Table of Contents. introduction permit fact sheet completeness checklist. Introduction

Similar documents
Asbestos Notification Form ANF-001 Instructions and Supporting Materials

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

APPLICATION TO UPGRADE A FAMILY CHILD CARE LICENSE OR ASSISTANT CERTIFICATE CHECKLIST

Application for Massachusetts Controlled Substances Registration for Advanced Practice Registered Nurses and Physician Assistants

Regulatory Services Division Industrial Discharge Control Section

DIRECTIONS: Industrial Stormwater Permit: Anyone seeking coverage under the ARR General Permit must perform the following:

APPLICATION FOR REGULAR OR CERTIFIED FAMILY CHILD CARE ASSISTANT CHECKLIST

Instructions for Filing the Raffle Report of Operations for Non-Draw Raffles (Carnival Games and Wheels)

APPLICATION FOR PERMIT TO PRACTICE AS A PARTNERSHIP, CORPORATION OR OTHER ENTITY

Procedure For Processing An Application. For A Permit To Install Or Modify An Individual Sewer System

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

ReWa Capacity Approval Process Public Main Extension Project

2018 Historic Preservation Grant Program

DIVISION OF PROFESSIONAL LICENSURE BOARD OF CERTIFICATION OF OPERATORS OF DRINKING WATER SUPPLY FACILITIES

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_

CHAPTER 5 RECORD KEEPING, REPORTING, & DATA MANAGEMENT

Eligibility Eligibility is restricted to private sector organizations operating in Nunavut as defined in the Inuit Language Protection Act.

Professional Credential Services, Inc.

Small Business Enterprise Program Participation Plan

March 4, Jonathan Huber Huber Rental Properties, LLC 324 Cherry Street Arkadelphia, AR RE: White Elephant Apartments. Dear Mr.

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

Bureau of Waste Management

INSTRUCTIONS AND INFORMATION FOR APPLICATION FOR INITIAL NURSE LICENSURE BY EXAMINATION

NANT Contact Hour Application Instructions

Joint Committee on Volunteer Permits EMERGENCY SERVICE VOLUNTEER WARNING LIGHT PERMIT APPLICATION PACKAGE

APPLICATION FOR NPDES OR WQM PERMIT TRANSFER INSTRUCTIONS

Carefully read the following information, application instructions, and the NCLEX Candidate Bulletin prior to completing the enclosed application.

*NOTICE * THIS APPLICATION WAS REVISED IN JULY 2016 PLEASE READ CAREFULLY -

ACT NMMM ACT No. 571 NURSING FACILITY and ADULT RESIDENTIAL CARE FACILITY DEMENTIA TRAINING CURRICULUM APPROVAL APPLICATION PACKET

NON-RESIDENT NON-DISPENSING PHARMACY Permit application instructions

CONDUCTING A COMPLIANCE REVIEW OF HOSPITAL- PHYSICIAN FINANCIAL ARRANGEMENTS

Professional Credential Services, Inc.

APPLICATION CHECKLIST - IMPORTANT - Submit all items on the checklist below with your application to ensure faster processing.

Downtown Business Council of Chambersburg

Florida Renewable Energy Technologies Investment Tax Credit Program Application

WARNING: GIVING FALSE INFORMATION AND/OR OMITTING INFORMATION WILL IMMEDIATELY DISQUALIFY AN APPLICANT

Source Water Protection Plan Implementation Grant Application

APPLICATION CHECKLIST IMPORTANT Submit all items on the checklist below with your application to ensure faster processing.

Mail Stop: SPFL Bldg. M6-306, Room 9030 Kennedy Space Center, FL Phone: Fax:

Request for Grant Proposals. Small Business Assistance and Capacity Building Grant

(letter continues the back of this page) OSWEGO COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT, TOURISM AND PLANNING

Nursing Student Loan Forgiveness Program Application Package

APPLICATION FOR RECIPROCAL LICENSE NURSING HOME ADMINISTRATOR

#613 Planning Basics Chapter 3: Planning Procedures & Paperwork

Chapter 90A. Sanitarians and Water and Wastewater Treatment Facility Operators.

Architectural & Engineering (A&E) Procurement Requirements Help Guide

INSTRUCTIONS AND INFORMATION APPLICATION FOR INITIAL NURSE LICENSURE BY EXAMINATION

APPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION. Progress Energy Carolinas INCENTIVE PROGRAM

MEDICAID ENROLLMENT PACKET

APPLICATION FOR ADMINISTRATOR-IN-TRAINING NURSING HOME ADMINISTRATOR. (Please type or print; Answer all questions in full)

SPEECH-LANGUAGE PATHOLOGY ASSISTANT (SLPA) REQUIREMENTS AND INSTRUCTIONS

Professional Credential Services, Inc.

Fire Department Safety Officer: Health and Safety Officer

SPEECH-LANGUAGE PATHOLOGY ASSISTANT (SLPA) REQUIREMENTS AND INSTRUCTIONS

Overview of the quality and completeness of wastewater ECA applications

GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372

ANNUAL STANDARDS AND SPECIFICATIONS

Request for Grant Proposals Small Business Assistance Grant Program

Voluntary Remediation Program (VRP) Application

Nursing Student Loan Forgiveness Program Application Package

DEPARTMENT OF ENVIRONMENTAL PROTECTION

New Jersey Motor Vehicle Commission

TOWN AUDITING SERVICES

Florida Department of Environmental Protection

IMPORTANT! If your company does not meet these three conditions, please return to our website to select a different application type.

2016 SCHOLARSHIP APPLICATION

Trading for Compliance Pennsylvania Nutrient Trading Program

Application for Home Care Licensure General Instructions

247 CMR: BOARD OF REGISTRATION IN PHARMACY 247 CMR 21.00: REGISTRATION OF OUTSOURCING FACILITIES. Section

STATE OF CONNECTICUT DEPARTMENT OF PUBLIC HEALTH Subsurface Sewage Disposal System INSTALLER License Application

Account name. Select when the grant should be issued. If an option is not selected, the grant will be issued as soon as possible.

*NOTICE * THIS APPLICATION WAS REVISED IN JUNE 2015 PLEASE READ CAREFULLY -

Name: (Last, First, Middle Initial) Home Street Address: City: State: Address: Date of Birth: In Case of Emergency Notify: Name:

INVITATION FOR BID Notice to Prospective Bidders IFB # Date Stamp Equipment Preventative Maintenance and Repair Services

FY 2018 BROWARD COUNTY EMS GRANT GENERAL INFORMATION

CONDUCTING A COMPLIANCE REVIEW OF HOSPITALPHYSICIAN FINANCIAL ARRANGEMENTS

Unregulated Heating Oil Tank Program Guidance

Town of Southampton Police Department

Summer Camp Lead Counselor-in-Training Program 2017 Application

LIBERTY DENTAL PLAN. Dental Hygienist - Credentialing Application. City: State: DEGREE: City: State: DEGREE:

APPLICATION CHECKLIST IMPORTANT Submit all items on the checklist below with your application to ensure faster processing.

Drug and Medical Device Registration FAQ

Instructions and Application for Speech Language Pathologist

RESIDENCY CLASSIFICATION MILITARY ACTIVE DUTY PETITION

Florida Department of Environmental Protection

Initial Application Letter of Instruction

Application for Home Care Licensure General Instructions

STANDARD OPERATING PROCEDURE 1

Rhode Island Department of Health Application and Instructions for Food Business:

Pennsylvania State Board of Barber Examiners

Ruby A. Robinson Scholarship Program

NORTH CAROLINA STRUCTURAL ENGINEERS ASSOCIATION 2018 EXCELLENCE IN STRUCTURAL ENGINEERING AWARDS

APPLICATION INSTRUCTIONS FOR EARTHWORK BOARD PERMIT

DURANGO SCHOOL DISTRICT 9-R Application for AUTHORIZED VOLUNTEER status

INSTRUCTIONS How to Correctly Fill Out and Submit a Plan Review Packet

Professional Credential Services, Inc.

Town of Stoughton. 10 Pearl Street, Stoughton, MA Meeting Minutes September 7, 2017

INSTRUCTIONS FOR COMPLETION OF ADVANCED PRACTICE APPLICATION

Version Don t place any stamps or stickers on the form, (e.g. those featuring Registered body details).

Transcription:

Instructions and Supporting Materials Table of Contents introduction permit fact sheet completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are available for download from the MassDEP Web site at mass.gov/dep in two file formats: Microsoft Word and Adobe Acrobat PDF. Either format allows documents to be printed. Instructions & Support Materials files in Microsoft Word format contain a series of documents that provide guidance on how to prepare a permit application. Although we recommend that you print out the entire package, you may choose to print specific documents by selecting the appropriate page numbers for printing. Permit Applications in Microsoft Word format must be downloaded separately. Users with Microsoft Word 97 or later may complete these forms electronically. Permitting packages in Adobe Acrobat PDF format combine Permit Applications and Instructions & Support Materials in a single document. Adobe Acrobat PDF files may only be viewed and printed without alteration. Permit Applications in this format may not be completed electronically. wp67ins.doc rev. 6/07 BRP WP 67 Introduction Page 1 of 1

Permit Fact Sheet 1. What is the purpose of this approval? This approval is necessary to ensure that the disposal of sanitary sewage through the use of a subsurface sewage disposal system is performed in an environmentally acceptable manner and in accordance with the provisions of Title 5 of the Environmental Code, 310 CMR 15.000. For a single-family dwelling designed in accordance with the provisions of 310 CMR 15.229(1) and (2), approval for pumping sewage prior to the septic tank is required only from the local approving authority; no MassDEP approval is required for such systems. However, in accordance with 310 CMR 15.229(3), all other types of facilities need MassDEP approval. MassDEP is the local approving authority for state and federal facilities, and reviews applications for pumping sewage prior to septic tanks at these facilities under another permit, BRP WP 63. Any individual, business or organization proposing to pump sewage prior to its entrance to a septic tank as part of a Title 5 disposal system pursuant to 310 CMR 15.229(3), but excluding systems designed and approved pursuant to 310 CMR 15.229(1) and (2). 2. What other requirements should be considered when applying for this approval? Only approval from the local approving authority is required for pumping sewage prior to septic tanks for a single family dwelling designed in accordance with the provisions of 310 CMR 15.229(1) and (2). No MassDEP approval is required for such systems. MassDEP is the local approving authority for state and federal facilities. All approvals for pumping sewage prior to a septic tank for state and federal facilities are reviewed under another permit: BRP WP 63. Note: This information on additional requirements is intended to serve as a guide to the applicant. Other requirements may also apply. 4. What is the application fee? The application fee is $70. 5. What is the Primary Permit Location? What is the Reserve Copy Location? Primary Permit Location: Department of Environmental Protection (2 copies) * Regional Office Title 5 Permitting Program *Find your region: http://mass.gov/dep/about/region/findyour.htm There are no Reserve Copy Locations for these permits. 6. Where can I get a copy of the timelines? The timelines are available on the MassDEP Website: www.mass.gov/dep/service/online/fees.htm 7. What is the annual compliance fee? There is no annual compliance fee for this category. wp67ins.doc rev. 6/07 BRP WP 67 Permit Fact Sheet Page 1 of 2

Permit Fact Sheet 8. How long is this approval in effect? This approval remains valid as long as the system and facility served remain unchanged or until MassDEP revokes or modifies the approval. 9. How can I avoid the most common mistakes made in applying for this approval? a. Review application for completeness to be sure all questions are answered correctly. b. Make sure two (2) copies of plans and specifications are complete and signed and stamped by a Massachusetts Registered Sanitarian or Professional Engineer, whichever is appropriate. c. Submit fee and one copy of the MassDEP Transmittal Form to: Department of Environmental Protection, P. O. Box 4062, Boston, MA 02211. 10. What are the regulations that apply to this approval? Where can I get copies? These regulations include, but are not limited to: a. Title 5 Regulations, 310 CMR 15.000. b. Timely Schedule Action and Fee Provisions, 310 CMR 4.00. These may be purchased at: State House Bookstore State Bookstore Room 116 436 Dwight Street, Room 102 Boston, MA 02133 Springfield, MA 01103-1317 617-727-2834 413-784-1376 MassDEP Regulations may also be obtained from MassDEP s website at http://www.mass.gov/dep. wp67ins.doc rev. 6/07 BRP WP 67 Permit Fact Sheet Page 2 of 2

Application Completeness Checklist The Transmittal Form is completed: http://mass.gov/dep/service/online/trasmfrm.shtml The application form has been completed. The following information has been provided: Name and address of applicant/owner. Location (address) of facility. Name, address and telephone number of design engineer or sanitarian. Two (2) complete sets of plans and specifications have been properly signed and stamped by a Massachusetts Registered Professional Engineer or Massachusetts Registered Sanitarian, whichever is appropriate. To submit the application package: Checklist items have been completed. Send two (2) copies of the application along with one copy of the MassDEP Transmittal Form to: Department of Environmental Protection * Regional Office Title 5 Permitting Program *Find your region: http://mass.gov/dep/about/region/findyour.htm Send fee of $70 in the form of a check or money order made payable to Commonwealth of Massachusetts, along with one copy of the MassDEP Transmittal Form to: Department of Environmental Protection P.O. Box 4062 Boston, MA 02211 wp67ins.doc rev. 6/07 BRP WP 67 Application Completeness Checklist Page 1 of 1

BRP WP 67 Approval for Pumping Sewage Prior to Septic Transmittal Number Facility ID (if known) For a single-family dwelling designed in accordance with the provisions of 310 CMR 15.229(1) and (2), approval for pumping sewage prior to the septic tank is required only from the local approving authority; no DEP approval is required for such systems. However, in accordance with 310 CMR 15.229(3), all other types of facilities need DEP approval. DEP is the local approving authority for state and federal facilities, and reviews applications for pumping sewage prior to septic tanks at these facilities under another permit: BRP WP 63. A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Applicant: Name Street Address State City/Town Zip Code Telephone 2. Facility Address / Location (if different from applicant): Address City/Town State Zip Code 3. System Designer Information (Registered Sanitarian [RS] or Professional Engineer [PE] for systems under 2,000 gallons per day; PE for systems 2,000 gallons or more per day): Name Company Name Address City/Town State Zip Code Telephone 4. Registration: P.E. Sanitarian Registration Number 5. Is the facility served by the system a single-family dwelling? Yes No wp67app 7/03 BRP WP 67 Page 1 of 2

BRP WP 67 Approval for Pumping Sewage Prior to Septic A. General Information (cont.) Transmittal Number Facility ID (if known) 6. The legal entity which owns or will own this facility is: Individual Municipality Private Partnership Federal State / County Corporation Other (specify): 7. Two sets of plans and specifications, including a locus map, properly stamped and signed by a Massachusetts Registered Professional Engineer or Massachusetts Registered Sanitarian must accompany the application. The plans must be prepared in accordance with 310 CMR 15.220. Are plans and specifications enclosed? Yes No Have the plans been revised? Yes No 8. Does the proposed system satisfy all technical requirements of 310 CMR 15.100 through 15.293? Yes No If no, has a variance been sought? Yes No B. Certification I certify under penalty of law that this document and all attachments, to the best of my knowledge and belief, are true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Applicant s signature Print Name Name of Preparer Date wp67app 7/03 BRP WP 67 Page 2 of 2