approval. In addition to the information required generally, the PIR will specifically address the damages from the storm, and clearly specify the increment of work necessary to restore the project from the design profile to the full project profile. (3) Cooperation Agreement. District Counsel will determine if the existing Project Partnership Agreement for the project sufficiently protects the interests of the Government for the CSRM project rehabilitation to be undertaken. Based on that determination, procedures set out in paragraph 4.b. of Reference 1.d. will be followed. 3. All work that involves contractor dredging will be entered into the USACE Dredging Information System (DIS). The DIS will be used to advise the dredging industry of upcoming work to promote competition and facilitate planning of industry dredge assets, as well as capture bid information and actual completion data. 2

SUBJECT: Bipartisan Budget Act of 2018 (Public Law 115-123) Policy Guidance Memorandum - Flood Control and Coastal Emergencies (FCCE) 4. Point of Contact. The technical point of contact for this guidance is Willem Helms, PL 84-99 Program Manager, at (202) 761-5909 or willem.ha.helms@usace.army.mil. The policy point of contact for this guidance is Ms. Sharron Dacosta-Chisley, Assistant for Water Resources Management, at (703)695-6789 or sharron.h.dacosta-chisley.civ@mail.mil. Assistant Secretary of the Army Civil Works 3

Public Law 115-123, Division B, Subdivision 1, Title IV "Flood Control and Coastal Emergencies For an additional amount for "Flood Control and Coastal Emergencies", as authorized by section 5 of the Act of August 18, 1941 (33 U.S.C. 701n), for necessary expenses to prepare for flood, hurricane and other natural disasters and support emergency operations, repairs, and other activities in response to such disasters, as authorized by law, $810,000,000, to remain available until expended: Provided, That funding utilized for authorized shore protection projects shall restore such projects to the full project profile at full Federal expense: Provided further, That such amount is designated by the Congress as being for an emergency requirement pursuant to section 251 (b)(2)(a)(i) of the Balanced Budget and Emergency Deficit Control Act of 1985: Provided further, That the Assistant Secretary of the Army for Civil Works shall provide a monthly report to the Committees on Appropriations of the House of Representatives and the Senate detailing the allocation and obligation of these funds, beginning not later than 60 days after the enactment of this subdivision." Encl

.. Initial c r, on st err,plate ruction Initial Construction. Renourishment (Advance Fill) = If available, 1--- ---- Construction Appropriation (either through PL 84-99 Level of Resto ation for FCCE after loss from an Fu11 ProJe c:t Profit@ PL 115-123 directed Level of Restoration for FCCE