Redesigning the Acute Coronary Syndrome (NSTE- ACS) pathway at Morriston Cardiac Centre - The case for change

Similar documents
March 28, 2018 For Decision Board of Directors Item 9.0 Comprehensive Regional Cardiac Program Plan

The PCT Guide to Applying the 10 High Impact Changes

Acceleration for ACS. NSTEMI Event 09 November. Outputs from Table Discussions

Background Paper For the Cardiology Audit and Registration Data Standards (CARDS) Conference during Ireland s Presidency of the European Union

Home administration of intravenous diuretics to heart failure patients:

Acute myocardial infarction: Tracking patients journeys and outcomes in a complex, acute healthcare system

Ambulance Operations Procedure Appropriate Hospital Access for ST Elevation Myocardial Infarction Patients. National Ambulance Service (NAS)

Intermediate Coronary Care Unit Rotation

CWM TAF LOCAL HEALTH BOARD

Specialised Services Service Specification. Adult Congenital Heart Disease

The PCT Guide to Applying the 10 High Impact Changes. A guide from NatPaCT

EP15: Describe and demonstrate interdisciplinary collaboration using continuous quality and process improvement.

Salisbury NHS Foundation Trust Individual Placement (Job) Descriptions for Foundation Year 1

SIMPLE SOLUTIONS. BIG IMPACT.

PURPOSE: The purpose of this policy is to establish requirements for designation as a STEMI Receiving Center (SRC) in San Joaquin County.

NHS Improvement advice to the Competition and Markets Authority Proposed merger of Burton Hospitals NHS Foundation Trust and Derby Teaching Hospitals

STEMI SYSTEM RECEIVING CENTER STANDARDS AND DESIGNATION

Main body of report Integrating health and care services in Norfolk and Waveney

Together for Health A Delivery Plan for the Critically Ill

NHS. Challenges and improvements in diagnostic services across seven days. Improving Quality

STEMI RECEIVING CENTER

Specialised Services Commissioning Policy: CP160 Specialised Paediatric Neurological Rehabilitation

Wales Critical Care & Trauma Network (North)

Seven Day Services Clinical Standards September 2017

Using mortality data to improve the quality and safety of patient care December 2015

REPORT 1 FRAIL OLDER PEOPLE

Your Care, Your Future

Committee of Public Accounts

CARDIAC CARE UNIT CARDIOLOGY RESIDENCY PROGRAM MCMASTER UNIVERSITY

Taking Organ Transplantation to 2020 Abertawe Bro Morgannwg University Local Health Board Action Plan

Integrated heart failure service working across the hospital and the community

SERVICE SPECIFICATION 2 Vascular Access

GOVERNING BODY MEETING in Public 27 September 2017 Agenda Item 5.2

Golden Jubilee National Hospital. Leading Quality, Research. and. Innovation

21 March NHS Providers ON THE DAY BRIEFING Page 1

Sue Brown Clinical Audit and Effectiveness Manager. Safety and Quality Committee

Cardiac patient workshop Pre-read document extended version - Proposed interventions (detailed) - Background to programme - Glossary

Specialised Services Service Specification: Inherited Bleeding Disorders

Curriculum Cardiac Catheterization

THE HEART DISEASE DELIVERY PLAN OF POWYS TEACHING HEALTH BOARD

Transforming Cancer Services In South East Wales

NORTH OF SCOTLAND PLANNING GROUP

INFORMATION STANDARDS GOVERNANCE PROCESS. INFORMATION STANDARD Draft FINAL PROPOSAL FOR NEW OR CHANGED (INCLUDING RETIRED) INFORMATION STANDARD

Buchanan, 1996; Knaus, Felton, Burton, Fobes, & Davis 1997, J. of Nsg Administration

Delivering the QIPP programme: making existing services improve patient outcomes

DUFFERIN COUNTY PARAMEDIC SERVICE

Clinical Cardiology Adult Congenital Heart Disease Clinical Service (1 month)

STEMI Receiving Center Designation Process

STEMI ALERT! Craig M. Hudak, MD, FACC,FACP 24 January 2015

South East Coast Complex Cardiology Services

NHS WAITING TIMES IN WALES EXECUTIVE SUMMARY

JOB DESCRIPTION. The post holder will take a key role in leading and developing the Stroke specialist nursing service across the organisation.

BARIATRIC SURGERY SERVICES POLICY

September Workforce pressures in the NHS

Pre-hospital emergency care key performance indicators for emergency response times

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

POSITION STATEMENT ON THE FUTURE MODEL OF NEUROSCIENCES IN MID AND SOUTH WALES. Chief Executive

Consultation on Congenital Heart Disease PAPER C

Plan for investment of retained marginal rate payment for emergency admissions in Gloucestershire

Objective Measurement

Two Hospitals-One Heart: World Class Heart Care through Multi-Disciplinary Collaboration

NHS Grampian. Intensive Psychiatric Care Units

Marginal Rate Emergency Threshold. Executive Summary

Integrated Performance Report

Commissioning for Quality and Innovation (CQUIN) Specialised Scheme Guidance for November 2016

STROKE AND HEART ATTACK PROJECT WORLD HEALTH ORGANIZATION/ MILLENIUM CHALLENGE ACCOUNT- MONGOLIA

Evaluation of the Hywel Dda Community Pharmacist pilot optimising medicines treatment in heart failure.

Angiography and Angioplasty

FULL TEAM AHEAD: UNDERSTANDING THE UK NON-SURGICAL CANCER TREATMENTS WORKFORCE

PARTICULARS, SCHEDULE 2 THE SERVICES, A Service Specification. 12 months

Organisational factors that influence waiting times in emergency departments

Health Care Quality Indicators in the Irish Health System:

Review of Follow-up Outpatient Appointments Hywel Dda University Health Board. Audit year: Issued: October 2015 Document reference: 491A2015

POSITION DESCRIPTION Job Title: Interventional Cardiology Fellow Last updated: June 2016

Acute Coronary Syndromes (ACS) Provincial Orders Dissemination. Final Evaluation Report

NHS Bradford Districts CCG Commissioning Intentions 2016/17

Northumberland, Tyne and Wear NHS Foundation Trust. Board of Directors Meeting. Meeting Date: 25 October Executive Lead: Rajesh Nadkarni

Seven day hospital services: case study. South Warwickshire NHS Foundation Trust

Working to improve the delivery of services for cardiac and stroke patients and their families across Cheshire and Merseyside

Duke Life Flight. Systems of Care for Time Dependent Emergencies. Disclosures. Disclosures 9/19/2017

Final. Andrew McMylor / Dr Nicola Jones. Jeremy Fenwick, Battersea Healthcare CIC

Heart attack care in Ireland 2014

Standard of Care for MTC inpatients

Final. Andrew McMylor / Dr Nicola Jones

Redesign of Front Door

Emergency admissions to hospital: managing the demand

The Cardiology Landscape

San Joaquin County Emergency Medical Services Agency

IN THIS ISSUE... KEOGH REVIEW PROGRESS

April Clinical Governance Corporate Report Narrative

Introduction. Singapore. Singapore and its Quality and Patient Safety Position 11/9/2012. National Healthcare Group, SIN

THE CANADIAN CARDIOVASCULAR SOCIETY QUALITY INDICATORS E- CATALOGUE QUALITY INDICATORS FOR TRANSCATHETER AORTIC VALVE IMPLANTATION (TAVI)

Improving Access to Psychological Therapies. Guidance for Commissioning IAPT Training 2012/13. Revised July 2012

South Warwickshire s Whole System Approach Transforms Emergency Care. South Warwickshire NHS Foundation Trust

Expert Rev. Pharmacoeconomics Outcomes Res. 2(1), (2002)

End of Life Care. LONDON: The Stationery Office Ordered by the House of Commons to be printed on 24 November 2008

Boarding Impact on patients, hospitals and healthcare systems

Board Meeting. Date of Meeting: 28 September 2017 Paper No: 17/62

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report

Gwent Clinical Futures

Transcription:

Redesigning the Acute Coronary Syndrome (NSTE- ACS) pathway at Morriston Cardiac Centre - The case for change 4 th July 2012 Dr D Smith & Dr S Dorman Introduction... 2 NSTE-ACS Where are we now?... 2 NSTE-ACS - Proposed future model of care... 6 How do we get there?... 8 The case for change... 10 Immediate action required... 11 Conclusion... 11

Introduction In a recent report by the Office of National Statistics Ischaemic heart disease was recognised to be the biggest cause of avoidable death in England & Wales as a whole. The report goes on to highlight that in 2010 whilst the age-standardised avoidable mortality rate for England was 181.4 per 100,000 population, the rate of avoidable mortality in Wales was significant higher at 205.2. Contemporary management of Acute Coronary Syndromes is a key component in reducing this avoidable mortality and inequity of access to timely revascularisation in Wales remains a major factor accounting for this. The situation is particulary acute in Mid & West Wales where patient s will currently wait an average of 7 days before they can be transferred to the Morriston Cardiac Centre to undergo angiography and revascularisation. Whilst the introduction of a 24/7 region wide Primary PCI service has transformed the care of patient s with ST elevation myocardial infarction( STEMI), these only represent one third of patient s with Acute Coronary Syndromes. The Non ST elevation Acute Coronary Syndromes ( NSTE-ACS) represent the majority of patient s and the quality of care that this patient group currently receives in Mid & West Wales is sub standard by all international comparisons. NSTE-ACS does not carry the same high initial risk of adverse events (such as death, stroke or recurrent heart attack) as STEMI, but contrary to popular belief, it does carry the same long term risk for adverse events if optimum treatment is not carried out urgently within a 96 hour time frame from initial admission to hospital (NICE recommended treatment time target). Therefore our current heart attack service is optimal for only the minority of our heart attack patients, with the majority of patients with NSTE-ACS having sub-optimal treatment with the greater likelihood of consequent adverse outcomes. This paper makes the case for structural changes to our historic model of care for patients with NSTE-ACS in order to transform the quality of care delivered to this patient group. As a by product it is likely that significant savings will be realised at a health board level because of the inherent inefficiencies of the current model of care. NSTE-ACS Where are we now? Current model of care in Mid & West Wales Morriston Cardiac Centre serves a secondary and tertiary catchment population of just under 1 million people. As well as the local Swansea population this results in over 800 referrals from surrounding hospital for patient s with NSTE-ACS per year.

A patient will typically be risk stratified in the referring hospital using the GRACE scoring system and then electronically referred after a minimum of 24 hours. The GRACE scoring system is the preferred tool recommended by NICE & 1000 lives plus for patient risk stratification.

If the patient is admitted to the referring hospital at the weekend they will frequently not be referred until the Monday ward round.

Equally at the current time, whilst we provide a 24/7/365 PPCI service for STEMI patients, we do not provide angiography and angioplasty at the weekend for NSTE-ACS. Therefore if an NSTE-ACS patient arrives in Morriston after 5pm on a Friday they will not receive angiography until Monday 9am at the earliest (a gap of 65 hours). Once the patient has been electronically referred there is an average wait of 6.8 days in the referring hospital before the patient can be transferred to Morriston hospital. There is no clinical utility in this waiting period and it is positively detrimental clinically, economically and socially. A complex set of reasons underpins the inability to transfer patient s more quickly. The principal determinants are however insufficient Catheter lab capacity, local bed pressures at Morriston, and limitations of Ambulance transport outside of normal working hours. Morriston Cardiac Centre has not expanded it s Cath lab capacity since 2005 despite increasing demands on the service from complex coronary intervention, electrophysiological procedures and most recent structural interventions such as TAVI. In addition bed pressures from the acute medical take, infection control outbreaks, long surgical waiters provide added complexity in physically accommodating these patients. Once patient s do undergo angiography + PCI they will usually go home either that evening or the next day, with the exception of patient s requiring surgical revascularisation. Within the Cardiac centre we have a dedicated team of Cardiac Nurse practitioners who have historically supported the transfer process. There are however competing demands on their time and they are not currently able to devote sufficient time to streamlining the transfer arrangements.

The delays within the NSTE-ACS transfer system are now so profound that the annual UK audit of PCI by the British Cardiovascular Intervention Society (BCIS) identifies Morriston as being one of the worst performing units in the country in this respect. NSTE-ACS - Proposed future model of care Evidence based management of NSTE-ACS There is currently a wealth of evidence based guidelines from which to choose for the contemporary management of NSTE-ACS patients. There include the European society of Cardiology guidelines 2011, NICE guidelines (CG94) and 1000 lives plus ACS guidelines. All of these guidelines contain common themes and advocate safe, effective, patient centred care. Essentially NSTE-ACS patient s require early diagnosis, appropriate pharmacotherapy and risk stratification to assess the likelihood of future cardiac events. Those found to be at medium to high risk of events need to be referred for coronary angiography with a view to either: continued medical therapy (drugs), coronary angioplasty or coronary bypass surgery, depending on the results of angiography and other clinical findings. This whole process needs to take place ideally within 48 hours (European guidance) or at least within 96 hours (NICE guidance).

The 2010 NICE algorithm for the management of NSTE-ACS patients is provided below. Whilst this business case discusses NSTE-ACS inter hospital transfers which represent 70% of the total interhospital transfer work it must be recognised that there are equally important issues concerning the long inter hospital transfer times for Non ACS patients. In particular patients awaiting permanent pacemaker implantation and treatment for endocarditis are undoubtedly receiving an inferior service and any solution to the inter hospital transfer issues should try to accommodate this equally important patient group who are currently waiting an average of 9.2 days. It has been quoted by the ABM health board executive that our Heart attack service would bear comparison to any service worldwide. This only applies to the minority of heart attack patients which present as ST elevation MI, our current service to NSTE-ACS patients is amongst the worst in the UK.

How do we get there? The principal issue for providing safe, effective, patient centred care for our NSTE-ACS cohort is to improve the currently unacceptable transfer times. The essential requirement is to provide the right care for the NSTE-ACS patient at the right time in the right place. This will undoubtedly necessitate changes to current working practices which have historically been organised around a pattern of Monday to Friday, 9-5 working. How do we improve transfer times? Timely transfer of patient s with NSTE-ACS is dependent on a number of key variables, and requires that the service has the potential to operate 24/7 365 days a year. The key variables are: Early recognition & prompt referral from surrounding hospitals Bed availability at Morriston Cardiac Centre to receive the patients Ambulance availability to facilitate patient transfer A trained Cath lab team & Cath lab capacity to perform angiography + intervention Flexing capacity to deal with the significant variations in weekly referrals Volume of Primary PCI workload Only when deficiencies in all variables are correctly identified and treated and the service is reorganised around a 7 day working week will significant improvements be made. The dependencies are now discussed in more detail. Early recognition & prompt referral Early recognition is highly dependent on the skill mix and availability of staff in referring units. In an ideal world all NSTE-ACS patient s would be seen and risk stratified by a Consultant Cardiologist within 24 hours of admission. This is a stated requisite of the Welsh National Service Framework for Cardiovascular disease. This is not however currently practical in many referring units within Mid & West Wales and so novel solutions will be required involving the use of Cardiac nurse practitioners, automated scoring systems and early discussion with the Cardiac Centre. The Cardiac network is currently facilitating this piece of work.

Bed availability at Morriston Cardiac Centre Availability of limited beds in the cardiac centre is heavily dependent on a number of factors Ward closures due to D& V & Norovirus outbreaks Acute medical bed pressures Upskilling of medical & nursing staff on Ward R Delays in repatriation Cardiac surgical workload and CITU bed availability Bed management policy & practical thereof In practice it is often the case that when there are hospital wide bed pressures the first group of patients to suffer are the cardiac interhospital transfers. This is in part related to the current bed management arrangements and the natural tendency to prioritise the patient who is in front of you. There have already been 2 cases of cardiac patients who appear to have died whilst awaiting transfer and it is no longer acceptable for the bed management arrangements to remain as they do currently Ambulance transfer Ambulance transfer arrangements are complicated and have been extensively reviewed previously. The dependencies include the funding arrangements for the Jumbulance, the ability to use 999 ambulances when needed, and the ability to access private ambulances. The large travel times to hospitals in West Wales have a particularly profound impact on capacity. Cath lab capacity Morriston Cardiac Centre is currently failing to operate a region wide emergency ACS revascularisation service, elective revascularisation & EP service and a structural heart disease service for a population of around 1 million from 2 Catheter laboratories and 1 pacing room. It is not uncommon for a UK district general hospital to have similar facilities for half the size of population with no EP or structural heart disease service. It is abundantly clear that currently Cath lab capacity is a major limiting factor in meeting contemporary ACS revascularisation targets. In the long term there will need to be a significant expansion in the Cardiac Centre however realistically in the short term extended hours of operation of the existing Cath labs or a mobile facility are likely to be most appropriate. Flexing capacity

Whilst the average number of ACS & General Cardiology referrals is around 16 per week, there is significant weekly variation from 6 to 25 referrals. This poses logistical challenges and mandates a degree of flexibility to match demand and capacity. Volume of Primary PCI workload There is significant variation in this areas which affects not only bed capacity within the Cardiac Centre but also the capcity of the on call interventional team to perform additional out of hours revascularisation workload The case for change Continuing with the status quo is unacceptable on clinical, economic and social grounds. Whilst the current system undoubtedly is delivering inferior clinical outcomes it is also highly expensive in terms of wasted bed days and the social cost to the patient of inappropriately long hospital stays. If we were to achieve a 48 hour transfer window for all cardiac inter hospital transfers this would save ABMU and Hywel Dda health boards around 4000 bed days recurrently per annum with an estimated financial savings of over 1 million.

Immediate action required Preliminary analysis has suggested that the most significant deficiencies in the system are currently the Cath lab capacity and ensuring a transfer bed is available. A composite of different solutions is likely to be required including but not limited to: 7 day working week system for the Cath lab team Extended opening hours of Cardiac Short stay Up skilling and appropriate resourcing of nursing & medical staff on Ward R Greater autonomy in bed management of Ward R Use of a mobile Catheter lab system Ringfencing of prioritised Inter hospital transfer beds Greater nurse practitioner involvement in co-ordinating transfers Due to the complex and dynamic interdependencies described previously we strongly advocate a move away from the traditional pattern of 9-5 service provision. In order to fine tune the exact operational requirements we would propose a 6 month pilot of extended Cath lab working including evening and weekend sessions. This mandates a change in the health board s approach to bed management to one that prioritises cardiac inter hospital transfers. By doing this we are more likely to realise greater bed efficiencies across the whole of this health board as well as Hywel Dda. Conclusion Cardiac disease remains the biggest killer in Wales and a significant proportion of this is avoidable. The current model of service provision for the majority of heart attacks in Mid & West Wales is inequitable, clinically outdated and financially unsustainable in the current climate. Whilst we have made successful progress with Primary PCI in treating ST elevation myocardial infarction, NSTE-ACS remains the elephant in the room in attempting to provide contemporary management of Acute Coronary Syndromes. Delays in inter hospital transfers remain the single biggest failing of the system

and pose an ongoing and ever present clinical risk to patient s and the health board. The financial, emotional and social cost of the current system cannot be allowed to continue any longer. We strongly advocate a long term structural solution which will involve increasing Cardiac Centre capacity allied to 7 day working. However an immediate interim solution is required that increases Cath lab capacity in conjunction with increased bed availability for inter hospital transfers. It should be recognised that such an interim solution may be necessary for the next couple of years until sufficient additional capital infrastructure has been realised. Succesful implementation of this enhanced service will be of undisputed benefit to patients but also has the potential to save over 4000 bed days recurrently per annum across ABMU & Hywel Dda health boards.