Pierce Joint Unified School District P.O. Box 239 Arbuckle CA 9592 (530) 476-2892 Fax (530) 476-2289 Carol Geyer, Superintendent 7-8: DATE POSTED: March 9, 208 PIERCE JOINT UNIFIED SCHOOL DISTRICT Citizens Bond Oversight Committee for Measure B Information Technology Building, Pierce High School 960 Wildwood Road, Arbuckle CA 9592 Monday, 8:30 AM. CALL TO ORDER Time: 2. ROLL CALL FOR Present Absent Mike Doherty (Chair) Barbara Scheimer Chuck Wayman Ariel Alonso Joh Lauwerijssen Ellen Voorhees Edella Maldonado 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF AGENDA Motion by Second Vote Abstentions 5. COMMUNITY INPUT/PRESENTATIONS/PUBLIC HEARING This is the time for members of the public to address the Citizens Oversight Committee on any matters of general interest within the Committee s jurisdiction that are not on the agenda. In accordance with the provisions of the Ralph M. Brown Act, the Committee may refer to the Administration on any matters that are brought before them at this time, and the matter may be placed on future agenda. Please note that the Committee Members may ask limited questions for clarification on a subject not on the agenda, but may not discuss the subject or take any action. All remarks must be kept to a maximum of five minutes per person on a given topic (Government Code 54954.2) 6. DISCUSSION ITEMS a. Quarterly Progress Report Executive Summary George Parker b. Attachment A - Draft Meeting Minutes for December 8, 207 c. Attachment B Program Design Schedule d. Attachments C & D - Program Updates e. Design Images - Handouts Board of Trustees: John Friel Nadine High George Green Amy Charter Abel Gomez President Vice-President Clerk Member Member
Citizens Oversight Committee Mtg. 7. FUTURE BUSINESS a. Next COC Meeting Date 8. ADJOURNEMENT Motion by Second Vote Abstentions Board of Trustees: John Friel Nadine High George Green Amy Charter Abel Gomez President Vice-President Clerk Member Member
PIERCE JOINT UNIFIED SCHOOL DISTRICT Measure B Bond Quarterly Program Progress Report Reporting Period: December, 207 through February 28, 208 Prepared by: G. Parker Capital Projects Manager
Quarterly Project Progress Report TABLE OF CONTENTS Executive Summary Pages 3-5 Program Updates: Pages 6-9 o Pierce High School o Lloyd Johnson Middle School o Arbuckle Elementary School o Grand Island Elementary School Attachments: o Previous Meeting Minutes Attachment A o Program Design Schedule Attachment B o Program Cost Summary Attachment C o Project Listing Matrix Attachment D o Design Images Handouts Attachment E The information contained herein is effective as of February 28, 208, and only includes projects in Active status. All information is subject to change and/or revision by the Measure B Bond Program requirements. 2
Quarterly Project Progress Report EXECUTIVE SUMMARY I. Executive Summary Since the last progress update report to the Measure B Citizens Oversight Committee held on November 30, 207, the District Board of Trustees have defined project listings and budgets for the Measure B Bond Program. During this period, the District has authorized the sale of the remaining Bond Authorizations (Series B - $8M) to be utilized to fulfill the revised project listing (Attachment C). The Measure B Bond Program has long anticipated matching funding support from the State s Proposition 5 that authorized $7B for K-4 School Facilities. The District is working with school facilities consultants to establish updated eligibility values and prepare the necessary applications for State matching funds (estimated to be approximately $3M Districtwide). On March 4, 208, the District intends to execute the sale of Series B Bonds ($8M) and shortly thereafter, these funds will be in deposit at the County Treasure for use on District Bond projects. The full accounting of this sale will be provided at the next Citizens Oversight Committee Meeting planned for June 208. As part of the Proposition 39 voter initiative (Education Code 5278), the Citizens Oversight Committee is established to provide accountability for the expenditures (CBOC Bylaws, 3.2) of bond proceeds that were approved by the voters for Measure B on November 8, 206. Work continues on Pierce High School s new multi-purpose building with the completion of the roofing, exterior lath and interior MEP Systems. Drywall and plastering activities are on-going with an expected completion of these activities by the end of March. During the month of February, a site tour was conducted with approximately 30 students from the High School and Junior High. These students were provided information on the project and took time to ask questions regarding the scope of the project and its amenities. Additional student involvement is planned in final space planning for furniture and activities planning. The project is ahead of schedule and is expected to be substantially complete by May 3, 208. Other projects for the Pierce High School Campus are moving forward with programming meetings with stakeholders & architects. These projects include; Girls locker room addition in Bldg. B, Main Gym Lobby and Weight Room with the modernization of the existing kitchen and cafeteria into a New Culinary Arts space. Meeting with key High School Staff continue around the Career Technical Program 3
Quarterly Project Progress Report EXECUTIVE SUMMARY to see if any of the District s vocational education (Agricultural Sciences) programs may benefit from a combined project submission. The District has executed an agreement with J.M. King Consultants that have extensive background in developing CTE Grant Application to assist in developing specific grant applications for Pierce High School. The District has made progress with repairing three large roof areas at Pierce HS, Johnson MS and Arbuckle ES. Work is complete at Pierce HS & Johnson MS with work at Arbuckle ES expected to be completed by the end of April. These roof repairs are NOT Measure B Bond Funded but are related as part of the larger commitment to provide adequate facilities for student instruction. Since the last report update, work for the Classroom replacement at Arbuckle Elementary continues with the finalization of the building floor plan (permanent construction) and interim relocation plan of the existing classrooms effected by this new work. The District s Architect has prepared a design timeline schedule (Attachment B) for this project that will allow for the relocation of these existing classrooms over the summer and the beginning of construction for the new building by September 208. The District has also begun the search for responsible contractors through a Request for Qualification and Contractor Pre-Qualification effort. This process is a requirement under the State s Public Contract Code if State matching funds are being requested or used. II. Contracts and Procurement During this period the District continued the process of finalizing contracts and agreements for various professional services as approved by the Board of Trustees. Agreements for Architect/Engineer Services: Architect s Modification is pending due to change of individuals within Sommers Architects. The modification is administrative only and identifies the new corporation name and their added officers. Professional Services Agreement (PSA) As required pursuant to the CA Public Contract Code and District Policies, the District has, or may subsequently enter into, more than one agreement with individual firms for separate and related services. This is the result of specifically distinct solicitation and procurement efforts being undertaken by the District for each particular service or scope of work. This process has continued during this reporting period. The District has entered into professional services for those listed below during this reporting period and is 4
Quarterly Project Progress Report EXECUTIVE SUMMARY provided for information of expected Measure B Bond expenditures. Clay Titus, Inc. Professional Services Agreement Portable Building Moving Services AES-0, Classroom Additions and Portable Relocations at Arbuckle Elementary School McCumber s Glass, Inc. Professional Services Agreement Window Replacement PHS -06, Girls (North) Gym at Pierce High School Solicitations: Request for Qualifications, AES -0, Classroom Additions and Portable Relocations at Arbuckle Elementary School III. Planning/Design/Pre-Construction: District Stakeholder Group Committees Meetings continue each month to maintain active stakeholder participation for each project. Below are the listings of the various user planning groups and the associated projects: Pierce HS PHS - 03, Girls Locker Room Addition & Gym Lobby/Restroom Modernization PHS - 04, Modernization of Existing Kitchen and Cafeteria (CTE/Culinary Arts) PHS 06, Weight Room Modernization PHS 08/09, Farm Expansion (CTE) & Agricultural Education Center (CTE) Arbuckle ES AES - 0, Classroom Additions & Portable Building Relocations AES 02, Kitchen Modernization District Wide - DM 0, Deferred Maintenance at All Sites DM 02, Infrastructure Upgrades at AES & PHS Standards Development (Paint Color, Instructional Technology, etc.) IV. Program Controls: Cost Report Program Cost Summary Report (Attachment C) was created using the District Cost Report dated March 3, 208, and is reflective of all bond costs expended to date through February 28, 208. Scheduling The attached schedule (Project Listing Master & Design Summary Schedule) will be updated periodically, per Measure B Bond Program requirements. Project Listing The attached Project Listing Matrix (Attachment D) provides an at-a-glance look at the current status, by phase, for all projects. Budgets - Total Project Budgets reflect the Board of Trustees approved Bond Program Budget Update on December 4, 207. 5
Quarterly Project Progress Report PROJECT UPDATES PIERCE HIGH SCHOOL Multi-purpose Bldg. Project Description: Exterior Lath The intent of this project is to provide a permanent expanded facilities for student dining and multi-use needs. The new 8,875 S.F. multi-purpose building began construction in August of 207. Within this facility a 2,600 S.F. Commercial kitchen is being planned that will be able to prepare sufficient meals for the entire District. The building, situated in the center of campus, has deep architectural ties to the surrounding campus structures. The main multi-use room is 4,485 S.F. which can comfortably accommodate approximately 300 students (non-seated using 5 SF/person ratio). As of this report: Completed This Period * Roofing System Complete * Interior Trades (MEP) Complete * Insulation & Drywall Started * Exterior Lath & Plaster Started Activity Planned for Next Period * Interior Finishes Completed * Kitchen Equipment Completed * Building Commissioning/Punch List * Beneficial Occupancy * Interior Space Planning Mtgs. 6
Quarterly Project Progress Report Pierce High School Weight Room Project Project Description: PROJECT UPDATES The intent of this project is to provide adequate space for weight training and other athletic conditioning stations. The Facilities Committee approved to renovate the old boys locker room located in the North (Girls) Gym at Pierce HS. This cost saving strategy would eventually support the use of the adjoining spaces for other P.E. or Athletic Sports Program. The total areas planned of renovation equals,325 S.F. and will provide suitable access to all. As of this report: Completed This Period * Hazardous Material Survey Completed * Program Needs/Design Completed * New Window Contract Issued * Procurement Bidding Being Prepared Activity Planned for Next Period * Demolition of Space Started * Design Drawings to DSA * Modifications to Entrances Complete * New Windows Installed * New Bleachers Being Installed 7
Quarterly Project Progress Report PROJECT UPDATES ARBUCKLE ELEMENTARY SCHOOL New Classroom Additions & Portable Relocations Project Description: Architect s Conceptual Building Elevation The intent of this project is to replace 8 existing portable classroom buildings with one single building with 8 classrooms. This project will provide permanent instructional facilities for students and create a connected environment for these new spaces. The proposed 9,500 S.F new facility will be located along the East edge of campus and be self-contained with its own restroom facilities. As of this report: Completed This Period * Program Planning for Interior Spaces * Underground Utility Located * 50% Construction Documents Activity Planned for Next Period * Construction Documents Completed * Increment, Site Work DSA Submittal * Increment 2, Bldg. Plans DSA Submittal * Field Trip to Corning USD (Gen 7 Bldgs.) * Final Site Plan Planning 8
Quarterly Project Progress Report ARBUCKLE ELEMENTARY SCHOOL - PROJECT UPDATES AES 02 - Kitchen Remodel/Modernization Project Schematic Design Development Completed, Design Development Continuing AES 03 - Joint Use w/county Library Project Development on hold GRAND ISLAND ELEMENTARY SCHOOL - GIES 0 - Roof Replacement Project PIERCE HIGH SCHOOL Project Schematic Design Development not yet begun PHS 03 - Second Locker Room Addition (Bldg. B) Schematic Design Development Competed, Design Development Continuing PHS 04 Modernization of Existing Cafeteria (Bldg. A) Schematic Design Development Competed, Design Development Continuing PHS 05 Replacement of Existing Portable Classrooms Project Development on hold PHS 06 Weight Room Modernization Schematic Design Development Competed, Design Development Continuing PHS 07 Career Center Addition at Small Gym Project Development on hold PHS 08 Farm Expansion Program Needs Assessment On-going PHS 09 Agricultural Education Center Program Needs Assessment On-going PHS 0 Modernization of Historic Main Bldg. (Bldg. A) Project Development on hold 9
Quarterly Project Progress Report ATTACHMENTS Attachments: o Previous Meeting Minutes o Design Schedule Overview o Program Cost Summary o Project Listing Matrix o Design Images Handouts Attachment A Attachment B Attachment C Attachment D Attachment E 0
MEASURE B BOND UPDATE Pierce Joint Unified School District Receives Rating Upgrade from Standard & Poor s and Successfully Sells General Obligation Bonds February 27, 208 The Pierce Joint Unified School District has received an upgrade from Standard & Poor s (S&P s) on its general obligation bonds to AA, based on the District s strong financial profile, stable enrollment, and solid tax base. The District received voter authorization to issue $5 million in general obligation bonds in November 206. The first series of bonds under the authorization (Series A) was issued in May 207. The District was in the market with the second series of bonds under the authorization (Series B) on February 27 th. The Series B bonds received good interest from investors and the District was able to lock in a true interest cost (TIC) for the bonds of 3.90%. The repayment ratio on the Series B bonds was.9 to, significantly less than the statutory maximum of 4.00 to. Despite the increased volatility and uncertainty in the current market, the District was able to lock in a lower borrowing rate for the Series B bonds than for the Series A bonds last year. The Series B bonds will be issued on March 4 th. With the proceeds of these bonds, the District looks forward to continuing with the facilities improvements to our schools.
Pierce Joint Unified School District P.O. Box 239 Arbuckle CA 9592 (530) 476-2892 Fax (530) 476-2289 Carol Geyer, Superintendent ATTACHMENT A Citizens Bond Oversight Committee for Measure B Meeting Minutes December 8, 207. Meeting was called to order at 8:3 by chair, Mike Doherty 2. Roll call was taken. All members were present with the exception of Joh Lauwerijssen who arrived at 8:40 a.m. Guests: Carol Geyer, Daena Meras & George Parker 3. Pledge of Allegiance took place 4. A motion to approve the agenda was made by Edella Maldonado and seconded by Chuck Wayman. Voting Aye: Mike Doherty, Barbara Scheimer, Chuck Wayman, Ariel Alonso, Ellen Voorhees and Edella Maldonado. Voting No: None. Absent: Joh Lauwerijssen 5. Community Input/Public Hearing: No one from the public spoke. Carol Geyer introduced George Parker, the new Capital Projects Manager for the District. 6. a. Quarterly Progress Report - George Parker presented the Quarterly Progress Report. Each member had a copy of the document that George reviewed orally with the group. This report contained an executive summary, information on contractors and procurement, planning/design/pre-construction, program controls, and project updates. Committee members asked questions as they arose regarding the information. b. Minutes from September 8, 207 Citizens Bond Oversight Committee Meeting - A motion to approve the minutes was made by Ariel Alonso and seconded by Ellen Voorhees. Voting Aye: Mike Doherty, Barbara Scheimer, Chuck Wayman, Ariel Alonso, Ellen Voorhees and Edella Maldonado and Joh Lauwerijssen. Voting No: None. Absent: None c. 207 Bond Audit Report Daena Meras distributed a slide presentation to the committee members that the auditor had previously presents. She went through each slide with the committee explaining as she went along. She referenced to the group that they had a copy of the entire audit report in their meeting packet. A question was asked by a member about the $559,43 Issue Premium. Daena explained that this money is set-aside for bond obligations. She stated that the money is in a special account at the county. There are no indirect fees charged by the county on this money. d. Program Updates, Attachments C & D George Parker went through the cost summary of each of the proposed projects from the spreadsheet he presented. This sheet included the current project budget and state share of projected funds as well as notes on certain projects. Attachment D was reviewed. This sheet had each of the projects listed with a matrix showing where the phase of that project is currently. 7. Future Business Next meeting is scheduled for at 8:30 a.m. at the IT Building. A field trip to look at current projects will follow this meeting. 8. Adjournment, 9: 4 a.m. A motion to adjourn the meeting was made by Ellen Voorhees and seconded by Edella Maldonado. Voting Aye: Mike Doherty, Barbara Scheimer, Chuck Wayman, Ariel Alonso, Ellen Voorhees and Edella Maldonado and Joh Lauwerijssen. Voting No: None. Absent: None Board of Trustees: John Friel Nadine High George Green Amy Charter Abel Gomez President Vice-President Clerk Member Member
ATTACHMENT B Measure B Bond Design Schedule Overview AES Classroom Addition Increment - Relocation of (E) Mods (Construction May 8 - August 8). Develop Site Plan for OTC Review at DSA Feb 8 - March 8 2. OTC Approval at DSA Early March 8 3. Bid March 8 - April 8 4. Award May 8 5. Construction May 8 - August 8 Increment 2 - Classroom Building. Finish CD's Feb 8 - April 8 2. Submit to DSA First of May 8 (DSA May, June, July, August) 3. Bid August 8 4. Award September 8 5. Construction September 8 - August 9 PHS Kitchen Modernization and Ag Education Center. Develop CTE Pathway and Grant Starting Feb 8 2. This project is only feasible with an approved CTE Grant PHS Locker Room. Finish CD's April 8 - July 8 2. Submit to DSA First of July 8 (DSA July, August, September, October 8) 3. Bid November 8 4. Award December 8 5. Construction January 9 - July 9 (Coach asked to not take locker room down until after basketball tourney in December 8) PHS Weight Room. Additional design review underway to verify structural elements of existing bldg. 2. Design to commence February 8 incrementally to minimize DSA impacts. 3. Note: The new hardship threshold is $60K. We need to be under that or the whole building is going to be an issue.
ATTACHMENT CC PIERCE JOINT UNIFIED SCHOOL DISTRICT MEASURE B BOND PROGRAM COST SUMMARY PROJECT NO. PROJECT Current Project Budget State Share (Unfunded) Total Estimated Construction Costs Obligations/ Commitments to Date Paid to Date Open Encumbrance STARTING BOND VALUE (Series A $7,000,000) $ 7,559,430.85 $ 559,430.85 Excess Funds Moved to Debt Service Account (Fund 5) Issuance Issuance, Underwriting and Insurance Costs $ 228,82.83 $ 228,82.83 00% 00% AES 0 Classroom Addition & Portable BLdg. Relocation $ 5,6,900.00 $,208,000.00 $ 8,874.50 0.05% % AES 02 AES Kitchen Modernization $ AES 03 Joint Use Project w/county Library $ LJMS 0 Classroom Reconfiguration (Removal of Tech Areas) $ PHS 0 New Multi Purpose Bldg. $ 4,800,000.00 $,49,000.00 $ 4,300,000.00 $ 4,034,87.00 $,778,254.00 $ 2,66,745.00 80% 45% Incl. Const. & Soft Costs PHS 02 Modernize Snack Bar Bldg. Football Field $ PHS 03 Construct Second Locker Room (Girls & Boys) $ 2,22,200.00 $ 850,000.00 $ 00,000.00 $ 28,562.00 *(,920 SF New Const) PHS 04 Modernize Existing Cafeteria into (N) Culinary Classroom $ $ Possible State CTE Funding PHS 05 Portable Classroom Replacement w/new CR Bldg. $ PHS 06 Construct New Weight Room $ 388,000.00 $ 55,200.00 PHS 07 Constr. Career Center at Small Gym $ PHS 08 Farm Expansion Upgrades to Existing Barn $ PHS 09 Agricultural Education Center $ Possible State CTE Funding PHS 0 Modernization of Historic Main Bldg. $ PHS Improvements to Atheltic Complex $ 500,000.00 DM 0 Deferred Maintenance Project All Sites $ DM 02 Infrastructure Upgrades at AES & PHS $ PN7 04 Roof Replacement at (3) Sites $ $ 559,237.00 Fund 4 Capital Outlay $576K Budget PC Program Contingency $,473,900.00 Totals $ 4,500,000.00 $ 3,362,200.00 $ 4,300,000.00 $ 4,362,999.83 $ 2,54,503.33 $ 2,66,745.00 Notes: Bond Sale yielded excess revenue of $559,430.85 and placed into Debt Service Account. Series B Bond Sales expected by March 30, 208 Total expenditures through 2/30/208 total $2,54,504 Estimated State Matching Funds Not assumed to be Released Soon Locker Rm Project Still Undergoing Review for Size & Budget Many project placed on hold until the State Matching Funds can be realized % Obligated % Complete Notes
ATTACHMENT D PIERCE JOINT UNIFIED SCHOOL DISTRICT MEASURE B BOND PROGRAM PROJECT MATRIX PROJECT Initial Planning Pre Design A/E Selection Programming Schematic Design AES 0 Classroom Addition & Portable BLdg. Relocation 3//208, 5/208 Inc. Site Utilites, Relocate Portables Inc. 2 New Bldg. AES 02 Kitchen Modernization Project Pending Programming AES 03 Joint Use Project w/county Library Project on Hold due to Budget Constraints LJMS 0 Classroom Reconfiguration (Removal of Tech Areas) Non Measure B Bond Project PHS 0 New Multi Purpose Bldg. Expect Completion by June 208 PHS 02 Modernize Snack Bar Bldg. Football Field Non Measure B Bond Project PHS 03 Construct Second Locker Room (Girls) Jul 8 PHS 04 Modernize Existing Cafeteria into (N) Culinary Classroom CTE Grant Application Prep. PHS 05 Portable Classroom Replacement w/new CR Bldg. Project on Hold due to Budget Constraints PHS 06 Construct New Weight Room Apr 8 PHS 07 Constr. Career Center at Small Gym Project on Hold due to Budget Constraints PHS 08 PHS 09 Farm Expansion Upgrades to Existing Barn Agricultural Education Center CTE Grant Application Prep. PHS 0 Modernization of Historic Main Bldg. Project on Hold due to Budget Constraints PHS Improvements to Atheltic Complex Project on Hold due to Budget Constraints DM 0 DM 02 PN7 04 Deferred Maintenance Project All Sites Infrastructure Upgrades at AES & PHS Roof Replacement at (3) Sites Non Measure B Bond Project Design Development Construction Documents DSA Bid & Award Construction Close out REMARKS Notes: See specific timelines on Desgin Schedule Overview Document.
ATTACHMENT E CBOC Mtg 3.2.208
46' - 0" CLASSROOM 04 SF CLASSROOM 2 00 SF CUSTODIAL 22 IT 23 CLASSROOM 3 00 SF CLASSROOM 4 04 SF BOYS RR 9 GIRLS RR 0 89' - 0" ROOF LINE ABOVE CLASSROOM 5 CLASSROOM 6 CLASSROOM 7 CLASSROOM 8 04 SF 009 SF 009 SF 04 SF ROOF OVERHANG CANOPY ABOVE FLOOR PLAN ARBUCKLE ELEMENTARY SCHOOL 3/32" = '-0" DSA APP: 0_ - TRENT S. SOMMERS ARCHITECT AND LEED AP 530 : 78 : 32 tsommers@sommersarch.com 370 Business Drive Suite 200 Sacramento, CA 95820 DD 02
A B C D E A4. A2.2-2 A3.0 2 2 A4. REVISIONS: 60' - 0" - --- TYP 5' - 0" 5' - 0" 5' - 0" 5' - 0" 4' - 2" 6' - 7" 3' - 3" 2' - 0" 4' - 0" 6' - 0" 6' - 4" 7' - 3" 3' - 7" 2' - 0" 3' - 9" 0' - 3" R EG I S T ERE D T R E N T S ARC HI TEC T SOMMER S S T A T E LISC NO. C - 33589 EXP 0-3-9 O F C A I L I A FO R N 2 4 5 A4.0 A3.0 2 A4.0 - --- 7' - 6" 7' - 6" 35' - 0" TYP ' - 8" 6' - 4" 3' - /2" 4' - 6 /2" 2' - 0" 5' - 6" 2' - 0" 5' - 6" 2' - 0" 7' - 0" ' - 2" 6' - 4" 42 (2"x24") 3 TIER 68 (2"x2") 6 TIER 20 (2"x24") 2 TIER 80 (2"x2") 4 TIER 3 2 A2.2-4 2 2 OFFICE 5 3 A2.2-2 4 30X48 CLR 30X48 CLR 2 GIRLS LOCKER ROOM 23 7 GIRLS RESTROOM 20 ø 5' - 0" GIRLS SHOWERS 3 6 A2.2-5 8 ø 5' - 0" 36 (8"x36") 2 TIER 2 (E) GYMNASIUM W 50 (8"x36") 2 TIER 30X48 CLR D 2 BOYS SHOWERS 2 BOYS RESTROOM 22 ø 5' - 0" BOYS LOCKER ROOM 24 ø 5' - 0" A2.2-0 - --- OFFICE 0 30X48 CLR 2 20 (2"x24") 80 (2"x2") ø 5' - 0" 42 (2"x24") 68 (2"x2") TRENT S. SOMMERS ARCHITECT AND LEED AP 530 : 78 : 32 TSommers@sommersarch.com 294 Carmel Valley Rd Del Mar, CA 9204 www.sommersarch.com PROJECT NO. DATE PIERCE HIGH SCHOOL LOCKER ROOM ADDITION IDENTIFICATION STAMP DIVISION OF THE STATE ARCHITECT AC FLS SS DRAWN BY CHECKED BY NEW LOCKER ROOM FLOOR PLAN 960 WILDWOOD ROAD, ARBUCKLE, CA 9592 DSA APP: 0_ - FILE NO. - DATE 04-20 - 207 Project Number Issue Date Author Checker LOCKER ROOM NEW FLOOR PLAN /4" = '-0" A2.. PROPOSED NEW LOCKER ROOM SCALE SEE DRAWING TITLE
ALL NEW WINDOWS ALL NEW WINDOWS NEW BEAM NEW BEAM PE STORAGE 34 45 SF (N) CLASSROOM 28 987 SF (N) BOYS RR 29 NEW WEIGHT ROOM 33 75 SF (E) GYMNASIUM 32 5264 SF NEW BEAM NEW LANDING AND RAMP DOWN (-4) NEW STOREFRONT GLASS DOOR (N) GIRLS RR 30 VESTIBULE 3 ALL NEW WINDOWS NEW STOREFRONT GLASS DOOR WEIGHT ROOM PIERCE HIGH SCHOOL 3/32" = '-0" DSA APP: 0_ - TRENT S. SOMMERS ARCHITECT AND LEED AP 530 : 78 : 32 tsommers@sommersarch.com 294 Carmel Valley Rd Del Mar, CA 9204 DD