District Report. Dolakha 1-7 September 2017

Similar documents
Operations Manual Summary

Nepal Rural Housing Reconstruction Program. Program Overview and Operations Manual Summary

June 30, SDR 32.4 m, US$ 50 m SDR 14.3 m, US$ 22 m. US$ 26.3 m (53%) US$ 11.7 m (53%) US$ 38.0 m or SDR 27.3 m (58%)

Nepal Government Distribution of Earthquake Reconstruction Cash Grants for Private Houses

Recent Books from Nepal February 2014

RAP 3 Staff List Sr.No. Name of the staff District Designation

BUILD NEPAL: EARTHQUAKE ASSISTANCE PROGRAM

Earthquake Response Operation Update of February 2016

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio)

Disbursement of Block Grants

I. Introduction. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Building National Capacity in Emergency Preparedness and Response

SUPPORTING NEPAL FOR EARTHQUAKE RECOVERY

revitalizing Bungamati after the earthquake of 2015

A monthly Dialogue for Disaster Risk Reduction Policy and Practices On DRR and Response in WASH. (Flood Specific)

Model Village Project, Nepal

Panel Discussion How to Mitigate Natural Disasters through Science and Technology

[QUESTIONING THE EXISTENCE: COMMUNITY URBAN HEALTH CLINICS IN KATHMANDU]

Nepal: Business Models for Private Sector-led Mini-grid Energy Access Project Preparation Consultations October 8-18, 2017 and November 20, 2017

Sustainable Energy for All NEPAL

Supporting Nepal to Build Back Better

P (TF and TF ) Rekompak. George Soraya

Terms of Reference for End of Project Evaluation ADA and PHASE Nepal August 2018

Disaster Preparedness Network Nepal

CSOs. Grants for. in Nepal. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

EVALUATION OF SOCIAL VULNERABILITY QUESTIONNAIRE

Proceedings of WINDOW 2 PROPOSAL WORKSHOP

COMPLAINTS IN LONG-TERM CARE HOMES

FIJI RECONSTRUCTION BUILD SEPTEMBER 2017, FIJI

YOU MUST HAVE ALL ITEMS LISTED BELOW:

Okhaldhunga Community Hospital

International Journal of Academic Research ISSN: : Vol.2, Issue-4(5), October-December, 2015 Impact Factor : 1.855

Odisha Disaster Risk Reduction Strategy. Meghanad Behera

Disaster Relief Response July 3, 2015

Health & Safety Policy

Training Facilitation and Management Guideline, 2073

Post-earthquake health-service support, Nepal

2013 Housing Colorado Design By Community Charrettes and Workshop for Affordable Housing

Nepal Humanitarian Situation and ACF response update n 3, May 28, 2015

Congratulations on the completion of your project that was supported by The Rufford Small Grants Foundation.

Emergency appeal operation update Nepal: Earthquake recovery


PROCEDURE. Ref. to Legislative Frameworks: HESF2015: Standard 2.1 / 2.3 / 3.3. Work Health and Safety (WHS) SRTO2015: Standard 1.3 / 7.4 / 8.5 / 8.

Instructions for the Incident/Accident Investigation Form

City of Mason 201 West Ash Street Mason, Michigan 48854

Project Report. July December Enhancing Community Health in Nepal

MANUAL HANDLING GUIDANCE

Overview of RMF Programs in Nepal

PTC Nepal Brief overview Details of courses conducted from Year 2004

GRANT AGREEMENT (Special Operations) (Strengthening Public Management Program) between NEPAL. and ASIAN DEVELOPMENT BANK DATED 27 DECEMBER 2012

3 rd Nepal Emergency Medicine International Conference NEMIC th Day

KOSHI RIVER BASIN MANAGEMENT

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009

PREPARATORY WORKSHOP FOR MIDWIFERY EDUCATION

West Virginia CDBG DR Action Plan COMMUNITY BRIEFING APRIL 4, 2017 & APRIL 5, 2017

Chartered Institute of Environmental Health (CIEH) Training Course Outlines

Health, Safety and Environment Management System

Drill of the Dead: Using Zombie Scenarios to Train Community Partners

Health & Safety Management. Course Brochure

CC1 - COMMUNITY CHEST APPLICATION FORM

Rapid Hospital Needs Assessment Report Mega-earthquake in Nepal

Pre-Event Site Visit Report. [LLF Event/Programme Title] [LLF Event Reference]

Mary Martin Booksellers Pte Ltd Nepal May

PETERBOROUGH SAFEGUARDING ADULTS BOARD (PSAB) MULTI-AGENCY TRAINING STRATEGY

Monitoring and Evaluation Form for Non Governmental Organizations

Appendix 2 LIVERPOOL STATEMENT OF COMMUNITY INVOLVEMENT

NORS TRAINING: PART III Verification, Disposition and Closing Cases

NEPAL EARTHQUAKE RESPONSE PROGRAM oxfam, dhading. progress presentation

Job Description Clinical Lead Nurse

Event security planning guidelines

Shelter Activation Tool Kit

Emergency appeal operations update Mozambique: Floods

Application for POOLING OF CONTRACTORS FOR VARIOUS CATEGORIES OF WORKS IN IIMK

Post : Cleaner. St. Mary s Primary School, Draperstown. Candidate Information Pack

POSITION DESCRIPTION. Position title: CSSD Supervisor Workflow processes

NABH-AYUSH-PA PRE-ASSESSMENT GUIDELINES AND FORMS. Issue No. 1 Issue Date: 01/ 10 Page 1 of 9

City of Edinburgh Council

Facade Grant Program Information

Rural Innovation Fund FAQS

Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0

Laboratory Safety Coordinator Meeting. Fall 2011

pennsylvania DEPARTMENT OF AGING Know Your Rights as a Nursing Home Resident Long-Term Care Ombudsman Program

HSE LEVEL 1: Introductory Occupational Safety and Health. Course Brochure

Disaster Risk Management in Health Sector: Experiences of Nepal

Shelter Cluster FIJI Meeting Minutes

City State Zip Code. Sponsorship Opportunities

Results-based Financing (RBF) Sub-Saharan Africa Grid Densification Challenge Fund. Call for Proposals

AFRICAN DEVELOPMENT BANK

Global Health V O L U M E I I I, I S S U E I I

Health and Safety Roles, Responsibilities and Organisation

Fundraising Opportunities in Your Community

PMA Business Continuity Plan

Theo Health Clinic Sangachok. Construction Completion Report

Nepal National and District Nutrition Capacity Assessment

Sheds Grant Fund Grant Guidelines for all Applicants 2018

Occupational Health and Safety Policy

Renewable Energy Subsidy Delivery Mechanism, 2013

HELAMBU EDUCATION AND LIVELIHOOD PARTNERSHIP (HELP)

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

COMPOSITION OF THE WORKING GROUP AND TECHNICAL TEAM

Transcription:

Activity Summary District Report Dolakha 1-7 September 2017 HRRP Coordination of Bilateral Meeting: A bilateral Meeting was coordinated between DLPIU- MoUD and Nepal Redcross Society in DLPIU- MoUD Office on Sep 1, 2017 (2074/05/16 B.S.) as per the request from DLPIU- MoUD chief Mr. Yek Raj Adhikari. HRRP coordinated for Bilateral Meeting. The with Nepal Red Cross Society and DLPIU on 1 st Sep 2017. The meeting minute is linked here (Nepali Version). A debriefing meeting was conducted with NRA Dolakha on 5 Sep. 2017 after Field Visit in Tamakoshi Rural Municipality where the field observations, the meeting minutes and the challenges were shared. A briefing pack was distributed to NRA and DCC. The briefing pack included the inspection maps provided from National HRRP and data provided by DCC of Dolakha. Partner Organizations A 5 days social mobilization training was conducted by NSET in Simpani, Dolakha. 30 participants from different partner organization participated in the training. Upcoming Events & Meetings HRRP An Orientation program on Confined Masonry, Dry Stone Masonry and Timber Treatment process for all the DLPIU Engineers working in Dolakha in Reconstruction. The date and venue will be fixed soon. Partner Organizations A program marking the Day against Corruption Commitment for Corruption Free Dolakha, Commitment Program NGO Federation in support from HURADEC Nepal, INSEC and ECARDS Dolakha is going to happen on 8 Sep, 2017 at Hotel Subhechyya from 7:45 am onwords. 7 September 2017 Page 1 of 6

Field Visit Report 7 September 2017 Page 2 of 6

Objective 1. Field Visit (Tamakoshi Rural Municipality- Sep 04, 2017) Reconstruction Observation: HRRP Team travelled to Tamakoshi Rural Municipality and visited the Rural Municipality s Ward 3, (previously Japhe VDC 2), Barabesi to observe the reconstruction process and interact with local community about the reconstruction on Sep 04, 2017. Meeting with Tamakoshi Rural Municipality representatives: Meeting was chaired by chairperson of Tamakoshi Rural Municipality, Ishwor Chandra Pokharel. Urmila Khadka KC (Vice-Chair of Tamakoshi Rural Municipality), Maheshwor Kafle (Ward 1 Chairperson), Harka Bahadur Yonjan (Ward 2 Chairperson), Ram Prasad Kafle (Ward 3 Chairperson), Hom Bahadur Shrestha ( Ward 4 Chairperson), Rajkumar Rokaya (Ward 5 Chairperson), Jhanak Bahadur Fuyal Khatri (Ward 6 Chairperson), Lekh Bahadur Sunuwar (Ward 7 Chairperson), Nisha Fuyal (Member), Mina Shiwakoti (Member), Minu Nepali (Member), Hira Devi Sunuwar (Member), Premika Nepali (Member), Ramesh Bahadur Sunuwar (Member), Dipesh Kattel (Member Secretary), Janak Raj Joshi DLPIU- MoUD M & E, Paban Raj Devkota DLPIU- MoFALD M & E Expert, Pralhad Karki (HRRP District Coordinator), Ravi Pajiyar (HRRP Information Officer), Ram Chandra Gautam ( DLPIU- Engineer) and Milan Shrestha (NSET Engineer) participated in the meeting. The Meeting Note in Nepal is linked here (Nepali Version). Following Activities were done during the meetings: 1. Introduction and Interaction with Gaupalika (Rural Municipality) Representatives 2. Distribution of briefing Pack and Presenting the reconstruction status During the meeting, the maps of Dolakha with respect to Damage, Tranche Status in Dolakha and Tamakoshi Rural Municipality, Information on Partner Organisations with respect to their Planned Programs and Completed Programs. A copy of Correction and Exception Manual for Masonary Wall was provided along with the briefing pack. The briefing Pack consist of To Whom it may concern Letter, its objectives and updated maps. Field Interviews of Locals Bakhan Singh Moktan, permanent resident of Japhe 2, Barabesi is a trained mason who has received 7 days Mason Training before 18 months ago. After the training, he has not been called by anyone for the house construction. He says, I am not a pro artisan and the artisan refuses me to be their colleague. Pro Artisans use their relatives and sons for the construction. Even house owner don t call me. I have been trained and I know the components for making the house safer. I know the joints and strengthening system however I am not able to use the knowledge and skills. We also found lacking in his technical knowledge which he may have forgotten. This was a new challenge for reconstruction where we are just focused in training and developing new masons only. The need of refresher trainings for already trained masons was reflected from this experience. Meanwhile, developing more masons are not the mere solution, there should be some solution for using the people like Bakhan who is unemployed. 2. Field Visit (Melung Rural Municipality- Sep 07, 2017) Reconstruction Observation: NRA Information Officer and HRRP travelled to Melung Rural Municipality. The field visit was to observe the reconstruction process and interact with local community about the reconstruction. Date Location Participants 04-09-2017 Tamakoshi Rural Municipality Paban Raj Devkota, Janak Raj Joshi (M & E Experts from MoFALD and MoUD resp.), Pralhad Karki, Ravi Pajiyar, Ram Chandra Gautam (DLPIU Engineer), Milan Shrestha (Engineer from NSET) 7 September 2017 Page 3 of 6

07-09-2017 Melung Rural Municipality Uttam Dhungel (NRA Engineer and Information Officer), Pralhad Karki [Meeting with Tamakoshi Gaupalika Representatives] Challenges and issues identified During Tamakoshi Rural Municipality Visit, the vulnerable people have been left out, the grievances were not resolves, the people are compelled to live in unsafe shelter, some people are even missed in re-survey and verification, the tranche process has been delayed because of which people are getting many troubles and the technical person deployed by DLPIU are still not staying within their deployed area. During Melung Rural Municipality Visit, many houses were found to be corrected. Challenges/issues Absence of Technical Persons More advocacy to Community People about the reconstruction Remarks Way forward Action Responsible Timeframe Sharing of information of absence of Technical Person with NRA Chief Sharing of missing of households in re-survey and verification with NRA Chief Pralhad 05 Sep 2017 Pralhad 05 Sep 2017 7 September 2017 Page 4 of 6

Housing Typology Report [Tamakoshi Ga Pa Japhe 3] [RCC] It has been recommended for 3 tranche [Tamakoshi Ga Pa Japhe 3] [Stone Masonry in Cement Mortar Rigid Floor] [Not received 2 tranche because of cement block partition] [Melung Ga Pa Sitali] [Stone Masonry] [Not received 3 tranche because of no partition wall] [Melung Ga Pa ] [Mixed Structre] [] Questions Collected Key Questions details During the visit and meeting the following questions were asked: S. No. Question Asked by Response provided 1 What are the criteria for eligibility for government grant? Tamakoshi Ga Pa Chairperson According to the damage grades as per Nepal government 7 September 2017 Page 5 of 6

Challenges & Way Forward Challenges Community Orientation for Reconstruction Way Forward Sharing of information with NRA 7 September 2017 Page 6 of 6