AIR FORCE RESERVE COMMAND

Similar documents
Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM

AIR FORCE RESERVE COMMAND

AIR FORCE RESERVE COMMAND

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM

DEPARTMENT OF THE NAVY

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011

FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13

AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

AIR NATIONAL GUARD Fiscal Year (FY) 2013 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2013

AIR NATIONAL GUARD. Fiscal Year (FY) 2016 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2016

DEPARTMENT OF THE NAVY

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

AIR NATIONAL GUARD Fiscal Year (FY) 2014 BUDGET ESTIMATES

DEPARTMENT OF THE ARMY UNITED STATES ARMY RESERVE

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES

Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands)

AIR NATIONAL GUARD. Fiscal Year (FY) 2006/2007 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830

Smithsonian Institution

DEPARTMENT OF THE ARMY Fiscal Year (FY) 2014 BUDGET ESTIMATES April 2013

DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands)

Air Force Reserve Facilities Update Briefing FY10

Report Documentation Page

Department of the Navy

Department of Defense INSTRUCTION

FY 2002 AMENDED BUDGET SUBMISSION ARMY NATIONAL GUARD MILITARY CONSTRUCTION PROGRAM FY 2002 JUSTIFICATION DATA SUBMISSION TO CONGRESS JUNE 2001

Military Construction Program

Report to Congress on Distribution of Department of Defense Depot Maintenance Workloads for Fiscal Years 2015 through 2017

NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2005

Department of the Air Force

DEPARTMENT OF THE NAVY FY 2017 BUDGET ESTIMATES BUDGET DATA BOOK OFFICE OF BUDGET

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate

AIR NATIONAL GUARD. Fiscal Year (FY) 2005 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830

Department of Defense INSTRUCTION

NATIONAL DEFENSE BUDGET ESTIMATES - FY 2004

Repair Project Approval

AIR FORCE CONTRACT CONSTRUCTION

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2013 Budget Estimate

Template modified: 27 May :30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE JULY 1994.

Real Property Category Codes

Department of Defense DIRECTIVE. SUBJECT: Enlistment and Reenlistment Bonuses for Active Members

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

Contents. Chapter 3 $1 - $2,500 RMA Projects Purpose Actions required Lessons learned

Executive Summary. Legislative Requirement

Compliance Appendix E: Compliance Budget Overview

AIR NATIONAL GUARD FISCAL YEAR (FY) 2001 BUDGET ESTIMATES APPROPIATION 3850 NATIONAL GUARD PERSONNEL, AIR FORCE

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2018 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES MAY 2017 RESERVE PERSONNEL, MARINE CORPS

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

DEPARTMENT OF THE NAVY

Department of Defense DIRECTIVE

ADDITIONAL AMENDMENTS RELATING TO TOTAL FORCE MANAGEMENT (SEC. 933)

DEPARTMENT OF THE ARMY UNITED STATES ARMY RESERVE FY 1999 AMENDED BUDGET ESTIMATE

Department of Defense INSTRUCTION

This publication is available digitally on the AFDPO WWW site at:

DOD MANUAL RESERVE COMPONENT FACILITIES, CONSTRUCTION, AND REAL PROPERTY PROGRAMS

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense

H. R. ll [Report No. 115 ll]

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

GAO DEFENSE INFRASTRUCTURE. DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities

Florida Job Growth Grant Fund. Public Infrastructure Grant Proposal. Table of Contents

AIR FORCE RESERVE REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS APPROPRIATION 3700 RESERVE PERSONNEL, AIR FORCE MARCH 2017

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

Military Construction Program

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

FAMILY HOUSING, DEFENSE-WIDE FY 2007 BUDGET ESTIMATE. Table of Contents PROGRAM SUMMARY...FH-2 APPROPRIATION LANGUAGE...FH-3 NEW CONSTRUCTION..

NATIONAL GUARD BUREAU. SUBJECT: Air National Guard Engineering Technical Letter (ANGETL) 10-04, Military Construction Cooperative Agreements (MCCA)

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Military Construction Program

AIR NATIONAL GUARD FY 1998 MILITARY CONSTRUCTION PROGRAM BIENNIAL BUDGET ESTIMATES FY1998 / FY1999. "I.. notion STATEMENT A

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW HOUSE BILL 1134

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

2016 Major Automated Information System Annual Report

GAO FUTURE YEARS DEFENSE PROGRAM. Funding Increase and Planned Savings in Fiscal Year 2000 Program Are at Risk

DEPARTMENT OF THE AIR FORCE

a GAO GAO DEFENSE ACQUISITIONS Better Information Could Improve Visibility over Adjustments to DOD s Research and Development Funds

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PERMITS AND SERVICES DIVISION STATE REVOLVING FUND PROGRAMS DIVISION

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES. JUSTIFICATION OF ESTIMATES February 2018 RESERVE PERSONNEL, NAVY

Military Construction Program

BY ORDER OF THE COMMANDER AFRS INSTRUCTION AIR FORCE RECRUITING SERVICE 21 FEBRUARY 2003 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

Environmental Management Chapter

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

NAVFAC Hawaii Construction Outlook

Pennsylvania State System of Higher Education (PASSHE) a. The October 17, 2013, Board meeting minutes state the following:

DEPARTMENT OF THE NAVY

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2015 Budget Estimate

Department of Defense

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

Transcription:

FY 1999 Budget Estimate AIR FORCE RESERVE COMMAND FY 1999 MILITARY CONSTRUCTION PROGRAM February 1998 Justification Data Submitted to Congress

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND JUSTIFICATION OF ESTIMATES FOR FISCAL YEAR 1999 MILITARY CONSTRUCTION PROGRAM TABLE OF CONTENTS Table of Contents...i FY 1999 Military Construction Audit Trail...ii FY 1999 Project Listing By State... iii FY 1999 New/Environmental/Current Mission Listing... iv SECTION 1 - SPECIAL PROGRAM CONSIDERATIONS FY 1999 Pollution Abatement/Energy Conservation Listing...b-i SECTION 2 - BUDGET APPENDIX EXTRACT Language...c-i Program and Financing Summary...c-ii Object Classification Summary...c-ii Special Program Considerations... c-iii SECTION 3 - INSTALLATION AND PROJECT JUSTIFICATION DATA DD FORMS 1390 AND 1391 Major Construction, Air Force Reserve Command...1 Unspecified Minor Construction...5 SECTION 4 - ARCHITECTURAL AND ENGINEERING SERVICES AND CONSTRUCTION DESIGN Architectural/Engineering Services and Construction Design...7 SECTION 5 - FUTURE-YEARS DEFENSE PROGRAM (FYDP) Air Force Reserve Command Military Construction Funding: Inclusion in FYDP...8 i

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION STATE/ COUNTRY Alabama FY 1999 MILITARY CONSTRUCTION AUDIT TRAIL FY 98/99 BIENNIAL INSTALLATION AND PROJECT BUDGET AMENDED FY 99 BUDGET CHANGE Maxwell AFB Consolidated Aircraft Maintenance Facility 5,200 0 5,200 SUBTOTAL 5,200 0 5,200 TOTAL IN THE UNITED STATES 5,200 0 5,200 Worldwide Unspecified Minor Construction 4,603-1,700 2,903 Arch & Eng Svsc and Const Design 2,532-100 2,432 GRAND TOTAL 12,335-1,800 10,535 ii

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION STATE/ COUNTRY Alabama FY 1999 MILITARY CONSTRUCTION STATE LIST AUTH AMOUNT APPROP AMOUNT DD FORM 1391 PAGE # INSTALLATION AND PROJECT Maxwell AFB Consolidated Aircraft Maintenance Facility 5,200 5,200 3 SUBTOTAL 5,200 5,200 TOTAL IN THE UNITED STATES 5,200 5,200 Worldwide Unspecified Minor Construction 2,903 2,903 Arch & Eng Svsc and Const Design 2,432 2,432 GRAND TOTAL 10,535 10,535 iii

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION FY 1999 NEW MISSION/ENVIRONMENTAL/CURRENT MISSION LISTING LOCATION PROJECT COST NEW/ENVIR/ CURRENT Maxwell AFB, AL Consolidated Aircraft Maintenance Facility 5,200 Current TOTAL 5,200 Subtotals: New Mission 0 Current Mission 5,200 Environmental Work 0 Unspecified Minor Construction 2,903 Arch & Eng Svcs and Const Design 2,432 GRAND TOTAL 10,535 iv

SECTION 1 SPECIAL PROGRAM CONSIDERATIONS b-i

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION FY 1999 POLLUTION ABATEMENT/ENERGY CONSERVATION LISTING No special program considerations in FY 1999 b-i

SECTION 2 BUDGET APPENDIX EXTRACT

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM FY 1999 APPROPRIATION LANGUAGE MILITARY CONSTRUCTION, AIR FORCE RESERVE COMMAND For construction, acquisition, expansion, rehabilitation, and conversion of facilities for the training and administration of the Air Force Reserve as authorized by Chapter 1803 of Title 10, United States Code, and military construction authorization acts, $10,535,000 to remain available until 30 September 2003. c-i

Mil. Con., Air Force Reserve Program and Financing (In Thousands of Dollars) Budget Plan (Amounts for MILITARY CONSTRUCTION actions programmed) Obligations Identification code 57-3730-0-1-051 FY 1997 Actual FY 1998 Estimate FY 1999 Estimate FY 1997 Actual FY 1998 Estimate FY 1999 Estimate Program by activities: Direct program: 00.0101 Major construction 42,580 8,550 5,200 38,725 18,120 6,956 00.0201 Minor construction 4,326 4,464 2,903 3,972 3,582 4,028 00.0301 Planning 5,900 2,016 2,432 1,991 4,944 3,606 10.0001 Total 52,806 15,030 10,535 44,688 26,646 14,590 Financing: 17.0001 Recovery of prior year obligations (40) Unobligated balance available, start of year: 21.4002 For completion of prior year budget plans (12,952) (21,087) (9,471) 21.4009 Reporgraming from/to prior year budget plan -22 Unobligated balance available, end of year: 24.4002 For completion of prior year budget plans 21,087 9,471 5,416 25.0001 Unobigated balance expiring 22 22 40.010 Budget authority 52,805 15,030 10,535 52,805 15,030 10,535 Budget authority: 40.0001 Appropriation 52,805 30,242 10,535 52,805 30,243 10,535 40.7901 Line item veto cancellation ( - ) (15,213) (15,213) 43.0001 Appropriation (adjusted) 52,805 15,030 10,535 52,805 15,030 10,535 Relation of obligations to outlays: 71.0001 Obligations incurred 44,688 26,646 14,590 72.4001 Obligated balance, start of year 57,244 49,573 31,844 74.4001 Obligated balance, end of year (49,573) (31,844) (19,999) 77.0001 Adjustments in expired accounts (net) 648 78.0001 Adjustments in unexpired accounts -40 90.0001 Outlays (net) 52,968 44,375 26,435 Mil. Con., Air Force Reserve Object Classification (In Thousands of Dollars) Identification code 57-3730-0-1-051 FY 1997 FY 1998 FY 1999 Allocation Accounts 332.001 Land and structures 44,688 26,646 14,590 399.001 Total obligations 44,688 26,646 14,590 999.901 Total obligations 44,688 26,646 14,590 Obligations are distributed as follows: Defense - Military: Army 33,808 22,618 6,032 Defense - Military: Navy 3,004 682 3,507 Defense - Military: Air Force 7,876 3,346 5,051 Total Obligations 44,688 26,646 14,590 c-ii

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND MILITARY CONSTRUCTION PROGRAM - FISCAL YEAR 1999 SPECIAL PROGRAM CONSIDERATIONS Pollution Abatement The military construction projects proposed in this program will be designed to meet environmental standards. Military construction projects proposed primarily for abatement of existing pollution problems at installations have been reviewed to ensure that corrective action is accomplished in accordance with applicable standards and criteria. Energy Conservation Military construction projects specifically designed for energy conservation at installations have been developed, reviewed and selected with prioritization by energy savings per investment costs. Projects include improvements to existing facilities and utility systems to upgrade design, eliminate waste, and install energy saving devices. Projects are designed for minimum energy consumption. Flood Plain Management and Wetlands Protection Proposed land acquisitions, disposals and installation construction projects have been planned to allow for the proper management of flood plains and protection of wetlands by avoiding long term impacts, reducing the risk of flood losses, and minimizing the loss or degradation of wetlands. Project planning is in accordance with the requirements of Executive Order Nos. 11988 and 22990. Design for Accessibility of Physically Handicapped Personnel In accordance with Public Law 900-400, provisions for physically handicapped personnel will be provided for, where appropriate, in the design of facilities included in this program. Preservation of Historical Sites and Structures Facilities in this program do not directly or indirectly affect any district, site, building, structure, object or setting listed in the National Register of Historic Places, except as noted on DD Form 1391. Environmental Protection In accordance with Section 102(2)(c) of the National Environmental Protection Act of 1969 (PL 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in this Military Construction Program. c-iii

Economic Analysis Economics are an inherent aspect of project development and design of military construction projects included in this program. This program represents the most economical use of resources. Reserve Manpower Potential The Reserve manpower potential to meet and maintain authorized strengths of all Reserve flying/non-flying units in those areas in which these facilities are to be located has been reviewed. It has been determined, in coordination with all other services having Reserve flying/non-flying units in these areas, that the number of units of the Reserve components of the Armed Forces presently located in these areas, and those which have been allocated to the areas for future activation, is not and will not be larger than the number that can reasonably be expected to be maintained at authorized strength levels considering the number of persons living in these areas who are qualified for membership in those Reserve units. Potential Use of Vacant Schools & Other State & Local Facilities The potential use of vacant schools and other state and local owned facilities has been reviewed and analyzed for each facility to be constructed under this program. Congressional Reporting Requirements Page iii, titled "New Mission/Environmental/Current Mission Listing," is in response to a Senate Appropriations Committee requirement contained on page 10 (New and Current Mission Activities) of Report #100-380. Section 4, titled Future-Years Defense Program, is in response to a House of Representatives Authorization Conference requirement contained on page 287, Section 1257 (Information on Proposed Funding for the Guard and Reserve Components in Future-Years Defense Programs) of Report #104-724. Unless otherwise noted, the projects comply with the scope and design criteria prescribed in Part II of Military Handbook 1190, "Facilities Planning and Design Guide." c-iv

SECTION 3 INSTALLATION AND PROJECT JUSTIFICATION DATA DD FORMS 1390 AND 1391

1. COMPONENT AFRC 3. INSTALLATION AND LOCATION MAXWELL AIR FORCE BASE, ALABAMA 5. FREQUENCY AND TYPE UTILIZATION FY 1999 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE FEB 98 4. AREA CONSTR COST INDEX 0.88 Facility to be used daily. Unit training assemblies are two days per month and field training is conducted 15 days per year. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS 1 Air Force Station 1 Air National Guard Unit 4 Army National Guard Units 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY CODE PROJECT TITLE SCOPE 211-152 Consolidated Aircraft Maintenance Facility COST ($000) DESIGN START DESIGN COMPLETE 3,000 SM 5,200 08/92 10/94 8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION Re-approved for unilateral construction 26 Jun 97 (Date) 9. LAND ACQUISITION REQUIRED NONE (Number of Acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE PROJECT TITLE SCOPE NONE COST ($000) YEAR 9. RPM BACKLOG AT THIS INSTALLATION ($000): RPM at an Active Air Force installation is the responsibility of the host. N/A DD Form 1390 S/1 Page 1 of 2 Page No. 1 1 MAY 78

1. COMPONENT AFRC 3. INSTALLATION AND LOCATION FY 1999 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE FEB 98 MAXWELL AIR FORCE BASE, ALABAMA 11. PERSONNEL STRENGTH AS OF 31 MAR 96 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 55 1 54 0 114 1 113 ACTUAL 56 1 55 0 99 1 98 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION AUTHORIZED ACTUAL 908th Maintenance Squadron 114 99 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED C-130H 8 8 DD Form 1390 S/2 Page 2 of 2 Page No. 2 1 MAY 78

1. COMPONENT AFRC 3. INSTALLATION AND LOCATION FY 1999 MILITARY CONSTRUCTION PROJECT DATA (computer generated) MAXWELL AIR FORCE BASE, ALABAMA 5. PROGRAM ELEMENT 55396F 6. CATEGORY CODE 211-152 2. DATE FEB 98 4. PROJECT TITLE CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY 7. PROJECT NUMBER PNQS919002 9. COST ESTIMATES ITEM U/M QUANTITY 8. PROJECT COST ($000) UNIT COST 5,200 COST ($000) CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY SM 3,000 1,100 3,300 SUPPORTING FACILITIES 1,360 FLEXIBLE/RIGID PAVEMENTS SM 8,500 28 ( 240) EARTHWORK/DEMOLITION CM 9,500 10 ( 95) WATER SUPPLY SYSTEM LM 2,000 95 ( 190) SANITARY SEWER SYSTEM LM 900 83 ( 75) EXTERIOR ELECTRICAL EA 1 445,000 ( 445) STORM DRAINAGE/GAS DISTRIBUTION LM 1,650 109 ( 180) LANDSCAPING LS ( 135) SUBTOTAL 4,660 CONTINGENCY (5%) 233 TOTAL CONTRACT COST 4,893 SUPERVISION, INSPECTION & OVERHEAD (6%) 294 TOTAL REQUEST 5,187 TOTAL REQUEST (ROUNDED) 5,200 10. Description of Proposed Construction: Construct a new facility with reinforced concrete foundation, concrete floor slab, structural steel frame, insulated walls and roof, fire protection system, utilities, and all necessary support. 11. REQUIREMENT: 3,000 SM ADEQUATE: 0 SUBSTANDARD: 3,757 SM PROJECT: Consolidated Aircraft Maintenance Facility. (Current Mission) REQUIREMENT: An adequate facility, properly sized and configured, is required for aircraft maintenance and associated equipment maintenance and storage. This facility provides area for nondestructive inspection, engine inspection and repair, storage, and general purpose aircraft maintenance shops. CURRENT SITUATION: Currently, existing maintenance shops are housed in two separate facilities. These buildings are not properly configured or located, and have outdated mechanical, electrical, and ventilation system deficiencies and requires frequent maintenance and repairs. Neither building can be altered or upgraded to meet mission requirements and one will be disposed of upon completion of the project. IMPACT IF NOT PROVIDED: Without this project, vital aircraft maintenance functions will continue to be degraded which would have an adverse impact on the unit s ability to maintain assigned aircraft. This would be detrimental to the Reserve s ability to perform it s missions at Maxwell AFB. ADDITIONAL: Cost estimate based on escalated A-E 100% Design. This new facility is sited on the opposite end of the runway away from the main base utility systems resulting in higher supporting facility costs. POC: Mr. Edward Rodgers, HQ AFRC/CEPD, DSN 497-1056. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No. 3

1. COMPONENT FY 1999 MILITARY CONSTRUCTION PROJECT DATA AFRC 3. INSTALLATION AND LOCATION 2. DATE FEB 98 MAXWELL AIR FORCE BASE, ALABAMA 4. PROJECT TITLE 5. PROJECT NUMBER CONSOLIDATED AIRCRAFT MAINTENANCE FACILITY 12. SUPPLEMENTAL DATA: PNQS919002 A. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started 92 AUG 04 b. Parametric Cost Estimate used to develop costs Y c. Percentage Complete as of January 1, 1998 100% d. Date Design 35% Complete 93 FEB 01 d. Date Design Complete 94 OCT 03 2. BASIS a. Standard or Definitive Design - Yes No X. b. Where Design Was Most Recently Used N/A. 3. COST (Total ) = c = a + b or d + e ($000) a. Production of Plans and Specifications ( 249) b. All Other Design Costs ( 166) c. Total ( 415) d. Contract ( 0) e. In-house ( 415) 4. CONSTRUCTION START 98 NOV. (year and month) B. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) NONE DD Form 1391c Page No. 4 1 MAY 78

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND JUSTIFICATION OF ESTIMATES FOR FISCAL YEAR 1999 APPROPRIATION: MILITARY CONSTRUCTION, AIR FORCE RESERVE PROGRAM 341.020 UNSPECIFIED MILITARY CONSTRUCTION $2,903,000 PART I - PURPOSE AND SCOPE The funds requested for unspecified military construction will finance new construction projects having cost estimates less than $1,500,000. PART II - JUSTIFICATION OF FUNDS REQUESTED The funds requested for unspecified military construction will finance unforeseen projects generated during the year and are necessary to support mission requirements. 5

1. COMPONENT AFRC 3. INSTALLATION AND LOCATION FY 1999 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 4. PROJECT TITLE 2. DATE FEB 98 VARIOUS LOCATIONS 5. PROGRAM ELEMENT 6. CATEGORY CODE UNSPECIFIED MINOR CONSTRUCTION 7. PROJECT NUMBER 8. PROJECT COST ($000) 55396F 010-211 PAYZ999341 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST 2,903 COST ($000) UNSPECIFIED MINOR CONSTRUCTION LS 2,903 SUBTOTAL 2,903 TOTAL CONTRACT COST 2,903 TOTAL REQUEST 2,903 10. Description of Proposed Construction: 11. REQUIREMENT: As required. PROJECT: Unspecified Minor Construction REQUIREMENT: This appropriation provides a lump sum amount for unspecified minor construction projects, not otherwise authorized by law, having a funded cost less than $1,500,000. Work includes construction, alteration or conversion of temporary facilities in accordance with Title 10, USC 18233 and 18233a. These projects are not now identified but are expected to arise in FY 99. IMPACT IF NOT PROVIDED: No means to accomplish exigent projects less than $1,500,000 will exist, severely degrading the ability of the Air Force Reserve Command to efficiently and effectively address unforeseen facility modifications, alteration and conversion requirements. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No. 6

SECTION 4 ARCHITECTURAL AND ENGINEERING SERVICES AND CONSTRUCTION DESIGN

1. COMPONENT AFRC 3. INSTALLATION AND LOCATION FY 1999 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 4. PROJECT TITLE 2. DATE FEB 98 VARIOUS LOCATIONS 5. PROGRAM ELEMENT 6. CATEGORY CODE PLANNING AND DESIGN 7. PROJECT NUMBER 8. PROJECT COST ($000) 55396F 010-211 PAYZ999313 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST 2,432 COST ($000) PLANNING AND DESIGN LS 2,432 SUBTOTAL 2,432 TOTAL CONTRACT COST 2,432 TOTAL REQUEST 2,432 10. Description of Proposed Construction: 11. REQUIREMENT: As required. PROJECT: Planning and Design. (Current Mission) REQUIREMENT: Funds for architectural and engineering services and construction provide for the completed design of facilities and evaluation of designs in terms of technical adequacy and estimated costs. In addition, these funds are required to prepare site surveys, develop master plans, working drawings, specifications, project planning reports, and designs required for those construction projects included in the Air Force Reserve Command (AFRC) Military Construction Program. The advanced age and continued deterioration of the AFRC physical plant and infrastructure have generated numerous facility requirements, requiring these architectural and engineering services for design. It is essential the AFRC be funded at the requested level to ensure operational readiness is not hampered or degraded due to inadequate facilities. IMPACT IF NOT PROVIDED: Continued design on this fiscal year program, as well as future year MILCON programs, will be impossible. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No. 7

SECTION 5 FUTURE-YEARS DEFENSE PROGRAM

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND FY 2000 - FY 2003 FUTURE YEARS DEFENSE PROGRAM (FYDP) (DOLLARS IN THOUSANDS) FYStateInstallationProjectTypeCost 00GARobins AFBRenovate AFRC Headquarters BuildingCurrent Mission16,100 00NYNiagara Falls ARSConsolidate Training FacilityCurrent Mission2,100 00ORPortland ANGBAdd/Alter Pararescue FacilityCurrent Mission1,400 Total MILCON19,600 Unspecified MC4,710 Planning & Design1,561 Total FY00 Program25,871 01COPeterson AFBAerial Port Training FacilityCurrent Mission5,085 01LANew Orleans NASRenovate HangarCurrent Mission5,200 01MAWestover ARBControl TowerCurrent Mission4,050 01NJMcGuire AFBSquad Operations/AMU FacilityCurrent Mission3,050 01PAWillow Grove ARSAdd/Alter Aquis Fire Fighting Foam Current Mission2,500 System 01WAMcChord AFBC-17 Squadron Operations/AMUNew Mission3,500 Total MILCON23,385 Unspecified MC4,846 Planning & Design2,034 Total FY01 Program30,265 02AZDavis Monthan AFBAdd/Alter Squadron Operations FacilityCurrent Mission4,100 02DEDover AFBAerial Port Training FacilityCurrent Mission1,600 02ILScott AFBExplosive Ordnance Disposal FacilityCurrent Mission1,205 02NYNiagara Falls ARSConsolidated Maintenance FacilityCurrent Mission3,900 02OKTinker AFBAdd to Squadron Operations FacilityCurrent Mission3,600 02TXKelly AFBAlter Aerial Port Training FacilityCurrent Mission1,850 02UTHill AFBMunitions Training/Storage FacilityCurrent Mission1,900 02WAMcChord AFBConsolidated Medical Training FacilityCurrent Mission3,400 02WIGen Mitchell ARSAerial Port Training FacilityCurrent Mission4,200 Total MILCON25,755 Unspecified MC4,996 Planning & Design2,664 Total FY02 Program33,415 03FLHomestead ARSFire Training FacilityEnvironmental2,300 03INGrissom ARBCivil Engineer ComplexCurrent Mission8,913 03MNMinneapolis-St. Paul ARSConsolidated Lodging FacilityCurrent Mission16,000 Total MILCON27,213 Unspecified MC5,160 Planning & Design2,806 Total FY03 Program35,179 8