Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval

Similar documents
CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

Exelkn. PSLTR: # U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

2. Classification of Nuclear Items Ability to identify nuclear components, parts, and appurtenances.

Preservice Inspection (PSI) of Nuclear Power Plant Components

TRAINING ON BACKGROUND AND IMPLEMENTATION OF ASME OM CODE, APPENDIX III

Qualifications for Authorized Inspection

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

PHMSA Update. Kenneth Y. Lee API AGA Joint Committee Oil & Gas Pipeline Welding Practices. Engineering & Research Division

ASME Nuclear Conformity Assessment. Bernard E. Hrubala Sr. Vice President Code and Standards October 7, 2008

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

GUIDE FOR COMPLETING NATIONAL BOARD FORM NR-1, REPORT

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

Control Number: Item Number: 209. Addendum StartPage: 0

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION (V, HV, UD, UV, UV3, UD3, TD, TV)

Saudi International Petrochemical Company Reliability & Engineering Department

NRC INSPECTION MANUAL STSB

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

ARMED SERVICES BOARD OF CONTRACT APPEALS

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF REACTOR REGULATION WASHINGTON, DC September 26, 2005

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT

CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1

DRAFT REGULATORY GUIDE

REGISTRATION FOR MAY 2013 CODE WEEK ATTENDEES

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C April 10, 2018

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

Nuclear Operating Company

license AUTHORITY FILE CC Apv il., 1982

February 13, 2013 EA

U.S. Nuclear Regulatory Commission

Preparation of Environmental Reports for Nuclear Power Stations

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

HEBER LIGHT & POWER COMPANY OPERATIONS DEPARTMENT REQUEST FOR PROPOSAL (RFP) Pole Testing and Pole Inventory

Defense Federal Acquisition Regulation Supplement: Micro- AGENCY: Defense Acquisition Regulations System, Department of

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION {A, M, PP, S, E, H, HLW, U, UM, U2, U3, PRT and T}

NRC INSPECTION MANUAL IRIB

May 23, Docket No License No. DPR-12

Research and Test Reactor Licensing Actions and Lessons Learned

Brachytherapy-Radiopharmaceutical Therapy Quality Management Program. Rev Date: Feb

Redirection of DPRK Nuclear Talent to the LWR Project. Authors: John B. Mulligan, HanKwon Choi. 1

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM

Anchorage Grounds; Galveston Harbor, Bolivar Roads Channel, Galveston, Texas

Title 10: COMMERCE AND TRADE

Request for Proposals for Angeltrax Mobile Video Surveillance Systems

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

NB-263, RCI-1, RULES FOR COMMISSIONED INSPECTORS (RCI-1)

Functions important to nuclear power plant safety, and training and qualification of personnel

HT CAREER PATH (SW) COMMISSIONING OR OTHER SPECIAL PROGRAMS

Minutes Board of Trustees

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

PRESSURE TACK WELDER CERTIFICATE OF COMPETENCY EXAMINATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

National Board Acceptance of Authorized Inspection Agencies (AIA) Accredited by the American Society of Mechanical Engineers (ASME)

Life Extension of Nuclear Power Plants

PROJECT FACT SHEET PROFESSIONAL SERVICES NATURAL GAS PIPELINE ENGINEERING

X STANDARD REVIEW PLAN

TRAINING. Schedules & Updates. The Complete Solution Provider. Technical Training and Certification WELDING AND PAINTING INSPECTION & NDT COURSES

Insider Mitigation Program for Nuclear Facilities. Joe Rivers Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission

FY 2018 Watershed-Based Funding Pilot Program Policy

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

Observations of Implementing the Nuclear Promise for CAP

Pipeline Operational Qualification (OQ) Crosswalks

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

Standard NUC Nuclear Plant Interface Coordination

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

NUCLEAR REGULATION AND LICENSING OF PNPP-1. Dr. Alumanda M. Dela Rosa Director Philippine Nuclear Research Institute

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

QUALIFICATION REVIEW REPORT FOR ACCREDITATION OF AUTHORIZED INSPECTION AGENCIES (INSERVICE)

API Qualification of Ultrasonic Examiners for Sizing Examination Program (QUSE) Candidate Orientation

RFP # Request for Proposal Grant Writing Services. Date: May 11, Proposals must be submitted by 3:00 PM: June 10, 2016

Infrared Reflectance Imaging for Environmentally Friendly Corrosion Inspection Through Organic Coatings Project Number WP-0407

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

Request for Qualifications Professional Engineering Services

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY

Coast Guard NVIC Oct 1992

REQUEST FOR PROPOSAL FOR. Security Cameras

TO: Related departments of CCS Headquarters; Branches and Offices; and Ship Companies

PERFORMANCE WORK STATEMENT FOR. Sustainment/Patching Service U.S. AIR FORCE OWNED LAND MOBILE RADIO (LMR) EQUIPMENT. (ASTRO 25 Core System)

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS

REQUEST FOR PROPOSALS: VIDEO PRODUCTION SERVICES

Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Emergency Preparedness Final Rule Implementation

JOINT FLEET MAINTENANCE MANUAL VOLUME VII CONTRACTED SHIP MAINTENANCE LIST OF EFFECTIVE PAGES

PEC BASIC SAFEGULF SAFELANDUSA ORIENTATION TRAIN THE TRAINER

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

CNL-CNSC Administrative Protocol for the Renewal of the Whiteshell Laboratories Licence and the Proposed In Situ Decommissioning of the WR-1 Reactor

American Recovery and Reinvestment Act (ARRA) Professional Engineering and Related Technical Services

MERCHANT MARINER CREDENTIALING

RFP Online Employee Rewards Program Addendum #1 dated 02/05/2016

Transcription:

Committed to Nudcea r : NMC Praire Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-PI-04-044 MAR 3 0 203 10 CFR 50.55a U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval Pursuant to 10 CFR 50.55a(a)(3)(i), Prairie Island Nuclear Generating Plant requests NRC approval of the attached request for the 3 rd Ten-Year In-Service Inspection Interval. These requirements are associated with the performance of Reactor Vessel Automated Examinations including compliance with ASME Boiler and Pressure Vessel Code Section Xl Appendix Vil Qualification of Nondestructive Examination Personnel For Ultrasonic Examination. Relief Request No. 20 addresses the use of 0.189" root mean square error (RMSE) depth sizing requirements in lieu of 0.125" RMSE sizing requirements as required per American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section Xl, Appendix VIII Supplement 10 Paragraph 3.2(b). This relief request provides requests to use an alternative examination requirement to a previously NRC-approved relief request submitted by the Nuclear Management Company (NMC) on September 17, 2003. Prairie Island Nuclear Generating Plant, as part of the NMC, submitted a Relief Request For an "Alternative to ASME Section Xi, Appendix Vil, Supplement 10." On February 26, 2004, the Nuclear Regulatory Commission approved the Request for Relief for Appendix VIII Supplement 10 for the Prairie Island Nuclear Generating Plant, 3rd Ten Year Interval (TAC Nos. MC0820 and MC0821). The attached request only addresses the use of a 0.189 RMSE value in lieu of 0.125 RMSE. All other provisions of the previously approved relief request for alternatives to Appendix Vil, Supplement 10 will be followed during the examinations. The details of the 10 CFR 50.55a(a)(3)(i) request are enclosed in the attached relief request for Prairie Island Unit 1 and Unit 2 (contained in one document). Nuclear Management Company requests approval by September 1, 2004 to support the 1717 Wakonade Drive East * Welch, Minnesota 55089-9642 Telephone: 651.388.1121 Aj J4v-

i.: 1 USNRC L-PI-04-044 Page 2 NUCLEAR MANAGEMENT COMPANY, LLC refueling outage on Unit 1. The proposed alternative was approved for the Virgil C. Summer Nuclear Station by NRC letter dated February 3, 2004 (TAC No. MC0108). This letter contains no new commitments and no revisions to existing commitments. Please contact Jack Leveille (651-388-1121, Ext. 4142) if you have any questions related to this letter. ice Presid t, Yrairie Island Nuclear Generating Plant cc: Regional Administrator, USNRC, Region IlIl Project Manager, Prairie Island Nuclear Generating Plant, USNRC, NRR NRC Resident Inspector- Prairie Island Nuclear Generating Plant Chief Boiler Inspector, State of Minnesota P. Fisher, Hartford Insurance Attachment: (one document) Prairie Island Unit 1 - RELIEF REQUEST NUMBER: 20 (Rev. 0) Prairie Island Unit 2 - RELIEF REQUEST NUMBER: 20 (Rev. 0) 1717 Wakonade Drive East * Welch, Minnesota 55089-9642 Telephone: 651.388.1121

Prairie Island Unit 1 and Unit 2 3"d Interval Examination Plan Prairie Island Unit 1 - RELIEF REQUEST NUMBER: 20 (Addendum 1) Prairie Island Unit 2 - RELIEF REQUEST NUMBER: 20 (Addendum 1) Alternative to Appendix VIII - Supplement 10 SYSTEM/COMPONENT(S) FOR WHICH RELIEF REQUEST WILL BE USED Code Class: Class 1 Reference: ASME, Section XI, 1989 Edition with no Addenda Examination Category: B-F Item Number: B5.10 Description: Dissimilar Metal Pressure Retaining Piping Welds subject to examination using procedures, personnel, and equipment qualified to ASME Section XI, Appendix VIII, Supplement 10 criteria. Component Numbers: See Table I CODE REQUIREMENTS: A volumetric examination of dissimilar metal pressure retaining piping welds is required per 1989 Edition per ASME Section XI Table IWB-2500-1, Examination Categories B-F, Item No. B5.10. In addition, 10 CFR 50.55a requires these examinations be performed using procedures, personnel, and equipment qualified to the criteria of ASME Section XI, 1995 Edition, 1996 Addenda, Appendix VIII, Supplement 10. PROPOSED ALTERNATIVE: Pursuant to 10 CFR 50.55a(a)(3)(i), relief is requested. As discussed below, this will provide an acceptable level of quality and safety. The inspection vendor to be employed by Prairie Island Nuclear Generating Plant for the remote automated Reactor Vessel examinations did not achieve the 0.125" RMS Appendix VIII, Supplement 10 acceptance tolerance during procedure qualification. Prairie Island Nuclear Generating Plant proposes using the vendor (WESDYNE) achieved sizing error of 0.189" RMS. The proposed procedure to address sizing of the flaws that may be found during the examination is to add to the measured flaw size the difference between the achieved sizing error and the '0.125" RMS Appendix VIII Supplement 10 acceptance criteria. In addition, as a supplementary examination to the volumetric examination, Prairie Island proposes to perform profilometry measurements of the weld inside diameter (ID) profile and to perform a visual inspection (VT-1) of the ID in those areas where an ultrasonic scanning limitation may be encountered. The Ultrasonic Weld Profiling is a tool to assist in the evaluation of poor transducer contact as a result of surface roughness and as a method to provide permanent record of the actual surface condition of the nozzle to pipe/elbow dissimilar metal weld joint. The data is taken with focused Revision 0 Page 1 of 3 Date 3/30/2004

Prairie Island Unit 1 and Unit 2 3rd Interval Examination Plan immersion transducers mounted on the ends of the examination array. The scan stroke is long enough to allow for a surface profile up to 3 inches on either side of the examination volume at approximately 1 degree increments around the nozzle bore. When translated through software, the profile data is presented on a section view scale showing the weld joint and geometry such as root protrusion and counter-bore. Perhaps the most important feature allows the examiner to transpose transducer position along the scan line to evaluate the effect of the geometry on the exam beam To support nozzle bore examinations and provide a confirmation mechanism for surface conditions, a remote enhanced visual examination (EVT) is planned for all four primary nozzles. The ROS PT-10 cameras are positioned near the ultrasonic end-effector. Lighting conditions, focus and zoom are adjustable and the angular/radial position data is transposed on the visual screen for interpretation/correlation with other data. The EVT is capable of a I-mil wire resolution. Visual data will be recorded directly to DVD. BASIS FOR REQUESTING RELIEF On September 17, 2003 Prairie Island Nuclear Generating Plant, as part of the Nuclear Management Company, submitted a Relief Request For Alternative to ASME Section XI, Appendix VIII, Supplement 10. On February 26, 2004, the Nuclear Regulatory Commission approved the Request for Relief for Appendix VIII Supplement 10 for the Nuclear Management Company Fleet Relief Request (TAC Nos. MCO820, MC0821, Prairie Island Nuclear Generating Plant, 3' Ten Year Interval). The 1995 Edition with 1996 Addenda of the ASME Code, Section XI, Appendix VIII Supplement 10, Paragraph 3.2(b), states that the examination procedures, equipment, and personnel are qualified for depth sizing when the RMS (root mean square) error of the flaw depth measurements, as compared to the true flaw depths, is less than or equal to 0.125". An RMS of 0.189" is based on actual vendor demonstrated in-process field qualifications and is the optimum value that could be achieved. Prairie Island Nuclear Generating Plant believes the use of 0.189" RMSE as an adjustment to the measured flaw will ensure a conservative bounding flaw depth value. Revision 0 Page 2 of 3 Date 3/30/2004

Prairie Island Unit 1 and Unit 2 IMPLEMENTATION SCHEDULE: 3rd Interval Examination Plan The proposed alternative is requested for the remainder of the 3 rd 10 Year Interval of the Program for Prairie Island Unit 1 and Unit 2. REFERENCE: By letter dated February 3, 2004, the NRC Staff authorized similar relief for Virgil C. Summer Nuclear Station, Docket No. 50-395 (Relief Request RR-II-20 [TAC No. MC0 108]) Table 1. Dissimilar Metal Pressure Retaining Piping Welds Within Scope of Request 'SI Unit No. Summary No. Component Identification Component Description 1 300518 W-5 Safe End to Nozzle 1 300538 W-5 Safe End to Nozzle 1 300923 W-7 Safe End to Nozzle 2 501130 W- 5 Safe End To Nozzle 2 501151 W- 5 Safe End To Nozzle 2 501484 W-1 1 Safe End to Nozzle 2 501499 W-11 Safe End To Nozzle Revision 0 Page 3 of 3 Date 3/30/2004