UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No.

Similar documents
November 13, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Standard Development Timeline

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Standard EOP System Restoration Coordination

Standard FAC Assessment of Transfer Capability for the Near-term Transmission Planning Horizon

Standard FAC Facility Ratings. A. Introduction

5. Effective Date: See the Implementation Plan for IRO B. Requirements and Measures

WECC Standard VAR-STD-2a-1 Automatic Voltage Regulators

CIP Cyber Security Incident Reporting and Response Planning

April 13, 2015 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2

VIA ELECTRONIC FILING

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

COM Operating Personnel Communications Protocols

BC Hydro writes to provide the BCUC with its second errata to the Addendum to Assessment Report No. 6 (Addendum) filed on September 30, 2013.

Standard CIP 004 4a Cyber Security Personnel and Training

PER-005 System Personnel Training

Standard NUC Nuclear Plant Interface Coordination

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

March 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

130 FERC 61,211 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

PEAK RELIABILITY. Enhanced Curtailment Calculator Task Force (ECCTF) Charter. Enhanced Curtailment Calculator Charter Final Draftv3.

Minutes Board of Trustees

NERC Notice of Penalty regarding Alliant Energy West, FERC Docket No. NP10-_-000

To ensure system protection is coordinated among operating entities.

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Implementation Plan Set Two of Phase III & IV Reliability Standards

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

Project Laura Anderson, NERC Standards Developer August 18, 2016

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

REPORT OF THE SYSTEM RELIABILITY, PLANNING, AND SECURITY COMMITTEE

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to:

Duquesne Light Our Energy...Your Power

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to PRC System Protection Coordination

AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

ERO Enterprise Strategic and Operational Planning and 2018 Business Plan and Budget Preparation Schedule (2017 Development Year)

Public Service Commission

WECC Criterion PRC-006-WECC-CRT-3

Appendix 5A. Organization Registration and Certification Manual. WORKING DRAFT-August 26, 2014

WICF GOTO Focus Group Update

Appendix 5A. Organization Registration and Certification Manual

Code. of CONDUCT R E L I A B I L I T Y COORDINATOR

Pursuant to the Public Utility Holding Company Act of 2005 ("PUHCA 2005"), 1 and

Business Requirements Specification

NERC BES Kickoff Webinar. May 2, 2014

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

El Paso Electric Company New Mexico Energy Efficiency and Load Management Programs

B Request for Proposal for. Qualified Firms. Financial Advisory Services. Grossmont-Cuyamaca Community College District

Summary of FERC Meeting Agenda

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 ) ) ) ) ) )

Open Telecommunications Cases

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. GenOn Energy Management, LLC ) Docket No. ER REQUEST FOR REHEARING

Attachment Actively Monitored Standards.17. Attachment Audit Schedule..18. Attachment 4 - Future Years Audit Schedule 19

Iifieate of service. HET AT

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 S 2 SENATE BILL 750* Health Care Committee Substitute Adopted 6/12/18

FUNDAMENTALS OF ELECTRICITY TRANSMISSION COURSE

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

Application of Proposals in Emergency Situations

Pilot Project Initiative

PHILADELPHIA ENERGY AUTHORITY

Teaching the Smart Grid

Standard EC Elements of Performance for EC The hospital manages fire risks.

Before the Federal Communications Commission Washington, D.C COMMENTS OF NTCA THE RURAL BROADBAND ASSOCIATION

Future Development Plan:

MARION COUNTY PARKS AND RECREATION DEPARTMENT FOLLOW-UP REVIEW

Application form for Commissioning Generation Facility Registration by a Market Participant. including explanatory notes

Administrative Policies and Procedures. Policy No.: N/A Title: Medical Equipment Management Plan

Meeting Notes Project Phase 2 of Relay Loadability: Generation Standard Drafting Team December 11-14, 2012

BEFORE THE PUBLIC UTILITIES Commission OF THE STATE OF CALIFORNIA

I. NPDES Permits BUREAU OF MINING PROGRAMS

Meeting Minutes Operating Reliability Subcommittee February 6-7, 2018

Agenda Date: 2/28/18 Agenda Item: BA CLEAN ENERGY ORDER

Request for Proposals and Specifications for a Community Solar Project

OREGON HEALTH AUTHORITY, DIVISION OF MEDICAL ASSISTANCE PROGRAMS

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Special Local Regulation; Fautasi Ocean Challenge Canoe Race, Pago Pago Harbor,

EJ Hurst II LIMITED TO FEDERAL AND CAPITAL CRIMINAL MATTERS

Town Center Distributed Energy Resource Microgrid Feasibility Study Incentive Program

ODP s Waiver Quality Strategy Where does IM4Q fit in?

2016 Final CMS Rules vs. Joint Commission Requirements

Healthcare Facility Regulation

Okla. Admin. Code 340: : Purpose. Okla. Admin. Code 340: : Definitions [REVOKED] Okla. Admin.

Outsourcing Guidelines. for Financial Institutions DRAFT (FOR CONSULTATION)

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: The Department of Veterans Affairs (VA) is amending its regulations that

Electric Rates Miscellaneous Order U

Federal Communications Commission DA

The State of Interconnection in NYS:

NPCC Tasks Related to NERC Blackout Recommendations Timeline

Cooperatives 101. Learning About A Unique Way Of Business

RULES OF THE TENNESSEE DEPARTMENT OF HUMAN SERVICES ADMINISTRATIVE PROCEDURES DIVISION CHAPTER CHILD CARE AGENCY BOARD OF REVIEW

Description of Company Operations. System Overview

CIO Legislative Brief

Approved Project Sponsor s Participating TO Application Process Clean-Up. Proposal and Tariff

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

REQUEST FOR PROPOSALS FOR REPLACEMENT OF GENERATOR AT LAKE HILLS 1860 BOOSTER PUMP STATION

Transcription:

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No. NP10-25-000 RESPONSE OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND WESTERN ELECTRICITY COORDINATING COUNCIL TO THE COMMISSION S JANUARY 29, 2010 LETTER ORDER REQUESTING DATA AND DOCUMENTS Gerald W. Cauley President and Chief Executive Officer David N. Cook Vice President and General Counsel North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540-5721 (609) 452-8060 (609) 452-9550 facsimile gerry.cauley@nerc.net david.cook@nerc.net Rebecca J. Michael Assistant General Counsel Holly A. Hawkins Attorney North American Electric Reliability Corporation 1120 G Street, N.W., Suite 990 Washington, D.C. 20005-3801 (202) 393-3998 (202) 393-3955 facsimile rebecca.michael@nerc.net holly.hawkins@nerc.net February 16, 2010

TABLE OF CONTENTS I. INTRODUCTION 1 II. NOTICES AND COMMUNICATIONS 2 III. RESPONSES TO JANUARY 29 ORDER 2 IV. CONCLUSION 5 -i-

I. INTRODUCTION The North American Electric Reliability Corporation ( NERC ) and the Western Electricity Coordinating Council ( WECC ) respectfully submit this Response to the Federal Energy Regulatory Commission s ( FERC or the Commission ) January 29, 2010 Request for Data and Documents ( January 29 Data and Document Request ) in the above captioned proceeding, 1 regarding NERC's December 30, 2009 Notice of Penalty filing regarding El Paso Electric Company ( EPE ) in the WECC Region. The Notice of Penalty pertains to a fifteenthousand dollar ($15,000) settlement agreed to by and between WECC and EPE for violations of Reliability Standards BAL-005-0 2 Requirement (R) 17, VAR-001-1 R3, BAL-005-0 R8, BAL- 005-0 R8 and EOP-008-0 R1. The January 29 Data and Document Request seeks additional data from NERC and WECC to assist FERC Staff with its analysis of the December 30, 2009 Notice of Penalty filing. This filing responds to the January 29 Data and Document Request seeking supplemental documentation to ensure that sufficient facts and evidence are provided in support of the Notice of Penalty regarding EPE filed with the Commission on December 30, 2009. Where available, EPE provided additional information to WECC in support of this response. 1 North American Electric Reliability Corporation, 130 FERC 62,113 (2010) ( January 29 Data and Document Request ). 2 This violation is subject to compliance with BAL-005-0b as it was the enforceable standard at the time of discovery. BAL-005-0 was approved by the Commission and became enforceable on June 18, 2007. BAL-005-0b was approved by the Commission and became enforceable on August 28, 2008. The interpretation provides clarity regarding the responsibilities of a registered entity and does not change the meaning or language of the NERC Reliability Standard and its requirements. 1

II. NOTICES AND COMMUNICATIONS Notices and communications with respect to this filing may be addressed to: Gerald W. Cauley* President and Chief Executive Officer David N. Cook* Vice President and General Counsel North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540-5721 (609) 452-8060 (609) 452-9550 facsimile gerry.cauley@nerc.net david.cook@nerc.net Constance B. White* Vice President of Compliance Western Electricity Coordinating Council 615 Arapeen Drive, Suite 210 Salt Lake City, Utah 84108 Phone: 801-883-6855 Email: cwhite@wecc.biz Rebecca J. Michael* Assistant General Counsel Holly A. Hawkins* Attorney North American Electric Reliability Corporation 1120 G Street, N.W., Suite 990 Washington, D.C. 2005-3801 (202) 393-3998 (202) 393-3995 facsimile rebecca.michael@nerc.net holly.hawkins@nerc.net Steve Goodwill* Associate General Counsel for Compliance Western Electricity Coordinating Council 615 Arapeen Drive, Suite 210 Salt Lake City, Utah 84108 Phone: (801) 883-6857 Email: sgoodwill@wecc.biz *Persons to be included on the Commission s official service list. NERC requests waiver of the Commission s rules and regulations to permit the inclusion of more than two people on the service list. Response: III. RESPONSES TO THE JANUARY 29 ORDER Request #1: The Notice of Penalty does not appear to indicate WECC s or NERC s assessment of the risk to the Bulk-Power System resulting from EPE s confirmed violations. Please provide WECC s and NERC s assessments of this risk and the reasons for these assessments. The violation of BAL-005-0 R17 has a Violation Risk Factor ( VRF ) of Medium and WECC assigned the only Violation Severity Level ( VSL ) available for R17, which is Severe, because EPE failed to annually check and calibrate its time error and frequency devices against a 2

common reference using minimal accuracy values as defined in the Standard. WECC determined that this violation posed only a minimal risk to the reliability of the bulk power system ( BPS ) because the devices used by EPE were Arbiter Systems Global Positioning Satellites ( GPS ) Clock time error devices that have a greater level of accuracy than similar devices that allow calibration. This is due to the fact that the devices are synchronized to a GPS satellite timing signal traceable to the National Institute of Standards and Technology. Furthermore, in the event these devices fail, an EPE backup device automatically takes over. The violation of VAR-001-1 R3 has a VRF of Lower and WECC assigned the only VSL available for R3, which is Severe, 3 because EPE did not specify any criteria to exempt generators from the automatic voltage regulator ( AVR ) requirements of R4 as mandated by R3 in the Standard. Although EPE did not specify criteria to exempt generators from having the AVR requirements, WECC determined that this violation posed only a minimal risk to the reliability of the BPS because EPE is subject to a WECC Regional Standard that limits the amount of time that an entity can operate with AVR out of service and EPE did not violate the WECC Regional Standard. This was determined by WECC s evaluation of EPE s compliance with the WECC Regional Standard VAR-STD-002a-1 at the Audit. This WECC Regional Standard contains specific limits on duration of operation with AVR out of service and is not dependent on and is without regard to criteria established by the entity. The Audit Team found that EPE s total duration of operation with AVR out of service did not violate the limits set forth in the WECC Regional Standard VAR-STD-002a-1. Both violations of BAL-005-0 R8.1 have a VRF of Medium. In addition, WECC assigned both violations the only VSL available for R8, which is Severe, because EPE failed to: (1) identify and make adjustments needed in the energy management system to account for 3 R3 has a Severe VSL, but the sub-requirements have all four VSLs. 3

changes in the Time Standard Interface ( TSI ) that would allow the TSI to restart automatically, and thereby keep the primary and backup frequency sources from failing; and (2) provide redundant and independent frequency metering equipment that automatically activated upon detection of failure. As a result, WECC determined that both violations posed a moderate risk to the BPS. Specifically, the system frequency is a fundamental part of the Area Control Error equation that drives the Automatic Generation Control ( AGC ) used to balance resources and load within the Balancing Authority Area while supporting and responding to the interconnection frequency. These violations resulted in a static frequency value, which means that the EPE AGC was not responsive to supporting interconnection frequency or responding to any deviations in the interconnection frequency. While WECC determined that both violations posed a moderate risk, WECC determined that these violations did not pose a serious or substantial risk to the bulk power system because EPE s static frequency value would have caused its AGC not to make any adjustments to generation to maintain net scheduled interchange; thus, EPE s adjacent Balancing Authorities would only have been impacted to the extent they needed to make adjustments to meet load requirements. The violation of EOP-008-0 R1 has a VRF of High and WECC assessed the only VSL available for R1.5 and R1.6, which is Severe, because EPE s plan failed to address each of these sub-requirements and did not include procedures and responsibilities for: (1) conducting periodic tests, at least annually, to ensure viability of the plan; and (2) providing annual training to ensure that operating personnel are able to implement the contingency plans. WECC determined that this violation posed only a minimal risk to the reliability of the BPS because EPE had a plan for loss of its primary control center and it maintained a fully redundant backup control center. 4

Based upon its consideration of the foregoing risk assessments, NERC also concluded that, while the violations posed minimal and moderate risks, the violations did not pose serious or substantial risks to the bulk power system as discussed above. IV. CONCLUSION The North American Electric Reliability Corporation and the Western Electricity Coordinating Council respectfully request that the Commission accept this filing as compliant with the January 29, 2010 Data and Document Request. Respectfully submitted, Gerald W. Cauley President and Chief Executive Officer David N. Cook Vice President and General Counsel North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540-5721 (609) 452-8060 (609) 452-9550 facsimile gerry.cauley@nerc.net david.cook@nerc.net /s/ Rebecca J. Michael Rebecca J. Michael Assistant General Counsel Holly A. Hawkins Attorney North American Electric Reliability Corporation 1120 G Street, N.W., Suite 990 Washington, D.C. 2005-3801 (202) 393-3998 (202) 393-3995 facsimile rebecca.michael@nerc.net holly.hawkins@nerc.net 5

CERTIFICATE OF SERVICE I hereby certify that I have served a copy of the foregoing document upon all parties listed on the official service list compiled by the Secretary in this proceeding. Dated at Washington, D.C. this 16th day of February, 2010. /s/ Rebecca J. Michael Rebecca J. Michael Attorney for North American Electric Reliability Corporation