Common Range Integrated Instrumentation System (CRIIS) Informational Briefing

Similar documents
Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS)

Systems Engineering & LRASM

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Department of Defense DIRECTIVE

Gerry Christeson Test Resource Management Center 20 October 2010

UNCLASSIFIED UNCLASSIFIED

Department of Defense DIRECTIVE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

DOT&E Initiatives from the Middle

The DoD T&E/S&T Program

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2019 OCO. FY 2019 Base

COMMON AVIATION COMMAND AND CONTROL SYSTEM

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Universal Armament Interface (UAI)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Technical Supplement For Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) Version 1.0

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

AIR FORCE MISSION SUPPORT SYSTEM (AFMSS)

UNCLASSIFIED FY 2018 OCO. FY 2018 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #136

2016 Major Automated Information System Annual Report

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

NATIONAL AIRSPACE SYSTEM (NAS)

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Army Ground-Based Sense and Avoid for Unmanned Aircraft

Subj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC

CAD/PAD Qualification and Second Source Processes

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

Exhibit R-2, RDT&E Budget Item Justification February 2007

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Secure LVC Advanced Training Environment (SLATE)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Report No. D February 23, Reimbursable Fees at Four Major Range and Test Facility Bases

Long Range Land Attack Projectile (LRLAP)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System (User Equipment) (SPACE)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

2016 Major Automated Information System Annual Report

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17

NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

2016 Major Automated Information System Annual Report

UNCLASSIFIED. FY 2018 Base FY 2018 OCO

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

SMALL BUSINESS OFFICE EGLIN AFB, FL

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

F-35 Weapon System Overview

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

Test Resource Management Center (TRMC) Perspective

23 rd Annual National Test and Evaluation Conference

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Transcription:

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) Informational Briefing Roshelle Orgusaar CRIIS Program Office AFLCMC/EBYC Eglin Air Force Base, FL DISTRIBUTION STATEMENT A: Approved for public release: distribution unlimited. CRIIS Program (AFLCMC/EBYC), 102 West D Avenue, Suite 5, Eglin Air Force Base, Florida 32542, 850-883-3609 This Briefing is: UNCLASSIFIED

CRIIS Overview CRIIS is a Family of Systems for Airborne Data Collection High Accuracy Time, Space, Position Information (TSPI) Secure Datalink(s) Transmit Real Time TSPI and Aircraft Data Multiple Independent Levels of Security Participant Packages (Pod & 2 Internal Configurations) and Ground Systems Integrated on F-15, F-16, F-18, F-22A (SIL) and F-35 (SIL) Development Funded by Central T&E Investment Program (CTEIP) Replaces Existing GPS Based ARDS at Major Test Ranges Interoperable System $300M Development Program Production and Sustainment Funded by Each Service Prime Ktr: Rockwell Collins, Inc. (Cedar Rapids, IA) CRIIS is a Test Range Replacement of the Existing GPS Based ARDS with Advanced Datalink, TSPI, Security Features 2

OSD - AFLCMC Relationship Requirements/ Funding Range/T&E Organizations TRMC/CTEIP AF/TE Acquisition Authority SAF/AQ HQ AFLCMC Air Force Life Cycle Management Center Armament Directorate (AFLCMC/EB) Test and Training Division (AFLCMC/EBY) OTICC CTEIP PM Range Systems Branch (AFLCMC/EBYC) AF/TER AFMC/A3F Services DPMs CRIIS P5 CTS 3

CRIIS Description CRIIS is a Family of Systems for Airborne Data Collection High Accuracy Time, Space, Position Information (TSPI) Increased throughput of Real Time TSPI and Aircraft Data Multiple Independent Levels of Security (MILS) Participant Packages (Pod & 2 Internal Configurations) & Ground Systems Integrating on F-15, F-16, F- 18, F-22A (SIL) and F-35 (SIL) Replaces Advanced Range Data System (ARDS) Phase II locations: Pax River, Eglin AFB, WSMR, and Edwards AFB Follow-on locations: China Lake, Nellis AFB, and Point Mugu 4

CRIIS Airborne & Ground Subsystems Participant Packages Configuration 4 Pod for Legacy Aircraft REC-POD Configuration 5 Internal Mount Liquid Cooled for 5 th Gen Aircraft Configuration 6 Internal Mount Air Cooled for Legacy Aircraft AFT HANGER AFT WEIGHT COLLAR* BATTERY MAC TUBE ASSEMBLY MSI CONNECTOR (MIL-STD-1760) FORWARD HANGER RAIL ASSEMBLY CENTER WEIGHT COLLAR* GPS ANTENNA (conformal) FORWARD WEIGHT COLLAR* UMBILICAL COVER (AIM-9) RF ANTENNAS (Qty 2) Threshold Platforms NOSE CONE ASSEMBLY F-15 F-16 (* Front, Center and Aft Weights are absent for Light Pod) F-22 F-35 F-18 5 th Generation Aircraft Legacy Aircraft Ground Subsystems Portable Test Set Remote Ground Station & Reference Receiver CRIIS Control Center Mission Rooms 5

CRIIS Program Schedule (EMD Detail) FY14 FY15 O N D J F M A M J J A S O N D J F M A M J J A S FY16 O N D J F M A M J J A S FY17 FY18 FY19 FY20 Milestones IBR Delta CDR TRR MRA FCA/PCA PRR Production Decision EMD Test & Integration Security Tech Orders & Training Module Design/Dev Pre-Prod Proto Builds System Env /EMI Testing F-16 F-15 40/50 A/C SIL Integ F-22 SIL Integ ECU PCA IATT ECU Cert Env Builds 6 20 System Lab Testing TSPI Truth Source Flight 70% IPR FQT F-18 F-16 F-15 A/C SIL Verification CT&E/GT&E Flt Test CT&E Builds 50 PTS/GSS (FCA-1) C5/6 (FCA-2) C4/System (FCA-3) Sec F-22 PAX Eglin TRR IATT Ext T.O. Development Build 28 TRR F-15(R) Cert F-35 F/A-18 (R) Ver Build 33 GT&E Edwards GT&E Install & C/O ATO Update EMD Refurb Edwards Flights ILT CBT WSMR Install Production Lot 1 Option Exercise Lot 1 Del Lot 2 Del Lot 3 Del Sustainment ICS 6

Major Range and Test Facility Base (MRTFB) and Initial Locations Naval Underwater Warfare Center, Keyport Air Force Air Warfare Center, Nellis AFB Utah Test & Training Range Dugway Proving Ground - Purple Text Denotes Initial Locations Naval Air Warfare Center, China Lake 30th Space Wing, Vandenberg AFB Naval Air Warfare Center, Point Mugu Air Force Test Center, Edwards AFB Yuma Proving Ground Kwajalein Missile Range Electronic Proving Ground, Ft. Huachuca Joint Interoperability Test Command 96 th Test Wing, Eglin AFB 46th Test Group, Holloman AFB High Energy Laser System Test Facility White Sands Missile Range Aberdeen Test Center Naval Air Warfare Center- Patuxent River Arnold Engineering Development Center 45th Space Wing, Patrick AFB Atlantic Undersea Test & Evaluation Center Atlantic Fleet Weapons Training Facility 7

Key Performance Parameters Requirement Status 0.5 meter horizontal RMS accuracy on fighter aircraft Top Secret encryption capability Datalink throughput greater than or equal to 400kbps per frequency within ARDS occupied bandwidth Met Met Met Mass properties consistent with ARDS, within constraints Met Fits internally in F-35 and F-22 See Notes* Fits on F-18 6L Bay Door Met Compatibility with Global Information Grid (through TENA) Met * Notes: 1. Design meets volume requirements defined in SPS at EMD start 2. F-22 aircraft configuration changes (post CRIIS EMD start) will require follow-on integration effort for physical fit. 8

Airworthiness and SIL Testing SIL Testing Approach Demonstrate Aircraft Interface Capability for All Threshold Aircraft CTE/GTE Flight Clearance Approach Obtain Interim/Local Flight Clearances for Flights Prioritize Qualification Testing needed for these Clearances Subset of Artifacts/Data Needed for Full Fleet Certification Aircraft SIL Objectives F-15 Cfg4, Cfg6 Power & 1553 Bus Interface F-16 Cfg4, Cfg6 Power & 1553 Bus Interface F/A-18 Cfg4, Cfg6 Power & 1553 Bus Interface F-22 Cfg5 Power & 1553 Bus Interface F-35 Cfg5 Fiber Channel Bus Interface 9

CRIIS MILS Architecture Data Sorted By Classification/Caveat or Mission Number (Notional) Mission #1 JSF Mission #1 F-16 Mission #2 F-35 Mission #2 F-16 TSPI S/JSF Fibre data TS/JSF TSPI Unclas 1553#1 S/NF TSPI S/JSF Fibre data TS/JSF TSPI Unclas 1553#1 S/NF MILS ECU MILS ECU MILS ECU MILS ECU HTDL HTDL HTDL HTDL TS/JSF S/JSF Data Link Controller S/NF Unclas MILS ECU Ground Guard #1 Ground Guard #2 Ground Guard #3 Ground Guard #4 Mission Room #1 Mission Room #2 Mission Room #3 Mission Room #4 All Mission # 1 Data TS/JSF, S/JSF, Unclass, S/NF All Unclass Data All Mission #2 Data TS/JSF, S/JSF, Unclass, S/NF All S/NF Data 10

Getting to FCA Adopted Incremental FCA Approach DoD 5000 accepted practice Volume of Requirements conducive to incremental approach Identifies issues early FCA 1 (GSS/PTS) Apr 2015 FCA 2 (Config 5/6) Aug 2015 FCA 3 (System) Jan 2016 Less Effort FCA Final Rpts Outbriefs FCA: A Natural Progression Witnessing Mini Readiness Reviews (MRR) Procedure CDRLS Much Effort 11

Physical Qual Tests Testing was performed against multiple product configurations Gen 2: Flight Test Configuration Gen 3: Production Configuration Since TRR, over 10,000 hours of Physical Qual Testing EMI, 704, TEMPEST, Dynamics, Climatics Physical Qual Testing Complete & Reports Approved Ground: TEMPEST, EMI, ENV CCC, MRE, RGS, RRS, PTS Cfg 4: TEMPEST, EMI, ENV Cfg 5: TEMPEST, EMI, ENV Cfg 6: TEMPEST, EMI, ENV Variances Captured 12

Functional Qual Tests Testing was performed against multiple Software Baselines Lab FQT: Builds 16, 17, 18, 19, 20, 21, 26 Lab Regression FQT: Build 28 Lab Regression FQT: Build 33 Since TRR, over 10,000 hours of Functional Qual Testing Lab FQT Complete & Reports Approved Lab FQT Report Build 28 Regression FQT Report Build 33 Regression FQT Report Variances Captured 13

The Process Rockwell Collins Verification Requirements Traceability Matrix (VRTM) Requirement (Customer Requirements: Attachment 2-SPS v3 1 thru P41 Located under contract Docs>Attachements) RC SPS ID The HTDL shall detect the presence of SPSmessage errors in realtime. 1903 Verif Verif-686 GSS Network Control and RF Interface Verif-2708 HTDL Test Verif-2710 HTDL Analysis Associated L2s (Strikethrough indicates no Verif case in DOORS for L2) Artifact RC Pass / Fail Eglin Concurrence Comments L2-1328 The Ground Subsystem shall provide the capability to control and monitor all SR-DLTs, MR-DLTs, ER-DLTs, and Lab FQT Rpt 26 Pass HT-DLTs simultaneously that are defined as part of the (946-9164-001) 30-Jul-15 HTDL FQT Test Case 09-01 CRIIS system for a specific range. L2-1218 The MAC Participant Package shall detect the presence of received message errors in real-time. HTDL FQT Rpt L2-5016 The Ground Subsystem HTDL network shall detect (946-4267-001) Pass 30-Jul-15 HTDL FQT Test Case 09-01 the presence of message errors in real-time. L2-1218 The MAC Participant Package shall detect the presence of received message errors in real-time. L2-1826 The MAC Participant Package shall have an undetected erroneous message rate of less than one per 16 HTDL FQT Rpt million. (946-4267-001) Pass 30-Jul-15 HTDL FQT Figure 3-241 L2-4550 The Ground Subsystem HTDL shall have an undetected erroneous message rate of less than one per 16 million. CRIIS Program Office Artifacts Review Meet 2-3 times a Week w/ Ktr 14

Functional Configuration Audit Results Incremental FCA approach allowed for earliest possible flight testing FCA-1 28-29 Apr 2015 125 SPS Requirements accepted as complete after variances and actions closed FCA-2 on 26-27 Aug 2015 20 SPS Requirements accepted as complete after variances and actions closed FCA-3 on 27-28 Jan 2016 69 SPS Requirements accepted as complete after variances and actions closed 214 SPS REQTS APPROVED AS PRODUCT BASELINE 15

Flight Test Overall Summary 16

Flight Test Summary Flight Test and SIL Execution Summary 21 Total Flight Test Events F-15, F-16, F/A-18, L-29 and 4 Low Dynamic Aircraft CRIIS System Successfully Integrated into Pax River and Eglin Range Infrastructure SIL Completed for F-15, F-16, F/A-18, F-22 and F-35 Flight Test Results Summary All TSPI Performance Requirements Successfully Verified All Datalink Networking and Reliability Requirements Successfully Verified On-Aircraft MILS Demonstration Conducted Successfully Aircraft Interface Requirements Successfully Verified at SIL All Planned Flight Clearances Obtained and Airworthiness Data Completed 17

Eglin Flight Testing Aircraft CRIIS Equipment Objective Execution Date(s) Eglin 1-4 F-15 TMAC (Cfg5, Cfg6) Cfg4 x 2 TMAC TSPI Performance + Cfg4 TSPI Characterization N/A Eglin L29 L-29 TMAC (Cfg5, Cfg6) Cfg4 x 1 TMAC TSPI Performance + Cfg4 TSPI Characterization 10 Aug 04 Sep 2015 Eglin 5 F-16 Cfg4 x 2 Cfg4 TSPI Characterization 20 Oct 2015 MILS Demo F-15 Cfg4 x 1 MILS Demonstration 30 Sep 2015 Regression As Needed As Needed N/A No Regression Necessary Eglin Changes from Plan F-15 Unavailable and Replaced 4 F-15 Flights with 13 L-29 Flights for TSPI Verification Alternate F-15 Not Available due to Extensive Mod Required for TMAC Installation L-29 Evaluated Against Planned Flight Cards to Ensure Representative High Dynamic Performance No Regression Test Required 18

Eglin Flight Test (TSPI Verification) Maneuver # Two airborne systems on-board Scored against TSPI Truth Plate 13 test flights 197 total maneuvers KPP (0.5 meter Real Time horiztonal RMS) Real Time TSPI (positional & non-positional) Post Mission Processed TSPI 2-6 G turns 46 3-5 sec level inverted flight 31 Aileron rolls 28 Steep climbing or diving 24 Immelmann 14 2-4 G Figure-8 11 Cuban 8 10 Descending turns 10 Barrel rolls 9 Split S 8 High speed straight and level 6 Total 197 19

Patuxent River NAS Flight Tests Pax 1 Pax 2A Aircraft 1 Baron, 3 x King Air F-18 1 x King Air CRIIS Equipment Objective Execution Date(s) Cfg6 x 4 Multi-Hop, Datalink Routing & Message Reliability 16 July 2015 Cfg6 x 2 Datalink Distance & Message Reliability (2 RGS) 23 Sep 2015 Pax 2B 1 x King Air Cfg6 x 1 Datalink Distance & Message Reliability 9 Sep 2015 22 Sep 2015 16 Oct 2015 Pax 3A F-18 1 x King Air Cfg4 x 2 Cfg6 x 1 Datalink Distance & Message Reliability (1 RGS) 30 Oct 2015 Pax 3B 2 x King Air Cfg6 x 2 Datalink Distance & Message Reliability (1 RGS) 11 Sep 2015 Regression 1 x King Air Cfg6 x 1 Message Reliability Confidence Flight (1&2 RGS) 03 Feb 2016 Pax River Changes from Plan Pax 2 and Pax 3 Separated into Two Parts to Ease Aircraft Scheduling Issues Additional Confidence Flight Added for Message Reliability Added 20

Pax River Flight Test (Datalink Verification) 1 2a 2b Baron 100 nm KA 130 nm 50 nm 100 nm F/A-18 70 nm 130 nm KA 130 nm 100 nm KA KA Obj 1: Networking Obj 2: Range Obj 4: Multi-Hop KA Obj 2: Range Obj 5: Message Reliability ( ) Obj 1: Networking Obj 5: Message Reliability ( ) Obj 1: Networking (1, 2b, 3b) 3a 3b Obj 2: Range (1, 2a, 3a) Obj 3: Egress/Ingress (3b) 70 nm F/A-18 w Pods 50 nm KA 100 nm Obj 4: Multi-Hop (1) Obj 2: Range Obj 5: Message Reliability (2a, 2b, 3a, 3b) Meet with Build 33 software (2b Refly) Obj 5: Message Reliability ( ) KA Obj 1: Networking Obj 3: Egress/Ingress Obj 5: Message Reliability ( ) KA 21

Phased PCA Approach Phase I: GSS/PTS HW (16-18 Nov 2015) FCA-1 and FCA-2 Completed Prior to Event HW Only No HW changes to GSS/PTS Expected Phase II: C4/C5/C6 HW (20-21 Jan 2016) FCA-1, FCA-2 and Regression Testing Completed Prior to Event Identified 4 Potential Variances from FCA Phase III: System SW/Final HW (2-4 Feb 2016) FCA-1, FCA-2 and FCA-3 Completed Prior to Event 22

Results Reviewed 327 HW & SW Parts with No Critical Issues Found Minor Configuration and Documentation Updates Confirmed All Subsystems Consistent with Production Documentation Confirmed all Subsystems Functionally Equivalent with FCA Config Includes FCA Known Potential Variances Completed Audit of SW and HW for All Subsystems Changes to these Parts Requires CCB Verified SW Load Procedures for All Field Loadable CPINs Successful PCA! 23

CRIIS Upgrade/Integration Lot 1 Production Contract Awarded 20 May 2016 IDIQ - CRIIS software upgrade for advanced capabilities and to further mature integration with range infrastructure and aircraft bus messaging Initial Scope (Phase 1): 12 month effort to field CRIIS software upgrade Modify CRIIS software to enable aircraft/range message handling Datalink Power Switching for 5th Gen aircraft Follow-on efforts : F-15, F-16, F/A-18, F-22, F-35 integration verification 24

F-22-CRIIS Integration Configuration 5 (2-Box) Targeted for 5th-Gen Aircraft Pre-CRIIS RFP analysis ID d Air to Air Range Instrumentation (AARI) location Operational Reqts superseded the available space forcing instrumentation relocation (ARIP) Identified as the preferred location for CRIIS Two CRIIS Config 5 installed as is in select A/C CRIIS and F-22 Program MOA established to integrate onto F-22 F-22 ID d emerging ARDS obsolescence and spares issues ARIP 25

Summary CRIIS is next generation test range instrumentation system 5x data throughput 4-20x TSPI accuracy Legacy and 5th Gen platforms CRIIS completed successful EMD; production deliveries started Follow-on efforts ongoing to continue to grow capability 26