NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

DRAFT REGULATORY GUIDE

ATOMIC SAFETY AND LICENSING BOARD

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

Emergency Preparedness Final Rule Implementation

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION

GAO NUCLEAR REGULATION. Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed

Nidia Cortes, Virgil Dantes, AnneMarie Heslop, Index No Curtis Witters, on Behalf of Themselves and Their RJI No.: ST8123 Children,

Preparation of Environmental Reports for Nuclear Power Stations

DRAFT REGULATORY GUIDE

Case 1:17-cv APM Document 29 Filed 11/13/17 Page 1 of 8 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

DEPARTMENT OF ENERGY

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C April 10, 2018

February 13, 2013 EA

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Decision. Matter of: California Industrial Facilities Resources, Inc., d/b/a CAMSS Shelters. File: B Date: February 22, 2012

NUCLEAR REGULATORY COMMISSION [NRC ] Nuclear Regulatory Commission Insider Threat Program Policy Statement

U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (MD) Governmental Relations and Public Affairs

Iifieate of service. HET AT

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

Illinois Hospital Report Card Act

Report on H-1B Petitions Fiscal Year 2013 Annual Report to Congress October 1, 2012 September 30, 2013

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

Federal Communications Commission DA

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

Case 3:06-cv DAK Document 24 Filed 04/06/2007 Page 1 of 8 IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF OHIO WESTERN DIVISION

Planning and Preparedness for Radiological Emergencies at Nuclear Power Stations

RE: UE 319 Portland General Electric Company Request for General Rate Revision Effective

Research and Test Reactor Licensing Actions and Lessons Learned

Yucca Mountain and Interim Storage Proposed Appropriation Language

DEPARTMENT OF HOMELAND SECURITY BOARD FOR CORRECTION OF MILITARY RECORDS FINAL DECISION

ADMINISTRATIVE HEARINGS COUNTY OF WAKE 15 BSW PROPOSAL FOR DECISION

Department of Defense INSTRUCTION

Telecommunications Advisors Since March 4, 2015 VIA ECFS

DUNHAM FUND DUNHAM. The Mission of the Dunham Fund. Online Grant Guidelines FUND. 8 East Galena Boulevard

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE UNITED STATES TELECOM ASSOCIATION

Contains Nonbinding Recommendations. Draft Not for Implementation

Technical Basis for the Emergency Preparedness Rulemaking

Emergency Preparedness Near Nuclear Power Plants

Technical Revisions to Update Reference to the Required Assessment Tool for. State Nursing Homes Receiving Per Diem Payments From VA

DEPARTMENT OF HOMELAND SECURITY BOARD FOR CORRECTION OF MILITARY RECORDS FINAL DECISION

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

DE NUCLEAR EMERGENCY PLANNING

RECORD OF PROCEEDINGS AIR FORCE BOARD FOR CORRECTION OF MILITARY RECORDS. IN THE MATTER OF: DOCKET NUMBER: COUNSEL: None HEARING DESIRED: No

Identifying Errors: A Case for Medication Reconciliation Technicians

GAO. MILITARY PERSONNEL Considerations Related to Extending Demonstration Project on Servicemembers Employment Rights Claims

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

Define a strategy for maintaining accuracy in the referral process and meeting all regulatory

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

Changes to QSR. The table below provides a history of changes to FDA s Quality System Regulation (QSR)

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

May 23, Docket No License No. DPR-12

RADIOLOGICAL EMERGENCY PREPAREDNESS PROGRAM (REPP)

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 ) ) ) ) ) )

Case 1:12-cv ABJ Document 11 Filed 07/23/12 Page 1 of 11 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN

Health & Hospitals Corp. (Cook Chill Plant) v. Murray OATH Index No. 1003/10 (Jan. 12, 2010)

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES

The Health Insurance Portability and Accountability Act (HIPAA) Implementation via Case Law

DEPARTMENT OF THE NAVY BOAR3 FOR CORRECTION OF NAVAL RECORD 2 NAVY ANNE X WASHINGTON DC

DEPARTMENT OF HEALTH & HUMAN SERVICES Public Health Service 3%3&4

PRACTICE PARTICIPANT AGREEMENT

STATE OF NEW JERSEY BEFORE THE PUBLIC EMPLOYMENT RELATIONS COMMISSION. Docket No. SN SYNOPSIS

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

DEPARTMENT OF HOMELAND SECURITY BOARD FOR CORRECTION OF MILITARY RECORDS FINAL DECISION

Open Telecommunications Cases

Empire State Association of Assisted Living

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

MILITARY COMMISSIONS TRIAL JUDICIARY GUANTANAMO BAY

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

Minutes Board of Trustees

Boutros, Nesreen v. Amazon

December 11, Enclosed is a copy of the decision resulting from the hearing held in the above-referenced matter.

2019 AANS Annual Scientific Meeting Abstract Instructions

OKLAHOMA STATE UNIVERSITY PUBLIC INFRACTIONS DECISION APRIL 24, 2015

Lawrence S. Criscione, PE Paul M. Blanch, PE

CIRCULAR LETTER NO. 1882

Mr. Daniel W. Chattin Chief Operating Officer

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

Raab v. Administrator FAA

NRC Public Meeting October 27, 2014

INTERNSHIP AND COMMUNITY SERVICE PLACEMENT HANDBOOK 2018/19

United States Court of Appeals for the Federal Circuit

DEPARTMENT OF HOMELAND SECURITY BOARD FOR CORRECTION OF MILITARY RECORDS

NRC INSPECTION MANUAL STSB

TOP SECRET//COMINT//NOFORN//MR

Subpeona served on Michael Brown by House Katrina Select Comm. Staff in Wash., D.C. (Feb. 10, 2006). 4

RE: NLADA Comments to Draft 2015 Compliance Supplement (80 Fed. Reg ) (December 4, 2015)

2018 AANS Annual Scientific Meeting Abstract Instructions

ARGUED DECEMBER 12, 2016 DECIDED APRIL 11, 2017 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

RECORD OF PROCEEDINGS AIR FORCE BOARD FOR CORRECTION OF MILITARY RECORDS

Transcription:

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC. ) ) December 12, 2014 (Vermont Yankee Nuclear Power Station) ) STATE OF VERMONT S SUBMISSION OF ADDITIONAL INFORMATION AND REQUEST TO FILE SUPPLMENTAL BRIEFING ADDRESSING NEW INFORMATION AND ARGUMENT RAISED AT ORAL ARGUMENT On December 8, 2014, the Nuclear Regulatory Commission ( NRC ) Staff ( Staff ) filed additional information with the Atomic Safety and Licensing Board ( Board ) in the abovecaptioned proceeding as part of an answer it provided the Board in response to questions posed at the December 1, 2014 contention admissibility oral argument addressing the State of Vermont s ( State ) hearing request. 1 The State hereby submits additional information to complete the evidentiary record with respect to the Staff s new arguments raised at oral argument and in the Staff s December 8, 2014 filing. The State submits an email exchange between Erica Borneman, Vermont Division of Emergency Response and Homeland Security Planning Section Chief and Michael McKenny, Entergy Vermont Yankee Emergency Preparedness Manager, dated July 1, 2014 (attached as Exhibit A), 2 and requests that the State be allowed to submit supplemental 1 NRC Staff Answer to Atomic Safety and Licensing Board Question Asked During December 1, 2014 Contention Admissibility Oral Argument, at 3 (Dec. 8, 2014) (ADAMS Accession No. ML14342A336); Official Transcript of Proceedings ( Tr. ) (Dec. 1, 2014) (Agencywide Documents Access and Management System [ADAMS] Accession No. ML14337A666); Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request (Sept. 22, 2014) (ADAMS Accession No. ML14267A524) ( Petition ). 2 Email from Erica Bornemann, VDEMHS Planning Section Chief to Michael McKenney, Entergy Vermont Yankee Emergency Preparedness Manager (Jul. 1, 2014) (ADAMS Accession No. ML14209A853). 1

briefing addressing the new information and arguments NRC Staff concedes it raised for the first time at the oral argument, (see Proposed State Reply attached as Exhibit B). 3 Dated at Montpelier, Vermont This 12th day of December, 2014 Respectfully submitted, /Signed (electronically) by/ Aaron Kisicki Counsel for the State of Vermont Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620 (802) 828-3785 aaron.kisicki@state.vt.us 3 Tr. at 94; See ASLB Memorandum and Order (Oral Argument Schedule), Docket No. 50-271-OLA, ASLBP No. 04-832-02-OLA, at 2 (The main purpose of the oral argument is to allow the Board to elicit legal and factual points that will assist it in deciding the issues presented by the pleadings) (Oct. 18, 2004) (ADAMS Accession No. ML042940087). 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC. ) ) December 12, 2014 (Vermont Yankee Nuclear Power Station) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. 2.305, I hereby certify that copies of the forgoing State of Vermont s Submission of Additional Information and Request to File Additional Briefing Addressing New Information and Argument Offered at Oral Argument, dated December 12, 2014, have been served upon the Electronic Information Exchange, the NRC s E-filing System, in the above-captioned proceeding, this 12th day of December, 2014. Dated at Montpelier, Vermont this 12th day of December, 2014 /Signed (electronically) by/ Aaron Kisicki Counsel for the State of Vermont Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620 Tel: (802) 828-3785 aaron.kisicki@state.vt.us

From: To: Subject: Date: McKenney, Michael P Chappell, Coley; Couture III, Philip Fwd: Post shut down ERO changes Tuesday, July 01, 2014 12:11:15 PM FYI Sent from my iphone Begin forwarded message: From: "Bornemann, Erica" <Erica.Bornemann@state.vt.us> Date: July 1, 2014 at 12:03:18 PM EDT To: "McKenney, Michael P" <mmckenn@entergy.com> Cc: "Flynn, Joe" <Joe.Flynn@state.vt.us>, "Nagy, Ross" <Ross.Nagy@state.vt.us> Subject: RE: Post shut down ERO changes EXTERNAL SENDER. Do not click on links if sender is unknown, and never provide your user ID or password. HI Mike, We have reviewed the changes to the staffing at the ERO and specifically the positions you have outlined as having responsibilities to directly interface with state representatives. Bill Irwin at VDH and Anthony Leshinske at PSD have also reviewed the changes. As it relates to the elimination of the EOF Manager and the JIC Logistic Coordinator we are comfortable with the reallocation of their responsibilities to other positions within the ERO. We don t, however, have enough information from the documentation to be able to tell what impact the broader staffing reductions have on the capacity of those individuals to be able to handle the additional responsibilities, but that is outside of the scope of this particular RAI. While having the opportunity to review the changes and provide input as outlined by the NRC RAI is appreciated, ideally we would be able to take a look at these impacts before these filings which could potentially reduce the back and forth after the fact. There are no additional changes needed in our plans related to those two positions being eliminated. Thank you. -Erica -----Original Message----- From: McKenney, Michael P [mailto:mmckenn@entergy.com] Sent: Monday, June 30, 2014 4:47 PM To: Bornemann, Erica Subject: RE: Post shut down ERO changes Hi Erica, Just checking on the status? Thanks, Mike Mike McKenney Emergency Preparedness Manager Entergy Vermont Yankee office 802 258-4183 pager 802 742-9086

mobile 802 380-2310 -----Original Message----- From: Bornemann, Erica [mailto:erica.bornemann@state.vt.us] Sent: Tuesday, June 17, 2014 1:42 PM To: McKenney, Michael P Cc: Giarrusso, John (CDA) (John.Giarrusso@MassMail.State.MA.US); Diane Becker (Diane.Becker@dos.nh.gov); Cederberg, Katharine (CDA) Subject: Re: Post shut down ERO changes Mike, We are going to run this by VDH and PSD and should have an answer by the 25th. Thanks. -Erica Erica Bornemann VT DEMHS Sent from my ipad On Jun 17, 2014, at 7:22 AM, "McKenney, Michael P" <mmckenn@entergy.com> wrote: Hi Folks, Would you be able to confirm that we didn t miss any needed changes to your plans or procedures associated with the positions we are eliminating from the VY ERO after we shut down and that the changes still provide for adequate coordination and interface with your people? If you could do this by 6/25 and let me know it would be very much appreciated. You may find our attached our response (previously distributed) to the NRC RAIs regarding the changes helpful. Pls give me a call if you have any questions. Thanks, Mike Mike McKenney Emergency Preparedness Manager Entergy Vermont Yankee office 802 258-4183 pager 802 742-9086

mobile 802 380-2310 From: McKenney, Michael P [mailto:mmckenn@entergy.com] Sent: Tuesday, May 13, 2014 6:21 AM To: Flynn, Joe (Joe.Flynn@state.vt.us<mailto:Joe.Flynn@state.vt.us>); Becker, Diane; Giarrusso, John (CDA) (John.Giarrusso@MassMail.State.MA.US<mailto:John.Giarrusso@MassMail.State.MA.US >) Cc: Mike McKenney Subject: RE: VY EPlan submittals and Tri State meeting Joe/Diane/John, As a follow up to my previous email below, we ve reviewed each of your plans and procedures for potential changes that may result from the reduction of ERO positions which are planned to take effect in the February 2015 timeframe. This review included the EOF Manager and JIC Logistics Coordinator ERO positions. The only changes that we identified were references to the EOF Manager in one of MEMA s procedures and I ve communicated the suggested changes with John. Thanks, Mike Mike McKenney Emergency Preparedness Manager Entergy Vermont Yankee office 802 258-4183 pager 802 742-9086 mobile 802 380-2310 From: McKenney, Michael P Sent: Friday, April 25, 2014 9:42 AM To: Flynn, Joe (Joe.Flynn@state.vt.us<mailto:Joe.Flynn@state.vt.us>); Diane Becker

(Diane.Becker@dos.nh.gov<mailto:Diane.Becker@dos.nh.gov>); Giarrusso, John (CDA) (John.Giarrusso@MassMail.State.MA.US<mailto:John.Giarrusso@MassMail.State.MA.US >) Subject: VY EPlan submittals and Tri State meeting Hi Folks, It was good seeing you at the Tri State meeting on Wednesday and having an opportunity to discuss topics that interest all of us including of course, VY Decommissioning Plans. I ve attached the two EP related submittals we ve made to the NRC in case you haven t received a copy and are interested in reviewing them in more detail. I ve also attached a copy of the presentation I gave on Decommissioning Planning. As I mentioned during the presentation, some of the ERO positions will be eliminated after the plant shuts down and is defueled. The tasks for every ERO position that are being eliminated have been evaluated and tasks that are required have been reassigned to other ERO positions. Also, I discussed that the following two positions that interface with state officials are being eliminated, there would be no impact to you. EOF Manager-briefed officials in EOF. Duplicate effort with the Lead Offsite Liaison (not eliminated). Therefore no impact JIC Logistics Coordinator-copying and distribution of press releases to state and local officials. Task assumed by the JIC Manager. Therefore no impact Although I think it is unlikely, I would like to review the State REP plans and procedures to determine if they require revision as a result of these upcoming changes. I am not going to review the local plans since they don t interface with VY ERFs. I have access to Vermont s online, and John is sending me Massachusetts on disk. I ll give Diane a call to discuss the easiest method on obtaining New Hampshire s. As always, if you have any questions, please give me a call anytime. Thanks, Mike Mike McKenney

Emergency Preparedness Manager Entergy Vermont Yankee office 802 258-4183 pager 802 742-9086 mobile 802 380-2310 <BVY 14-034 Post Shutdown E-Plan LAR - Supplement 1 05-12- 14.docx.pdf>

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC. ) ) December 12, 2014 (Vermont Yankee Nuclear Power Station) ) STATE OF VERMONT S PROPOSED REPLY TO NRC STAFF ANSWER TO ATOMIC SAFETY AND LICENSING BOARD QUESTION ASKED DURING DECEMBER 1, 2014 CONTENTION ADMISSIBILITY ORAL ARGUMENT On December 1, 2014, an oral argument was held before the Atomic Safety and Licensing Board ( Board ) in the above-captioned proceeding, 1 addressing the State of Vermont s ( State ) hearing request. 2 At the oral argument, the Nuclear Regulatory Commission ( NRC ) Staff ( Staff ) cited to and quoted from a non-public letter, dated August 19, 2014, from Vanessa Quinn of the Federal Emergency Management Agency ( FEMA ) Radiological Emergency Preparedness Branch to Joseph Anderson of the NRC Office of Nuclear Security and Incident Response ( FEMA Letter ). 3 The FEMA Letter states, in part, that: A review of the license amendment noted that the changes were coordinated with, and approved by the States of Massachusetts, New Hampshire and Vermont. FEMA Region I reviewed these changes for impact to the State and local 1 Official Transcript of Proceedings ( Tr. ) (Dec. 1, 2014) (Agencywide Documents Access and Management System [ADAMS] Accession No. ML14337A666). 2 Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request (Sept. 22, 2014) (ADAMS Accession No. ML14267A524) ( Petition ). 3 Letter from Vanessa Quinn, FEMA Radiological Emergency Preparedness Branch to Joseph Anderson, NRC Office of Nuclear Security and Incident Response (Aug. 19, 2014) (ADAMS Accession No. ML14233A593).

organizations and determined the amendment would not significantly affect the state plans based on information from the affected states. 4 The NRC Staff further cited the FEMA Letter in its answer to the Board s question at the oral argument, filed on December 8, 2014. 5 The State reiterates its position that the Staff presentation of the FEMA Letter at oral argument was inappropriate, given that: (1) as Staff conceded during the oral argument, the letter was not contained in the Staff s pleadings under consideration at the argument, 6 and (2) the letter was not a public document and thus was neither available to the State in this proceeding, nor had counsel for the State seen it until after the pleadings were submitted and oral argument had occurred. For both of these reasons, the State has been unfairly deprived of an opportunity to fully analyze this letter and respond to the Staff s arguments. The State therefore respectfully suggests that the Board give no weight to the FEMA Letter, and/or representation from Staff regarding the same, when considering the admissibility of its contention. More importantly, the Board should give no weight to the FEMA Letter because it is contextually incomplete and therefore inaccurate in stating that the LAR changes were coordinated with, and approved by... Vermont. To the contrary, as the State noted in its Petition, it first learned about this LAR when it was filed. 7 As the State further noted, [d]espite ongoing discussions with the State on decommissioning matters, Entergy did not 4 Id. at 1. 5 NRC Staff Answer to Atomic Safety and Licensing Board Question Asked During December 1, 2014 Contention Admissibility Oral Argument, at 3 (Dec. 8, 2014) (ADAMS Accession No. ML14342A336). 6 Tr. at 94; See ASLB Memorandum and Order (Oral Argument Schedule), Docket No. 50-271-OLA, ASLBP No. 04-832-02-OLA, at 2 (The main purpose of the oral argument is to allow the Board to elicit legal and factual points that will assist it in deciding the issues presented by the pleadings) (Oct. 18, 2004) (ADAMS Accession No. ML042940087). 7 DPS Notice and Petition at 1. 2

consult with the State before making this filing. 8 NRC Staff is aware of Entergy s failure in this regard. Again, as noted in the Petition, Staff sent two Requests for Additional Information ( RAI ) asking Entergy whether it had considered licensee interface and coordination with State and local response organizations. 9 The RAIs prompted Entergy to reach out to and solicit comments from the Vermont Division of Emergency Management and Homeland Security ( VDEMHS ) regarding its proposed elimination of two Emergency Response Organization ( ERO ) positions at the plant only after filing its LAR. Entergy s communications on that front are telling it did not once mention the elimination of ERDS. 10 To the contrary, Entergy s communications asserted that the tasks for every ERO position that are being eliminated have been evaluated and tasks that are required have been reassigned to other ERO positions. 11 Entergy then affirmatively told the State that there would be no impact to you. 12 A month later, in May 2014, Entergy explicitly stated that it had reviewed the Radiological Emergency Response Plans ( RERP ) for Vermont, New Hampshire, and Massachusetts, and that [t]he only changes that we identified were references to the EOF Manager in one of [Massachusetts s] procedures. 13 In June 2014, Entergy asked the State to confirm its assessment, again without any mention of the elimination 8 Id. 9 See NRC Request For Additional Information Regarding License Amendment Request For Emergency Plan Change (TAC NO. MF3668) (May 5, 2014 & July 1, 2014) (ADAMS Nos. ML14115A029 & ML14163A590) 10 See Email from Michael McKenney, Entergy Vermont Yankee Emergency Preparedness Manager, to Erica Bornemann, VDEMHS Planning Section Chief (Apr. 25, 2014) (ADAMS Accession No. ML14209A853). 11 Id. 12 Id. (emphasis added). 13 Email from Michael McKenney, Entergy Vermont Yankee Emergency Preparedness Manager, to Erica Bornemann, VDEMHS Planning Section Chief (May 13, 2014) (ADAMS Accession No. ML14209A853). 3

of ERDS, and on July 1, 2014, VDEMHS s Planning Section Chief, Erica Bornemann, gave the following response to Entergy: We have reviewed the changes to the staffing at the ERO and specifically the positions you have outlined as having responsibilities to directly interface with state representatives.... As it relates to the elimination of the EOF Manager and the JIC Logistic Coordinator we are comfortable with the reallocation of their responsibilities to other positions within the ERO. We don t, however, have enough information from the documentation to be able to tell what impact the broader staffing reductions have on the capacity of those individuals to be able to handle the additional responsibilities, but that is outside of the scope of this particular RAI. While having the opportunity to review the changes and provide input as outlined by the NRC RAI is appreciated, ideally we would be able to take a look at these impacts before these filings which could potentially reduce the back and forth after the fact. There are no additional changes needed in our plans related to those two positions being eliminated. 14 Ms. Bornemann s response makes clear that the State s agreement was limited only to the reduction of two identified staff positions contemplated in the LAR, in the context of representations made by Entergy that all relevant duties had been reassigned to others. The email also makes clear that the State did not voice support for or comfort with any additional aspect of the LAR, including the discontinuance of the ERDS relay. The State had significant concerns about the broader impacts that the proposed staffing reductions might have on overall RERP effectiveness. In this instance, the State was in no way made aware of Entergy s plan to discontinue the plant s ERDS feed to the NRC (and thus the State) prior to the filing of the LAR with the NRC. This is precisely the kind of broader impact Ms. Bornemann spoke of in her response, as well as a suggestion that the State be made aware of all changes proposed in the LAR prior to filing in order to allow the State to better understand potential impacts on the RERP. Furthermore, the State had no direct contact with FEMA regarding its support (or lack thereof) for the changes proposed in the LAR. The FEMA Letter, 14 Email from Erica Bornemann, VDEMHS Planning Section Chief to Michael McKenney, Entergy Vermont Yankee Emergency Preparedness Manager (Jul. 1, 2014) (ADAMS Accession No. ML14209A853). 4

at best, reflects only the representations Entergy made regarding the three states approval of the proposed staffing reductions. The State s contention it now seeks to have admitted is entirely consistent with the comments it made to Entergy about the proposed staffing reductions. The State had not received sufficient information to allow it to properly understand and evaluate the full impacts of the LAR on July 1, 2014. Indeed, the State s concerns about this lack of information have proved to be correct, as the State now requests this Board to hold an in-depth inquiry into the broader impacts of Entergy s proposed discontinuance of its ERDS relay as proposed in the LAR. Based on the foregoing, the State respectfully recommends that this Board not consider the FEMA Letter as part of a determination on the admissibility of the State s contention. Alternatively, if the FEMA Letter is to be considered in any respect, the proper place to do so would be at a later merits hearing, where it could be placed into proper context and the State would have an opportunity to challenge the accuracy and reliability of these hearsay statements. As noted in numerous filings in this proceeding, if a hearing is granted, the State is prepared to present testimonial evidence that elimination of ERDS will adversely impact the State s RERP implementation and effectiveness. Dated at Montpelier, Vermont This 12th day of December, 2014 Respectfully submitted, /Signed (electronically) by/ Aaron Kisicki Counsel for the State of Vermont Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620 (802) 828-3785 aaron.kisicki@state.vt.us 5