REQUEST FOR PROPOSALS

Similar documents
REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE

MINER AVENUE COMPLETE STREET IMPROVEMENTS

Facilities Condition Assessment

REQUEST FOR PROPOSALS For Design Services for New Fire Station

REQUEST FOR PROPOSALS

CITY OF PLACERVILLE Development Services Department ENGINEERING DIVISION

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

January 19, To Whom It May Concern:

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Request for Proposals (RFP) INNOVATIVE FINANCING STUDY FOR THE INTERSTATE 69 CORRIDOR

TABLE OF CONTENTS. Notice Inviting Qualifications Background Scope of Work Request for Qualifications (RFQ) Selection Process...

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

PIEDMONT TRIAD AIRPORT AUTHORITY

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

BASIN CITY WATER AND SEWER DISTRICT Request for Qualifications

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

Request for Qualifications (RFQ) Environmental and Permitting Services

Request for Proposals To Provide Engineering Services for the Wastewater Treatment Facility Improvements Project

REQUEST FOR PROPOSALS FOR ON-CALL SERVICES FOR VARIOUS PROJECTS

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

REQUEST FOR PROPOSALDevelopment of a Local

Request for Qualifications B Hazardous Material Surveying, Testing and On-Site Observation Firms. RFQ Due Date: October 1, :00 P.M.

REQUEST FOR PROPOSAL FOR BACKUP EMERGENCY GENERATORS DESIGN TOWN OF YUCCA VALLEY

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY

REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

QUALIFICATIONS BASED SELECTION (QBS)

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

RFP # Request for Proposal Grant Writing Services. Date: May 11, Proposals must be submitted by 3:00 PM: June 10, 2016

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

ADDENDUM NO. 2. Date Of Addendum: April 21, 2014

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT CONSULTANT SERVICES

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Purchasing and Support Services County Administration Building 44 N. San Joaquin Street, Suite 540 Stockton, CA 95202

REQUEST FOR PROPOSALS

STATE UNIVERSITY CONSTRUCTION FUND P R O G R A M D I R E C T I V E S

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES

REQUEST FOR PROPOSALS FOR REPLACEMENT OF GENERATOR AT LAKE HILLS 1860 BOOSTER PUMP STATION

REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES WATER SYSTEM RELIABILITY STUDY CITY OF MT. PLEASANT WATER DEPARTMENT

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS (RFP) TRIENNIAL PERFORMANCE AUDIT FOR THE MADERA COUNTY TRANSPORTATION COMMISSION

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

On-Call Traffic Engineering Services

Knights Ferry Elementary School District

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

City of Malibu Request for Proposal

REQUEST FOR PROPOSALS FOR INFORMATION TECHNOLOGY SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT MARKETING AND BRANDING PLAN

REQUEST FOR QUALIFICATIONS Construction Engineering Services for On-Call Consulting Services. and

CITY OF PORTSMOUTH NEW HAMPSHIRE Department of Public Works

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

CITY OF LOMITA REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO PROVIDE BID PROPOSAL FOR

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

SECTION 2 INSTRUCTIONS TO BIDDERS (IB)

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA

TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

CITY OF GREENVILLE, SC REQUEST FOR PROPOSALS RFP NO

REQUEST FOR QUOTATIONS

FISCAL & COMPLIANCE AUDITS

FLORIDA DEPARTMENT OF TRANSPORTATION

REQUEST FOR PROPOSALS (RFP #18-001) Vessel Construction Management Services

BID # Hunters Point Community Library. Date: December 20, Invitation for Bid: Furniture & Shelving

Architectural Services

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

REQUEST FOR PROPOSALS FOR REALTOR SERVICES RELATED TO MARKETING & SALE OF SUCCESSOR AGENCY-OWNED REAL PROPERTIES RFP # SA

CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project

CITY OF ROCHESTER, NEW HAMPSHIRE INVITATION TO BID

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION REQUEST FOR QUALIFICATIONS NOTICE NUMBER 03A2139

REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR PROPOSALS FOR A COMMUNITY DEVELOPMENT BLOCK GRANT WRITER/ADMINISTRATOR

Request for Qualifications Construction Manager

Scope of Services The City is seeking consulting services for the following tasks:

SR-86/AVENUE 50 NEW INTERCHANGE PROJECT

All proposals must be received by August 30, 2016 at 2:00 PM EST

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

CITY OF PITTSBURGH Office of Management & Budget

REQUEST FOR PROPOSALS (RFP)

Transcription:

REQUEST FOR PROPOSALS FOR TO PREPARE PROFESSIONAL DESIGN SERVICES PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) FOR THE RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD CITY PROJECT NO. PW1716/ FEDERAL PROJECT NO. HSIPL-5008(167) CITY OF STOCKTON PUBLIC WORKS DEPARTMENT ATTN: JASON BUSTOS 22 E. WEBER AVENUE, ROOM 301 STOCKTON, CA 95202 Date Issued. October 25, 2017 Deadline for Submissions.. November 29, 2017 by 3:00 PM If you are interested in submitting a Proposal, please read this document in its entirety and follow all instructions for submission. LATE SUBMITTALS WILL NOT BE ACCEPTED

1.0 INTRODUCTION The City of Stockton (COS) requests proposals from qualified consulting firms to prepare plans, specifications, and estimate for the installation of raised median curbs along Martin Luther King Jr. (MLK) Boulevard between Beighle Alley and Mariposa Rd. The qualified consulting firms will also prepare the necessary environmental documentation for the project. 2.0 BACKGROUND The City of Stockton was awarded federal funds from the Highway Safety Improvement Program (HSIP) to install median curbs along MLK Boulevard between Beighle Alley and Mariposa Rd. 3.0 PROJECT DESCRIPTION This s (RFP) will provide for the preparation of plans, specifications, and estimate for the installation of raised median curbs along MLK Boulevard between Beighle Alley and Mariposa Rd. New median curb, gutter, and hardscape will fill in and connect to existing curb with standard height curbing. Hardscape will be 1-2 wide from the inside edge of curb towards the center of median. The Consultant will develop a cost-effective approach to raising one (1) median street light, multiple median pull boxes, and design improvements. The qualified consulting firms will also prepare the necessary environmental documentation for the project. 4.0 SCOPE OF WORK Each Consultant shall prepare a detailed scope and services based, in part and at the minimum, on information presented in this RFP and other information. The Consultant shall provide a cost proposal and anticipated schedule, which accomplishes the objectives of the project. It is anticipated that the design contract will be awarded in March 2018 with construction to start in March of 2019. Consultants are encouraged to include items that are not presented in the RFP, but are thought to be necessary for this project. 4.1 Background Research The consultant shall examine the grant application and propose scope of work that conforms to the grant. The Consultant shall examine Attachment A Location Map, Project Layout, and Roadway Cross Sections to determine the appropriateness of the segment for the proposed facility to be installed and to plan the location of the signs, striping, and street legends. The Consultant will notify the City of any segments that are Page 1 of 10

determined to be inappropriate, or that will require additional work to be made appropriate, before design begins. 4.2 Environmental Services The Agency has the signed PES form (Attachment F Preliminary Environmental Study). The consultant shall prepare and submit Hazardous Waste Initial Site Assessment (ISA) report pursuant to Caltrans LAPM. The consultant shall prepare documents to obtain California Environmental Quality Act (CEQA). The consultant shall prepare and submit the construction Request for Authorization (RFA) package, Award Package to low bidder, Post- Construction Package per the Local Assistant Procedures Manuals (LAPM) and Local Programs Procedures (LPPs). The construction RFA must be submitted to Caltrans District 10 office prior to July 2018 (internal City review by June 2018). NEPA clearance must be secured before construction RFA can be submitted. The consultant is responsible for arranging and coordinating with all utility companies, within the project sphere, to resolve any utility issues. 4.3 Plans, Specifications, and Estimate The Consultant will prepare and complete PS&E documents, which include design improvement plans, traffic control plans, specifications, and engineer s estimate. PS&E shall be prepared per the City s Standards, 2015 Caltrans Standards, and current CA MUTCD, as appropriate. The Consultant shall prepare a base map showing existing information to facilitate the design of all the necessary improvements. The base map limits shall be sufficient to cover all necessary improvements within the project area. The Consultant will provide five (5) sets of plans, specifications, and estimates (PS&E) in 24 x36 (full scale) when the design is at 60% and 100% completion to the City for review and comments. With each stage, the review comments from the previous stage shall be itemized and a written response to each shall be prepared in a comment matrix. The original red-line comments from the reviewing agency shall be returned with the succeeding submittal. After all edits have been made to the 100% PS&E, the Consultant will submit a check print (at 100%) for review purposes prior to plotting on mylars. The final submittal shall include: one (1) complete mylar plan set (24 x36 ) stamped and signed, final cost estimate (stamped in Excel and pdf format) and final specifications (in Word and pdf format) stamped and Page 2 of 10

signed, and shall be delivered to the City, along with a Compact Disc containing all electronic files, including AutoCAD drawing files. The project location, layout, and cross sections are attached for reference. 4.4 Public Outreach Conduct the necessary public outreach to support the environmental documentation. One informational meeting must be conducted prior to construction. 4.5 Coordination/Meetings The Consultant shall attend the project kickoff meeting. The Consultant shall establish and maintain clear and consistent communication with City Staff to discuss the progress of the design. The Consultant shall attend meetings (or conference call) with City Staff as needed to discuss and finalize the design. If necessary, the Consultant may request field meetings to discuss existing street conditions. The Consultant shall meet with City Staff to go over Consultant Performance Evaluation at the contract close out. 4.6 Design Support During Bidding and Construction As part of the proposal, Consultant shall include bid support services that consist of assisting the City in responding to Requests for Information (RFI) during the project advertisement phase. Consultant shall also include services for design support during construction. These services include responding to all RFIs, submittal reviews and approvals, altering project plans to address any design changes or inconsistencies (at no additional cost to the City), attendance at the pre-construction meeting, and any needed consultation with the construction contractor and/or the City Project Manager. 4.7 As-built Drawings The Consultant shall prepare as-built drawings upon receipt of red-lines from the contractor. Consultant should produce one complete set of asbuilt drawings. Changes should be reflected on the mylars either by hand or by a new printed sheet created in AutoCAD. Page 3 of 10

5.0 PROJECT GENERAL INFORMATION 5.1 Proposal Submissions Costs for developing proposals are entirely the responsibility of the consultant and shall not be chargeable in any way to the COS. All materials submitted become the property of the COS and may be returned only at the City of Stockton s option. Submit four (4) copies of the proposal, signed by an authorized representative and submit on or before November 29, 2017, by 3:00 p.m. to: Jason Bustos City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202 The proposal should be firmly sealed in an envelope which will clearly be marked on the outside with HSIP 8 Raised Median along Dr. Martin Luther King Jr. Boulevard City Project No. PW1716 / Federal Project No. HSIPL-5008(167). Late proposals will not be accepted. 5.2 Acceptance or Rejection of Proposal The City reserves the right to negotiate an agreement with the firm submitting the highest-ranking proposal. Also, the City reserves the right to reject any and all proposals or to waive any irregularity in a proposal if it is deemed to be in the best interest of the City. Failure to submit all requested information could be grounds to reject the proposal. 5.3 Proposal Questions and Requests for Clarification Any question or request for clarification shall be submitted in writing to: CC: jason.bustos@stocktonca.gov chyerle.leach@stockontca.gov Requests for clarification shall be submitted at least seven (7) business days prior to the proposal due date. If a response warrants an addendum to the RFP, such addendum will be delivered to Consultants at least two days prior to the proposal due date. It is the proposer s responsibility to check the website for any addendums or responses to questions. The website address is as follows: Page 4 of 10

http://www.stocktongov.com/services/business/bidflash/pw.html?dept=publ ic_works 5.4 Causes for Disqualification Any of the following may be considered cause to disqualify a proposal: A. Evidence of collusion among proposers B. Any attempt to improperly influence any member of the evaluation panel C. Proposer s default or breach of contract in previous work that resulted in termination of that agreement and/or D. Existence of any lawsuit, unresolved contractual claim, or dispute between proponent and the City. 5.5 Licensing Requirements Any professional certifications or licenses that may be required are the sole cost and responsibility of the proposer. A City of Stockton business license is required. Please contact the City of Stockton Business License Customer Service at (209) 937-8313. 5.6 Insurance Requirements The proposer must obtain and maintain the required insurance. Proposer should review Attachment B Instructions to Proposers for information regarding insurance, indemnification, Disadvantaged Business Enterprises, prevailing wages, etc. Failure to comply with the Instructions to Proposers may be grounds for rejection. 5.7 Disadvantaged Business Enterprises The requirements for federally funded projects including Disadvantaged Business Enterprise (DBE) apply to this project. The DBE goal for this project is 12%. Proposers shall submit Caltrans form Exhibit 10-O1, Consultant Proposed DBE Commitment, with their proposals. The successful proposer will also submit Caltrans form Exhibit 10-O2, Consultant Contract DBE Commitment. See Exhibit B, Instructions to Proposers for a description of the DBE Program and required forms. Any questions regarding the DBE program should be directed to Miguel Mendoza, DBE Liaison Officer, at (209) 937-7446. Page 5 of 10

5.8 Federal Program Requirements The requirements for federally funded projects will apply to this Request for Proposals, and the Proposers will be required to submit all required forms. See Attachment E Federal Aid Consultant Provisions for copies of currently required forms. Forms can also be found on Caltrans website (http://www.dot.ca.gov/hq/localprograms/lam/forms/lapmforms.htm#goher e10) 5.9 Department of Industrial Relations Please refer to Attachment B Instructions to Proposers, for registration requirements with the Department of Industrial Relations. 5.10 Product Ownership Any documents resulting from the performance of work in the contract will become property of the City. This includes all work performed by subconsultants. 6.0 REQUIRED PROPOSAL CONTENT The proposal shall contain the following, at a minimum: Cover Letter Table of Contents Executive Summary Project Team Project Understanding and Approach Detailed Work Plan Examples of experience with similar types of work References (Three for the firm, two of which are familiar with the proposed team) Schedule (Microsoft Project schedule, with key dates, milestones, critical path) Cost Proposal in a separate sealed envelope See Attachment D Sample Cost Proposal for format Federal Forms The body of the technical proposal shall not exceed fifteen (15) double-sided pages (8 ½ x 11 ) with a minimum font size of 10. Proposer shall submit six (6) bounded sets, one (1) unbounded set, and a pdf copy of the proposal. The maximum allowable length is exclusive of any folder, cover, or section dividers. Proposals shall be no more than twenty (20) pages, including resumes and the cover letter. Page 6 of 10

6.1 Cover Letter The letter shall be signed by an official with the authority to negotiate and contractually bind the firm with the City of Stockton. Provide name, title, address, email, and telephone number for this officer. Describe any subcontract arrangements or licensing agreements. Include any potential conflict of interest. 6.2 Table of Contents The proposal should include a table of contents. 6.3 Executive Summary The Executive Summary shall include a summary of the proposal, emphasizing the approach to be taken and including a work plan, schedule, and description of the capabilities of the Consultant and sub consultants. The summary should convey an understanding of the purpose of the project and the services required for performance. 6.4 Project Team Describe your team organization including the qualifications of the prime consultant and any sub consultants. Provide an organizational chart of the proposed team structure. The following should be addressed: Demonstrate the firm s experience in each of the areas of expertise needed to successfully complete the project. This should include a description of prior experience in working with public agencies, including working with City staff. Provide references with emphasis on the completion of projects related to pedestrian improvements with similar challenges (provide list with proposal). Ability for project team to perform the proposed work within the time limits of the project, considering their current and projected workload and assignments. Ability to provide quality control of all deliverables and be responsive to all issues in a timely manner. Provide project team resumes. Page 7 of 10

6.5 Project Understanding Describe your understanding of the needs of the HSIP 8 Raised Median along Dr. Martin Luther King Jr. Boulevard, City Project No. PW1716/ Federal Project No. HSIPL-5008(167), 6.6 Detailed Work Plan Provide a proposed work plan for development and implementation of the project as described in the Scope of Work. Describe the proposed approach and the activities to be accomplished. Describe how the team will complete each task. Alternative approaches to the project can be submitted if a rationale is given for the suggested changes. Information on software which will be used to prepare all working documents and final documents shall be provided to the City.. 6.7 Examples of Experience with Similar Types of Work Provide examples of projects similar in scope and size to this project. 6.8 References Provide three client references for the firm, two of which are familiar with the project manager and key personnel. This shall include the name, company, contact information, and description of related work that was provided to the client. 6.9 Schedule Provide a Microsoft Project Schedule with key dates, milestones, and critical path. The selected consultant shall be expected to begin work within two weeks of contract signing. Construction closeout is anticipated in March 2019. This date shall be reflected in the project schedule due to the preparation of the As-built drawings. 6.10 Cost Proposal Identify all key team members, including sub consultants, in a work chart, including their name, title, hours per task, hourly rate, total hours, direct labor, overhead, and percentage of work by task. Include overall cost proposal and submit it in a separate sealed envelope clearly labeled Cost Proposal. See Attachment D Sample Cost Proposal. Page 8 of 10

The cost proposal must be in a sealed envelope separate from the proposal. 7.0 PROPOSAL EVALUATION The Consultant Selection process will follow the estimated timeline shown below: Event Date Post s October 25, 2017 Written Questions submitted by November 16, 2017 Response to Written Questions November 27, 2017 Proposals Due November 29, 2017 Negotiations December 20, 2017 City Council Approval March 27, 2018 7.1 Proposal Evaluation The selection committee will evaluate all proposals. This is a qualifications and cost based selection, so ranking will be in accordance with Attachment C Evaluation Scoring Sheet. Cost will be a factor in evaluation, but selection is predominately qualifications based. Cost Proposals will not be opened until after other categories have been evaluated. 7.2 Negotiations City staff will begin negotiations with the highest ranked firm. If an agreement cannot be reached after a reasonable period of time, as determined by the City, Then the City will terminate negotiations with the number one ranked firm and negotiations will be opened with the second ranked firm. The compensation discussed with one prospective Consultant will not be disclosed or discussed with another Consultant. The selected consultant will be expected to enter into a Professional Services Contract with the City. Proposers should direct their attention to Attachment B Instructions to Proposers for the most current insurance and indemnification language. It is expected that the successful proposer will accept these terms without modification. The contract shall not be in force until the Council approves the contract and the City Manager signs it. Work performed before the issuance of a Notice to Proceed cannot be paid by the City. Page 9 of 10

ATTACHMENTS: Attachment A Location Map, Project Layout, and Roadway Cross Sections Attachment B Instructions to Proposers Federally Funded Contracts Attachment C Evaluation Scoring Sheet Attachment D Sample Cost Proposal (Exhibit 10-H in Local Assistance Manual) Attachment E Federal Aid Consultant Contract Provisions Attachment F Preliminary Environmental Study Page 10 of 10