The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

Similar documents
The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

Gainesville City School System

Request for Qualifications

ARCHITECTURAL SERVICES COLLEGEWIDE

Request for Qualifications Construction Manager at Risk Contract

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Ricardo Flores Magón Academy New PK 8 School Architect/Engineer Services Request for Qualifications/Proposal

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

November 16, 2015 I. INTRODUCTION

Request for Qualifications for Assistive Technology Consultant Services

Wastewater Master Plan Request for Proposals May 20, 2014

Attention Design Firms

REQUEST FOR QUALIFICATIONS

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) DESIGN SERVICES FOR TOWN SPACE NEEDS AND FEASIBILITY STUDY FOR BELMONT TOWN FACILITY STRATEGY RFQ # MFP

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR QUALIFICATIONS for Vancouver Life Sciences Building Pre-Design/Programming Services

The District is looking for the architectural firm to provide the following (not listed in order of preference):

ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services

REQUEST FOR QUALIFICATIONS. Design Professional Services

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

REQUEST FOR PROPOSALS For Design Services for New Fire Station

Chabot-Las Positas Community College District

Introduction. Proposal Submission

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

Galesburg Public Library, Galesburg, IL

Request for Qualifications Construction Manager

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

Request for Qualifications

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama REQUEST FOR PROPOSALS RFP WEBSITE DEVELOPMENT AND REDESIGN

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

Request for Qualifications: Gulf State Park Lodge, Interpretive Center, and Learning Campus Operational Support February 13, 2016

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC

Washington County Public Works, Building Services

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

ARCHITECTURAL/ENGINEERING SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM

CAYUGA COUNTY, NEW YORK REQUEST FOR QUALIFICATIONS STERLING NATURE CENTER CONCEPTUAL DESIGN & DESIGN SERVICES. Issue Date: March 27, 2018

Chabot-Las Positas Community College District

SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3

REQUEST FOR PROPOSALS

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

REQUEST FOR PROPOSALS SELECTION OF EXECUTIVE SEARCH FIRM

San Mateo County Project Development Unit. Issued: August 4, 2017 Responses due: September 1, 2017 at 2:30 pm. Sam Lin, Manager

Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

A. PROJECT INFORMATION

REQUEST FOR QUALIFICATIONS

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: CMAR

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project

TOWN OF BRECKENRIDGE BLUE 52 TOWNHOMES HOA MANAGEMENT SERVICES REQUEST FOR PROPOSALS. Issued August 1, 2017

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

Architectural Services

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

January 19, To Whom It May Concern:

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

The University of North Carolina at Charlotte Facilities Management 9201 University City Blvd. Charlotte, N.C TEL: 704/

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

REQUEST FOR PROPOSALS

University of Washington. Request for Qualifications. Commissioning Services for. UW Bothell Phase 3 Project Number:

Knights Ferry Elementary School District

INFRASTRUCTURE FOR SPACEPORT DEVELOPMENT RFQ NO.: H27-SFDB TABLE OF CONTENTS PART 1 GENERAL INFORMATION GENERAL INFORMATION...

BASIN CITY WATER AND SEWER DISTRICT Request for Qualifications

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR:

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS ASU PROJECT DESIGN PROFESSIONAL DP (CMAR) 11976

REQUEST FOR PROPOSALS FOR ADMINISTRATION BUILDING REMODELING

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

Design/Builder Qualifications Supplement (DBQS) Instructions. GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg)

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

The City of Oxnard invites qualified consulting firms or individuals to submit qualifications for On-Call Permit Processing Services.

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

Request for Qualifications No. RFQ Pay Card for Payroll Services. for. Seattle Public Schools. Submittal Deadline: Date: April 6, 2018

The SoIN Tourism staff will supply editorial content and direction, as well as photographs to illustrate the content.

REQUEST FOR QUALIFICATIONS PROFESSIONAL ARCHITECTURAL SERVICES

Morgan Hill Unified School District

REQUEST FOR PROPOSALS

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS

Transcription:

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ) DESIGNER for Energy and Environmental Science Research Bldg. (Ellington) (Planning) SBC No. 540/001-04-2013 UT Institute of Agriculture August 21, 2018 The University of Tennessee (Owner) issues this RFQ to qualified Designers interested in providing architectural, engineering, and consulting services for the complete design, contract documents, and construction administration of the Energy and Environmental Science (Planning) project on the UT Institute of Agriculture campus. The Owner intends to enter into an agreement with a Designer that will deliver design services enabling construction of a facility having the highest possible quality within the available funding and the required schedule. Qualifications Statements in response to this RFQ shall be submitted in accordance with the requirements provided herein. Summary of Project and Required Designer Services The site for this new project is the current location of the Ellington Plant Science Building (1966) which will be demolished. The new building will house teaching laboratories, research/public service labs, offices, new classrooms, and a 500 seat-teaching and learning center with appropriate support facilities. Included will be a New Surge Building to accommodate adequate surge space. Also included will be renovation/expansion of existing other facilities to accommodate adequate surge space. For more information refer to the project program dated on July 20, 2018 and located at http://facilitiesplanning.tennessee.edu/requests_rfdqualifications.html. Designer services for this project will be divided into two phases. Phase 1 Surge Building will proceed through full planning or the Construction Document Phase of 71% of the total fee for full services until the total construction funding is approved. The design fee budget of $241,766 is established for these services which is based upon an MACC of $5,433,750. Phase 2 Main Building will proceed through partial planning or the Design Development Phase of 41% of the total fee for full services until the total construction funding in approved. The design fee budget of $1,404,568 is established for these services and based upon an MACC of $65,231,250. Entire project allocation is based on the State s approval amount for the Maximum Allowable Construction Cost (MACC) of $70,665,000. However, the Owner, with State Building Commission approval, at its sole discretion, may revise the MACC and corresponding designer s fee. All Designers must register with the Office of the State Architect to be able to enter into an agreement for this work. A Designer will be selected, approved, and retained under State Building Commission policy and standard Owner agreements and procedures as provided in the UT Designers Manual found through the following web link. http://facilitiesplanning.tennessee.edu/links_designersmanual.html 1

Qualifications Statement Submittal Deadline and Tentative Schedule Submittal Location: Qualifications Statements will be received at UT Office of Capital Projects. The schedule below is tentative. Any events scheduled prior to the submission deadline may be modified at any time with changes issued in an addendum. Events scheduled after the deadline may be modified without notice. Event Date Time** *Project Review Conference: at UTK Student Health Center, 1800 Volunteer Blvd., Room 206B, Knoxville, TN 37996 Deadline for Questions: emailed to RFQ Coordinator Final issuance of Addenda: posted to web site Submittal Deadline: Qualifications Statements will be received at UT Office of Capital Projects, 5723 Middlebrook Pike, Suite 201, Knoxville, TN 37996-0040. August 28, 2018 September 7, 2018 September 13, 2018 September 17, 2018 Proposal Review Period September 18 September 23, 2018 Target Date for Notification of Short-listed Designers for Interviews September 25, 2018 Target Date for Interviews October 8, 2018 Target Date to Award by the State Building Commission Executive Subcommittee Target time for Designer Agreement Signing and Negotiation Period October 22, 2018 October 22 November 5, 2018 10:30 a.m. *Attendance is not a prerequisite for submission of Qualifications Statement. **All times noted above are Eastern Time. Received by 5:00 pm Posted by 5:00 pm Received by 12:00 pm Qualification Statement Submittal Format Qualifications Statements shall be submitted as ten bound copies and a single digital file copy in.pdf format on a flash drive. The digital file should not exceed 20 MB and should be named using the following format: Designer Name UTK EESRB 2018-09-17.pdf. Submitted packages should be clearly marked as follows: Qualifications Statement Energy and Environmental Science Research Building (Planning) SBC No. 540/001-04-2013 Submitted By: <<Designer Name>> Contact: <<Contact Person Name, Address, Telephone Number>> 2

The Qualifications Statement shall be on standard 8 1/2" x 11" paper (landscape or portrait) only. It shall not exceed 50 pages including pages with photos (used as dividers or section headers or otherwise), charts, spreadsheets, and appendices. Binding covers, a one-page transmittal letter, and table of content pages may be provided in addition to the maximum of 50 pages. Pages or sheets with print on both sides will be counted as two pages. All pages must be numbered. Follow the information structure provided herein with clear identification of each information section. Request for RFQ Communications The Owner will convey all official communications and addenda pursuant to this RFQ to the interested parties from whom the RFQ Coordinator has received a Request for RFQ Communications in writing, by letter or by email, with the request clearly indicating the organization name and the name and title of a contact person with their telephone number and email address. The Request for RFQ Communications shall be made no later than the date of the Project Review Conference detailed herein. Such request creates no obligation and is not a prerequisite for submitting a Qualifications Statement. RFQ Communications Process Interested parties must direct all communications regarding this RFQ to the following RFQ Coordinator, who is the Owner s official point of contact for this RFQ. Rebecca Douglas, RFQ Coordinator Office of Capital Projects The University of Tennessee 5723 Middlebrook Pike, Suite 201 Knoxville, TN 37996-0040 Telephone: (865) 974-2628 Email: designer@tennessee.edu Only the Owner s official written responses and communications shall be considered binding with regard to this RFQ. Each Proposer shall assume the risk of the method of dispatching any communication to the Owner. The Owner assumes no responsibility for delays or delivery failures resulting from the method of dispatch. Postmarking of a communication or proposal shall not substitute for actual receipt of a communication by the Owner. The Owner may interview up to five selected Designers that have submitted responsive Qualifications Statements. Additional Information The Owner intends to utilize a Construction Manager/General Contractor (CM/GC) for the project construction delivery method in accordance with State policy and procedures. This procurement process is described at the following link: http://www.tn.gov/assets/entities/finance/osa/attachments/osa_plcy_deliverymethods.pdf. The Programming Consultant for the project, Lord Aeck Sargent, has waived rights to be awarded a contract for design and preparation of contract documents for the project but may be a part of the team to design and prepare contract documents for the project as a consultant to another firm. A consultant to Lord Aeck Sargent in their work as Programming Consultant may be awarded the contract for the design and preparation of contract documents for the project or may serve on the team as a consultant to another firm who is awarded the design and contract document preparation contract. 3

The use of Building Information Modeling Standards (BIM) are not required for this project, however if the designer on their own use BIM they will agree to do so according to the State s standards. These standards can be reviewed at the following link: https://www.tn.gov/content/tn/osa/capital---real-estate/capital-projects/bim-standards.html Additional Program Information Section 109 Conceptual Project Budget Budget Numbers as shown in the Program Document were provided to the Owner for budgetary review only. Disclosed SBC Budget is listed in the RFQ under Summary of Project and Required Designer Services. 4

Qualifications Statement Required Information and Scoring Designer Forms of Business Any form of business arrangement with consultants or joint venture partners may be proposed. However, the Owner requires that a single Designer contract with the Owner and serve as the primary contact, project leader, administrative manager and single source of responsibility, with any necessary business partners and consultants serving under that Designer s management. The Owner also prefers that this Designer have its principal place of business located in the State of Tennessee. A Qualifications Statement that is submitted by a Designer with supporting partners or as a joint venture will be evaluated on the combined experiences of the individual member firms as performed through the previous joint venture agreement. A. Designer Information (Pass/Fail scoring) A.1 Provide the Designer s name, address, website address, and number of years in business. A.2 Provide the name, e-mail address, mailing address and telephone number of the primary contact for the Designer. A.3 This project will be evaluated based on the Designer(s) providing Basic Services only including utilizing the services of various consultants as provided in B.3 of this RFQ. Provide a statement that confirms that the consultants listed are included in Basic Services and there are no consultants listed for which additional services are expected. This statement must be signed by a principal of the submitting firm. A.4 Provide a statement of whether the Designer, its consultants or any individual who shall perform work under this contract has a possible conflict of interest (e.g., employment by the State of Tennessee) and, if so, the nature of that conflict. B. Qualifications and Experience (Maximum Score: 80 Points) B.1 Describe the Designer s qualifications to deliver the services needed for this project in regard to the following. The form of business and the general credentials of the Designer. The proposed personnel experience in working together on projects. Identify up to five example projects which required the collaborative effort of the Designer and consultant s personnel, and their specific role in the projects. The firm s sustainable design capabilities including experience with State of Tennessee Sustainable Design Guidelines or The Tennessee High Performance Building Requirements, sustainable design credentials of personnel, and example sustainable design projects. B.2 Provide the following information on up to five of the Designer or consultant s projects that have been completed within the last ten years and are of similar type, scope, and complexity. Extent of services provided for each project. 5

A reference (by an Owner representative) for each project including contact name, address, telephone number, email address. The Owner may contact references as well as any other source available. Photographs for each project. Design and construction schedules Construction Cost and effected square footages Key project components to identify: Laboratories (similar to program requirements) o Flexible Laboratory Research Space o General Laboratory Space Classrooms / Lecture Halls (formal and informal) Collaboration Spaces Technology Integrated Spaces Example construction documents of each project may be requested if your firm is shortlisted. B.3 Provide the resumes of key Designer and consultant personnel who shall be assigned to this project and describe their proposed role and time commitment to this project for each stage of the Design and Construction process. Provide each individual s current position, years with the firm, education, licensing, professional credentials, and similar project experience. B.4 Provide a matrix showing the relationship between the projects (B.2) and the Designer and consultant s personnel (B.3). Show projects in columns and personnel in rows. B.5 Provide the Designer and consultant office location(s) that will be supporting this project with the distance in miles to the project site. If the Designer and consultants have multiple locations serving this project describe how personnel from each location are involved. C. Technical Services (Maximum Score: 20 Points) C.1 Describe how the Designer will approach and document various aspects of the project: program confirmation, planning, design, architectural and engineering, contract documents, specifications, graphics, accessibility, data/av services, building envelope, interiors, cost estimating, value engineering, sustainability, construction administration, etc. Describe how the Designer will adapt its approach to meet the requirements of the project. C.2 Provide an organizational chart for this project illustrating lines of authority and specific staff proposed. The chart and related explanations shall describe the responsibilities of the personnel (Designer and consultants) and the lines of communication. Clarity of responsibility and communication Completeness and inclusion of key personnel and design phase which they will be involved. List all personnel and roles as described in B.3. C.3 Provide a preliminary schedule for this project identifying the time appropriate for each phase/tasks for design and construction. Designers shall demonstrate their approach to 6

meeting the schedule. Provide examples of experience in enabling Owners to meet aggressive project completion schedules. Describe in detail how the schedule will be met. Show examples of experience. Total Maximum Score: 100 points 7