Balancing pilot projects update. April 2016

Similar documents
Cooperation between the Nordic and the Baltic power systems in Electricity Balancing

CWE FB MC project. PENTA SG1, April 8 th 2013, Brussels

Publishing date: 29/05/2015. We appreciate your feedback. Share this document

Joint European Stakeholder Group. Tuesday 21 November 2017 Meeting 25 London

BritNed: Enabling Market Integration

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels

Current and future challenges of TSOs in the European Market design. Dr. Oliver John 27 September 2016

CWE Flow-Based Market Coupling: on the Eve of Implementation. Pieter Schavemaker and Philippe Noury

Explanatory document for the Nordic synchronous area proposal for coordination actions aiming to reduce FRCE as defined in Article 152(14) and

CWE MC Go-Live Forum. Düsseldorf June 8th

Status WG European Market Design. Users Group 20 March 2014

CWE Flow-based Market Coupling Project

Methodology for capacity calculation for ID timeframe

Flow-Based Market Coupling First lessons

POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY

Nordic TSO Perspective on the future of the Nordic Electricity Market

Context paper CWE Intraday

Implementation of day-ahead (DA) market coupling in the North-Western Europe (NWE) region summary memo

CWE Flow-based Market Coupling Project. at EMART Energy 2012

Joint European Stakeholder Group. Monday 12 February 2018 Meeting 29 WebEx

Casc Publication Handbook

Joint European Standing Group Meeting 31

Position Paper of CWE NRAs on Flow- Based Market Coupling

Nordic FB Stakeholder Forum

Joint European Standing Group Meeting 32

CWE Enhanced FB. Report presentation. March 22 nd, 2011

Leading coordination For enhanced reliability of supply.

Publishing date: 04/02/2014 Document title: We appreciate your feedback. Share this document

Documentation of the CWE FB MC solution as basis for the formal approval-request (Brussels, 9 th May 2014)

Integrating mental health into primary health care across Europe

NWE Day-Ahead Market Coupling Project. 2 nd Progress Report

Envisaged national contribution to the attainment of the commitments

investment expenditure on defence equipment, and regularly review these objectives, in the light of the security environment and of the

An action plan to boost research and innovation

CWE Flow-Based Market Coupling Forum. 23 rd of June 2014 in Düsseldorf

ACER s functions and responsibilities in the European Union

Developing an Incremental Proposal for EU gas transmission. Draft Project Plan

Early Access Programs (EAPs)

1st Workshop Federal Grid Code

COST. European Cooperation in Science and Technology. Introduction to the COST Framework Programme

ManpowerGroup Employment Outlook Survey Global

Lifelong Learning Programme

Modification Proposal BSCP40/03

quarter 2018 results.

ACER Agency for the Cooperation of Energy Regulators Trg republike LJUBLJANA SLOWENIEN Mail:

Contribution by Mr. Bruno Wenn, Senior Vice President of KfW Development Bank

Advisory Workshop on AHRB Centre Anchor Project on Implementing the E-Commerce Directive Ways Forward Edinburgh, December 17 th am 3pm

Manpower Employment Outlook Survey

SUSPRISE. Towards the sustainable enterprise. Berlin workshop October Laurens Meijering SenterNovem Co-ordinator SUSPRISE

Health Statistics in Estonia. Health Statistics Department

ESF Member Organisation Fora on. European Alliance for Research Career Development

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

Darstellung der TEN-E Verordnung und der Connecting Europe Facility

PATIENT SAFETY AND QUALITY OF CARE

RISK DASHBOARD Q (DATA AS OF Q4 2013)

What would you do, if you inherit ?

capital markets day 2017 london. human forward.

ManpowerGroup Employment Outlook Survey Global

ManpowerGroup Employment Outlook Survey Global

FOR EUPA USE ONLY ERASMUS+ PROGRAMME EN

Skillsnet workshop. "Job vacancy Statistics"

Report on the Pilot Survey on Obtaining Occupational Exposure Data in Interventional Cardiology

3 rd quarter results 2009

Online Consultation on the Future of the Erasmus Mundus Programme. Summary of Results

AGENCY WORK BUSINESS INDICATOR: FEBRUARY 2016

Swiss interim solution for Erasmus+ SEMP: Swiss-European mobility programme

July Assessment Report on PES capacity

AGENCY WORK BUSINESS INDICATOR: DECEMBER 2016 EVOLUTION OF NUMBER OF HOURS WORKED BY AGENCY WORKERS IN EUROPE. Oct Oct 2016

AGENCY WORK BUSINESS INDICATOR: NOVEMBER 2016 EVOLUTION OF NUMBER OF HOURS WORKED BY AGENCY WORKERS IN EUROPE. Sept 2016.

ManpowerGroup Employment Outlook Survey India

The European Research Area and the National Perspective: Horizon 2020 and Beyond

March Annual Results NextRadioTV Group

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

SNSF Funding Opportunities Complementary to SPHN. Ayşim Yılmaz, 29 June 2017

OPEN. for your business

ICD to AIS for Road injuries Current practices & problems Discussion on possible solutions

The EU ICT Sector and its R&D Performance. Digital Economy and Society Index Report 2018 The EU ICT sector and its R&D performance

A new Youth Guarantee for Europe: Roadmap for Member States

Chapter One. Globalization

Chances and challenges of digitalisation in rural areas (CORA project)

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

ManpowerGroup Employment Outlook Survey Hong Kong

BUILDING MULTINATIONAL MEDICAL CAPABILITIES: THE EUROPEAN DEFENCE AGENCY EXPERIENCE

Annual results: Net income from ordinary operations increased by 21%

ENRD LEADER Cooperation Practitioner-Led Working Group Proposals and summary < April 2017 >

EIT Health. Innovation for Better Longer Lives. EWI-Focus 20: Vlaanderen in de Knowledge and Innovation Communities (KIC s) (17-June-2015)

RISK DASHBOARD Q (DATA AS OF Q2 2014)

Valorisation of Academic R&D: The INTERVALUE Platform

Digital Wealth Management and Investment Industry Trends and Regulatory Approaches across the APAC to fund distribution and digital advisory services

Stefan Zeugner European Commission

Introduction & background. 1 - About you. Case Id: b2c1b7a1-2df be39-c2d51c11d387. Consultation document

Manpower Employment Outlook Survey

About London Economics. Authors

Interim Report. First quarter 2017, BioPorto Group. May 4, 2017 Announcement no. 09. BioPorto A/S CVR DK

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

Payment innovations in healthcare and how they affect hospitals and physicians

Consultation: Transformation Health and Care in the Digital Single

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

Social Welfare Report / 2014*

Guidelines on developing TYNDPs Stakeholders Workshop

Transcription:

Balancing pilot projects update April 2016

12 April 2016 Page 1 Click Contributions to edit and geographic Master extension title style of Pilot Projects Increase of social welfare and market liquidity Pilot projects in operation are demonstrating that XB balancing is increasing social welfare and is giving more flexibility for TSOs (especially needed with increasing RES penetration). Challenge to keep local adequate incentives for BRPs in a cross border balancing market with marginal pricing. Geographical extension Several pilot projects have increased the number of participating TSOs / geographic scope because TSOs see benefits in wider cooperation: Pilot 1: feasibility studies for cooperation with PP 5 and 7, afrr cooperation with Austria scheduled to go live in Q2/2016 There has been no merger between the EXPLORE study and pilot GCC/pilot project 1. Pilot 2: extension towards German, Austrian, Dutch and Swiss TSOs went live on April 7 th ; Preparations for joining of Elia (Belgium) on 01.08.2016 and RTE (France) in 2017 are ongoing. Pilot 4: Consultation period towards stakeholders of design document finished. Pilot 5: feasibility studies with Baltics, Poland and pilot 1 Pilot 7: currently Project on hold (in parallel, Explore study going on) Pilot 9: MLA signed, RTE joined IGCC (begin of operation since February 22nd) Pilot projects are actively contributing to the early implementation of NC EB and extend in geographical size. Harmonization increases among more TSOs

Click Current to Pilot edit Projects Master title style

4 June 2015 Page 3 Click to edit Master title style Pilot projects and current proposal of manual products P-DA/SCH-15-15/30 (mfrr) P-DA-10-10/25 (mfrr) P-DA-5-5/15 (mfrr) P-Sch-30-15 (RR) FAT 15 10 5 30 Min delivery 15* 10 5 15 Max delivery 30* 25 20 15 / 60 Temporal divisibility yes yes yes No Links (temporal) No No No Yes Activation method Continuous process/clearing Continuous process Continuous process clearing Pilot projects Pilot 5 (DA) and Pilot 1 (SCH) Pilot 5 Pilot 5 Pilot 4 (*) Min and Max delivery still under discussion

Additional updated info from pilot projects April 2016

12 April 2016 Page 5 Click Pilot 4 to TERRE edit (i) Master title style Key Learnings TSOs are willing to cooperate and harmonize knowing the challenges derived from increasing the number of involved TSO s. These challenges can be either technical (e.g. DC link between FR-GB) or market oriented. Despite the fact that there are many TSOs involved in TERRE with different local market designs, the parties set up a design solution on which these TSOs all agree. Interaction of RR process with Intraday market: TSOs are requesting the harmonization of ID markets (GCT and resolution). The interaction with XBID project is important and the definition of the ID GCT could has an important impacts on the TERRE process. Challenging project: Target of setting up of an implicit XB balancing solution/market Expected timescales

4 June 2015 Page 6 Click Pilot 4 to TERRE edit (ii) 2016 Master title style Achievements Finalizing of the design phase: The algorithmic optimization was tested The optimization mix a netting of need and activation of offer The CMO will allow elasticity at TSOs need Regarding settlement issues: it is envisaged the application of marginal price and the treatment of congestion rents Consultation phase was closed on the 01 st of April The NRA approval package will be submitted by the TSOs during May Modular IT solution The simulation on balancing market for 2013 highlighted a potential benefit for BRP of 150M per year

Click Road map to pilot edit 4 2016 Master title style 4 June 2015 Page 7

Click to edit Master title style Re-focus of Pilot Project 5 In Dec. 2015 the Pilot project 5 decided to refocus the Project, focus is now on: Drafting a dedicated mfrr CoBA agreement between DK, FI, NO and SE, and ensuring equal treatment of connections to and from all external Nordic borders Towards Germany, focus is on developing CoBA-CoBA exchange models. At present the markets are still quite different. Marginal pricing/pay-as-bid, 15 min Vs 60 min imbalance settlement period and very different views on imbalance price calculation. Towards Baltic, focus is on developing CoBA-CoBA exchange models as a first step, and merging of Nordic and Baltic CoBA as a possible next step Towards Poland, No ongoing actions Page 8

Click to edit Master title style Standard mfrr products used in the Nordic P-DA-15-15/30 (mfrr) P-DA-10-10/25 (mfrr) P-DA-5-5/20 (mfrr) FAT 15 10 5 Min delivery 15** 10** 5** Max delivery 30** 25** 20** Ramps (financial settlement) 7.5 min* 5 min* 2.5* Typically fraction used compared to all mfrr activations 10% 45% 45% FAT = Full Activation Time The Nordic primarily uses mfrr for balancing, and hence fast manual products are needed. 90% of the mfrr needs are today covered by products with a FAT of 5-10 minutes. All products are however on the same Nordic CMOL, where the only requirement today is a FAT of 15 min. The fact is however that most of the bids (Hydro) are much faster than 15 min. Hence the Nordic will use both 15,10 and 5 minutes FAT products. When Nordic market for afrr is established, the need of 5-10 minutes products might decrease. Page 9

Click to edit Master title style Welfare and feasibility Estimations indicate a large welfare gain from having a Nordic CMOL today Feasibility studies indicate a clear potential for increased gain from integrating Nordics with other countries, but there are still large uncertainties related to size of gain, that has to be compared to the implementation cost. Main barriers to integration: Nordic DE: Large differences in market design and balancing methodology, hence focus is on CoBA- CoBA exchange as a first step #. Nordic-Baltic: Foundations of Baltic market for mfrr needs to be developed first see roadmap Nordic-Poland: Central vs self dispatch Need to convert Polish bids to enable trade Increased complexity in Nordic operation. IT systems needed to manage coordination with other control areas. It cost and implementation time should not be underestimated. #60 min ISP Vs 15 mis ISP A BSP in a 15 min ISP area, can easily submit a bid to a 60 min ISP area, but a BSP in a 60 min ISP area will not be able to provide a bid to a 15 min ISP area. Hence the ISP has to be harmonised in order be in the same CoBA. The TSO s in the 60 min ISP area, will not know what the BSP has been supplying on a 15 min interval. Page 10

Click to edit Master title style Roadmap towards Baltic CoBA Development of a dedicated Baltic CoBA is ongoing. Learnings from the Nordic design are being provided directly to the Baltic TSO s CoBA-CoBA exchange models are being developed Page 11

Click to edit Master title style Learning on Governance The market governance of the common Nordic Balance Market is taken care by a Market Steering Group (MSG), that consist of one market director per TSO. This group has no direct reference to any Entso-e group, by corporate with RGN. There is however quite some overlap with MC members, and hence market implementation can be ensured this way. MSG refers directly to the Nordic CEO s, who meets 2-4 times per year. Regulatory approval: there is need for finding new solutions for cooperation with NRA s when we go from bilateral to multilateral agreement and also how to involve market participations. Currently very different national processes (also in the Nordic) are in place and more common process is needed Governance: with GL EB some Nordic operational agreements will change into market agreements and this will also change the governance from operational to market governance structures. At present there is no regional Entso-e Market Governance Structure, Do we need such a regional ENTSO-e structure for say CoBA governance? In the Nordic governance is ensured via the Nordic MSG Page 12

12 April 2016 Page 13 Click Pilot 8 RR to on edit BritNed Master (currently on title hold) style Key Learnings The current different market models used in GB and the Netherlands make the exchange of cross border energy very difficult Proactive balancing in GB vs Reactive balancing in NL The main barrier is that GB is more likely to use an RR service as it provides the system operator with greater balancing tools. NL is very unlikely to ever use RR as they very rarely use products of this type. It may not be possible to fully develop replacement reserves between the two countries. Potential to combine Pilot 8 with Pilot 4, but significant differences in market design exist between GB and CE.

12 April 2016 Page 14 Click Pilot 8: some to questions edit Master and answers title (i) style Why would further clarification from NCEB be decisive for pilot project 8? Requirements in NCEB may restrict the number of CoBAs that a TSO can join. If GB is prevented from joining different CoBAs for different products, then it is severely limited in its ability to develop other services with different TSOs, which is not truly in the spirit of cooperation and coordination. (e.g. by joining TERRE, why should GB be prevented from joining a FRR pilot project with different TSOs to TERRE if it is technically and commercially possible to do so?) Why not consider mfrr? Possibility to merge pilot 8 with pilot 7 regarding mfrr? NGET and TenneT have met to discuss the possibility of establishing a mfrr service over BritNed, both sides agree it would be beneficial for NGET to meet with TenneT and Elia to establish if it might be possible for NGET to join BPP7.

12 April 2016 Page 15 Click What incompatibilities to edit Master need to be harmonized title style to enable cooperation between proactive and reactive systems? NGET manages its system proactively, and so uses RR products in timescales further ahead than 15 minutes to balance its system according to forecasts. TenneT does not do this, and so does not need/use RR services. TenneT s approach is to enable BRPs to maintain the balance of its portfolio in real time: TenneT reacts only to any residual imbalance in its control area. In separate discussions it has been established that there are similarities in the FRR products that both TSOs use. There is also a desire to make the current frequency response services under trial in GB over BritNed available to Continental Europe as well. An Ad Hoc Frequency Coupling WG has been set up. The differences between proactive and reactive system management techniques by the TSOs are the most significant barrier to developing a RR service. However, the similarities in the use of FRR products by the TSOs could offer an opportunity for the development of SO-SO services. NGET and TenneT are in discussion to establish if it is commercially and technically possible to do so, firstly on a bilateral basis, but with a long term view to integrating with other TSOs if possible. Any service requires the involvement of BritNed, which will expect payment for their services. The involvement of merchant interconnectors in the balancing process needs to be further developed in the NCEB.

Click to edit Master title style Pilot 9 IGCC: Achievements The IGCC Multilateral Agreement (MLA) has been signed in January 2016. Clear governance rules and decision making process Flexible contract that can be adapted Quick guide on how TSOs can become IGCC members has been created. RTE has joined the IGCC on February 22 nd, 2016. Experience with new accession process New settlement method is applied since February 2016 Page 16

Click to edit Master title style Pilot 9 IGCC: Key Learnings Imbalance netting can be easily implemented even if the participating TSOs do not have same national legal and balancing frameworks. (8 countries = 8 different legal and balancing frameworks) There is no need for a standard product (no need to harmonize technical preconditions for BSPs) and for any kind of a contract with BSPs. Based on the MLA experience to combine multiple legal frameworks, to set a common framework for cooperation, to agree on a governance structure and on a decision making process takes some time (2,5 Y) even if it is only TSO-TSO cooperation. Establishing well-functioning governance bodies with the right experts is essential for the cooperation. All participants must be highly involved and want to cooperate, otherwise, further development is impossible (bottom-up approach). Opportunity pricing scheme is quite flexible solution. However, without harmonization of national market designs some TSOs can have different monetary benefits than the others. Even though, the cooperation still brings significant benefits to all. Page 17

Click to edit Master title style Pilot 9 IGCC: Further Development Questions Envisaged steps and barriers to constitute future IN CoBA? Steps All TSOs are invited to contact IGCC for information and to start the process to join IGCC. The IGCC, and its IGCC MLA, is endorsed to be used and to facilitate the IN CoBA. IGCC MLA contains the processes to adapt if needed and to accommodate connection of further TSOs. Barriers The technical implementation needs enough time (national implementation). National legal and regulatory changes could take time. Agreement on settlement needs time, especially as long as the afrr markets are not harmonized. Ongoing development Further development is planned in flow-based congestion management; in settlement in order to ensure more robust benefit distribution; and in a document sharing the IGCC principles. Page 18

Click to edit Master title style Pilot 9 IGCC: Social Welfare and Market Liquidity Aggregated value of monthly netted imbalances (long and short) Aggregated amount of netted imbalances 270 mil. 210 180 150 120 90 60 30 AT BE CZ CH NL DK DE 0 2012 2013 2014 2015 Time Page 19

12 April 2016 Page 20 Click Pilot 3 e-gcc to edit Master title style Key Learnings Experiences gained from TSO-TSO real-time cooperation and settlement. Multilateral agreement, as this is the basic document for the cooperation. It contains the operational rules, settlement rules, liability rules and define boundaries of the cooperation in general. Achievements Important savings of afrr activation and appropriate good experience running egcc Imbalance settlement scheme