ADDENDUM TO INVITATION FOR BIDS Southern Humboldt Unified School District Proposition 39 LED Lighting Upgrade Project Bid No.

Similar documents
I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

Maryland Municipal League Summer Conference How to Fund Energy Projects City of Salisbury

Request for Proposal (RFP) Tell City Troy Township School Corporation LED Conversion Proposal

Light is healing Improving patient outcome in healthcare facilities

One-Stop Efficiency Shop

REQUEST FOR PROPOSALS. Cleaning for Victory Ridge Academy

School Safety Audit Checklist

City of Waterbury Safety & Security Assessment

Knights Ferry Elementary School District

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

LIVONIA PUBLIC SCHOOLS FARMINGTON ROAD LIVONIA, MI (734)

St. Michael s Lutheran Church Church Custodian

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial

CITY OF PORT ARANSAS, TEXAS REQUEST FOR PROPOSAL (RFP) BASEBALL FIELD LIGHTING NOTICE TO BIDDERS

Proposals must be received by the University in pdf format no later than June 16, 2011 at 5:00pm CST.

Public Address System Norwalk Public Schools REQUEST FOR PROPOSAL 1/16/15 Proposal Response Date:

Frequently Asked Questions May 8, 2018 Sinking Fund Election

Request for Proposal: Cabling

Special Operations - Aerospace Pararescue and Recovery Facility (Guardian Angel Rescue Squadron [RQS]). FAC: 1444

Pedernales Electric Cooperative. Comprehensive Commercial Rebate Program Manual

Request for Proposal: Cabling

ADDENDUM NO. 1 SECURITY CAMERA SYSTEM AT 4 HIGH SCHOOLS AND 1 BRIDGES LEARNING CENTER BID NO

REQUEST FOR QUOTATION For Renovation of Juvenile Court Administrative Office

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

Waterford School District 2003 Bond Update

IES 2016 Educa-on Series

Bond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:

Request for Proposal P Computer Training Room Furniture

ILLINOIS VALLEY COMMUNITY COLLEGE, DISTRICT No North Orlando Smith Road Oglesby, Illinois Sound System - Proposal # PR11-P04

Request for Proposal: Wireless Access Points

ERATE 470 FORM # REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: NETWORKING EQUIPMENT Stanton Community Schools

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP

Pierce Joint Unified School District P.O. Box 239 Arbuckle CA (530) Fax (530)

ADDENDUM NO. 1. ATTENTION TO PLANHOLDERS OF RECORD is called to the following revisions of the contract documents:

Website:

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

REQUEST FOR FACILITIES or EQUIPMENT USAGE SETON LaSALLE CATHOLIC HIGH SCHOOL (Use Only Black Ink to Complete)

Higher Education Energy Efficiency Partnerships

Commercial Lighting Program PROGRAM GUIDE. *Manitoba Hydro is a licensee of the Trademark and Official Mark.

CITY OF PORT ARANSAS, TEXAS REQUEST FOR PROPOSAL (RFP) FIRE STATION TEMPORARY FACILITY NOTICE TO BIDDERS

Herricks Union Free School District Capital Improvements Bond Update. July 20, 2017

ROLLING RIVER SCHOOL DIVISION REGULATION

REQUEST FOR PROPOSAL FOR SECURITY CAMERA INSTALLATION: Stones River Baptist Church. 361 Sam Ridley Parkway East. Smyrna, Tennessee 37167

RFP ADDENDUM NO. 1 DISTRICT RFP NO. SV EDUCATION, CLASSROOM, MISCELLANEOUS SUPPORT FURNITURE AND RELATED PRODUCTS AND SERVICES

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

What s Next for Proposition 39: Beyond the Fifth Year! Anna Ferrera SEC Executive Director

Request for Qualifications & Proposal

Asbury Communities, Inc. Asbury Methodist Village Human Resources Department

City of Coquitlam. Request for Information and Qualifications RFIQ No Design Services for Maillardville Community Centre

SERVICES REQUEST FOR PROPOSAL (RFP) FOR JANITORIAL

E-BOOK // DOUBLE SWITCH DIAGRAM LIGHTS

Bond Projects Update A. R. Rucker Middle

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III)

COST SAVINGS AND EFFICIENCIES

REQUEST FOR BID BOXLIGHT PROJECTOWRITE3 INTERACTIVE PROJECTORS and LAMPS4LIFE FOR ILLINOIS VALLEY COMMUNITY COLLEGE BID # BID2013-B09

MULTMED MODULAR MEDICAL BED LIGHT

PLEASE QUOTE PRICES FOB DESTINATION TO BE DELIVERED TO ITEM DESCRIPTION/SPECIAL INSTRUCTIONS QUANTITY UNIT PRICE EXTENDED PRICE

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

Referendum Review and Report. School Board Meeting, July 11, 2016

Energy Savings Bid Program 2007 Policy Manual

105 CMR : GENERAL STANDARDS OF CONSTRUCTION FOR LONG TERM CARE FACILITIES IN MASSACHUSETTS

WHEELING-OHIO COUNTY BOARD OF HEALTH WHEELING-OHIO COUNTY HEALTH DEPARTMENT

Enclosed please find the inspection report for the above-referenced location.

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift (Class II)

medical and commercial f ields.

RULES OF THE TENNESSEE DEPARTMENT OF INTELLECTUAL AND DEVELOPMENTAL DISABILITIES OFFICE OF LICENSURE

RULES OF TENNESSEE DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION CHAPTER ADEQUACY OF FACILITY ENVIRONMENT AND ANCILLARY SERVICES

ALABAMA THE UNIVERSITY OF ALABAMA SURPLUS PROPERTY SALE PS /15/15

PROPOSAL FOR REVIEW AND COMMENT

EASYLINE SYSTEM OVERVIEW

The Killeen ISD Board of Trustees unanimously approved calling a $426 million bond election, consisting of two propositions, to be held on May 5,

2018 Facility Master Plan

LED T8 - LINEAR REPLACEMENT LAMP DIRECTFIT COATED GLASS SERIES 5 UL TYPE-A

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

September 14, 2016 ADDENDUM NO. 1 SPECIFICATION NO FOR REPAIR SERVICES FOR VEHICLE IMMOBILITY DEVICES ( BOOTS )

Enclosed please find the inspection report for the above-referenced location.

SOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES

Enclosed please find the inspection report for the above-referenced location.

HOME RENOVATION TAX CREDIT (HRTC)

DOD SPACE PLANNING CRITERIA CHAPTER 230: EDUCATION AND TRAINING AUGUST 7, 2015

Part B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships

OSHPD 3 CLINIC CERTIFICATION INSTRUCTIONS

Green Building Incentive Guidelines

Introduction and Instructions

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift High School (Class II)

Classroom Chronicle. Security grant to help district. Capital project vote Dec. 5. New visitor identification equipment to be purchased.

BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election

GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated

A PROMISE MADE, A PROMISE KEPT. Cape Fear Valley s New Hospital Finally Delivers

Cities of Rockland, South Portland and Biddeford, and Town of Falmouth, Maine

Q & A from November 1st Tour

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations.

Dated: 8/29/17. IFB No. B For Purchase & Installation of Manufactured Home

INTRODUCTION BACKGROUND

Grant Application to the Alaska Energy Authority Emerging Energy Technology Fund Grant Program AEA COVER PAGE

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

Transcription:

ADDENDUM TO INVITATION FOR BIDS Southern Humboldt Unified School District Proposition 39 LED Lighting Upgrade Project Bid No. 17-006 Addendum #1 March 22, 2017 To All Prospective Bidders: The Southern Humboldt Unified School District (District) herewith issues Addendum No. 1 to the above-referenced solicitation. This Addendum shall be made part of the Contract Documents and the bidder shall acknowledge receipt thereof on the Bid Proposal Form. Except as specifically modified by this document, all other terms and conditions remain in full force and effect. 1. In the Notice Inviting Bids, page 4, section 2: The RCEA website shall be revised to: http://www.redwoodenergy.org/index.php/services/bidopportunities 2. Appendix A is replaced in its entirety with a revised Appendix A, attached to this addendum. Notes/comments on changes to Appendix 2, Table 1: Quantities and totals have been updated. Area F1: Bathroom was added. Area C1: Storage by Boiler was removed. Ballast Type was changed from Normal Power Output Ballast to also indicate the number of lamps driven by the ballast. Notes/comments on changes to Appendix 2, Table 2: B001: Head Start Building was removed from the scope. Quantities and totals were updated. Notes/comments on changes to Appendix 2, Table 3 and Table 4: Impact cages were added to the proposed fixture. Notes/comments on changes to Appendix 2, Table 5: Quantities and totals were updated. 20W Canopy fixtures by office were changed to 10W. s already upgraded to LED were removed from scope. 1

3. Appendix B is replaced in its entirety with a revised Appendix B, attached to this addendum. Notes/comments on changes to Appendix B: Quantities were updated. recommendations were updated with fixtures that meet DLC Technical Requirements 4.0+. 4. Appendix C is replaced in its entirety with a revised Appendix C, attached to this addendum. Notes/comments on changes to Appendix C: Exterior fixtures were added to the Agnes Johnson School map. Interior areas included in the scope of work were highlighted on the Redway School map. 2

APPENDICES Appendix A Itemized Scope of Work Retrofit existing fluorescent fixtures with new tubular LED T8 lamps and compatible electronic ballasts: Table 1. Agnes Johnson School Linear Fluorescent Lighting Area Type s per Fixt Ballasts Lamp Type Lamp Type Ballast/ Type C: Boiler Room Strip 2 2 2 4 40W 4' T12 12W 4' LED T8 5000K 2-Lamp NPO Ballast D: Office 2 8 Wrap 2 4 4 8 40W 4' T12 12W 4' LED T8 5000K 4-Lamp NPO Ballast New 4 Fluorescent Wrap 1 2 1 2 E: Office 1 4' Wrap 40W 4' T12 12W 4' LED T8 5000K F: Front (Main) Office 4' Wrap 2 4 4 8 40W 4' T12 12W 4' LED T8 5000K 4-Lamp NPO Ballast F1: Bathroom 2 Wrap 1 1 1 1 17W 2 T8 7W 2 LED T8 5000K 2-Lamp NPO Ballast (2 ) G: Computer Lab & 17 2 17 32 Library Portable Troffer 40W 4 T12 12W 4 LED T8 5000K 2-Lamp NPO Ballast H:Portable Room 8 Troffer 8 2 8 16 40W 4 T12 12W 4 LED T8 5000K 2-Lamp NPO Ballast H1: Room 8 Side 2 4 4 8 Office Troffer 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast H2: Room 8 Side Bay Troffer 2 2 2 4 40W 4 T12 12W 4 LED T8 5000K 2-Lamp NPO Ballast J: Custodial Storage Strip 1 1 1 1 40W 4 T12 12W 4 LED T8 5000K 1-Lamp NPO Ballast K: Boy s Restroom 8 Wrap 2 4 2 4 40W 4 T12 12W 4 LED T8 5000K 2-Lamp NPO Ballast L: Girl s Restroom 8 Wrap 2 4 2 4 40W 4 T12 12W 4 LED T8 5000K 2-Lamp NPO Ballast M: Room 6 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast N: Room 5 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast O: Room 4 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast 3

Area Type s per Fixt Ballasts Lamp Type Lamp Type Ballast/ Type P: Room 3 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast Q: Room 2 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast R: Room 1 Box 8 4 16 32 40W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast Totals 90 56 144 284 Table 2. Redway Linear Fluorescent s Building Area Description s per Ballasts Lamp Type Lamp Type Ballast Type B001 Break Room 1 4 1 4 32W 4 T8 12W 4 LED T8 5000K 4-Lamp NPO Ballast B001 Office/Basement 1 4 1 4 32W 4 T8 12W 4 LED T8 5000K 4-Lamp NPO Ballast B001 Storage/Basement 5 4 5 20 32W 4 T8 12W 4 LED T8 5000K 4-Lamp NPO Ballast B001 Kitchen 4 3 4 12 32W 4 T8 12W 4 LED T8 5000K 3-Lamp NPO Ballast B001 Performance Stage 6 4 6 24 34W 4 T8 12W 4 LED T8 5000K 4-Lamp NPO Ballast B006 Hallway 14 2 14 28 17W 2 T8 7W 2 LED T8 5000K 2-Lamp NPO Ballast B006 Psychologist 2 3 2 6 32W 4 T8 12W 4 LED T8 5000K 3-Lamp NPO Ballast B006 Speech 2 3 2 6 32W 4 T8 12W 4 LED T8 5000K 3-Lamp NPO Ballast B006 Special Ed 7 2 7 14 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast B006 Occupational 32W 4 T8 12W 4 LED T8 5000K 3-Lamp NPO Ballast 2 3 2 6 Therapy B006 English Language 2 3 2 6 32W 4 T8 12W 4 LED T8 5000K 3-Lamp NPO Ballast B006 Unisex Restroom 1 2 1 2 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast B006 Janitor 1 1 1 1 32W 4 T8 12W 4 LED T8 5000K 1-Lamp NPO Ballast B006 Girls RR 1 2 1 2 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast B006 Boys RR 1 2 1 2 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast B006 SDC-1 18 2 18 36 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast 4

Building Area Description s per Ballasts Lamp Type Lamp Type Ballast Type B006 Resource 8 2 8 16 32W 4 T8 12W 4 LED T8 5000K 2-Lamp NPO Ballast B007 Office 8 4 8 32 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B007 Closet 1 4 1 4 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B007 Restroom 1 4 1 4 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B007 Office 2 4 2 8 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B007 Conference Room 4 4 4 16 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B007 Quiet Room 2 4 2 8 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B008 Classroom 10 4 10 40 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B008 Band Locker 2 4 2 8 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B009 Classroom 12 4 12 48 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast B010 Classroom 12 4 12 48 34W 4 T12 12W 4 LED T8 5000K 4-Lamp NPO Ballast Totals 130 86 130 405 Replace HID high bay fixtures with new LED high bay fixtures: Table 3. Agnes Johnson High Bay s Area Type s A: Gym/Cafeteria High Bay 9 Description 400W Metal Halide Mounting Type Accessories Monopoint suspended 160W LED High Bay 5000K Impact Cages 5

Table 4. Redway High bay s Building Area Type s Description Mounting Type Accessories B001 Gym/Cafeteria High Bay 1 250W Metal Halide Monopoint suspended B001 Gym/Cafeteria High Bay 11 400W Metal Halide Monopoint suspended Replace existing exterior fixtures with new LED fixtures: Table 5. Agnes Johnson Exterior s. Also see Map in Appendix C. 160W LED High Bay 5000K 160W LED High Bay 5000K Impact Cages Impact Cages Location Type s Description Mounting Controls Height Type Sensor Outside Office Canopy 3 2-Lamp 14W CFL Surface Ceiling Time Clock 10 10W LED Canopy 5000K None Outside 7 classrooms Strip 1-Lamp 40W 4 T12 Surface Ceiling Time Clock 10 20W LED Canopy 5000K Cafeteria corner Security 1 2-Lamp CFL Surface- Wall Motion Sensor 10 RAB 12W Bullet Flood Motion Sensor Basketball courts 1 175W Mercury 24-29W LED Cobrahead Streetlight 5000K, Type V Streetlight Vapor Pole Tenon Unknown 20 Distribution Pattern Photocell Portables Wallpack 2 26W CFL Surface Wall Switch 9 20W LED Wallpack 5000K Photocell Cafeteria Wallpack 1 35W HPS Surface Wall Time Clock 9 20W LED Wallpack 5000K Photocell Cafeteria Wallpack 1 45W Incandescent Surface Wall Time Clock 9 20W LED Wallpack 5000K Photocell Total 16 6

Add occupancy sensors to restrooms and classrooms: Table 6. Rooms needing occupancy sensors Room Controls Control Type Mounting Location Girls and Boys Bathrooms 2 Dual technology occupancy sensor Ceiling Classrooms 1-6 6 Dual technology occupancy sensor Wall, near corner 7

Appendix B Lighting Equipment List Type Equivalent Qty 12W 4 LED T8 5000K Philips 12W Instantfit 12T8/48-5000 or 10W Instantfit 10T8/48-5000 638 7W 2 LED T8 5000K Philips 7W Instantfit 7T8LED/24-5000 29 1-Lamp NPO Ballast Philips Advance ICN-1P32-N-35I 2 2-Lamp NPO Ballast Philips Advance ICN-2P32-N-35I 83 3-Lamp NPO Ballast Philips Advance ICN-3P32-N-35I 12 4-Lamp NPO Ballast Philips Advance ICN-4P32-N-35I 175 10W LED Canopy 5000K RAB VANLED10 3 20W LED Canopy 5000K RAB VANLED20 7 29W LED Pole Mount 5000K Cree XSP 29W 1 20W LED Wallpack 5000K Atlas WSPS20 4 160W LED High Bay 5000K Cree CXB-A-UV-M-50K-8-UL-10V with CXB16P16 Reflector and WG-AP impact cages 21 16.5W U LED T8 5000K Philips 16.5W InstantFit 16.5T8/22.5-5000 2 12W Bullet Flood (double head) RAB 2X12 BULLET with motion sensor 1 Dual Technology Ceiling Mount Occupancy Sensor and power pack Leviton O2C05-MDW 2 Dual Technology Wall Mount Occupancy Sensor and power pack Leviton OSW12-M0W 6 4 Fluorescent Wrap Lithonia LB-2-32-MVOLT 1 8

Appendix C Agnes Johnson School Site map 9

Appendix D Redway School Site map Exterior fixtures at Redway are not part of the scope of work. Only the highlighted (pink) buildings are included in the interior lighting retrofit. 10