Report on the Planning Workshop at SIIDCUL IIE Haridwar [Sustainable and Environment-friendly Industrial Production Project] Date: 18 th October, 2016 Venue: Conference Hall, SIIDCUL IIE Haridwar Participants: S.No. Name Organisation 1. Mr. H R Nautiyal Regional Manager, SIIDCUL IIE Haridwar 2. Mr. L K Mishra AM (IT) Manager, SIIDCUL IIE Haridwar 3. Dr. Ankur Kansal Regional Officer, UEPPCB, Roorkee 4. Mr. Harindra Garg Chairperson, SIIDCUL Manufactures Association of Uttarakhand (SMAU) 5. Mr. Anil Sharma Executive President, SIIDCUL Entrepreneurs Welfare Association (SEWA) 6. Mr. Raju Solanki Owner, Sharp Industries 7. Mr. Amit K Singh CETP Project Manager, IIE Haridwar 8. Mr. Anuj Sharma Representative from RSPL Limited 9. Mr. Mahendra Kumar Representative from Havells India Ltd. Representative from Akums Drugs and 10. Mr. Sandeep Sharma Pharmaceuticals Representative from Pure and Cure 11. Mr. Rohit Chudhury Healthcare 12. Mr. Mukesh Mishra Representative from ITC Limited 13. Mr. Balwant Singh Representative from ITC Limited 14. Mr. S K Tripathi Representative from ALPS India Ltd. Representative from Neel Metal PL 15. Mr. Ravikant Saini Haridwar 16. Mr. Bhuwan Sharma Representative from Cholayil (P) Ltd. 17. Mr. Shailendra Bhandari Representative from Cholayil (P) Ltd. 18. Mr. Manish Rawat Representative from AG Industries 19. Mr. G A Sapvit Representative from AG Industries 20. Mr. Deepak Tiwari Representative from WIPRO Limited 21. Mr. Amit Sharma Representative from Genka Healthcare Representative from Sunmax Auto 22. Mr. Kamal Verma Engg Pvt. Ltd. 1 P a g e
23. Mr. Toshar Dange Representative from Akashyog Health Products Pvt. Ltd. 24. Mr. John Thomas Senior Advisor, SGR- GIZ (Dehradun) 25. Mr. Raghu B Nukala Project Director, SEIP- GIZ 26. Mr. Hemant Verma Technical Advisor, SEIP Dehradun Junior Technical Advisor, SEIP 27. Ms. Gurpreet Kaur Dehradun 28. Ms. Shipra Pandey Admin Assistant SEIP Dehradun Purpose of the workshop: Finalise activities and broad timelines for the SIIDCUL IIE Haridwar under SEIP Project Define project management structures Identify key stakeholders and cooperation landscapes of agencies to be involved Finalisation of members of site level Advisory Group Formation of Project Facilitation Teams Identification of results based activities for SIIDCUL IIE Haridwar under 5R6M Summary of discussions and decisions taken: Mr. Hemant Verma from GIZ made a presentation on activities and their status. Discussions were moderated by Mr. Raghu Babu from GIZ. Following are the decisions taken are given below. 1. Following major activities for SIIDCUL IIE Haridwar have been identified: a) Modernisation / Upgradation of CETP / ETPs, ZLD, Improve Conveyance/ Drainage b) Environment Improvement in Industries (promotion of BAT tecniques). c) Skills Development ETP/CETP Operators (Helpers, Technicians) d) Other Activities for IIE Haridwar/Uttarakhand: Environmental drives through participatory approaches (removal of waste dumps, plantation etc.) Develop viable solution for management structures for IIE Haridwar for managing infrastructure & services in IIE Haridwar GIS mapping and development of strategic action plan Improvement of the drain carrying wastewater/sewage passing through IIE Haridwar Voluntary improvements in wastewater management in industries Voluntary improvements in production processes in industries 2 P a g e
These activities will be complemented by the SEIP project at national level with the following: Environmental Technology Platform Green rating and certification system for industrial areas Replication, upscaling in other industrial areas New measures under policies, plans, programmes [e.g., Enforcement directives for industries (tannery); Policy measures on skills development; Guidelines for CETPs; Guidelines for continuous/online monitoring systems etc.] 2. For providing solutions for up-gradation/modernisation solutions of ETPs (09 nos), a list of 22 industries from various sectors has been identified with ETPs of which 09 will be finalised for providing solutions for improvement. Ref. Annexure I. Following tasks with responsibilities and milestones has been identified: Tasks Action by By when Develop questionnaire GIZ * 25 th October, 2016 Circulation of questionnaire SMAU, SIA and October, 2016 SEWA Survey of sample industries GIZ* November, 2016 Completion of survey (GIZ) GIZ* 15 th November, 2016 Presentation to Advisory group on findings of questionnaires Conceptual solutions, rough estimates for ETPs *GIZ: SEIP and SGR GIZ* 1 st week December, 2016 RODECO February, 2017 3. For improvement at industries and replication of successful models, a list of 50 industries has been identified under the following sectors from SIIDCUL IIE Haridwar by the participants of the workshop including those identified for providing solutions with ETPs viz.: a) Pharma b) Plastic c) Electronics/Electricals d) FMCG (Soaps and Food products) e) Metal f) Automobile g) Packaging h) Misc. including apparels and service industry 3 P a g e
List of industries under above mention sectors has been detailed out in Annexure II. 4. Decisions taken on skills development of ETP/CETP operators (helpers/technicians): Industries agreed to participate in the survey. Helpers and technicians should be given a short crash course on ETP operations and management. Government Institutions in the nearby areas should be empaneled to provide training to the helpers and technicians. Industry representatives identified the following institutions in nearby areas for empanelment with Skill Council for Green Jobs (SCGJ) of the National Skill Development Corporation (NSDC) to provide skill development training to helpers and technicians of ETPs and CETP in IIE Haridwar: o Government Polytechnic in Haridwar o Pollution Control Research Institute (PCRI)- BHEL o College of Engineering Roorkee (COER) GIZ will coordinate with these institutions and SCGJ for affiliation and carrying out training courses. ETPs being operated and maintained by the third party operators (outsourced companies) should also be covered in the survey and training. Following tasks with responsibilities and milestones has been identified: Tasks Action by By when a) Inventory of qualifications of technicians and helpers Develop Questionnaire GIZ 30th October, 2016 Circulation of Questionnaire SMAU, SEWA and November, 2016 SIA Survey of Sample Industries GIZ November, 2016 Completion of survey GIZ 30 th November, 2016 b) Participation in skills courses and competitions Courses to be organized by GIZ GIZ March 2017 Participants from industries SMAU, SEWA and SIA 4 P a g e
Pics: From the Planning Workshop at the Conference Hall of SIIDCUL at IIE Haridwar 5 P a g e
5. On the steering structures at the industrial area level the following decisions had been taken: SEIP Project Advisory Committee A Project Advisory Committee would be set up to monitor, review and advice the project. The Committee would be chaired by Mr. H R Nautiyal, Regional Manager, SIIDCUL IIE Haridwar and will have members from SIA/SMAU/SEWA, Mr. Amit K Singh from CETP and Dr. Kansal from UEPPCB Roorkee. The Committee will meet once every month (meeting coinciding with single window meeting of UEPPCB). The suggested composition is as follows: 1. Mr. H. R. Nautiyal, Regional Manager SIIDCUL IIE Chairperson Haridwar 2. Representative SMAU from SIIDCUL IIE Haridwar Member 3. Representative SEWA from SIIDCUL IIE Haridwar Member 4. Representative SIA from SIIDCUL IIE Haridwar Member 5. Dr. Ankur Kansal, Regional Officer, UEPPCB Member Roorkee 6. Mr. Amit K Singh, CETP Project Manager SIIDCUL Member IIE Haridwar 7. Mr Hemant Kumar, Technical Advisor, GIZ Cell at Member SIIDCUL 8. Rep. of SIIDCUL Haridwar Convenor It was also decided to constitute the following Facilitation Teams to promote cross learning by inviting industries and experts to participate in the discussions and to identify measures for implementation of environmental improvement in individual industries and IIE Haridwar: Facilitation Team - Water Pollution Reduction Facilitation Team Cleaner Production in Industries Facilitation Team - Environmental Drives and Outreach Facilitation Team - Water Pollution Reduction Purpose: To promote cross learning by inviting industries and experts to participate in the discussions and to identify water pollution reduction measures for implementation in individual industries and IIE Haridwar. The Facilitation Team would be coordinated by Mr. R C Jain (M/s Parma Synth). The Committee will meet in the 2 nd week of every month. The suggested composition is as follows: 6 P a g e
1. Mr. R C Jain (M/s Parma Synth) Coordinator 2. Mr. Amit K Singh (CETP Project Manager) Member 3. Rep. of M/s Akums Drugs and Pharmaceuticals Ltd. Member (to be identified) 4. Rep. of M/s ITC Limited (to be identified) Member 5. Rep. of M/s Kwality Polythreads Pvt. Ltd. (to be Member identified) 6. Rep. of UEPPCB Invitee Facilitation Team - Cleaner Production in Industries Purpose: To promote cross learning by inviting industries and experts to participate in the discussions and to identify cleaner production measures for implementation in individual industries. The Facilitation Team would be coordinated by Mr. Tushar Dongre (M/s Akashyog). The Committee will meet in the 3 rd week of every month. The suggested composition is as follows: 1. Mr. Tushar Dongre (M/s Akashyog) Coordinator 2. Mr. Deepak Tiwari, M/s Wipro Member 3. Rep. of M/s Hero Moto Corp Limited (to be identified) Member 4. Rep. of M/s Cholayil Pvt. Ltd. (to be identified) Member 5. Rep. of Mahindra Group (to be identified) Member 6. Rep. of UEPPCB Invitee Facilitation Team Environmental Drives and Outreach Purpose: To promote environmental drives and outreach so as to improve environment, cleanliness, infrastructure & services in IIE Haridwar, including environmental drives, clean-up drives, plantation drives, awareness programmes, events (workshops, conferences etc.). The Facilitation Team would be coordinated by Mr. Anil Sharma (SEWA). The Committee will meet in the 4 th week of every month. The suggested composition is as follows: 1. Mr. Anil Sharma (SEWA) Coordinator 2. Mr. Harindra Garg (SMAU) Member 3. Mr. Raj Tiwari Member 4. Mr. Himesh Kapoor (SEWA Member 5. Mr. Raj Arora (SEWA & SMAU) Member 6. Mr. Arun Raghav Member 7. Mr. Raju Solanki (Sharp Industries) Member 8. Mr. Sudhir Mehta Member 9. Mr. L K Mishra (SIIDCUL) Member 10. Rep. of UEPPCB Invitee 7 P a g e
These three Facilitation Teams will meet on monthly basis and invite industries to participate in the discussions and will identify measures that could be implemented and would follow-up to showcase success stories. Following tasks with responsibilities and milestones has been identified: Tasks Action by By when Monthly Facilitation Team meetings (Information exchange, experience sharing on BAT etc., identification of measures to be implemented voluntarily, documentation etc.) Organize monthly meetings SMAU/SEWA/SIA and Industry representatives 2 nd, 3 rd and 4 th week of every month Follow-up GIZ Regularly Document success stories GIZ Regularly a) Month long environmental drives Environment drives for improvements in industries SMAU /SEWA/ SIA 15 to 25 Oct. 2016 Documentation of successes GIZ Oct. 2016 6. As part of 5R6M (5 successful measures in 6 months) following activities has been identified: Plantation drive- around CETP IIE Haridwar Cleanliness drive - removal of waste dumps on the peripheral areas of the industrial estate Rejuvenation/improvement of the Rawali Rao Drain (redesigning of the drain with natural filters etc.) Following tasks with responsibilities and milestones has been identified: 5 Results in 6 Months Plantation drive Tasks Action by By when GIZ and SMAU/SEWA/SIA and Industry representatives Oct & Nov 2016 Cleanliness drive-removal of waste dumps Rejuvenation of the Rawali Rao drain Follow-up GIZ Regularly Document success stories GIZ Regularly Oct & Nov 2016 December 2016 to April 2017 For programme agenda and photographs of the Planning Workshop. Ref. Annexure III and IV. 8 P a g e
Annexure I: List of industries and other with ETPs identified in SIIDCUL IIE Haridwar 1) Hindustan Unilever Limited 2) ITC Limited 3) WIPRO Ltd. 4) Hero Moto Corp Ltd. 5) A G Industries 6) Akash Yog Health Products 7) Surya Processed Food Pvt. Ltd. 8) Rockman Industries Ltd. 9) Akums Drugs and Pharmaceuticals Ltd. 10) Zydus 11) Cavinkare Pvt. Ltd 12) Neel Metal Products Ltd. 13) Pharma Synth Formulation Ltd 14) Kwality Polythreads Pvt. Ltd 15) Havells India Ltd 16) C&S Electric Ltd.(Plot 4, Sector 11) 17) US Metal products 18) Rohit Surfactant Pvt. Ltd. (RSPL) 19) Aman Metal Pvt. Ltd 20) Pentagon Mall- Supertech 21) Gardenia Hotel 22) Metro Hospital 9 P a g e
Annexure II: List of industries identified under various sectors in SIIDCUL IIE Haridwar 1. Pharma Synokem Pharmaceuticals Ltd. Aarogya Formulation Pvt. Ltd Esckay Talent Health Care Eastern Healthcare PIL Pharaceuticals Pvt. Ltd. SBL 2. Plastic Cello Industries Hamilton Housewares Pvt. Ltd. Luxar Writing Instruments Pvt. Ltd VIP Industries Creative Industries Arvind camy Arun Plasto 3. Electronics/Electricals Anchor Electricals Pvt. Ltd Napino HQ Lamps Halonix Eon Electricals Indo Asian Asian cables Orbit cables KKG Industries 4. FMCG (Soaps and Food products) 4.1 Food Genus Food Pvt. Ltd. Raja Biscuits Pvt. Ltd. Perfect Food Pvt. Ltd. MD Printing 4.2 Soap GK Burban Herbals Cholayil 10 P a g e
Padm Services Herbal Concepts Healthcare Pvt. Ltd. Lotus Herbals 5. Automobile/Metal Satyam Auto Components Ltd. Classic Industries Autofit M&M CMR (century) Affyn Steel 6. Packaging TCPL Packaging Ltd. Uttarakhand Packaging Revati Print O Pack Unit Kanhe Packaging ShreeJi Packaging and Logistic services Shree Balaji Packaging 7. Misc. (apparels and service industries) K2 Cloths Kirby Godrej Safeguard industries Kundan Care Products Ltd 11 P a g e
Annexure III: Planning Workshop Programme Schedule 12 P a g e