Strategies for the Successful Prop 39 Program

Similar documents
Utility Programs and Prop 39: Recent Changes and Case Studies. Green California Schools Summit October 30, 2015

District Options in Maximizing Your Opportunity

ENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM

What s Next for Proposition 39: Beyond the Fifth Year! Anna Ferrera SEC Executive Director

Proposal Narrative - Capital Region MC3 Strategy

Higher Education Energy Efficiency Partnerships

SDG&E PROP 39 CASE STUDY CAJON VALLEY UNION SCHOOL DISTRICT

We Build Program Update & UCLA Labor Center Study Summary. Facilities Committee March 5, 2009

What s Inside... January 2013

FREQUENTLY ASKED QUESTIONS

07/01/2010 ACTUAL START

American Association of Port Authorities Environmental Improvement Awards

Southern Kern Unified School District

State Fiscal Stabilization Fund (SFSF) Grant Opportunities being pursued by California Community Colleges

Solano County Transit (SolTrans) Overall Disadvantaged Business Enterprise (DBE) Goal FFY through FFY

Efficient Buildings Fund Presentation for the Rhode Island Public Utilities Commission. Jeffrey R. Diehl Executive Director and CEO December 8, 2016

5.6 Home Energy Savings Program

Job Order Contracting: An Alternative Delivery Method

Sustainable Jersey Smal Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:

San Francisco Energy Efficiency Program Descriptions and Annual Budgets

CAMPBELL UNION HIGH SCHOOL DISTRICT

The views and opinions expressed in this presentation are those of the authors and do not necessarily reflect those of CASBO.

Energy Optimization Plan

Re: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program

ENERGY STAR OVERVIEW OF 2005 ACHIEVEMENTS

Sustainable Jersey Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:

WIB incentivize faculty to join these discussion so to educate industry on the needs (e.g., Videotape or live feed for broader access shared online

Xcel Energy Colorado DSM Roundtable Discussion. February 13, :00pm to 4:00pm 1800 Larimer, Room 03G01

Knights Ferry Elementary School District

Southern CA eziqc Contracts for HVAC ENERGY EFFICIENCY SERVICES (C 10)

AMERICAN RECOVERY AND REINVESTMENT ACT ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS REQUEST FOR APPLICATIONS (RFA)

Finding Funding for Energy Efficiency

APPENDIX F. Sector Specific Objectives

FREQUENTLY ASKED QUESTIONS FOR RFA CALIFORNIA APPRENTICESHIP INITIATIVE (CAI) PRE-APPRENTICESHIP AND ENHANCED ON THE JOB TRAINING GRANT PROGRAM

MULTIFAMILY ENERGY EFFICIENCY IMPROVEMENT PROGRAMS

Hampshire College Sustainability Revolving Fund (SURF) Application

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID NUMBER: SJCC Parking Garage LED Lighting Retrofit EVERGREEN VALLEY COLLEGE

SOLICITATION OF INTEREST

GREEN CAREER TRANSITIONS AND PATHWAYS. Massachusetts Green Career Conference October 1, 2010

Board Report No. 216-F Meeting Date: March 23, 2009 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA

Delaware Sustainable Energy Utility

A helpful tactic to achieve the strategy is to use Historically underutilized. Richmond based companies

ERIC GARCETTI MAYOR SPECIAL STUDY ITEM R121: STATUS OF ENERGY EFFICIENT RETROFIT OF CITY BUILDINGS

REGIONAL INDUSTRY CLUSTERS OF OPPORTUNITY SFP COVER/SIGNATURE PAGE AND PROPOSAL SUMMARY. Funding

Con Edison Commercial and Industrial Energy Efficiency Program

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

Competitive Cal Grants by California Community College,

DOE Request for Information (RFI) DE-FOA Weatherization Assistance Program Sustainable Energy Resources for Consumers Grants

Workforce Development, Training and Education

for the Multifamily Sector

Oakland Workforce Development Board (OWDB) Confirming Local & Regional Priority Industry Sectors

UTILITY COMPANY PROGRAMS

Port of San Diego Resiliency in Terminal Operations at Tenth Avenue Marine Terminal Renée Yarmy, Program Manager, Energy & Sustainability

Issued: April 22, Submittal Deadline Date. Friday, May 13, 2016 at 4:00 p.m.

The Board of Governors of the California Community Colleges

Request for Qualifications to Certify Qualified Providers for the Arkansas Energy Performance Contracting Program

RTR for the Targeted Process Evaluation of the Local Government Partnership Program: Final Report

CALIFORNIA ZNE SCHOOL RECOGNITION AWARDS Frequently Asked Questions (FAQs)

CALIFORNIA COMMUNITY COLLEGES CHANCELLOR S OFFICE 1102 Q STREET, SUITE 4400 SACRAMENTO, CA (916)

UC MERCED. Sep-2017 Report. Economic Impact in the San Joaquin Valley and State (from the period of July 2000 through August 2017 cumulative)

UC/CSU/IOU Energy Efficiency Partnership

What are the steps? Incentives for energy efficient buildings

Low-Carbon Building Skills Training Fund for Ontario Non-College Training Delivery Agents

Engaging Businesses Through Technical and Educational Resources

Chico Energy Pioneers Project

Ross Borden, Director of Intergovernmental Affairs. American Recovery & Reinvestment Act (Stimulus) Update

CLEAN ENERGY DEVELOPMENT FUND

SOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM REVISIONS TO MEASURE Q SMALL, LOCAL, AND DIVERSE BUSINESS PROGRAM PILOT PROGRAM

MEETING SOLE SOURCE REQUIREMENTS UNDER PROPOSITION 39 SOLE SOURCE PROCESS UNCERTAINTIES

The Evolution of a Successful Efficiency Program: Energy Savings Bid

San Francisco Public Utilities Commission WATER SYSTEM IMPROVEMENT PROGRAM PROJECT LABOR AGREEMENT. EMENT Quarter Ended March 31, 2009

Maryland Municipal League Summer Conference How to Fund Energy Projects City of Salisbury

RULES AND REGULATIONS IMPLEMENTING THE FIRST SOURCE HIRING ORDINANCE

August 9, Re: DBE Program Triennial Goal Concurrence - Recipient ID #1674. Dear Mr. Smith:

PENNSYLVANIA GREEN ENERGY LOAN FUND

FREQUENTLY ASKED QUESTIONS TO RFA CALIFORNIA APPRENTICESHIP INITIATIVE NEW AND INNOVATIVE GRANT PROGRAM

THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS: LOCAL BUSINESS PREFERENCE PROGRAM

REQUEST FOR CITY COUNCIL ACTION

California Apprenticeship Initiative (CAI) Pre-Apprenticeship Grant Program RFA Bidder s Conference February 1, 2017

OPTER. Optimization Program for Refrigeration Systems DETAILED GUIDE FOR APPLICANTS. Supermarkets

Defining the Terms: POLST, Advance Directives, and California s Infrastructure

EMERGENCY SHELTER RELOCATION/EXPANSION

Energy Efficiency and Economic Recovery Initiative

New Jersey State Plan Presentation. September 2012

Santa Clara Valley Transportation Authority Disadvantaged Business Enterprise (DBE) Program

2012 Grant Eligibility and Application Guidelines

2017 HeatSmart Massachusetts Pilot Table of Contents

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

Powering Our Communities. Grant Guidelines

The Budget increases propose to fully-funding of the Local Control Funding Formula (LCFF).

SAN JOSE CAPITAL OF SILICON VALLEY

Florida Job Growth Grant Fund Workforce Training Grant Proposal

Recovery. Retrofit. Through OCTOBER 2009 MIDDLE CLASS TASK FORCE COUNCIL ON ENVIRONMENTAL QUALITY. Recovery Through Retrofit Page 0

Weatherization and Intergovernmental Program

DEPUTY DIRECTOR, POWER RESOURCES City of San Jose, CA

Request for Proposals: Solar Training Pipeline Program

National E3 Webinar Summit March 6, 2013

DRAFT USE ONLY. Disclaimer

Illinois Solar for All

Title 35-A: PUBLIC UTILITIES

Transcription:

CALIFORNIA CLEAN ENERGY JOBS ACT (PROPOSITION 39) Strategies for the Successful Prop 39 Program October 29, 2015

Panel Members Christine Marez Director of Energy Cumming Corp (Moderator) Dale McCurry Energy Manager Santa Ana Unified School District David Miranda Senior Director Tustin Unified School District Veronica Soto Program Manager Emerald Cities Collaborative

Cumming Cumming has ranked in Engineering News Record Magazine s Top 40 listing of top 50 CMfor-Fee Firms in the US; Top 4 of strictly Owner s Representatives 20 years K-12 School District and Community College Districts Experience providing program management services to implement large, complex educational capital programs 10 years Energy Services providing technical and engineering services and energy efficiency and renewable energy projects. $50 Million in eligible Prop 39 energy efficiency measures identified for K-12 clients since the program start

Prop 39 School Districts Cumming providing Prop 39 Energy Services to: Glendale USD Santa Ana USD La Canada USD Anaheim Joint Union USD Chaffey Joint Union HSD San Bernardino City USD Vacaville USD Placer County of Education Oxnard School District Tustin USD Baldwin Park USD Pasadena USD San Francisco USD Los Rios CCD Irvine USD El Centro Elementary SD Hanford Joint Union HSD Alhambra USD Beverly Hills USD Lake Elsinore USD West Contra Costa USD Bowman Charter School Val Verde USD Green Dot (18 Charter Schools) Guajome (Charter) Schools

Proposition 39 Energy Measures Nov 6, 2012 California Clean Energy Jobs Act (Prop 39) $550 Million Annually for 5-Years (2013 2018) $381M to Local Educational Agencies (LEAs) $47M to Community College Districts $28M for Low-Interest and No-Interest Revolving Loans $3M to California Workforce Investment Board (CWIB) $5M to California Conservation Corps (CCC) for Energy Surveys

Proposition 39 Guideline Revisions (2015) LEA-Wide SIR Calculation: Multiple school sites allowed in one expenditure plan. Multi-year expenditure plan awards will be issued annually in January. CEC Energy Expenditure Plan (EEP) Online Portal Post-project reporting tool available Nov 2 nd. Prohibition against demolishing Energy Conservation Measure s (ECM) before simple payback is achieved.

Proposition 39 Year 3 Year Three, Only Two to Go: Year 3 Allocations due in November 2015 Need to get funding approved and out and we need successful school projects to showcase so state focus continues to be on K-14. Get your EEPs in to the CEC Don t wait. CCs have 90% authorized.

1 PROP 39 LOCAL EDUCATIONAL AGENCIES

Prop 39 Funding Summary Year 1 2013-14 Year 2 2014-15 Year 3 2015-16 Change from 2014-15 to 2015-16 Proposition 39 Funding Allocation $381 M $279 M $313 M + 12% LEA Funding Approved $154 M* $16 M $253 M $148 M $571 M *Planning Funds allocated for Planning Services, Energy Audits, or Rollover to Energy Project Installations

Prop 39 Program Impact Estimated Annual Energy Savings Total kwh Savings Total Therm Savings Total Propane Savings Total Fuel Oil Savings Estimated Annual Energy Cost Savings Estimated Greenhouse Gas (GHG) Emission Reductions 170,230,555 kwh 1,264,528 Therms 122,834 Gallons 7,357 Gallons $30,729,382 132,190,834 lbs. Carbon Dioxide Emissions

Prop 39 Program Approved Energy Measures Energy Measure Category Total No. Measures Approved % Total No. Measures Approved # Approved for Fiscal Year 2013-14 # Approved for Fiscal Year 2014-15 # Approved for Fiscal Year 2015-16 Lighting 3610 47% 1238 2155 217 Lighting Controls 822 11% 230 549 43 HVAC 1343 17% 389 870 84 HVAC Controls 756 10% 229 489 38 Plug Loads 539 7% 138 372 29 Pumps, Motors, Drives 180 2% 62 107 11 Generation (PV) 178 2% 48 116 14 Domestic Hot Water 114 1% 39 69 6 Building Envelope 113 1% 22 84 7 Kitchen 27 0.3% 8 16 3 Electrical 13 0.2% 0 13 0 Energy Storage 8 0.1% 0 8 0 Power Purchase Agreement (PPA) 7 0.1% 0 5 0 Pool 5 0.1% 3 2 0 Irrigation 3 0.0% 0 1 2 7718 100% 2406 4856 454

2 PROP 39 K12 OWNER CASE STUDIES DALE MCCURRY SANTA ANA UNIFIED SCHOOL DISTRICT

Santa Ana Unified School District Year 1 and 2 EEP Plan APPROVAL $3,800,000 in Eligible Energy Projects Performed ASHRAE Level I and II Audits Identifying Over $1 Utility Rebates and Incentives FASTRAK 7-Week Schedule for CEC Submission

Prop 39 & HVAC Plan, Design, & Bid Early Utility Rebates Construction Considerations Expenditure Plans

HVAC Costs Summer 2014 7 Mz s Total 234 Tons Avg. Cost $4,327 per Ton 29 Each 4 Ton Split Systems Cost $3,825 per Ton All Sites New EMS 1 Site Duct Cleaned All Sites Plenums Cleaned 2 Sites Duct Sealed $1.46M Hard Costs Summer 2015 4 Mz s Total 96 Tons Avg. Cost $5,930 per Ton 19 Each Split Systems Cost $4,170 per Ton 58 Each Rtu s Cost $4,031 per Ton All Sites New EMS All Sites Plenums Cleaned $1.696M Hard Costs $153,566 in Utility Incentives

Construction Pre-Read Air to Establish Baseline Fix Leaks/Clean Duct if $$ Available EMS Choices Try Not to Single Source EMS Programming is Proprietary Choose Wisely Carefully Consider EMS Service Contracts They Can Be Costly Demand Control Ventilation Issues

3 PROP 39 K12 OWNER CASE STUDIES DAVID MIRANDA TUSTIN UNIFIED SCHOOL DISTRICT

Tustin Unified School District Year 1 and 2 EEP Plan APPROVAL $1,554,984 in Eligible Energy Projects Performed ASHRAE Level I and II Audits Completed Lighting Retrofits Projects in Year 1 and 2 Major Solar PV Project Underway 2016

Prop 39 Funding Snapshot Prop 39 Year Annual Total Allocation Year 1 Year 2 Year 3 Year 4 Year 5 Annual Allocation $1,062,999 $932,649 $932,649 $932,649 $932,649 ANNUAL Energy Expenditure Plan (EEP) Projects Project Costs Year 1 YEAR 1: EEP PROJECTS $1,197,654 Project Costs Year 2 YEAR 2: EEP PROJECTS $770,600 Other Funds (BOND) $487,000 PROP 39 FUNDS REQUIRED $705,879.00 $748,984 Energy Manager Salary $100,000 Project Costs Year 3 Project Costs Year 4 APPROVED $1,554,984 Project Costs Year 5 TOTAL GRANT FUNDS APPROVED $705,879 $848,984 Annual Prop 39 Rollover Balance $357,120 $440,785

TUSTIN EEMs - Year 1 EEM Number YEAR 2 EEP - Table 2 Project Costs Year 1 Annual Electrical Savings (kwh) Annual Cost Energy Savings ($) SIR Currie Middle School EEM 7 Lighting- Interior/Exterior Fixture Retrofit $128,647 119,376 $21,222 2.64 EEM 8 Boiler Retrofit $46,040 $881 0.66 Guin Foss Elementary School Total $174,687 119,376 $22,103 2.11 EEM 9 Lighting- Interior/Exterior Retrofit $46,279 39,794 $7,040 2.45 EEM 10 HVAC- Packaged/Split Replacement (20 Units) $408,808 70,096 $12,400 0.85 EEM 11 Install Cool Roof $567,880 1,714 $396 1.06 Total $1,022,967 111,604 $19,837 1.06 ANNUAL EEP COSTS $1,197,654 230,980 $41,939

TUSTIN EEMs Year 2 EEM Number YEAR 2 EEP - Table 2 Projects Costs Estimate Year 2 Annual Electrical Savings (kwh) Annual Cost Energy Savings ($) SIR Beckman High School EEM 1 Lighting Interior LED Retrofit (2,521) $264,510 $254,458 $39,695 9.70 EEM 1 Lighting Exterior LED Retrofit (Gym & Exterior) Foothill High School $64,051 $85,517 $13,641 9.70 Total $328,561 339,975.00 $53,336 EEM 2 Lighting- Interior LED Retrofit (2418) $267,899 252,881 $42,484 2.93 EEM 2 Lighting-Exterior LED Retrofit (537) $174,140 184,697 $31,029 2.93 Total $442,040 437,578.00 $73,513 ANNUAL EEP COSTS $770,601 777,553.00 $126,849

Prop 39 Bid and Construction Completed Prop 39 Projects (Year 1) HVAC Project Part of Larger Bond Project in Construction Lighting Retrofit Projects Installed Utilizing In-House Labor and CA Conservation Corps Labor Year 2 Project Installations Starting Oct 2015 Lighting Project Procurement Adhered to Best Value (AB4217) Shorter Bid Time Selection from Qualified Bidders Evaluation of Factors Other than Price: Safety Experience Modification Rate (EMR) Previous Lighting Project Experience Project Team Qualifications Price

4 PROP 39 Workforce Development & Job Creation Veronica Soto, Program Manager, Emerald Cities Collaborative CAWIB Technical Assistance and Capacity Building Team

Prop 39 Job Creation Goals CAWIB CA Workforce Investment Board EE Skills Training Linked to Broader Occupational Program Hands-on Work Experience on Clean Energy Projects Industry Recognized Credentials High Probability of Placement in Industry Track Careers Partnership with State-Recognized Apprenticeship Programs

CWIB Goals for Prop 39 Training 1) Train 500 disadvantaged youth, veterans, and other disadvantaged jobseekers in green job skills; 2) Create structured paths to apprenticeship; 3) Diversify green job opportunities (beyond Prop 39 creation options); and 4) Align systems and leverage funding to optimize results and reduce duplication.

Approach & Grants Technical Assistance and Capacity Building California Labor Federation WED Program Emerald Cities Collaborative Development Workforce Investment Board of Santa Cruz County Six Regional Programs Training Implementation Six Regional Programs

Training Project Snapshot Regional Pilot Sacramento Valley (SETA) Training Goal Placement Goals 65 100% - Enrollment,, 90% (Completion) - Receive MC3 Certificate 71% - Placement in Registered Apprenticeship 31% - Placement in post-secondary education Central Valley (Fresno WIB) 70% - Placement in construction or energy efficiency employment 125 100% Enrollment, 95% (Completion) - Receive MC3 Certificate 67% - Placement in Registered Apprenticeship 10% - Placement in post-secondary education East Bay Area (Richmond Works) 10% - Placement in construction or energy efficiency employment 125 100% Enrollment, 90% (Completion) Receive MC3 Certificate 60% - Placement in Registered Apprenticeship 12% - Placement in post-secondary education 88% - Placement in construction or energy efficiency employment

Training Project Snapshot Regional Pilot San Francisco (SF Conservation Corps) San Mateo & Santa Clara (Work2Future) Los Angeles County (LA Trade Tech) Training Goal Placement Goals 75 100% Enrollment, 80% (Completion) - Receive MC3 Certificate 50% - Placement in Registered Apprenticeship (Laborers - 18, Carpenters - 8, and Painters 4) 11% - Placement in post-secondary education 50% - Placement in construction or energy efficiency employment 120 100% Enrollment, 88% (Completion) - Receive MC3 Certificate 90% - Placement in Registered Apprenticeship 3% - Placement in post-secondary education 79% - Placement in construction or energy efficiency employment 250 95% Enrollment, 90% (Completion) - Receive MC3 Certificate 26% - Placement in Registered Apprenticeship 80% - Placement in post-secondary education 39% - Placement in construction or energy efficiency employment

Tracking Metrics Workforce Issue Area Training Investments Workforce Diversity Data Being Tracked to Measure Progress Completion rates and certificate attainment Placements in joint- apprenticeship, and industry-related job placements Retention in employment Tracking recruitment numbers of target populations enrolled in training Tracking recruitment methods for achieving diversity Training Delivery What type of entity is performing the training (CBO, Labor, etc.) Methods for delivering training (classroom instruction, hands-on, etc.) Supplemental instruction assistance with remediation; soft skills; physical fitness Quality can it meet the highest trade standard (i.e. math of the mechanical trades) Involvement of Registered Joint- Apprenticeship Programs Diversity of trades involved in partnership Creation of clear articulation agreements between training partner and union apprenticeship program Are trades willing to institutionalize this MC3 program as a permanent form of a pipeline into apprenticeship?

Prop 39 Placement Prep Approach 1 MC3 Training 5 Job Start Preparation Placement 2 Trainee Assessment & Employment Plan 4 Union/Cont ractor Alignment 3 Determine Apprenticeship Pathway

Prop 39 Placement Preparation Approach MC3 Training National Standard Quality Curriculum Introduction to Crafts Consistent Outcome Trainee Assessment & Employment Plan Identify Strengths & Weaknesses Identify and Address Barriers Develop Soft Skills Set Training Goals/Milestones Engage WorkSource Partner Apprenticeship Pathway Intro to Apprenticeship Options Prepare for Exam Prepare for Boot Camp Prepare to Hunt for Work Union/Contractor Alignment Engage Craft Unions Early Identify Graduate Pathway Solidify Contractor Partnership Identify Contractor Manpower Needs & Schedule Survey Contractor Satisfaction Check-in with Graduate Job Start Preparation Job Readiness Workshop Manage Expectations Personal Protective Equipment, Boots & Tools Union Initiation Fees Helmets to Hardhats for Veterans

Prop 39 Challenges & Opportunities Limited or no tracking of job creation data Not required for funding application submission Certified Payroll Reports to be submitted to DIR Self reported worker wage data allowed Limited agency follow-up for data No consistent inclusion of workforce goals in LEA/CC bidding docs or solicitations Current agencies may or may not include existing workforce provisions No consistent link between Apprenticeship Prep Programs to Prop 39 contractors

Prop 39 Contracting Opportunity to Create Jobs Public Contracting Principles Open and Competitive Process Public Bid Opening Licensed Contractors Subcontractor Protections Labor Compliance Contracting/Project Delivery Methods-Construction Low-Bid Best Value* Design-Build* Job Order Contracting (JOC) Performance Contracting/ESCO* Contracting/Project Deliver Methods-Professional Services Request for Qualifications (RFQ)* Request for Proposals (RFP)*

Prop 39 Contracting Opportunity to Create Jobs Local Worker Hiring Goals - 35% to 40% Local Worker hiring goal - 10% Disadvantaged Local Workers - 5% Veterans - Pathway to Union Apprenticeship - Campus and Community Partnerships Procurement & Contract Framework - Project Labor Agreement (PLA) - Contract specification for Local Worker Hiring Program - Establish process for implementation, compliance and reporting - Two-tiers procurement process: RFQ measures past performance RFP measures proposed plan 10% to 15% of overall points assigned to workforce requirements - Online Certified Payroll System Requirement

5 PROP 39 LESSONS LEARNED

Prop 39: Lessons Learned Administrative: Register for Online Portal Access in advance. The project description MUST BE DETAILED; general one-two sentence statement such as "Various energy efficiency measures will be installed will not be approved. Upload all back-up documentation at once. You can send in additional documentation if requested, but the PM s sometimes forget you sent it if it s not in their original package.

Prop 39: Lessons Learned Administrative (Continued): Perform Quality Assurance check to make sure Reports and Backup calculations and worksheets match Always follow up with the CEC within a couple days after submitting a plan to make sure they received it. Hi, CEC Did you receive our Expenditure Plan?

Prop 39: Lessons Learned Technical: Note that each type of chiller requires a specific custom calculator (ex. air cooled vs. water cooled). For measures not specifically covered under the Prop 39 ECM descriptions, custom calculators can be created.

Prop 39: Lessons Learned SIR Calculations: Use the CEC Prop 39 SIR calculator for all measures submitted (download from CEC Site). When a particular measure doesn t achieve needed SIR level using online calculator, may want to utilize custom calculator; often the LEA s actual $/kwh is higher than the numbers hardcoded into the online calculators. Using rebates can help increase the SIR but districts are committing themselves to securing those rebates if they are used in the submission. Since rebate programs change regularly, the District may not get their intended rebates and will need to come up with their own money to make up the difference.

Prop 39: Lessons Learned Improving the SIR: Consider including previously implemented projects (completed after 12/19/13) that meet Prop 39 eligibility requirements and funded by local non-repayable funds in Expenditure Plan to increase overall LEA SIR. With new Prop 39 solar PPA calculator, consider adding this measure to Expenditure Plan to bring up overall LEA SIR. With addition of Advanced Energy Storage ( battery storage ) as an eligible Prop 39 measure, consider adding to the Expenditure Plan to reduce demand charges.

Thank You Q & A DISCUSSION CONTACT Christine Marez, Director of Energy Services 523 West 6th Street, Suite 1001 Los Angeles, CA 90014 C: (626) 688-4634 Email: cmarez@ccorpusa.com