CHAPTER 9 MARSHALLING AND MOVEMENT ORGANIZATIONS AND RESPONSIBILITIES

Similar documents
MEDICAL REGLUATING FM CHAPTER 6

Joint Publication Joint Tactics, Techniques, and Procedures for Transportation Terminal Operations

Joint Publication Joint Tactics, Techniques, and Procedures for Joint Reception, Staging, Onward Movement, and Integration

Joint Publication Joint Tactics, Techniques, and Procedures for Joint Theater Distribution

Department of Defense DIRECTIVE

Distribution Statement A: Approved for public release; distribution is unlimited.

POLICY AND BUDGETARY GUIDANCE FOR EXERCISE OF THE MARITIME PREPOSITIONING SHIPS (MPS) AND AVIATION LOGISTIC SUPPORT SHIPS (T-AVB)

EMERGENCY DEPLOYMENT READINESS EXERCISE (EDRE) 366 TH CBRN COMPANY

2.0 Air Mobility Operational Requirements

AUSA BACKGROUND BRIEF

Joint Publication Deployment and Redeployment Operations

JOINT PUB JOINT TACTICS, TECHNIQUES, AND PROCEDURES FOR MOVEMENT CONTROL

Department of Defense DIRECTIVE

ORGANIZATION AND FUNDAMENTALS

Thi Directiveo: I

DEFENSE TRANSPORTATION REGULATION PART III

DEPARTMENTOFTHENAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC

Joint Publication Joint Doctrine and Joint Tactics, Techniques, and Procedures for Air Mobility Operations

Army Deployment and Redeployment. March 2015

Army Deployment and Redeployment. March 2015

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO A SO-LIC 26 Jun 92

Army Container Operations

Support of Contingency Forces by ñir Lines of Communication

Intentionally Blank. Logistics Support To Operations

DANGER WARNING CAUTION

Unmanned Aerial Vehicle Operations

MANAGEMENT OF PROPERTY IN THE POSSESSION OF THE MARINE CORPS

Marine Corps Supplement To the Department of Defense Dictionary of Military and Associated Terms

Re-Shaping Distributed Operations: The Tanking Dimension

MOVEMENT CONTROL IN THE OPERATIONAL ENVIRONMENT

Aviation Logistics MCWP Chapter 1. Marine Corps Aviation Logistics

1st Marine Expeditionary Brigade Public Affairs Office United States Marine Corps Camp Pendleton, Calif

Aviation Planning The Commander s Role in Planning. Chapter 5

Command and Control of Marine Aviation Operations

CHAPTER 11 MPF REGENERATION ORGANIZATIONS AND RESPONSIBILITIES

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

1 Marine Corps ITV Strategy

Aviation Logistics. MCTP 3-20A (Formerly MCWP ) US Marine Corps PCN

REDEPLOYMENT REDEPLOYMENT PLANNING FM CHAPTER 5

Aerial Delivery. June 2014

SOP FOR OPERATION AND MAINTENANCE OF MCALF BOGUE 1. Puroose. To provide guidance for the operation and maintenance of MCALF Bogue.

Adaptive Logistics in Africa:

Organization of Marine Corps Forces

US Marine Corps Tactical Wheeled Vehicle Strategy Update Briefing to NDIA Tactical Wheeled Vehicle Conference 2 February 2009

MCWP Aviation Logistics. U.S. Marine Corps PCN

(a) DoD M, Department of Defense Postal Manual, 15 August 2002

UNIT MOVEMENT PLANNING

R Z SEP 17 FM CMC CDI MEXWID WASHINGTON DC TO RUJIAAA/COMMARFORCOM RUJIAAA/COMMARFORCOM G FOUR RUJIAAA/COMMARFORCOM G THREE G FIVE G SEVEN

COMMERCIAL AIRLIFT AUGMENTATION: AN ORGANIZATIONAL STUDY GRADUATE RESEARCH PROJECT. Presented to the Faculty

Organization of Marine Corps Forces

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Joint Publication 4-0. Doctrine for Logistic Support of Joint Operations

The shift in focus from forward deployed. Army. Prepositioning Afloat. By ROBERT A. CHILCOAT and DAVID S. HENDERSON

Marine Air Command and Control System Handbook

Department of Defense INSTRUCTION

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

Chapter 5 Crisis Response

Expeditionary Maneuver Warfare and Strategic Sealift: Ways to Improve the Marines Expeditionary Capability

Deployment and Redeployment Operations

Engineering Operations

Theater Sustainment Command JUNE 2013

Air Force Loadmaster Manual

OPNAVINST L N96 30 Mar Subj: REQUIREMENTS FOR AIR CAPABLE AND AMPHIBIOUS ASSAULT SHIPS TO OPERATE AIRCRAFT

Airfield and Flight Operations Procedures AUGUST 2008

BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE DOCTRINE DOCUMENT NOVEMBER 1999

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Commander Naval Surface Force, U.S. Pacific Fleet Ships & Commands News Archives Events

Chapter 3 Deployment/Redeployment

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

PART ONE THE AMPHIBIOUS OPERATION CHAPTER 1 INTRODUCTION

United States Forces Korea Regulation 95-5 Unit #15237 APO AP Aviation ARMISTICE DEPLOYMENTS TO ROK AIR BASES AND AIRFIELDS

Emergency Support Function #9 Urban Search and Rescue Annex

Emergency Support Function #9 Urban Search and Rescue Annex

Operational-Level Logistics

CHAPTER 302 MOBILIZATION AND PRE-DEPLOYMENT ACTIVITIES

Army Deployment and Redeployment

Joint Publication Joint Doctrine for the Defense Transportation System

The Verification for Mission Planning System

CHAPTER 4. PLANNING. Objectives. Tasks. Functional. Conceptual

UNCLASSIFIED UNCLASSIFIED 1

For More Information

5-1 Enclosure (1) MCO B 27 Apr 12. Chapter 5. FDP&E Process (Redeployment) PARAGRAPH 5000 PAGE 5-2 DEFINITIONS OVERVIEW

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC

Army Pre-Positioned Operations OCTOBER 2015

OPNAVINST C N AUG 2011

MAGTF Aviation Planning Documents

MAGTF 101. The Marine Air Ground Task Force (MAGTF) is the Marine Corps principle organization for. Marine Air Ground Task Force.

Department of Defense DIRECTIVE

USTRANSCOM. USTRANSCOM Research, Development, Test & Evaluation (RDT&E) Joint Deployment and Distribution Enterprise. 15 April Mr.

Joint Warfare System (JWARS)

AMPHIBIOUS OPERATIONS I & II B1V1000 B2V1000 STUDENT HANDOUT

Remote Sensor Operations

Department of Defense INSTRUCTION

MCWP Aviation Logistics. U.S. Marine Corps PCN

DEPARTMENT OF THE NAVY CHIEF OF NAVAL AIR TRAINING 250 LEXINGTON BLVD SUITE 102 CORPUS CHRISTI TX

Mobility. Defense Science Board. Task Force. DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited

The future operating environment will continue to be characterized by national

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Joint Logistics Fireside Chat NDIA Logistics Conference 27 March Balancing Readiness and Resources

UNITED STATES MARINE CORPS FIELD MEDICAL TRAINING BATTALION Camp Lejeune, NC

Transcription:

CHAPTER 9 MARSHALLING AND MOVEMENT ORGANIZATIONS AND RESPONSIBILITIES 9001. General Marshalling is that phase in which units complete final preparations for movement, including preparation of personnel, equipment, transportation to POEs, staging, and loading. Preparations necessary to conduct timely marshalling and movement are explained in Appendix C. In the movement phase, deploying forces proceed by different modes to the AAA in a planned sequence in order to support the efficient off-load of the MPS and the preparation of the MAGTF. 9002. Deployment Deployment "encompasses all activities from origin or home station through destination, specifically including intracontinental United States, intertheater, and intratheater movement legs, staging, and holding areas." (Joint Publication 1-02). The key point is that MPF deployment involves movement from home station all the way to the tactical assembly area (TAA). 9003. Movement Groups The MPF is divided into two movement groups based upon those units that arrive by sea (Sea Movement Group) and those that arrive by air (Air Movement Group). Units that arrive by sea are divided into movement elements that deploy from one geographic area at approximately the same time. Units that arrive by air, collectively called FIE, are divided into elements that deploy from different geographic areas at different times (see figure 9-1). FLY IN ECHELON and FLIGHT FERRY APOE TAA SPOE SPOD APOD APOE OPP AAA SPOE Air Movement Group Sea Movement Group Figure 9-1. Movement Concept 9-1

a. Air Movement Group The MPF air movement group consists of four elements that make up the FIE. (1) Survey, Liaison, and Reconnaissance Party See Chapter 10 for functions of the survey, liaison, and reconnaissance party (SLRP), appendix G for a notional SLRP T/O, and appendix D, tab D for the SLRP checklist. (2) Advance Party The advance party consists of personnel designated to form the AAOG, LFSP, the remainder of the NSE (those not deployed in the OPP or SLRP), and the AAOEs (see Chapter 10 for functions of these elements). The advance party is task-organized by the CMPF and the MAGTF Commander. The primary task of the advance party is to arrange for the reception of the main body and MPE/S. The advance party should deploy prior to the movement of the main body. It may also include the command elements of the MAGTF and CMPF. (3) Main Body The main body of the FIE is the balance of forces, less the FF, that remain after the OPP, SLRP, and advanced party have deployed. The movement of the main body is sequenced to support the off-load, arrival, and assembly operations. It is essential that the main body's flow be relatively uninterrupted to permit expeditious closure, arrival, and assembly. WARNING: Forces must not be introduced faster than logistic support can be provided from the off-load and throughput process. (4) Flight Ferry Flight ferry operations involve the movement of self-deploying aircraft of the ACE with possible aerial refueling support. b. Sea Movement Group The MPF sea movement group consists of three elements. (1) Maritime Prepositioning Ships Squadron See appendix B. (2) Off-Load Preparation Party The off-load preparation party (OPP) initially deploys by air, but arrives in the AAA as part of the Sea Movement Group. See Chapter 10 for the functions of the OPP, appendix G for a notional OPP T/O, and appendix D, tab E for the OPP checklist. (3) Follow-On Sustainment Follow-on sustainment (FOS) is comprised of seaborne shipping that supplements, complements, and augments the MPF. This includes T-AVB, T-AH, and other ships that provide all classes of supply past 30 days of sustainment on the MPSRON. 9-2

9004. Movement Control Organization A movement control organization is required to provide unity of effort and accomplish required interface with the joint deployment system. Sea movements are planned and executed by the fleet in accordance with normal movement control procedures. COMMARFOR, as the primary user of airlift, is responsible for coordinating the air movement. Consequently, the CMPF coordinates with the MAGTF Commander for marshalling and movement of Navy personnel by air. Coordination for air movement is made directly with USCINCTRANS and other supporting agencies. Reports of the movement are made through normal chains of command keeping all commands informed (see figure 9-2). MARFOR (CAT) MEF (FMCC) MAGTF (MLE) MCB (BOSG) DIV/FSSG (LMCC) GCE/CSSE (UMCC) NMCB/FH (UMCC) SPOE (SLE) (ECO) MCAS (SOSG) MAW (LMCC) (SDACC) ACE (UMCC) APOE (TALCE) (DACG) (ALE) ESB (EMCC) a. Force Movement Control Center Figure 9-2. Movement Control Organizations The force movement control center (FMCC) is the MEF Commander's principal movement control organization, and is responsible for the support necessary to facilitate marshalling and movement. Through coordination with AMC, the FMCC promulgates the air movement schedule with which parent commands execute the marshalling activities of the FIE. The FSCC will coordinate directly with MSC and NCC concerning the movement of the MPSRON. b. Logistic Movement Control Center The logistic movement control centers (LMCCs) are organized from service support elements (or the supporting establishment) in geographic proximity to the marshalling units. LMCCs are tasked by the FMCC to provide organic/commercial transportation, transportation scheduling, materials handling equipment, and any other logistics support required by the parent commands during marshalling. LMCCs will provide a departure airfield control group for the APOE as directed by the FMCC. 9-3

c. Departure Airfield Control Group Departure airfield control groups (DACGs) are the primary interface with the Air Force at APOEs. A DACG is responsible for receiving deploying equipment from the units at the APOE, coordinating with the TALCE to ensure that the cargo and personnel are properly prepared for air shipment, and delivering cargo to the ready line. d. Arrival Airfield Control Group Arrival airfield control groups (AACGs) are the primary interface with the Air Force TALCE at APODs. An AACG is responsible for receiving and moving personnel, equipment, and supplies from the aircraft flight line to initial staging areas. e. Embarkation Control Team An embarkation control team (ECT) provides coordination and oversight at the seaport of embarkation (SPOE) of surface movements as required (TAVB, T-AH, etc.). f. MAGTF Liaison Element The deploying MAGTF Commander will establish a MAGTF liaison element to Interface between the deploying MAGTF and the deployment support organizations Prepare all deployment documents and manifests for all loads of personnel, equipment, and supplies Supervise, coordinate, and monitor the marshalling, movement, and embarkation of personnel, supplies, and equipment from origins to final destinations Provide liaison personnel to the FMCC and LMCC as required The MAGTF liaison element coordinates with the airlift liaison element and sealift liaison element at the APOE and SPOE, as required. The MAGTF liaison element also coordinates with the survey, liaison, and reconnaissance party (SLRP) or arrival assembly operations group (AAOG) to effect adjustments to the deployment flow of personnel and/or to specific items of equipment or supplies needed in the arrival and assembly area (AAA). g. Airlift Liaison Element The MAGTF commander will establish a liaison element at each APOE to provide for coordination with the departure airfield control group (DACG). The airlift liaison element (ALE) includes personnel from the MEF and major subordinate elements (MSEs). The ALE is normally located in the staging areas at designated APOEs. The ALE Establishes liaison with the MLE, DACG, and other deployment support agencies as required Assists in the final preparation of vehicles and equipment in accordance with FMFM 4-6 Ensures that required dunnage, shoring, and tie-down materiel accompanies unit loads to the joint inspection (JI) area Provides load plans, personnel and cargo manifests, with appropriate copies to the DACG in accordance with FMFM 4-6; assembles personnel, supplies and equipment into sequenced pre-planned aircraft loads, in accordance with established load plans Ensures plane and/or troop commanders are appointed and properly briefed on their responsibilities 9-4

Ensures aircraft loads arrive at the JI area at times required and coordinated with the DACG Ensures correction of all load discrepancies found during join inspections Adjusts aircraft load sequence as required Deploys with late departing elements of the MAGTF h. Sealift Liaison Element The MAGTF Commander will establish a liaison element at each SPOE to provide for coordination with the embarkation control team (ECT). The sealift liaison element (SLE) includes personnel from the MEF and major subordinate elements. It is normally located in the staging areas at designated SPOEs. The SLE establishes liaison with the MLE, ECT, and other deployment support agencies as required, and assists in the final preparation of vehicles and equipment. i. Unit Movement Control Center The deploying unit will establish an area where the unit will marshal for movement to the APOE or SPOE. The command and control (C2) for this area is the unit movement control center (UMCC). The UMCC will coordinate with the MLE on their planned movement to the APOE or SPOE. j. En Route Movement Control Center The MEF Commander will form EMCCs to support the deploying MAGTF by monitoring the air movement and informing the MLE of any delays in the movement of the fly-in echelon and flight ferry. If an unacceptable delay in the deployment of critical personnel or equipment for the arrival and assembly phase does occur, the OIC of the EMCC will direct the off-load and reload of personnel and equipment onto other aircraft. k. Tanker Airlift Control Element The tanker airlift control element (TALCE) coordinates all Air Force operational aspects of the airlift mission, to include aircraft movement control, communications, and technical supervision of loading and marshalling of aircraft. An advanced echelon (ADVON) will deploy ahead of the main TALCE to coordinate AMC requirements at the arrival airfield. Areas of concern include ramp parking, runway conditions, cargo marshalling areas, and airfield support (crash/fire/rescue, navigation aids, personnel support, etc.). The ADVON will coordinate with the SLRP to obtain (through the airfield coordination officer) services from U.S. forces and from the host nation as necessary. The AD- VON may deploy equipment to establish communications with AMC command and control agencies, and to establish the airfield coordination officer prior to the arrival of the main TALCE. l. Host Base/Stations Host base/stations assist marshalling units through the provision of local logistics support, and provide MHE, transportation, security, and other support required by the deploying unit. If required, host base/stations assume custody of remain-behind equipment. The Marine Corps bases (MCBs) and Marine Corps air stations (MCASs) will establish a base operations support group (BOSG) and station operations support group (SOSG) respectively. The BOSG and SOSG will coordinate their support efforts for the deploying MAGTF. m. Ports of Embarkation The installation commanders at, or in the vicinity of, POEs provide materials handling equipment, transportation, security, and other support as requested by the deploying unit. 9-5

9005. Marshalling During the marshalling phase, deploying echelons, organized by plane or ship team(s), assemble at their home station, prepare for deployment, and move in accordance with the established plan or when called to stage at APOEs or SPOEs. Marshalling for sea movement involves normal amphibious embarkation procedures (see Joint Publication 3-02.2, Joint Doctrine for Amphibious Embarkation). For marshalling for air movement, see MCRP 4-13.1A, Movement of Units in Air Force Aircraft. Parent commands supervise preparation for deployment. Appendix C outlines required actions prior to and after an alert. These procedures should be included in unit readiness SOPs. Movement to APOEs/SPOEs is accomplished with organic transportation to the maximum extent. Requests for transportation in excess of organic capability are coordinated by the LMCC. The CMPF transportation requirements for elements deploying by airlift are coordinated with the MAGTF Commander. a. Aerial Port of Embarkation Operations Air Mobility Command will exercise overall control of airlift operations at APOE(s). Air Mobility Command TALCE will establish an AOC at the airfield, with all information related to onload operations coordinated through the AOC. Coordination between the moving unit, DACG, and TALCE is critical to an orderly movement of airlift aircraft through the APOE. The arrival of unit equipment and personnel for onload must be sequenced to avoid bottlenecks at the APOE. Major commands will provide an officer at the APOE to coordinate (with DACG and TALCE) the arrival of unit equipment and personnel. TALCE, DACG, and APOE installation commanders must jointly ensure that sufficient ramp space for aircraft parking and equipment staging areas is available to support the airlift flow. DACG, in coordination with the APOE installation commander and LMCC, will ensure shelter and messing for deploying personnel are provided. Helicopter disassembly areas should be located away from passenger and cargo staging areas, yet close enough that aircraft can be towed to the staging area. This area should be sufficiently large enough for MHE to move safely between aircraft. Helicopter disassembly requires cranes, forklifts, tow tractors, light units, and ramp space for work and staging. b. Seaport of Embarkation Operations Normal embarkation procedures and relationships apply. 9006. Movement a. Conduct of Sea Movement The MPSRON will move as directed by the Fleet Commander. Ship movement should accommodate the earliest possible embarkation of the OPP. The MPSRON will rendezvous with escorts (if assigned), and conduct transit to the AAA. TAVB, T-AH, and FOS will proceed as directed. b. Conduct of Air Movement Air movement is a continuous, progressive operation that transports successive elements of the deploying force to the objective area. The total time required will depend on the number, type, and initial locations of forces to be deployed, aircraft availability, range, and throughput considerations. Some follow-on sustainment may arrive by air (e.g., Classes I and VI). (1) Airlift The airlift is accomplished through air mobility command aircraft and civil contract carriers. Air mobility command will determine the airflow routing. 9-6

(2) Flight Ferry Flight ferry operations involve the movement of ACE tactical aircraft capable of self-deploying with the support of aerial refueling. Supporting refuelers may be provided by the operating forces, AMC, or ACC. Different aircraft types may require different planning considerations. If flight ferry aircraft use the same arrival airfields as the airlift aircraft, coordination with AMC is required. Profiles/routes should be established for each type of aircraft. The final staging base should be located within 1,000 nautical miles of the arrival airfield. This will facilitate movement of the ACE to the arrival airfield on call and without the requirement for external tanker support. (3) En Route Planning Considerations Flight ferry and airlift aircraft have similar requirements that must be coordinated by the supported and supporting CINCs. AMC and MAGTF aircraft must be moved in concert to avoid saturation of staging bases, weather divert alternates, and air traffic control facilities. Enroute support bases must possess sufficient air traffic control, navigational aids, command and control, billeting, POL, maintenance, and service facilities to support flight operations. Over-flight rights may impact on in-flight refueling and staging base requirements. Supporting and supported CINCs are responsible for providing security for staging bases and flight routes within their AOR. (4) Staging Base Coordination If a staging base is required for AMC aircraft, a TALCE will deploy to that base and coordinate AMC activity there. The MAGTF will deploy a liaison section (EMCC) with the TALCE to coordinate support for MPF FIE assets delayed at the staging base because of aircraft maintenance or other disruptions to the deployment flow. Civil contract carriers determine their own en route support requirements, and are responsible for support of MPF FIE passengers delayed en route because of aircraft maintenance problems. (5) Aerial Refueling Considerations Some portion of the AMC flow may be air refuelable, enhancing the scheduled FIE's deployment. 9-7