PRIOR YR FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 TO COMP TOTAL PROG QUANTITY End Cost

Similar documents
PRIOR YR FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TO COMP TOTAL PROG QUANTITY End Cost

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

FY 2016 President's Budget February Electronics (NOTIONAL): N/A. RCS (Radio Communication System) Turnkey 216 M CANES 32 M

DATE: FY 2012 President's Budget February 2011

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2008/2009 BIENNIAL BUDGET JUSTIFICATION OF ESTIMATES FEBRUARY 2007 SHIPBUILDING AND CONVERSION, NAVY

FY 2014 President's Budget April 2013

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW)

Trusted Partner in guided weapons

9 th Annual Disruptive Technologies Conference

DATE: FY 2013 President's Budget February 2012

DDG 1000 Class Destroyer

FFG UPGRADE Brochure Delivering tag integrated line warfare solutions.

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

CLASSIFICATION: UNCLASSIFIED

Sea Air Space. Sea Power to the Hands of Our Sailors. RDML Jon Hill April 13, 2015

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

AEGIS Ballistic Missile Defense

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED R-1 ITEM NOMENCLATURE

N/SHIP SELF DEFENSE - DEM/VAL

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support

FFG(X) Update National Symposium - Surface Navy Association

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07

The Integral TNO Approach to NAVY R&D

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

Air Defense System Solutions.

Exhibit R-2, RDT&E Budget Item Justification February 2007

PROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS. NAVAIR Small Business Aviation Technology Conference

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

Aircraft Carriers Enduring and Transformational

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. PROGRAM ELEMENT TITLE: Satellite Communications (Space)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED CLASSIFICATION: DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/COMBAT SYSTEM INTEGRATION

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

EXHIBIT R-2, RDT&E Budget Item Justification. February COST ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

UNCLASSIFIED UNCLASSIFIED

C4I System Solutions.

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

Gun and Missile Systems An Integrated Warfare Perspective

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

Transcription:

BUDGET ITEM JUSTIFICATION SHEET (P-40) : FY 204 President's Budget (PB) April 203 APPROPRIATION/BUDGET ACTIVITY P- LINE ITEM NOMENCLATURE /BA 2 Other Warships BLI: 200 (Dollars in Millions) PRIOR YR FY 202 FY 203 FY 204 FY 205 FY 206 FY 207 FY 208 TO COMP TOTAL PROG QUANTITY 0 0 0 0 0 0 3 End Cost 2,829.3 0.0,338.4 0.0 0.0 0.0 0.0 3,874.2 0.0 38,04.9 Less Advance Procurement 3,693.2 0.0 3,327.9 0.0 0.0 0.0 0.0,726.7 0.0 8,747.7 Less Cost to Complete,37. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0,37. Less Subsequent Year FF 5,34.0 0.0 7,402.3 0.0 0.0 0.0 0.0,084.9 0.0 23,62.2 Plus Subsequent Year FF 5,34.0 0.0 0.0 944.9,834.,235.6,496.0,89.8,084.9 23,62.2 Full Funding TOA 7,89.0 0.0 608.2 944.9,834.,235.6,496.0 2,954.4,084.9 27,977. Plus Advance Procurement 6,466.2 554.8 0.0 0.0 0.0 682.8,043.8 0.0 0.0 8,747.7 Plus Cost to Complete 0.0 0.0 0.0 588. 729.0 0.0 0.0 0.0 0.0,37. Obligational Authority 4,285.3 554.8 608.2,533.0 2,563.,98.4 2,539.8 2,954.4,084.9 38,04.9 Plus Outfitting / Plus Post Delivery 0.0 0.0 0.0 54.0 96.8 40.7 2.5 0.0 59.8 73.8 4,285.3 554.8 608.2,587.0 2,659.9,959. 2,542.4 2,954.4,604.7 38,755.7 Unit Cost ( Ave. End Cost) 2,829.3 0.0,338.4 0.0 0.0 0.0 0.0 3,874.2 0.0 2,680.6 MISSION: To provide credible, sustainable, independent forward presence during peacetime without access to land bases; operate as the cornerstone of a joint and/or allied maritime expeditionary force in response to crisis; and carry the war to the enemy through joint multi-mission offensive operations. Characteristics: Hull: Length overall: 092' Beam: 34' Displacement: 97,337 Tons Draft: 38.7' /79 Major Electronics/Ordnance: Ship Self Defense System (SSDS) Electromagnetic Aircraft Launch System (EMALS) Dual Band Radar (DBR) Advanced Arresting Gear (AAG) Production Status: Contract Award 09/08 Production Status: Contract Award 09/3 Months to Complete: a) Contract Award to Delivery 84 Months Months to Complete: a) Contract Award to Delivery 08 Months b) Construction Start to Delivery 2 Months b) Construction Start to Delivery 39 Months Delivery Date 09/5 Delivery Date 09/22 Completion of Fitting Out /5 Completion of Fitting Out /22 Obligation Work Limiting Date 0/6 Obligation Work Limiting Date 0/23 -

APPROPRIATION: WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5) (Dollars in Thousands) P-5 EXHIBIT FY 204 Presidents Budget April 203 BUDGET ACTIVITY: 2 Other Warships P- LINE ITEM NOMENCLATURE SUBHEAD NO. BLI: 200 FY 2008 FY 203 ELEMENT OF COST PLAN COSTS 3,278,258 802,402 BASIC CONST/CONVERSION 5,988,78 5,728,834 CHANGE ORDERS 28,06 26,45 ELECTRONICS 329,262 397,668 PROPULSION EQUIPMENT,55,62 2,044,582 HM&E 30,939 34,72 OTHER COST 66,663 06,087 ORDNANCE,40,736,346,457 ESCALATION 662,033 TOTAL SHIP ESTIMATE 2,829,294,338,380 LESS ADVANCE PROCUREMENT FY0 2,668 LESS ADVANCE PROCUREMENT FY02 35,34 LESS ADVANCE PROCUREMENT FY03 395,493 LESS ADVANCE PROCUREMENT FY04,62,905 LESS ADVANCE PROCUREMENT FY05 623,073 LESS ADVANCE PROCUREMENT FY06 68,880 LESS ADVANCE PROCUREMENT FY07 735,800 52,750 LESS ADVANCE PROCUREMENT FY08 23,530 LESS ADVANCE PROCUREMENT FY09,20,56 LESS ADVANCE PROCUREMENT FY0 482,938 LESS ADVANCE PROCUREMENT FY 903,297 LESS ADVANCE PROCUREMENT FY2 554,798 LESS SUBSEQUENT FULL FUNDING FY09 2,684,565 LESS SUBSEQUENT FULL FUNDING FY0 736,989 LESS SUBSEQUENT FULL FUNDING FY,72,459 LESS SUBSEQUENT FULL FUNDING FY4 944,866 LESS SUBSEQUENT FULL FUNDING FY5,834,072 LESS SUBSEQUENT FULL FUNDING FY6,235,600 LESS SUBSEQUENT FULL FUNDING FY7,495,98 LESS SUBSEQUENT FULL FUNDING FY8,89,792 LESS COST TO COMPLETE FY4 588,00 LESS COST TO COMPLETE FY5 729,000 NET P- LINE ITEM: 2,685,02 608,95-2

Complete I. Design/Schedule Start/Issue Reissue /Response Issue date for TLR APRIL 04 Issue date for TLS SEPT 06 Preliminary Design JAN 03 JUL 08 Contract Design MAY 04 APR 08 Detail Design JAN 04 SEP 09 Analysis of Ship Cost Estimate - Basic/Escalation Complete /Response HUNTINGTON INGALLS Design Agent INCORPORATED II. Classification of Cost Estimate C III. Basic Construction/Conversion FY 2008 FY 203 A. Actual Award Date SEP 08 SEP 3 B. Contract Type CPIF FPI C. Request for proposals: Start/Issue: JUL 07 APR 2 Complete/Response OCT 07 OCT 2 IV. Escalation Base Date N/A OCT 20 Escalation Termination Date N/A SEP 22 Escalation Requirement N/A 662,033 Labor/Material Split N/A 58.9% / 4.% Allowable Overhead Rate N/A 95% V. Other Basic(Reserves/Miscellaneous) Amount Amount April 203 P-5B Exhibit FY204 Presidents Budget : - 3

EXHIBIT P-27 FY 204 Presidents Budget SHIP PRODUCTION SCHEDULE : April 203 SHIP CVN CVN CVN HULL NUMBER SHIPBUILDER FISCAL AUTHORIZED CONTRACT AWARD START OF CONSTRUCTION DELIVERY 78 79 80 Huntington Ingalls Industries Newport News Shipbuilding Huntington Ingalls Industries Newport News Shipbuilding Huntington Ingalls Industries Newport News Shipbuilding 2008 SEP-08 AUG-05 SEP-5 203 SEP-3 FEB- SEP-22 208 DEC-7 DEC-7 SEP-27-4

Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) P-8A EXHIBIT FY 204 Presidents Budget April 203 FY 2008 FY 203 ELECTRONICS a. P-35 Items AN/USQ-T46X(V)X, BATTLE FORCE TACTICAL TRAINING SYSTEM (BFTT) 5,434 4,784 CONSOLID AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) 5,430 20,595 AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) 8,768 5,838 DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF SIGHT (EHF/VHF LOS) SATCOM,563 3,556 AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII 6,844 7,934 SPN-46, AUTOMATIC CARRIER LANDING SYSTEM 0,920 SHIP SELF DEFENSE SYSTEM (SSDS) 88,798 6,979 AN/TPX-42A(V)4, CARRIER AIR TRAFFIC CONTROL CENTER - DIRECT ALTITUDE AND IDENTIFY READOUT (CATCC-DAIR) 5,499 6,374 NAVY MULTI-BAND TERMINAL (NMT) 6,9 7,99 AN/SLQ-32(V)6, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 2,09 AN/SRQ-6/MCS-2, SHIPS SIGNAL EXPLOITATION EQUIPMENT (SSEE) 7,767 9,937 ELECTRONIC CONSOLID AUTOMATED SUPPORT SYSTEM (ECASS) 33,733 AN/SLQ-32(V)7, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 70,028 HIGH FREQUENCY RADIO GROUP (HFRG) 3,085 6,905 SEA-BASED JOINT PRECISION APPROACH & LANDING SYSTEM (JPALS) 6,7 7,780 Subtotal 98,0 256,642 b. Major Items AN/USQ-55(V) TACTICAL VARIANT SWITCH 2,72 2,530 INFORMATION ASSURANCE (IA),978 2,02 MAST CLAMP CURRENT PROBE (MCCP) UPGRADE,862,538 AN/URC-4X(V), MULTI-FUNCTION INFORMATION DISTRIBUTION SYSTEM (MIDS)-ON SHIP (MOS) 2,025 2,239 AN/SLQ-25C DUAL, SURFACE SHIP TORPEDO DEFENSE SYSTEM, NIXIE (Note ) 2,229 0,907 AN/SMQ-, METEOROLOGICAL/OCEANOGRAPHIC (METOC) SATELLITE RECEIVER - RECORD SET,34,564 SHIPBOARD AIR TRAFFIC CONTROL COMMUNICATIONS (SATCC),903 2,246 AN/WSN-7(V)3, RING LASER GYRO NAVIGATOR (RLGN),729 2,004 DISTRIBUTED SYSTEMS DESIGN INTEGRATION SERVICES 6,575 6,646 C4I INTEGRATION & COORDINATION 8,920 9,30 DISTRIBUTED COMMON GROUND STATION - NAVY (DCGS-N) 2,22 2,084 Note : Surface Ship Torpedo Defense System (Nixie) adds detect-to-engage hard-kill capability in addition to the electro-acoustic soft-kill countermeasure decoy system which the version does not have. The Department directed rapid fielding of this capability. - 5

Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) P-8A EXHIBIT FY 204 Presidents Budget April 203 FY 2008 FY 203 AN/USQ-44K AUTOMATED DIGITAL NETWORK SYSTEM (ADNS),494,290 AN/UYQ-86 COMMON DATA LINK MANAGEMENT SYSTEM (CDLMS) WITH NGC2P,729 2,00 OA-9277 ULTRA HIGH FREQUENCY (UHF) MULTICOUPLER 2,22 2,350 ARC-20 CARRIER AIR TRAFFIC CONTROL CENTER (CATCC) - PRIFLY - LANDING SIGNAL OFFICER (LSO) SYSTEM,406,582 WARFARE SYSTEM INTEGRATION 26,790 24,53 NET-ENABLED COMMAND CAPABILITY (NECC) 888 936 COMMERCIAL BROADBAND SATELLITE PROGRAM, FORCE LEVEL VARANT (CBSP-FLV),252,436 AN/SSN-6(V)X BLOCK 4, NAVIGATION SENSOR SYSTEM INTERFACE (NAVSSI) 4,28 2,570 AN/SPS-73(V)2 TECH REFRESH - SURFACE SEARCH RADAR 2 3,04 2,252 INTEGRATED STRIKE PLANNING & EXECUTION SYSTEMS (ISP&E) 2,055 9,652 AN/USQ-23(V), COMMUNICATIONS DATA LINK-SYSTEM (CDL-S) 2,034 2,308 AN/SPN-4 (V), INSTRUMENT LANDING SYSTEM (ILS) 3,338 3,870 SHIP SIGNAL EXPLOITATION SPACE (SSES/SI) COMMUNICATIONS 4,442 4,25 TURNKEY RADIO COMMUNICATIONS SYSTEM (RCS) 7,090 7,233 Subtotal 5,394 8,054 c. Other ELECTRONICS 5,767 22,972 Subtotal 5,767 22,972 ELECTRONICS 329,262 397,668-6

Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) P-8A EXHIBIT FY 204 Presidents Budget April 203 FY 2008 FY 203 ORDNANCE a. P-35 Items ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM (EMALS) 670,038 777,838 DUAL BAND RADAR (DBR) (SPY-3 AND VOLUME SEARCH RADAR (VSR)) 484,033 277,535 ADVANCED ARRESTING GEAR (AAG) 68,566 89,799 PHALANX BLOCK B MK 5 MOD 2 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) 3 7,755 3 20,583 AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) 6,675 6,585 MK29 MOD 5, GUIDED MISSILE LAUNCHING SYSTEM (GMLS) 2 2,782 2 6,36 AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) BLOCK 3 7,597 8,57 INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) 8,30 5,096 MK 49, MOD 3 ROLLING AIRFRAME MISSLE (RAM) 2 3,9 2 6,26 IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) 3,347 4,09 Subtotal,393,04,322,459 b. Major Items LANDING SIGNAL OFFICER DISPLAY SYSTEM (LSODS),666,94 MORIAH BLOCK 2,403,65 JET BLAST DEFLECTORS (JBD) 773,056 JOINT STRIKE FIGHTER AUTONOMIC LOGISTICS INFORMATION SYSTEM (JSF ALIS),268,469 NULKA ELECTRONIC WARFARE DECOY LAUNCHING SYSTEM 4,656 MK-38, MOD 2 - MACHINE GUN SYSTEM (MGS) 5 7,675 LONG RANGE LINEUP SYSTEM (LRLS) 2,684 Subtotal 5,0 2,32 c. Other ORDNANCE 3,62 2,866 Subtotal 3,62 2,866 ORDNANCE,40,736,346,457 Note : LRLS in the PB 3 budget was included in "other ordnance". Cost of the system has not changed since the PB 3 submit. - 7

Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) P-8A EXHIBIT FY 204 Presidents Budget April 203 HM&E a. P-35 Items Subtotal b. Major Items HM&E ENGINEERING SERVICES INTEGRATED LOGISTICS SUPPORT LIFE RAFTS SUPSHIP MATERIAL AND GFE TEST & INTEGRATION TRUCKS (FORKLIFTS) Subtotal c. Other HM&E Subtotal HM&E FY 2008 FY 203 9,227 24,227 2,292 662 2,252 3,078 484 560 4,02 500 2,602 28,767 3,29 2,72 3,043 2,72 3,043 30,939 34,72-8

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/USQ-T46X(V)X, BATTLE FORCE TACTICAL TRAINING SYSTEM (BFTT) PARM Code: PEO IWS 7.0 BFTT is a highly flexible, interactive system that provides capability for coordinated shipboard combat system team and Battle Group/Battle Force level tactical training. The mission of the system is to provide training capabilities for fleet personnel to achieve and maintain combat readiness. P-35 Category FY 2008 FY 203 2,760,788 Technical Data and Documentation 25 268 3 5 System Engineering 52 922 469 374,537,37 5,434 4,784 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 KONTRON FFP APR-2 AUG-9 /OPTION QTY 2,760,788 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 25 2 AUG-2 FY 3 SEP-22 25 2 AUG-9-9

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: CONSOLID AFLOAT NETWORK AND ENTERPRISE SERVICES (CANES) PARM Code: PMW 750 CANES will provide the Navy tactical/non-tactical information environment and infrastructure necessary to enable hosting, extended services reach-back and reach-forward, and relay functions. These capabilities will support real time and non-real time tactical/non-tactical edge connected, connectionless, and ad-hoc voice, video and data information exchange requirements. CANES is the technology replacement for the following existing afloat networks: Combined Enterprise Regional Information Exchange System-Maritime (CENTRIXS-M), limited shipboard Internal Voice (IC), Integrated Shipboard Networking System (ISNS), Sensitive Compartmented Information (SCI) Networks, to include the Top Secret enclave, and Video Information exchange System (VIXS). CANES will incrementally collapse Unclassified, Secret, Secret-Releasable, and SCI enclaves. CANES Increment is the current POR for. The estimate includes potential to collapse additional networks P-35 Category FY 2008 FY 203 0,740 3,908 75 278 System Engineering 2,452 3,527 547 643,56 2,239 5,430 20,595 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 NORTHROP GRUMMAN MAR-3 JAN-20 /OPTION QTY 0,740 3,908 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 8 2 MAR-3 FY 3 SEP-22 20 2 JAN-20-0

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/USG-2, COOPERATIVE ENGAGEMENT CAPABILITY (CEC) PARM Code: PEO IWS 6.0 CEC significantly improves battle force air and missile defense capabilities by coordinating battle force air defense sensors into a single, near real-time, composite track picture capable of fire control quality. CEC is a sensor netting system which distributes sensor data from each CEC equipped ship, aircraft, and/or Cooperating Unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data rate sensor and engagement data distribution network. CEC is highly resistant to jamming and provides accurate grid locking between CUs. Each CU independently employs high capacity parallel processing and advanced algorithms to combine all distributed sensor data into a high quality track picture that is the same for all CUs. CEC data is presented as a superset of the best sensor capabilities from each CU, all of which are integrated into a single input to each CU's combat weapons system. P-35 Category FY 2008 FY 203 4,745 2,750 390 43 System Engineering,278,058 234 8 2,2,48 8,768 5,838 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON RAYTHEON FFP APR- SEP-8 /OPTION OPTION QTY 4,745 2,750 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 30 8 SEP- FY 3 SEP-22 30 8 SEP-8 -

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: DIGITAL MODULAR RADIO (DMR) ULTRA HIGH FREQUENCY/VERY HIGH FREQUENCY LINE OF SIGHT (EHF/VHF LOS) SATCOM PARM Code: PMW 750 DMR-VHF/UHF LOS/SATCOM is an open architecture system that allows transmission and reception of UHF and VHF RF signals. The DMR replaces many legacy systems, including some crypto, Line Of Sight (LOS) and Satellite Communications (SATCOM) components. P-35 Category FY 2008 FY 203 0,004 2,36 Technical Data and Documentation 3 0 50 50 System Engineering 5 556 305 434 662 380,563 3,556 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 GENERAL DYNAMICS VARIOUS SEP- SEP-8 /OPTION QTY 0,004 2,36 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 30 8 SEP- FY 3 SEP-22 30 8 SEP-8-2

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/UPX-29(V), INTERROGATOR FRIEND OR FOE (IFF) W/MK XII PARM Code: PMA 23 IFF is an approved and fully supported centralized Mark XII Interrogator system. It uses one receiver transmitter that synchronizes video with up to four radar sweeps. It supplies synthetic video (symbology) to, and accepts requests from, as many as 22 remote locations. It provides digital target reporting to the combat systems/weapon systems computer via full scan, sectored, and/or pop-up interrogations. It provides instantaneous target reporting at requested range and azimuth through the use of an electronically-steered Antenna Group OE-20/UPX or OE-20A/UPX. It provides electronically evaluated Mode 4 target reporting directly to operators and over the combat systems/weapon system computer interface. It provides full redundancy so identification capabilities are retained in case of main processor, main antenna, or main receiver/transmitter failure. P-35 Category FY 2008 FY 203 5,080 7,8 97 0 System Engineering 932 395 55 82 580 276 6,844 7,934 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE /OPTION QTY FY 3 NORTHROP GRUMMAN-BAE SYSTEMS SS/FFP NOV-08 5,080 NORTHROP GRUMMAN-BAE SYSTEMS SS/FFP SEP-7 7,8 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 47 24 OCT-09 FY 3 SEP-22 36 24 SEP-7-3

Equipment Item: SPN-46, AUTOMATIC CARRIER LANDING SYSTEM PARM Code: PMA 23 FY 204 Presidents Budget (Dollars in Thousands) April 203 AN/SPN-46 (V)3 provides Precision Approach Landing System (PALS) used for non-clear weather aircraft landings on board carriers. P-35 Category FY 2008 QTY COST System Engineering 6,558, 3,25 0,920 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE NAWCAD N/A APR-08 /OPTION QTY 6,558 PROGRAM SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 25 64 APR-08 SPN-46 will not be on. All flight squadrons should be JPALS compatible eliminating the need for SPN-46 on the. - 4

Equipment Item: SHIP SELF DEFENSE SYSTEM (SSDS) PARM Code: PEO IWS 0.0 FY 204 Presidents Budget (Dollars in Thousands) April 203 The SSDS MK 2, Mod (x) Common C2 system provides capabilities for multi-mission requirements including Ship Protection against air, surface, and subsurface threats using both own-ship and remote data (Joint Composite Track Number (JCTN) and Joint Data Network (JDN)) in support of the Anti-Air Warfare (AAW) Capstone requirements. P-35 Category FY 2008 FY 203 4,40 8,532 Technical Data and Documentation,294,288 848,048 System Engineering,720 3,555,526,350 59,270 26,206 88,798 6,979 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON/GEN DYNAMICS FFP SEP-08 NOV-8 /OPTION NEW QTY 4,40 8,532 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 22 24 NOV- FY 3 SEP-22 22 24 NOV-8-5

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/TPX-42A(V)4, CARRIER AIR TRAFFIC CONTROL CENTER - DIRECT ALTITUDE AND IDENTIFY READOUT (CATCC-DAIR) PARM Code: PMA 23 CATCC-DAIR is an automatic beacon and radar that when integrated with an air traffic control radar, provides numeric and symbolic displays of position, identity, and altitude of aircraft in the terminal airspace on an operator's Plane Position Indicator (PPI) display. P-35 Category FY 2008 FY 203 3,007 3,486 228 264 System Engineering,649,865 42 49 573 70 5,499 6,374 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 NAVAIR VARIOUS NOV-09 NOV-6 /OPTION QTY 3,007 3,486 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 46 24 NOV-09 FY 3 SEP-22 46 24 NOV-6-6

Equipment Item: NAVY MULTI-BAND TERMINAL (NMT) PARM Code: PMW 750 FY 204 Presidents Budget (Dollars in Thousands) April 203 The Advanced Extremely High Frequency (AEHF) Navy Multi-band Terminal (NMT) will be used to receive signals from the Advanced EHF satellites which is a follow-on to the DoD's highly secure, highly protected MILSTAR communications satellite system. P-35 Category FY 2008 FY 203 5,277 6,224 Ancillary Equipment 40 46 329 325 System Engineering 0 43 75 83 260 278 6,9 7,99 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON FFP OCT- FEB-8 /OPTION QTY 5,277 6,224 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 28 8 NOV- FY 3 SEP-22 28 27 FEB-8-7

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/SLQ-32(V)6, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 2 PARM Code: PEO IWS 2E SEWIP Block 2 is a scalable Electronic Warfare enterprise suite to provide improved Electromagnetic Interference (EMI) mitigation and Combat System Interface capabilities to select new construction ships as well as upgrade current AN/SLQ-32(V)3 and (V)4 Electronic Warfare (EW) suites on existing ships. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning and protection from anti-ship missiles. SEWIP Block 2 focused on Electronic Support (ES) capability improvements. P-35 Category FY 2008 QTY COST Ancillary Equipment System Engineering 5,79 393 56 3,223 477 69 2,09 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE LOCKHEED MARTIN FFP SEP-2 /OPTION QTY 5,79 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 8 8 SEP-2 Block 2 capability is included in Block 3 on the - 8

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/SRQ-6/MCS-2, SHIPS SIGNAL EXPLOITATION EQUIPMENT (SSEE) PARM Code: PMW 750 SSEE provided for cryptological signal acquisition, recognition, analysis and geo-location. It replaces Maritime Cryptological System (MCS-2) which replaces the Battle Group Passive Horizon Extension System (BGPHES). P-35 Category FY 2008 FY 203 4,583 5,66 Ancillary Equipment 68 79 Technical Data and Documentation 96 227 38 35 System Engineering 964 995 262,76,476,529 7,767 9,937 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 ARGON FFP/CPFF JUN-2 JUN-9 /OPTION QTY 4,583 5,66 PROGRAM FY 3 SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 2 8 JUN-2 SEP-22 2 8 JUN-9-9

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: ELECTRONIC CONSOLID AUTOMATED SUPPORT SYSTEM (ECASS) PARM Code: PMA 260 The ecass program is the CASS replacement program to address obsolescence and test capability issues. The system is used to test both WRAs (Weapons Replaceable Assemblies) and SRAs (Shop Replaceable Assemblies, which are circuit cards and modules. It provides the latest testing technologies to support Intermediate and Depot level testing of current and future USN/USMC electronics, avionics, and missile systems. The system will replace all five configurations of Mainframe CASS, but not the USMC's RT CASS. Additionally, ecass will rehost over 700 existing CASS test programs utilized to test and repair approximately,00 weapon system electronics units. P-35 Category FY 203 QTY COST 33,97 36 400 33,733 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 JAN-7 /OPTION QTY 33,97 PROGRAM SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD FY 3 SEP-22 54 4 JAN-7-20

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/SLQ-32(V)7, SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 PARM Code: PEO IWS 2.0 SEWIP Block 3 is a scalable Electronic Warfare enterprise suite to provide improved Electronic Attack (EA) capabilities to select new construction ships as well as upgrade current AN/SLQ-32 (V)3 and (V)4 Electronic Warfare (EW) suites on existing ships. It provides enhanced shipboard Electronic Warfare (EW) for early detection, analysis, threat warning, and protection from anti-ship missiles. P-35 Category FY 203 QTY COST Ancillary Equipment System Engineering 6,63 705 2,473 2,500,92,266 70,028 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 MAR-20 /OPTION QTY 6,63 DELIVERY BEFORE DELIVERY LEADTIME AWARD FY 3 SEP-22 2 8 MAR-20 Block 3 includes Block 2 capabilities along with adding the electronic attack capability not provided by Block 2. - 2

Equipment Item: HIGH FREQUENCY RADIO GROUP (HFRG) PARM Code: PMW 70 FY 204 Presidents Budget (Dollars in Thousands) April 203 HRFG supports the by providing broadband High Frequency Radio Frequency capability to transmit (2-30MHz) and receive (0KHz-30MHz). will be supported by the HFRG replacement system. This system provides broadband capability to communicate long range using HF frequencies. The HFRG replacement system is required to meet the HF transmit and receive channel count on aircraft carriers while minimizing topside complexity. P-35 Category FY 2008 FY 203,373 5,550 Technical Data and Documentation 0 00 40 0 System Engineering 466 435,062 330 44 490 3,085 6,905 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 HARRIS CORP GENERAL DYNAMICS VARIOUS SEP-08 OCT-8 /OPTION QTY,373 5,550 PROGRAM FY 3 SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 29 2 APR-2 SEP-22 29 8 OCT-8 received a refurbished HFRG unit. The HFRG system is in sustainment and approaching end of life. The system is no longer in production and there are no fleet assets available to refurbish for use on. The replacement system for HFRG is High Frequency Distribution Amplifier Group (HFDAG). - 22

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: PARM Code: SEA-BASED JOINT PRECISION APPROACH & LANDING SYSTEM (JPALS) PMA 23 JPALS is a precision approach landing system that uses differential GPS to provide an all-weather precision approach and landing capability. JPALS works with the GPS satellite navigation system to provide accurate, reliable and high-integrity guidance for fixed- and rotary-wing aircraft. The system features anti-jam protection to ensure mission continuity in hostile environments. P-35 Category FY 2008 FY 203 2,648 3,070 Technical Data and Documentation 0 7 453 525 System Engineering 747 866 627 727 2,35 2,475 6,7 7,780 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON RAYTHEON FPIF FFP OCT 4 SEP-9 /OPTION QTY 2,648 3,070 PROGRAM SHIP EARLIEST SHIP DELIVERY MONTHS REQUIRED BEFORE DELIVERY PRODUCTION LEADTIME REQUIRED AWARD SEP-5 0 (Note ) 2 MAY-3 FY 3 SEP-22 24 2 SEP-9 JPALS unit for is part of the LRIP buy for the JPALS increment A scheduled to award in October, 204. Unit will be procured and installed with SCN endcost funding. JPALS unit will be installed during the post shakedown availability. - 23

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM (EMALS) PARM Code: PMA 25 EMALS is an advanced technology electrically generated launching system that uses a moving electromagnetic field to propel aircraft to launch speed. EMALS is made up of six primary sub-systems: prime power interface, energy storage, energy distribution, power conversion, launch motor, and launch control subsystem. Benefits over the current C3 steam catapults include reduced weight and volume, greater launching flexibility for future aircraft, improved control, and reduced manning workload requirements. P-35 Category FY 2008 FY 203 64,677 73,664 Technical Data and Documentation 54 596 Systems Engineering 0,759 3,357 3,89 5,479 30,269 34,742 670,038 777,838 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 GENERAL ATOMICS GENERAL ATOMICS FFP JUN-09 JUL-6 /OPTION QTY 64,677 73,664 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 52 22 JUL-09 FY 3 SEP-22 52 22 JUL-6-24

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: DUAL BAND RADAR (DBR) (SPY-3 AND VOLUME SEARCH RADAR (VSR)) PARM Code: PEO IWS 2.0 The DBR suite performs horizon and volume search functions during which the system can detect stealthy targets in sea-land clutter, provide periscope detection, and counter battery functions. The dual band approach (wave form integration) has the ability to provide improved performance in adverse environments, demonstrate avoidance of multi-radar track-to-track correlation and provides for reduced software development and maintenance. The SPY-3 function provides an affordable, high-performance radar for the ship's self defense. SPY-3 greatly enhances ship defense capability against all surface and air threats envisioned in the littoral environment. VSR provides a solid state active phased array with low signature and a three-dimensional air search capability. The VSR function also provides long range above the horizon surveillance, detection, and tracking of high diving targets, and provides the SPY-3 with timely cuing and aircraft marshaling assistance. P-35 Category FY 2008 FY 203 300,983 249,557 Technical Data and Documentation 25 28 2,344 3,000 Systems Engineering 56,62 5,60 6,537 0,424 7,882 9,266 484,033 277,535 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON RAYTHEON CPIF CPIF MAR-08 JUN-5 /OPTION QTY 300,983 249,557 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 53 34 JUN-08 FY 3 SEP-22 53 34 JUN-5 The June 200 Nunn McCurdy Certification for DDG 000 program de-scoped VSR from the ship class baseline design, resulting in a PB 2 resolution that removed $M from the GFE budget and provided the three VSR Arrays for use on. Hardware costs consists of the following: DBR (includes SPY-3 arrays and below deck electronic cabinets) 09,565 VSR (Volume Search Radar) 08,840 Common Array Power/Cooling Systems (CAPS/CACS) 59,385 Misc hardware 9,466 High Power Interface 27,800 Production Lead Time: Common Array Power/Cooling Systems (CAPS/CACS) 24 months VSR 34 months Multi-Function Radar (MFR) 30 months - 25

Equipment Item: ADVANCED ARRESTING GEAR (AAG) PARM Code: PMA 25 FY 204 Presidents Budget (Dollars in Thousands) April 203 AAG provides an upgraded ability to recover all existing and projected aircraft carrier based air vehicles. The AAG system will replace the Mark 7 arresting gear system found on the NIMITZ class carriers and will be the aircraft recovery system for both and. AAG consists of six primary systems; energy absorption subsystem, energy storage subsystem, dynamic control subsystem, thermal management subsystem, cross deck pendant, and the control subsystem. P-35 Category FY 2008 FY 203 48,65 69,358 Technical Data and Documentation 427 495 4,463 2,669 Systems Engineering 6,50 6,425,095,269 8,266 9,583 68,566 89,799 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 GENERAL ATOMICS GENERAL ATOMICS FFP NOV-09 NOV-6 /OPTION QTY 48,65 69,358 PROGRAM FY 3 SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 37 33 NOV-09 SEP-22 37 33 NOV-6-26

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: PHALANX BLOCK B MK 5 MOD 2 & 22, CLOSE - IN WEAPONS SYSTEM (CIWS) PARM Code: IWS 3B Phalanx is a high fire rate Close-In Weapon System (CIWS) that automatically acquires, tracks and destroys Anti-Ship cruise missiles, Helos, Aircraft, and all types of Surface threats. The installed version will have one MK-5, Mod 2 and two MK-5 Mod 22 CIWS systems. P-35 Category FY 2008 FY 203 3 4,058 3 6,297 Ancillary Equipment 99 23 240 278 Systems Engineering,744,857 638 628 876,292 7,755 20,583 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON RAYTHEON FFP FFP MAY-09 MAR-9 /OPTION QTY 3 3 4,686 5,432 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 20 22 MAR-2 FY 3 SEP-22 20 22 MAR-9-27

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AN/SQQ-34, CARRIER-TACTICAL SUPPORT CENTER (CV-TSC) PARM Code: PEO IWS 5E CV-TSC provides for carrier organic Anti-submarine Warfare (ASW), Mine Warfare (MIW), Surface Warfare (SUW), and other composite warfare area sensor data processing, tactical command and control, and organic/battle-group aircraft mission support. CV-TSC supports both ship self defense and embarked Destroyer Squadron (DESRON) missions. This system is Open Architecture Computing Environment (OACE), Joint Fires Network (JFN), and FORCEnet compliant, and includes redesign to maximize introduction of expected transformational technologies such as Common Processing System (CPS), Common Display System (CDS), sensor processing in support of the MH-60R helicopter, high speed bandwidth network, Excomm systems, net-centric warfare components, etc. P-35 Category FY 2008 FY 203 3,295 2,980 Technical Data and Documentation 45 0 25 50 Systems Engineering,890,050 400 800 920,705 6,675 6,585 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 GTS/GENERAL DYNAMICS CPFF MAR-09 JAN-9 /OPTION QTY 3,295 2,980 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 26 2 OCT- FY 3 SEP-22 26 8 JAN-9-28

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: MK29 MOD 5, GUIDED MISSILE LAUNCHING SYSTEM (GMLS) PARM Code: PEO IWS 3 The MK 29 Mod 5 GMLS is a launcher only configuration integrated with the C2 system and will provide and with a cost effective means of employing the initial Evolved Sea Sparrow Missile (ESSM) capability. This configuration consist of an open architecture launching system and does not include operator workstations; all workstations and operator interactions necessary for system operation including but not limited to power application to the GMLS and control and safety/status monitoring of loaded cells is assumed to exist at the combat system level. P-35 Category FY 2008 FY 203 2 5,993 2 0,057 Ancillary Equipment 327 407 Technical Data and Documentation 56 0 530 894 Systems Engineering,502,633 55,065 3,859 2,305 2,782 6,36 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON FFP JUN- JUN-8 /OPTION NEW QTY 2 2 2,997 5,028 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 22 29 JUN- FY 3 SEP-22 22 29 JUN-8-29

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: AVIATION DATA MANAGEMENT AND CONTROL SYSTEM (ADMACS) BLOCK 3 PARM Code: PMA 25 ADMACS is a virtual, seamless, data sharing, knowledge based data system that provides interface for all aviation data systems. It is a tactical real-time information management system maintaining data integrity throughout the ship spaces that manage aircraft launch and recovery operations on board the carrier. ADMACS includes data from launch and recovery equipment, air traffic control, aviation maintenance, landing signaling officer, etc. P-35 Category FY 2008 FY 203 4,443 4,600 Technical Data and Documentation 97 0 24 90 Systems Engineering 907,249 753 966,56,62 7,597 8,57 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 CHUGACH FFP JUL-2 APR-8 /OPTION NEW QTY 4,443 4,600 PROGRAM FY 3 SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 26 2 JUL-2 SEP-22 26 27 APR-8-30

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: INTEGRATED LAUNCH AND RECOVERY TELEVISION SYSTEM (ILARTS) PARM Code: PMA 25 The primary purpose of the ILARTS system is to simultaneously monitor and record aircraft recoveries and launches aboard aircraft carriers during both day and night operations. This system also provides the LSO with information on aircraft lineup during recovery and is used both as a pilot debriefing medium and as a detailed accident analysis tool. ILARTS consists of eighteen cameras in different locations aboard ship that are connected to a closed circuit television system. P-35 Category FY 2008 FY 203 4,663 2,777 Technical Data and Documentation 229 0 343 0 Systems Engineering,702,38 95 339,78 662 8,30 5,096 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 EPSILON/FULLVIEW FFP OCT-0 FEB-8 /OPTION NEW QTY 4,663 2,777 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 9 36 FEB- FY 3 SEP-22 9 36 FEB-8-3

Equipment Item: MK 49, MOD 3 ROLLING AIRFRAME MISSILE (RAM) PARM Code: PEO IWS 3B FY 204 Presidents Budget (Dollars in Thousands) April 203 The MK 49 Mod 3 Rolling Airframe Missile (RAM) Weapon System is a lightweight, low cost, high power system for anti-ship missile defense against current and evolving threats. The Block upgrade adds the capability of infrared, all-the-way missile guidance while maintaining the original dual-mode (RF/IR) capability. The Helos, Aircraft, and Surface (HAS) upgrade enables the engagement of asymmetric threats. The and system provides refurbished MK 49 Guided Missile Launching Systems upgraded to MK 49 Mod 3. P-35 Category FY 2008 FY 203 2 6,86 2 7,902 Ancillary Equipment,9,38 Technical Data and Documentation 30 35 2 40 Systems Engineering,897 2,90 332 380 3,524 4,098 3,9 6,26 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 RAYTHEON FFP JAN-09 JAN-9 /OPTION QTY 2 2 3,408 3,95 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 20 2 APR-2 FY 3 SEP-22 20 24 JAN-9-32

FY 204 Presidents Budget (Dollars in Thousands) April 203 Equipment Item: IMPROVED FRESNEL LENS OPTICAL LANDING SYSTEM (IFLOLS) PARM Code: PMA 25 The IFLOLS is the primary visual landing aide displaying glide path, and trend information to fixed wing pilots on final approach from.5 nautical miles to touchdown. It is centered between two fixed green datum reference bars. This stabilized "meatball" indicates to the pilot his position above, below, or on ideal glide slope by ball displacements above or below the datum reference. P-35 Category FY 2008 FY 203,78 2,079 System Engineering 743,000 255 276 568 664 3,347 4,09 PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE FY 3 N/A N/A FEB-09 SEP-7 /OPTION QTY,78 2,079 DELIVERY BEFORE DELIVERY LEADTIME AWARD SEP-5 36 24 SEP-0 FY 3 SEP-22 36 24 SEP-7 : Refurbishment of existing IFLOLS unit done at Naval Air Station North Island and Naval Air Warfare Center, Lakehurst, NJ. - 33