US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

Similar documents
Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

Dallas Floodway System Update

Appendix B Review Matrix Text & Table Footnotes

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

King County Flood Control District 2017 Work Program

Better Cultural, Arts and Recreational Amenities. Trinity Watershed Management

Expedited Bridge Replacement Program

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

2017 Developer Handbook

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG

Transportation Alternatives (TA) Northeast Minnesota Workshop

Digitally signed by BIGELOW.BENJAMIN.JAMES ou=pki, ou=usa, cn=bigelow.benjamin.james Date:

CRS Floodplain Management Plan Annual Report

Armoring Pilot Project now underway

DAM AND LEVEE SAFETY

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

New Orleans Hurricane and Storm Damage Risk Reduction System Update

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

CITY OF LAREDO Environmental Services Department

2018 Developer Handbook

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

REQUEST FOR PROPOSALS Long-Term Community Recovery Strategy Town of Union, NY

Guidance. Historical Studies Review Procedures

Engineer Circular Requests to Alter USACE Projects

REQUEST FOR PROPOSALS

Water Quality Improvement Program. Funding Application Guide

State Project No. XXXXXX City Project No. c401807

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

January 19, To Whom It May Concern:

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Emergency Management THERE WHEN YOU NEED US

NEPA PUBLIC INVOLVEMENT

CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review

5/25/2017 FUNDING STORMWATER PROJECTS OVERVIEW PROJECT FUNDING BRIDGE KNOWN PROBLEMS KNOWN SOLUTIONS

FLORIDA DEPARTMENT OF TRANSPORTATION

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

Table of Contents. October 2016 i

Update on USACE Civil Works Program Authorities, Policies, and Guidance

NCDOT Planning Summary for NCTA Projects

CRAWFORD MEMORIAL PARK

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355

Status of Convention Center Hotel Project. Briefing to the Economic Development Committee August 15, 2008

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

University of North Texas Libraries

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

Sabine Pass to Galveston Bay, Texas

TxDOT Statewide 2017 TA Set-Aside Questions & Answers

Texas Department of Transportation Corpus Christi District

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items...

Updated August Metro State Aid Payment Guide

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

Little Calumet River Basin Commission EXECUTIVE DIRECTOR DAN REPAY

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO HOUSE APPROPRIATIONS COMMITTEE LEGISLATIVE BUDGET BOARD STAFF

FEMA Grant Program Comparison

REQUEST FOR QUALIFICATIONS (RFQ) FOR DESIGN ENGINEERING SERVICES FOR TOWN CENTER STORMWATER IMPROVEMENTS

BRF-009-9(73) IA 9 Black Hawk Bridge

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009

(This page intentionally left blank)

Quality Assurance/Quality Control Procedures for Environmental Documents

Federal Emergency Management Agency Public Assistance Program

City of Jersey Village

Determining Residual Flood Risk Associated with a

Company Profile Phillips & Jordan, Inc. Key Markets

THE BROOKINGS INSTITUTION

REQUEST FOR PROPOSALS Town of Brattleboro, VT

Request for Qualifications (RFQ) Environmental and Permitting Services

RICHLAND COUNTY BLUE RIBBON COMMITTEE MAY 19, :00 PM 4 TH FLOOR CONFERENCE ROOM

Plan of Development Review Process County of Henrico, Virginia

Panel Decision & Report. SRP MAPC Plymouth County, MA

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Vista Ridge Project Technical Advisor

VERMONT S RESILIENCE PROGRESS REPORT ROADMAP. August 20, 2015 BACKGROUND WHAT IS RESILIENCE? TRACKING OUR PROGRESS.

FLORIDA DEPARTMENT OF VETERANS AFFAIRS

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Port of Long Beach Community Grants Program. Community Infrastructure

jobs program earmark ban

New Draft Section 408 Policy Document EC

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson

PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting

BOROUGH OF STONE HARBOR CRS ACTIVITY 510. Progress Report on Hazard Mitigation Initiatives

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY

HAZARD MITIGATION ASSISTANCE GRANTS

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

MAP-21 and Project Delivery: A Legal Perspective

APPENDIX J FUNDING SOURCES

REQUEST FOR PROPOSALS TO PREPARE PS&E FOR Las Virgenes Creek Restoration Project Phase II

Surface Water Improvement Program

Virginia Beach. of One of America s. An Exciting Opportunity to Shape the Infrastructure. Most Amazing Big Cities!

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C.

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

HAZARD MITIGATION ASSISTANCE (HMA) GRANTS

METROPOLITAN NASHVILLE- DAVIDSON COUNTY. ACTION PLAN FOR DISASTER RECOVERY Amendment Four

Transcription:

US Army Corps of Engineers Periodic Inspection Report 9 Update Dallas City Council June 3, 2009 1

Briefing Overview Flood Protection is of primary importance to the City. The Dallas Floodway System protects an estimated $7.3B of the City s tax base. The Corps performed Periodic Inspection Report 9 (PI 9) and rated the System Unacceptable. Ratings were based on visual inspection and engineering judgment. A System Study is required to identify and address these issues regardless of any current projects. Four City issued contracts valued at approximately $29M are required for the Study. 2

Purpose To provide an update of PI 9 To outline the categories of work to confirm/address the findings in PI 9 To update FEMA Levee Accreditation status To detail action items 3

PI 9 Update The Dallas Floodway Project has historically received good, very good or excellent ratings. After Hurricane Katrina, the Corps set more rigorous and standardized criteria for inspecting levee systems National Levee Safety Program in 2007. 4

PI 9 Update 12/2007 Corps performs PI 9 using new standards 12/2008 City receives Very Good Rating for Annual Inspection 3/31/2009 City receives PI 9 with Unacceptable rating 4/1/2009 Dallas City Council is briefed 5

PI 9 Update Corps used visual inspection and engineering judgment to rate items. 206 items received ratings of minimally acceptable and unacceptable: 138 minimally acceptable 68 unacceptable Not all components of the floodway were inspected, but will be in the future. 6

Periodic Inspection Report 9 Update Primary concerns expressed in PI 9 are related to seepage, stability and height of the levees. Major categories of unacceptable ratings include: Insufficient crest height Significant encroachments and penetrations in the levees Damaged gate closures Unstable structures Severe desiccation cracking of the levees Erosion Vegetation Siltation Channel instability 7

Periodic Inspection Report 9 Findings The City and Corps categorized minimally acceptable and unacceptable items into two categories: A. Operations and Maintenance B. System Study (Additional Study and Analysis Required) 8

Operations and Maintenance A. Operations and Maintenance (O&M) Repairs/funding are responsibility of City. Three subcategories: 1. O&M (Supported by Existing Resources) 2. Enhanced O&M (Requires Additional Resources) 3. Major Maintenance (Requires Engineered Solutions and Construction Contracts) Note: The City must complete O&M repairs by April 1, 2010 to remain eligible for assistance under Public Law 84 99 9

A1 Operations and Maintenance (Supported by Existing Resources) Items are routine operations and maintenance that can be addressed with existing staff and equipment. Items can be addressed without Corps approval. Some work will be coordinated with partner agencies (i.e. TxDOT, DART, Utilities). Staff has made progress on several items. Additional work continues. 10

A1 Operations and Maintenance (Supported by Existing Resources) The current O&M budget for the Dallas Floodway is $7.3M. Concrete and Structural Repair (Levee, Sump, Pump Station, Retaining Walls and Channel Repairs) $700K Floodway Pump & Motor Operations (Mechanical, Electrical, and Technical Operations and Maintenance; Flooding Response) $2.9M Earthen Maintenance & Repair; Vegetation Management and Debris Removal (Floodway, Levees, Sumps, Basins & Pump Stations) $1.5M Other Flood Control (Lined & Earthen Channels, Stormwater Pipe Inspection, Flood Roadway Warning System) $2.2M 11

A1 Operations and Maintenance (Supported by Existing Resources) Repaired Concrete Flume Able Station Damaged Concrete Flume Able Station 12

A1 Operations and Maintenance (Supported by Existing Resources) Sump Erosion Corrected Able Sump Sump Erosion Able Sump 13

A1 Operations and Maintenance (Supported by Existing Resources) Levee Erosion Corrected Trinity Rail Express Levee Erosion Trinity Rail Express 14

A1 Operations and Maintenance (Supported by Existing Resources) Example of Collected Debris along river channel Santa Fe Bridge (Before and After) 15

A2 Enhanced Operations and Maintenance (Requires Additional Resources) New inspection criteria requires higher level O&M of the entire Dallas Floodway. This will require additional staff and equipment. Some items may require additional engineering analysis and Corps approval. 16

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Enhanced O&M will require additional $8.45M in FY 10. This is composed of ongoing and one time expenses. The additional annual ongoing costs are: Levee Mowing and Vegetation Management $1.26M Concrete Structural Maintenance $ 455K Erosion Control and Channel Maintenance $ 576K Mechanical and Structural Maintenance $ 290K Pump Station Facility Maintenance $ 192K Levee Grading Maintenance $ 35K Creek and Culvert Debris Removal $1.70M TOTAL $4.508M 17

A2 Enhanced Operations and Maintenance (Requires Additional Resources) One time costs are need for: Tree Removal & Levee Inspection (Approximately 2800 Trees) $3.0M Access Control $950K TOTAL $3.95M Storm water fees primary funding source for these activities. 18

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Concrete Repairs for Outfall Structures 19

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Trees within 15 Trees within 50 20

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Debris needs to be removed more frequently 21

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Siltation and vegetation must be removed/mowed more frequently 22

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Channel slope stability and displaced rip rap Damaged trash rack 23

A2 Enhanced Operations and Maintenance (Requires Additional Resources) Baker Pump Station Maintenance Delta pump Station Maintenance 24

A3 Major Maintenance (Requires Consulting and Construction Contracts) Requires additional resources (to be determined) to complete. Needs contract engineering support and construction contracts. Requires Corps approval. Must be coordinated with applicable partner agencies (i.e. TxDOT, DART, Union Pacific Railroad, Utilities). 25

A3 Major Maintenance (Requires Consulting and Construction Contracts) Land side (low road) erosion TxDOT/COD Tree removal related to gabion retaining walls (Turtle Creek) 26

A3 Major Maintenance (Requires Consulting and Construction Contracts) Other Agency DART pier erosion Seals are out at joints in floodwall near DART Bridge 27

A3 Major Maintenance (Requires Consulting and Construction Contracts) Stop Log Structure Missing Sill at Union Pacific Railroad Turtle Creek Pressure Sewer Wall Separation of Wall 28

B System Study (Additional Study and Analysis Required) B. System Study Corps has determined a thorough, comprehensive engineering analysis of levee system must be done to determine if levees can safely pass floods. The study will: Analyze potential for seepage under and through levees. Analyze effects of pier penetrations. Analyze slope stability issues. Identify any necessary remediation work for 100 Year and 800 Year flood events (e.g. Levee Remediation Plan). Identify funding source (City or combination of Corps/City). 29

B System Study (Additional Study and Analysis Required) More specifically, System Study includes: Geotechnical analysis of entire floodway system Hydraulic modeling to determine water carrying capacity Development of Levee Remediation Plan Investigation of a variety of solutions for stability and seepage issues Cost benefit analysis of alternative solutions Environmental impact analysis 30

B System Study (Additional Study and Analysis Required) Corps has determined they can assist in identifying and potentially implementing needed improvements due to: 1. Pre existing conditions and/or infrastructure in place when Corps completed levee upgrades in 1959. 2. Changed conditions due to upstream urbanization. Because of this, Corps can assist with System Study. 31

FEMA Levee Accreditation Update FEMA standards require levees to perform to 100 Year flood event. PI 9 questioned whether levees contain 100 Year flood. Corps rescinded support for accreditation. FEMA began de accreditation process in April 2009. 18 to 24 months to completion. City must prove levees will perform during a 100 Year flood. 32

FEMA Levee Accreditation Update Levee Remediation Plan portion of the System Study will ascertain if levees will protect adjacent properties during a 100 Year flood. Plan will be complete in February 2010. Should this analysis demonstrate levees will perform as prescribed, then City will ask FEMA to keep current flood plain map. 33

FEMA Levee Accreditation Update Should the analysis demonstrate levees will not perform as prescribed: Appropriate engineering and construction projects must be completed before levees can be accredited. Informational meetings with neighborhoods, businesses and development community would begin in Spring 2010. 34

FEMA Levee Accreditation Update City s goal complete construction of any repairs necessary to enable the levees to handle the 100 year flood by January 2011. If goal is met, FEMA will stop its remapping process. If goal is not met, new FEMA floodplain map will show no flood protection by levees. Property owners who hold federally backed mortgages/loans will be required to obtain flood insurance. New development/redevelopment will need to meet new development code criteria regarding floodplain reclamation. 35

Path Forward System Study Lengthy, detailed meetings have occurred between City, Corps, Federal Highways Administration (FHWA), TxDOT and NTTA since April. An aggressive schedule has been developed to complete the System Study. To achieve this aggressive schedule, all agencies must work diligently and meet individual deadlines. 36

Path Forward System Study The Trinity River Corridor Project (TRCP) has always been, first and foremost, a flood control project with plans to address several items raised by PI 9, such as levee height and slope stability. The TRCP allows us to move forward, cooperatively, with our federal partners. As a result, City is in unique position to immediately begin and to cost share in System Study with Corps. 37

Path Forward Action Items Contract is required to cost share with Corps for System Study (known as a Feasibility Cost Share Agreement or FCSA). City anticipates bringing FCSA to Council for approval in Fall. For Corps to continue work until Fall, City can supplement contract with North Texas Council of Governments (NTCOG). NTCOG currently has existing contract with Corps to work on regional efforts related to Trinity River Basin that can be modified to include this work. 38

Path Forward Action Items City can advance funding to Corps and award contracts to expedite and complete the System Study. City currently has three contracts that directly tie to existing and proposed study work: Floodplain Management Contract with HNTB Trinity Lakes Design Contract with CH2MHILL Trinity Parkway Contract with NTTA 39

Path Forward HNTB Supplemental Agreement Staff proposes $25.5M supplemental agreement to current Floodplain Management Contract with HNTB. Supplemental agreement has been developed with: Set fees for certain work elements. Special services that require prior authorization to proceed. Depending on results from System Study, some portions of funding for engineering support may not be required. 40

Path Forward HNTB Supplemental Agreement Major components of the supplement include: $14.6M for soil borings, analysis and hydraulic modeling $6.3M for engineering support to address work in categories A2 and A3 $2.8M for Maintenance Deficiency Correction Plan (MDCP), levee remediation plan, policy integration and miscellaneous engineering support $700K for reimbursable expenses $550K for reviews and mock inspection (including detailed report findings) of the Dallas Floodway and coordination with partner agencies $400K for FEMA accreditation efforts About half of these costs will apply towards cost share requirements of Dallas Floodway Project with Corps. 41

Path Forward HNTB Supplemental Agreement HNTB Currently provides floodplain program management services for 2006 Bond Program for City. Serves as Corridor Manager for NTTA and is oversees the geotechnical work for Trinity Parkway. Is a leader among engineering firms with respect to working with Corps. Has a number of retired, high level Corps employees on staff who can assist with District, Division and Head Quarters processes. 42

Path Forward CH2MHILL Supplemental Agreement City is proposing supplement to lakes design contract with CH2MHILL, not to exceed $600K. CH2MHIll has been working with hydraulic analysis for Dallas Floodway. Major components of supplement contract include continued work towards completion of EIS portion of System Study: Environmental and Archaeological Testing Hydraulic Modeling This action will apply towards cost share requirements of Dallas Floodway Project with Corps. 43

Path Forward Interim FCSA with NCTCOG City is proposing entering into interim FCSA with NCTCOG, not to exceed $1.8M. NCTCOG currently has active FCSA for Upper Trinity River Basin that can provide Corps with ability to continue working on System Study until final FCSA this fall. Major components will include: Environmental impact analysis Deed Research Unsteady flow hydraulic model Data compilation of property values behind levees 44

Path Forward NTTA Supplemental Agreement City is proposing entering into supplemental agreement with NTTA, not to exceed $1.3M. FHWA has determined that a Limited Scope Supplement to Supplemental Draft Environmental Impact Statement (LSSSDEIS) needs to occur. Therefore, City will need to enter into supplemental agreement with NTTA to address components of Trinity Parkway. 45

Path Forward Final FCSA with Corps City will need to enter into FCSA for Dallas Floodway with Corps this fall. Cost for this action is unknown at this time. 46

Project Impacts It is the goal to complete System Study by spring 2012 which would result in: Construction for Dallas Floodway delayed 10 months. Trinity Parkway construction delayed 20 months. Schedule assumes design of levee improvements and Trinity Parkway would proceed concurrent to environmental permitting. 47

Next Steps Council Action To confirm/address PI 9 findings, Council will consider the following actions on June 10, 2009 City Council Addendum: 1. Approval of Supplemental Agreement with HNTB for $25.5M. 2. Approval of Supplemental Agreement with CH2MHILL for $600K. 3. Approval of Interim Feasibility Cost Share Agreement with North Texas Council of Governments for $1.8M. 4. Approval of Supplemental Agreement with NTTA for $1.3M. 48

Appendix Summary A. Dallas Floodway Levee System Map B. Funding strategy for the June 10 th Action Items C. HNTB Supplemental Agreement M/WBE Participation D. CH2MHILL Supplemental Agreement M/WBE Participation E. Major Tasks Flow Chart 49

Appendix A Dallas Floodway Levee System Map Flood of 1990, a 35 50 year flood event 50

Appendix B Funding Strategy 1998 Bond Program and 2006 Bond Program included $571M to address flood control initiatives and other associated improvements to Dallas Floodway. Since this work will provide flood control for City, this is an appropriate source of funding. Using this source of funding will require deferring a project until next bond program 51

Appendix B Funding Strategy Staff recommends construction for Able Pump Station be delayed to fund this action. Design and right of way acquisition for Able Pump Station will continue. Delays construction 12 18 months. Bonds scheduled to be sold for Able Pump Station in November 2010. Until bonds are sold, funding will be borrowed from other projects in 1998 Trinity River Corridor Project proposition. 52

Appendix C HNTB Proposed M/WBE Participation Mas Tek Engineering & Associates, Inc. Geotechnical Investigation $ 3,200,000 12.5% HVJ Associates Inc. Geotechnical Investigation $ 2,000,000 7.8% Levee Condition Jaster Quintanilla Assessment and Engineer Support Services $ 335,000 1.3% Pacheco Koch Surveying and Engineer Consulting Support Services Engineers, Inc. $ 600,000 2.4% Gupta & Associates,Inc Trevino Engineering Support Services LLC Urban Engineers Group, Inc. Levee Condition Assessment and Engineer Support Services Printing, Plotting and Reproduction $ 335,000 1.3% $ 110,000 0.4% Engineer Support Services $ 265,000 1.0% 53

Appendix D CH2MHILL Proposed M/WBE Participation Xenco Laboratories Environmental Testing $150,000 25.6% Geo Marine, Inc. Archeological Support $ 82,465 14.0% Gorrondonna Associates Surveying and Engineer Support Services $ 20,000 3.40% APM and Associates Engineer Support Services $ 2,273 0.03% 54

Appendix E Our goal is to complete work by Spring of 2012 WRDA 5141 Project Management Plan NEPA Public Scoping Meeting Problem Identification Geotechnical / H&H Feasibility Scoping Meeting Develop Levee Remediation Plan and Approval Process Identify FDR Plan ( NED ) Comprehensive Analysis w/ + w/o Tollway Select Plan Levee / 5141 / Tollway Draft WRDA Report / DEIS Public Hearing Final Report EIS Record of Decision Levee / 5141 / Tollway U.S. Army Corps of Engineers Levee Inspection Report In Progress Review Independent? 408 Projects ( except Tollway ) Alternatives Formulation briefing Parkway Alt Analysis Tollway P & S Review / Approval Receive Levee Inspection Report O&M Correction Plan (MDCP) FEMA AR Zone Decision O&M MDCP Corrections complete PL 84 99 Temp Ext Implement 100 year Levee Remediation Plan FEMA 100 Year Certification Submittal 4(f) and Practicability Analyses Prepare Draft LSS SDEIS/Draft Section 4(f) Evaluation NOA and Notice of Public Hearing (45 days) Prepare Draft FEIS/ Section 4(f) Evaluation Public Hearing Reviews of Draft LSS SDEIS/ Draft Section 4(f) Evaluation by TxDOT/USACE/ FHWA Austin Public Hearing LSS SDEIS/Draft Section 4(f) Evaluation Reviews of Draft FEIS/Section 4(f) Evaluation by TxDOT/USACE/ FHWA Austin U.S. Department of Transportation Federal Highway Administration Processes Trinity Tollway PL 84 99 Certification WRDA 5141 Review of LSS SDEIS/Draft Section 4(f) Evaluation by FHWA Atlanta FEIS/Section 4(f) Evaluation Approval & NOA Review of FEIS/ Section 4(f) Evaluation by FHWA Atlanta Record of Decision FEMA Levee Accreditation Potential 408 Modifications Receive Levee Inspection Report Revised Preliminary FIRM Maps Levees De Accredited Public Comment / Appeal Effective FIRM Maps 55