1st 'boneyard' CH-53E returned to Fleet

Similar documents
Depot helps Spanish air force get their Hornets flying and back in country

Eastern Carolina Section 1126

NAVAIR News Release AIR-6.0 Public Affairs Patuxent River, MD

ARS 2004 San Diego, California, USA

EC-130Es of the 42nd ACCS play a pivotal role in the course of an air war. The Eyes of the Battlespace

Huey Goes Long. At USAF s 23rd Flying Training Squadron, chopper pilots will train on the new Huey II for another 20 years. Photography by Ted Carlson

Final Marine Corps Cessna Citation Encore Delivered

NAVAIR Commander s Awards recognize teams for excellence

FRCSE receives first Super Hornet to prototype maintenance

HILL AFB : UTAH. Military Asset List 2016 FAST FACTS

Soldiers from Headquarters and Headquarters Company, 1034th Combat Sustainment Support Battalion, 734th Regional Support Group, Iowa Army National

Apache battalion transitions to more powerful drones

Navy & Marine Corps Vertical Lift: Past and Future

Comments at the 20 SOS (Green Hornets) Dining Out, 10 Nov 2007 By: Maj Gen Donny Wurster

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center

Fighter/ Attack Inventory

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

AIR FORCE Magazine / September 2012

COMMAND MISSION COMMAND ORGANIZATION

Flight PatternQ&A with the first military test pilot to fly the X-35 and F-35

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

ENVIRONMENTAL IMPACT IN OFFICERS AND NCO, INVOLVED IN THE EXERCISE "RED FLAG" 2012 AT NELLIS AIR FORCE BASE, NEVADA, UNITED STATES

WARFIGHTER FOCUSED. Training Systems

An Update on the A400M

ADVERSARY TACTICS EXPERTS

FRCSE returns unique P-3 Billboard Orion to Fleet

AVIATION AFTERMARKET DEFENSE DEFENSE THE BEST PUTTING THE FIGHT BACK IN THE F-5 EDUCATION ASSISTANCE FLYING PHANTOMS SWITZERLAND

The F-86Ls remained with the overall Natural Metal Finish, and carried most of the same

Cherry Girl. Cherry Girl

The Air Dominance. Fledgling F-15C Eagle pilots learn the art of air superiority at Tyndall AFB, Fla.

REPORT DOCUMENTATION PAGE

Re-Shaping Distributed Operations: The Tanking Dimension

VADM David C. Johnson. Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DOD Leases of Foreign-Built Ships: Background for Congress

TOWNSEND BOMBING RANGE MODERNIZATION

The Sikorsky fleet has provided safe and. July 2009 Visit us at Sikorskyarchives.com Contact us at

Mr. Steve Callaghan BIO

Small Business Opportunities with the Naval Air Systems Command

Last Production A-6 Flies Into History

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND

DOD Leases of Foreign-Built Ships: Background for Congress

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited.

MEDIA CONTACTS. Mailing Address: Phone:

Joint Logistics Fireside Chat NDIA Logistics Conference 27 March Balancing Readiness and Resources

Preparing to Occupy. Brigade Support Area. and Defend the. By Capt. Shayne D. Heap and Lt. Col. Brent Coryell

HMX-1 is the place where helicopter innovations began and where they continue today in the squadron s Operational Test and Evaluation Department.

Marine Corps Resetting the Forces

Fleet Readiness Centers

Department of Defense

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

F-35 Lightning II Program Status June 2017

Edited by Alfred M. Biddlecomb

Assembly Area Operations

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

CBO TESTIMONY. Statement of Douglas Holtz-Eakin Director

BASE VISIT REPORT. Naval Air Depot, North Island, Naval Air Station, Coronado, Ca. June 8,2005

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

Phase I Submission Name of Program: AH-64E Achieves Initial Operational Capability

Capital Flying. The 1st Helicopter Squadron provides critical transportation on a moment s notice.

A Ready, Modern Force!

TOPOGRAPHIC OPERATIONS ANNEX TO. CONPLANs/OPLANs/and OPORDs.

HELICOPTER MECHANIC, HELICOPTER MECHANIC SUPERVISOR, 3749

ANCILLARY EQUIPMENT FOR: PERSONNEL TROOP PARACHUTE SYSTEM

Subj: REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAISSANCE SQUADRON SEVEN (VQ-7)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support

Name of Program: The Boeing Company / Apache 64 D Block III

Sustaining Systems Engineering: The A-10 Example

Unmanned Aerial Vehicle Operations

Coloring Book of Air Force Reserve History

Title: Radioactive Material Storage

Transportability and the Acquisition Process

NAVAIR News Release FRCSW Public Affairs

Maximum utility: the future of support helicopters

UNITED STATES MARINE CORPS 2D MARINE AIRCRAFT WING II MARINE EXPEDITIONARY FORCE POSTAL SERVICE CENTER BOX 8050 CHERRY POINT, NC

Littoral OpTech West Workshop

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE

NAVAL AVIATION SURVIVAL TRAINING PROGRAM DEVICES QUALITY ASSURANCE AND REVALIDATION POLICY

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES

SOP FOR OPERATION AND MAINTENANCE OF MCALF BOGUE 1. Puroose. To provide guidance for the operation and maintenance of MCALF Bogue.

Making the Best of the Fighter Force

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

The RAAF and Culture Change: Building Sustainable Reach

Naval Audit Service Audit Report Aircraft Quantitative Requirements for the Acquisition of the Joint Primary Aircraft Training System

resource allocation decisions.

ASSIGNMENT 1. Textbook Assignment: "Maintenance Administration." Pages 1-1 through 1-29.

Exhibit R-2, RDT&E Budget Item Justification February 2008

Specifications for the procurement of a new combat aircraft (NKF) and of a new ground-based air defence system (Bodluv) [German version is authentic]

US Marine Corps Tactical Wheeled Vehicle Strategy Update Briefing to NDIA Tactical Wheeled Vehicle Conference 2 February 2009

BRIGADIER GENERAL FLOYD W. DUNSTAN

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by:

SECNAVINST B ASN (RDA) 22 Dec 2005 PRODUCT DATA REPORTING AND EVALUATION PROGRAM (PDREP)

Axis & Allies Anniversary Edition Rules Changes

ORGANIZATION AND FUNDAMENTALS

Us Navy Aircraft Firefighting Manual

Transcription:

Phoenix Risen First retired CH-53E Super Stallion helicopter returns to active service By Rob Koon, NAVAIR Public Affairs NAVAIR -- Like the Phoenix renewed, the first retired CH-53E Super Stallion helicopter to come out of the desert was reborn and returned to the fight at Marine Corps Air Station New River June 29. Marine Heavy Lift Squadron 464, the "Condors," received the aircraft. This Super Stallion helicopter and two others spent more than 11 years in storage before arriving at the Naval Air Systems Command Depot, Cherry Point, N.C., last August from the Aerospace Maintenance and Regeneration Center, located at Davis-Monthan Air Force Base, Tucson, Ariz. They arrived in pieces, large pieces, on-board two Air Force C-5 Galaxy cargo aircraft. Page 1 of 5

That s where the hard work began. "The artisans at Cherry Point greatly exceeded the very high expectations we had for them on this project!" said Marine Corps Col. Paul Croisetiere, the H 53 Heavy Lift Helicopter Program manager here. "Our heavy lift CH-53E squadrons have been in high demand for many years, and this project will help alleviate the growing strain on our shrinking inventory of CH-53E helicopters. And from a practical perspective, anything our operational forces can move in-country by helicopter is one less thing that has to go by truck convoy and put Marines at risk of insurgent attack. "This effort will directly ensure the critically needed heavy-lift capability and logistics support continues to be there when they need it -- which is around the clock!" Croisetiere added. Depot artisans started with rough airframes and refurbished and updated them to the same configuration as current fleet Super Stallions, according to program officials. These updates included adding the Ballistic Protection system to the cabin and cockpit floors, adding the ramp-mounted gun system (GAU-21), the ALE/ALR-47 missile warning and flare/chaff dispenser units and Night Vision Device-compatible cockpits. Of the eight aircraft originally in storage in Arizona, one has now been returned to service leaving two still in rework and five still in storage at AMARC, according to Marine Corps Lt. Col. Stewart Gold, the H-53 program's assistant program manager for Logistics. Current plans call for two more to be pulled from storage this year. Originally slated to take 18 to 20 months to return to active service, the first aircraft began ground and flight checks on May 19 and entered the Fleet Marine Force on June 29, seven months ahead of schedule, with the other helicopters following close behind. The first three aircraft regeneration efforts cost a total of $24 million (approx $8 million each). The final two are expected to cost $17 million (approx. $8.5 million each). The last two will cost more than the first three because the best ones were pulled first. They are coming along just fine, said Duane Crow, Super Stallion helicopter production manager. We certainly have the skilled artisans who can not only do this, but do this ahead of schedule. Crow attributes the success of the restoration to the artisans, engineers and logisticians using the tools of AIRSpeed, specifically the Theory of Constraints (TOC). As a management practice, TOC focuses on reducing process time and costs. We are using that program with great success on our other aircraft, so we wanted to mirror that with these AMARC birds, Crow said. The success of TOC depends on your people being in tune with the program, and that is exactly Page 2 of 5

what we have on the Super Stallion line. In 1999, Sikorsky stopped producing the CH-53E, which makes refurbishing AMARC aircraft the only way to add to the total Fleet Marine Force inventory. The Super Stallion community is optimizing the available assets to our warfighters by using these as complementary improvements, said Marine Corps Maj. Warren Bair, Super Stallion program officer at Cherry Point. The Super Stallion program s ability to reduce turn-around time has effectively increased the number of aircraft that are mission assignable at the squadron level in the heavy lift community. "We're activating these war reserve Super Stallion helicopters to sustain high, hot and long duration heavy lift for U.S. and coalition forces engaged in the global war on terrorism. We haven't lost any aircraft to enemy action, but the harsh and unforgiving natural environment where these aircraft are relied upon for day-to-day logistics and assault support has taken its toll, said Gold. "We're doing this, as well as some other on-going readiness enhancing strategies, to ensure heavy lift continues to be ready wherever and whenever the Marine Air-Ground Task Force or joint force commander needs it." Most aircraft repaired at the depot are currently in service. Normally we don t do all the modifications, airframes changes and accessory changes that will be necessary to restore these aircraft to the fleet, Owen said. The depot will perform twice the amount of work normally required to make an aircraft ready for flight. The aircraft will be thoroughly evaluated by the Super Stallion production line and depot engineers. If nonstandard repairs are required, engineers will perform an analysis to ensure that the repair is safe. Logistics engineers will acquire the kits needed to make modifications to the airframes changes. These aircraft have been out there in the bone yard in long-term preservation for 11 years. Nothing has turned on these aircraft for 11 years so there will be a lot more replacement and repair of components and checking and testing of the components, Owen said. We will do special rework and get them up to the latest configurations and ready for all missions in the fleet. As the first of the three rebuilt Echoes enters the post-rework ground and flight-testing phase, Crow said a painstaking effort, totaling 228 separate inspections, is taken to ensure the aircraft meet all specifications and requirements before leaving the depot. Aircraft testing and re-declaring the airworthiness of an aircraft that has undergone a rigorous maintenance evolution Page 3 of 5

is a complicated process, he said. It involves not only on-the-ground simulation of as many conditions as possible, but also includes a functional flight test that may require several flights to correct discrepancies encountered during the test phase. This is what the AMARC was designed for, Crow said. At a time of need in the Marine Super Stallion community, we are giving them the resources they need to complete their mission. The Super Stallion has a very safe record. These will be very carefully scrutinized as all our aircraft are, Owen said. When they leave here, they ll be as good as the newest ones. Our main goal is to support those Marines out there on the front lines by delivering a quality product to ensure their success, Owen said. The aircraft will be assigned according to the needs of the Marine Corps when work is completed at the depot. -30- Cutline: Photo 1: Marine Aircraft Group 16 Marines off-load a CH-53E Super Stallion helicopter from an Air Force C-5 at MCAS Cherry Point, N.C. Aug. 9. Three Super Stallions have been pulled from the nation s war reserve, or bone yard, at Davis-Monthan Air Force Base, Ariz., for upgrading and reconfiguration at NAVAIR Depot Cherry Point, N.C. before being returned for service in the fleet. Photo by Larry Conley. Photo 2: CH-53E Super Stallion, Bureau Number 161542, departs from MCAS Cherry Point, N.C., after receiving extensive maintenance upgrades and updates at Naval Air (NAVAIR) Depot Cherry Point. The helicopter had been stored in the nation s aircraft war reserve at Davis-Monthan AFB, Ariz, and had not been operated or flown for almost 11 years following its retirement from the U.S. Marine Corps Super Stallion Fleet. The newly refurbished Super Stallion, piloted by Col. J. Mark Reed, NAVAIR Depot Cherry Point commanding officer, was delivered June 29 to Marine Heavy Helicopter Squadron 464 at MCAS New River, N.C., to begin another tour of active service with the U.S. Marine Corps. (Photo by David Hooks). Page 4 of 5

Page 5 of 5