Sea Air Space. Sea Power to the Hands of Our Sailors. RDML Jon Hill April 13, 2015

Similar documents
Virginia Ship Repair Association Commonality and Flexibility in Combat Systems

State of IAMD 2014 IAMD Achievements. RADM Joseph Horn. Program Executive Officer Integrated Warfare Systems June 12, 2014

9 th Annual Disruptive Technologies Conference

Gun and Missile Systems An Integrated Warfare Perspective

ASNE Combat Systems Symposium. Balancing Capability and Capacity

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Air and Missile Defense Radar (AMDR)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support

UNCLASSIFIED R-1 ITEM NOMENCLATURE

AEGIS Ballistic Missile Defense

ARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

FFG(X) Update National Symposium - Surface Navy Association

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

DDG 1000 Class Destroyer

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

SSC Pacific is making its mark as

AVW TECHNOLOGIES, INC.

NATO SEASPARROW Case Study: Taking International Cooperation to the Next Level

Distribution Statement A: Approved for Public Release; Distribution Unlimited

US Navy Ships. Surface Warfare Officer First Tours

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Advanced Above Water Sensors. FY 2011 Total Estimate. FY 2011 OCO Estimate

The Ship Acquisition Process: Status and Opportunities. NDIA Expeditionary Warfare Conference 24 October 07

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 22 R-1 Line #105

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW)

RESEARCH PROTECTIONS UPDATE News and Comment on the Protection of Human Subjects in Navy and Marine Corps Research

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARCHIVED REPORT. SSDS (Ship Self-Defense System) - Archived 2/98

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION

Ballistic Missile Defense Overview

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

OPNAVINST F N4 5 Jun 2012

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

N/SINGLE INT. AIR PICTURE (SIAP) SYS ENG

Office of Executive Director for Conventional Ammunition (O/EDCA)

Trusted Partner in guided weapons

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2010 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES MAY 2009 OTHER PROCUREMENT, NAVY BUDGET ACTIVITY 4

NDIA Munitions Executive Summit Sustaining Industrial Readiness

Aircraft Carriers Enduring and Transformational

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

An Introduction to SSDS Concepts and Development

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

Under defense strategic guidance, The Aegis Warship. Joint Force Linchpin for IAMD and Access Control. By John F. Morton

WikiLeaks Document Release

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Lockheed Martin Corporation Integrating Air & Missile Defense

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Combat System Integration FY 2012 OCO

Future of MIW from the LCS Platform

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #108

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

Aegis BMD Update to the National Defense Industrial Association & Strike, Land Attack, and Air Defense Division 14 July 2011

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

Navy Information Warfare Pavilion 19 February RADM Matthew Kohler, Naval Information Forces

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

UNCLASSIFIED UNCLASSIFIED

Composites Road to the Fleet - - A Collaborative Success Story

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

AEGIS BALLISTIC MISSILE DEFENSE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

CRS Report for Congress

OPNAVINST L N96 30 Mar Subj: REQUIREMENTS FOR AIR CAPABLE AND AMPHIBIOUS ASSAULT SHIPS TO OPERATE AIRCRAFT

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow

A Ship Defense Analysis Process

NAVY FORCE STRUCTURE. Actions Needed to Ensure Proper Size and Composition of Ship Crews

Transcription:

Sea Air Space Sea Power to the Hands of Our Sailors RDML Jon Hill April 13, 2015

Sea Power to the Hands of Our Sailors AMOD IAMD Flight III AMDR Lethality & Commonality Activation Romania Poland Lethality Modernization FORD (CVN 78) Combat System Activation Distribution Statement Statement A: Approved A: Approved for Public for Release Public by Release; NAVSEA PAO Distribution MM/DD/YY; Unlimited. Distribution Unlimited. ZUMWALT (DDG 1000) Combat System Activation 2 2

PEO IWS Programs and Projects AEGIS Combat Systems Integration into DDG 51 and CG 47 class ships CEC: 1 Country SM-1/SM-2: 15 Countries MK 34 GWS: 4 Countries AEGIS Modernizationn New Construction Common Computing Equipment BL 9 Common Source Library CPS AN/SPY-6 Integration CDS BFTT: 1 Country AMIIP FTAMD AEGIS/ AWS: 5 Countries SQQ-89: 2 Countries Enterprise T&E (SDTS) SFSE WSN-7/9: 4 Countries Ammunition: 17 Countries CIWS: 9 Countries MK 41 VLS: 8 Countries Future C/S NFCS: 1 Country Radars: 1 Country International & FMS RAM BLK 1 RAM RAM GMLS NSPO RAM BLK 2 SSDS ESSM BLK 1/2 Single Source Library RIM-7/ MK57 NSSMS DDG 1000 LCS 1 LCS 2 LCS 1 & LCS 2 Combat Systems Variant Integration DDG 1000 Combat Systems (TSCE) Integration SSDS Combat Systems Integration in the following classes: CVN NIFC-CA 125 Program & Projects 3 ACAT I 6 ACAT II 4 ACAT III 3 ACAT IV 3 R&D 29 Inactive 77 Non ACAT Information Assurance AN/WSN-9 MIPS III ECIDIS-N RLGN CEC AN/BSN-2 ASW Advanced Dev. SDRW/SRD /SCD CADRT MK-32 CV-TSC Sub Arctic USW DSS Warfare Dev. Undersea Systems UQN-4A WQC-2A/6 Surface ASW SeaRAM AGS MK 38 Systems Imp. DISTRIBUTION STATEMENT D: Distribution authorized to DOD and DOD contractors only; Other requests must be referred to PEO IWS. SQQ-89 LCS Mission Modules MK 75 76mm MK 110 57mm SQS-56 Surface Ship Weapons SM-2 Blk IIIB/ BLK IV SM-6 NFCS Above Water Sensors LRLAP Griffin MK 45 MK 57 VLS SPY-3 SEWIP MK 46 30mm SPS-73 SPY-1A/B/D SPS-67 AN/SPY-6 Phalanx SPS-64 SPS-55 AN/SLQ-32 MMSP LHD AN/SPQ-9B LSD SPS-49 AOEW AMP Mission: To develop, deliver, and sustain operationally dominant combat systems to Sailors and Marines: Sea Power to the Hands of our Sailors SPS-48 NULKA LPD LHA SPS-40 DBR 3

PEO IWS FY15 Priority Focus Areas FLEET READINESS Execute determined focus on sustainment In service support for Sensors, Weapons, Launchers and Combat Systems Navigation Wholeness LCS Combat System Readiness Maritime Theater Missile Defense Forum At Sea Demo 15 PACE THE THREAT Fleet introduction of new capabilities AEGIS Air Defense Cruiser and IAMD Destroyer DT/OT, Fleet Introduction NIFC CA DT/OT, Fleet Introduction SM 6 DT/OT, Fleet Introduction AEGIS Ashore In service Operations under Navy Leadership ENGINEERING DEVELOPMENT Aggressively manage cost and deliver on time LCS Radar Trades and Common Combat System ZUMWALT Combat System Activation CVN 78 Combat System Activation Modernization Programs for AEGIS, Carriers, Amphibs and LCS CVN 79/80 Combat System and Radar Baseline Definition DDG 51 Class Flight III Combat System Development PEOPLE Maintain Our Professional Workforce 4

DDG-51 Flight III AEGIS Combat System NOV 2014: DEC 2014: JAN 2015: FEB 2015: MAR 2015: ESSM Block II program achieved the Milestone B Decision and an approved Acquisition Decision Memorandum DDG 51 FLT III Program Review SPY-6 Hardware Critical Design Review ESSM Block II E&MD contract agreement reached: $520M. Delivered a signed ESSM Block II Engineering & Manufacturing Development MOU between the 12 nations of the NATO SEASPARROW Consortium Achieved a successful SEWIP Block 3 Milestone B SEWIP Block III Contract awarded to Northrop Grumman DDG Flight III AEGIS ACB 20 Scope Definition approved. Near Term Events APR 2015: SPY-6 System Critical Design Review APR 2015: DDG 51 Gate 6/CSB Review MAY 2015: SEWIP Block III SFR AEGIS Combat System Scope (ACB 20 OPNAV FEB 2015) Long Term ECP award to DDG 51 contract for Flight III configuration- FY16 1 st AEGIS ACB 20 Light-Off- FY 2020 Q4 DDG 51 Flight III Ship Delivery 2021 ACB 20 Initial Operational Capability- Q4 FY 2023 5

AMDR Air & Missile Defense Radar Recent Accomplishments MAY 2014: Hardware Delta Preliminary Design Review (PDR) AUG 2014: System Delta PDR DEC 2014: Air & Missile Defense Radar Hardware Critical Design Review JAN 2015: ACAT I Program Review Selected USNS HARRY L. MARTIN (T-AK 3015) as a launch platform for the AMDR DT-3 targets FEB 2015: Entered Engineering Development Model (EDM) array production MAR 2015: AMDR Gate 6 Sufficiency/CSBB Near Term Events APR 2015: AMDR Critical Design Review (Sudbury, MA) AMDR is a multi-function, active-phased array radar capable of simultaneous search, detection, and tracking of airborne missile targets and ballistic missile targets for engagement support S-band radar (AMDR-S) X-band radar (SPQ-9B for the first 12 shipsets) Radar Suite Controller (RSC). Long Term Far Field Range McKinney, TX Radar System CDR - Apr 2015 AMDR-S, RSC EDM to PMRF - Mar 2016 Testing at PMRF to complete - May 2017 In-yard Need Date - 2019 DDG 51 Flight III Ship Delivery 2021 6

EASR Enterprise Air Surveillance Radar EASR is slated to go on the Navy s second Ford-class aircraft carrier, the USS KENNEDY (CVN 79), as well as the services third big-deck Americaclass amphib, called LHA 8. It will replace the in-service SPS-48 and SPS- 49 radars. Recent Accomplishments MAR 2015: Completed draft EASR RFP specification adjudication Common Radar Technology Shipboard Fixed Phased Array (backfit or forward fit) Rotating Phased Array (backfit) Office of Naval Research (ONR) Integrated Topside Program (InTop) 18 Months, Completes Spring 2015 Near Term JUN 2015: Expected completion of the Enterprise Radar Suite Naval Capabilities Document (NCD). MAY 2015: Expected completion of RFP Long Term JAN-MAR 2016: Gate 3/Gate 4 Briefs AUG 2016: Contract Award 7

Sea Power to the Hands of Our Sailors