MALAWI P IRRIGATION, RURAL LIVELIHOODS & AGRICULTURAL DEVELOPMENT PROJECT (IRLADP) Revised Procurement Plan for 9 months

Similar documents
GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD

KENYA NATURAL RESOURCE MANAGEMENT PROJECT - WORLD BANK FUNDED PROCUREMENT PLANS (MAY 1st JUNE 30 TH 2010) - WORKS CONTRACTS.

Procurement Plan Enhancing Quality of Financial Reporting (EQ-FINREP) Grant No:

PROCUREMENT PLAN. b) Project Name: Market-led Smallholder Development in the Zambezi Valley Project

2) Rivers State Works Goods Consultancy

GHA/WATTFP/G01/ , NCB Post Prior Plan 22 Feb Mar Jun 2010 Actual 30 Jun Aug 2010

Procurement Plan. Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) and (Non-

Ayeyarwady Integrated River Basin Management Project (AIRBM) Procurement

Procurement Plan. Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) and (Non-

Lao PDR: Trade Development Facility Project Procurement Plan (April 2012 March 2013)

GOVERNMENT OF INDONESIA SCHOLARSHIP PROGRAM FOR STRENGTHENING REFORMING INSTITUTIONS (SPIRIT) PROCUREMENT PLAN

PROCUREMENT PLAN N/A. Date of First Procurement Plan: 31 May 2017 Date of this Procurement Plan: 3 September 2018, Version 2

Project Name: Land Titling Project II. ANNUAL PROCUREMENT PLAN FOR PROJECT YEAR V Covering the Period from October to September 2008

GOVERNMENT OF INDONESIA SCHOLARSHIP PROGRAM FOR STRENGTHENING REFORMING INSTITUTIONS (SPIRIT) PROCUREMENT PLAN

Egypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014

National Electrification Project (P152936) Detailed Procurement Plan

PROCUREMENT PLAN KETSANA EMERGENCY RECONSTRUCTION AND REHABILITATION PROJECT (ERRP) COVERING PROJECT PERIOD: THREE YEARS April-01,2011

Andhra Pradesh Rural Water Supply and Sanitation (APRWSS) Project

Goods and Equipment List Item Narosec BuginyaNARL ABI Bulindi KAZARDNASARIMbararaNAFORI Ngetta Nabuin NaCRRI

PROCUREMENT PLAN. A. Methods, Thresholds, Review and 18-Month Procurement Plan. 1. Procurement and Consulting Methods and Thresholds

PROCUREMENT PLAN. Energy Efficiency Measures and Solar Photovoltaic Plant Project Executing Agency:

Thresholds for Procurement Methods and Bank s Prior Reviews:

Summarized Procurement Plan

NATIONAL SLUM UPGRADING PROGRAM (NSUP) LOAN No. IBRD Ln.8636; AIIB LN 004-IDN. Procurement Plan Version No.: 3 Date: March 15, 2018

REVISED PROCUREMENT PLAN FOR POVERTY REDUCTION FUND PROJECT, PHASE II Fund: IDA Grant No. H685-LA Revised date: 23 July 2012

ICDS Systems Strengthening & Nutrition Improvement Project (ISSNIP)

MOZAMBIQUE Technical and Vocational Education and Training Project

NATIONAL AFFORDABLE HOUSING PROGRAM (NAHP) LOAN No. IBRD 8717-ID. Procurement Plan Version No.: 2 Date: June 9, 2017

GESP Procurement Plan MARCH 2017

1. Project Information: Land Administration and Management Project. The IBRD Loan number is 4851 ALB. The SIDA Grant number is TF090309

SKILLS DEVELOPMENT PROJECT

(Ist Phase 18 months )

PROCUREMENT PLAN. Consulting Services

Loan Credit No. : IDA Bank s Approval Date of the Procurement Plan : May 24, Date of General Procurement Notice : May 24, 2017

Second Tamil Nadu Road Sector Project PROCUREMENT PLAN

Overview of Operational Procurement. Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group June 2013

Measuring Implementation Strength (IS)

2. Bank s approval Date of the procurement Plan: Revised version: June 5, Period covered by this procurement plan: 30 June June 2017

Draft Bidding Docs and SPN. Bank s NO to bidding docs. Invitat. To Bidder b Goods

Access to Sustainable Energy Project (ASEP) Procurement Plan

Sample Procurement Plan

PROCUREMENT PLAN. Procurement of Goods and Works

PROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev.

Sample Procurement Plan

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A

Sample Procurement Plan

Procurement Plan dated January 2, 2013

Sample Procurement Plan

World Bank Consultant Guidelines and Business Opportunities

PROCUREMENT PLAN. Basic Data

Procurement Plan. US$ 1. ICB and LIB (Goods) All contracts procured under ICB

Sample Procurement Plan

Sample Procurement Plan

PROCUREMENT PLAN. Consulting Services

Procurement Plan. I. General. 1. Project Information Country: Malawi Project Name: Lilongwe Water and Sanitation Project Project ID: P163794

18 Months Procurement Plan Page 126

procurement Plan I. General

Table 2. Annual Disbursement Plan (in LKR)

RCIP-4 Comoros, Procurement Plan

Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)

procurement Plan I. General

Global Partnership on Output-based Aid Grant Agreement

04f'33- OFFICIAL DOCUMENTS

procurement Plan I. General

Kerala State Transport Project II (P130339)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. PROCUREMENT PLAN FOR WORKS - Uva Province.

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Procurement Plan Attachment 2

EXPERTS ON 5S-KAIZEN-TQM FOR HOSPITAL MANAGEMENT FINAL REPORT

If Post-Review, No-objection Dates are not needed Spec Proc Notice Advert. Bidding Period Bid Evaluation Contract Finalization

Guidelines to Consultant

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PROCUREMENT PLANFOR THE FY OF NGRBP

NHS Forth Valley. Annual Procurement Report 2017/18

Sample Procurement Plan

Project Information Country: Austria

Staff Development Institute

MINISTRY OF HEALTH SERBIA HEALTH PROJECT - additional financing. Estimated cost in 000 EUR. Contracted. Type. CS Blank IC 7

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

A Quick Roll-out Strategy for eid Projects in fulfilment of SDG 16.9

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

DIME-GAFSP First Quarterly Progress Report

Commissariat à la Promotion des Investissements

Approved till Jan 15 (less Dropped) Amount Approved

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

BANGLADESH National Agricultural Technology Project (NATP): Phase 1 [IDA Cr. No BD and IFAD Cr. No. 739 BD] PROCUREMENT PLAN FY to 2013

Afghanistan Reconstruction Trust Fund Grant Agreement

MALAWI Humanitarian Situation Report

Global Environment Facility Trust Fund Grant Agreement

Project Administration Memorandum. Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

MINISTRY OF HEALTH SERBIA HEALTH PROJECT - 2 (SHP - 2) Prior/Post review No of packages. Doc. Preparation. Proc. Method. Type

1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

OFFICIAL r0 4 DOCUMENTS

Transcription:

Public Disclosure Authorized MALAWI P084148 IRRIGATION, RURAL LIVELIHOODS & AGRICULTURAL DEVELOPMENT PROJECT (IRLADP) Revised Procurement Plan for 9 92741 I. General Public Disclosure Authorized Public Disclosure Authorized 1. Project information: Country : The Republic of Malawi Borrower : The Government of Malawi Ministry of Agriculture and Food Security Project Name: The Irrigation Rural Livelihoods and Agricultural Development Project Loan/Credit No.: IDA 51410 2. s approval Date of the procurement Plan [Original 2005; Revision 1:26 th October, 2006; Revision 2: 30 th December, 2007; Revision 3: 11 th February, 2008; Revision 4: 30 th March, 2009; Revision 5: 12 th October, 2009, Revision 6: 12 th April, 2010; Revision 7: 12 th April, 2011; Revision 8: 24 th February, 2012. Revision 30 th April 2012, 30 th June 2012 ;12 th February, 2013 and 01 st August, 2013. 3. Date of General Procurement Notice: 27 th October, 2006; revised 24 th August, 2012 4. Period covered by this procurement plan: 01 st April, 2014 31 st December,2014(9 ) II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior the as stated in Appendix 1 to the Guidelines for Procurement: losure Authorized

Procurement Prior Review Threshold 1. ICB and LIB (Goods/nonconsulting services) >=2million All contracts 2. NCB (Goods/ non-consulting services)) <2million None 3. ICB (Works) >= 5 million All contracts 4. NCB (Works) < 5 million None 5. Shopping/ IAPSO (Goods) <200,000.00 None 6. Shopping/Community Participation (Works) <200,000.00 None 2. PROCUREMENT PACKAGES WITH METHODS AND TIME SCHEDULE GOODS AND EQUIPMENT Ref. No Estimated Cost in Procurement Domestic Preference Yes/No Prior/Post Expected date of Issuance of documents G.1.01 G.1.02 G.1.03 G.1.04 Production and airing of radio programmes Production and airing of television programmes Designing and production of IEC materials ( leaflets, brochures, posters, signposts etc) Designing and printing 20 Shopping No No Post 20-June, 2014 27-June, 2014 01-July- 2014 40 Shopping No No Post 20-June, 2014 27-June, 2014 01-July- 2014 70 Shopping No No Post June, 2014 June, 2014 June 2014 On need Basis 50 Shopping No Post 23-Sept, 2014

Ref. No Estimated Cost in Procurement Domestic Expected date Preference of Issuance of Yes/No Prior/Post documents No 16-Sept, 2014 01-Oct-2013 2015calendars G.1.05 and diaries IT Equipment/ 70 Shopping No No Post 02-June 2014 09-June, 2014 09-June 2014 various Irrigation software for design G.1.06 authentication and 110 Shopping No No Post March 2014 Hand On training Total Good &Equipment 268 GOODS UNDER CATEGORY 5 (b) PUBLIC WORKS SUBPROJECTS Ref. No Estimate d Cost in USD 000 Procureme nt Domestic Preference Yes/No Prior/Post Expected date of Issuance of documents G.1.06 G.1.07 G.1.08 IFA Urea Fertilizer (Rainfed 2014) IFA NPK Fertilizer (Rainfed 2014) IFA Hybrid Maize Seed (Rainfed 2014) 2,000 ICB No No Prior 2,113 ICB No No Prior 1,243 NCB No No Post 21-March,2014 21-March 2014 07-March 2014 14-Apr 2014 17-Apr 2014 07-Apr 2014 18-Apr, 2014 24-Apr, 2014 11-Apr, 2014 All districts except Likoma Island. Tender floated on 02 nd April, 2014. To close and open on 30 th April, 2014 All Districts except Likoma Island, Chikwawa and Nsanje. Tender floated on 02 nd April, 2014. To close and open on 29 th April, 2014 All districts except Likoma Island. Tender closed and opened on 07 th April, 2014. To finalise evaluation by 08 th April, 2014 G.1.09 IFA Food Maize 12 Shopping No No Post 01-Apr 2014 07-Apr 2014 07-Apr 2014 Likoma Island Bean Seed and Post 01-Apr 2014 07-Apr 2014 07-Apr 2014 Likoma Island, Chikwawa G.1.10 228 Shopping No No Table Beans and Nsanje 01-Apr 2014 07-Apr 2014 07-Apr 2014 Rumphi,Mzimba South, Dowa,Dedza,Ntcheu, G.1.11 Onion Seed 52 Shopping No No Post Mangochi, Zomba, Chiradzulu,Blantyre Thyolo, Mulanje and

Ref. No G.1.12 Leafy Vegetable Seed IFA Equipment G.1.13 and Materials (Rain fed) Total Goods Cat 5(b)US$,000 Estimate d Cost in USD 000 Procureme nt Domestic Preference Yes/No Prior/Post Expected date of Issuance of documents 38 Shopping No No Post 01-Apr 2014 07-Apr 2014 07-Apr 2014 910 Shopping No NO Post 01-Apr 2014 07-Apr 2014 07-Apr 2014 6,596 Phalombe Chitipa, Karonga,Nkhata Bay, Mzimba North,Kasungu, Nkhota Kota, NtchisiSalima, Lilongwe, MchinjiBalaka, Zomba,Neno and Mwanza Small procurements across all 29 districts WORKS Ref. No Estimated Cost in Procurement Domestic Preference Yes/No Prior/Post Issuance of documents W.1.1 Office maintenance General 20 Shopping No Yes Post June 2013 PCU, These include maintenance office works W.1.2 Construction of schemes: Works new SSI including ESMP implementation(lot 1: Luju Irrigation Scheme) 650 NCB No No Post 08 th Nov, 2013 06 th Dec, 2013 21 st March, 2014 Contract awarded to Enstein Construction On 21 st March, 2014. Construction period 9 W.1.3 Construction of schemes: Works new SSI including ESMP implementation (Lot 2: Ntchete Irrigation Scheme) 350 NCB No No Post 31 st January, 2014 11 th Feb, 2014 24 th March, 2014 Bid closed and opened on 28 th February, 2014. Bid Evaluation finalized. To seek IPC s approval by 28 th March, 2014. Construction period 6 W.1.4 Construction of schemes: Works new 800 NCB No No Post 11 th Feb, 2014 Bid closed and opened on 28 th February, 2014.

Ref. No Estimated Cost in Procurement Domestic Preference Yes/No Prior/Post Issuance of documents SSI including ESMP implementation (Lot 3: Mdala & Nsikita Irrigation Schemes) 31 st January, 2014 24 th March, 2014 Bid Evaluation finalized. To seek IPC s approval by 28 th March, 2014. Construction period 6 W.1.5 Construction of schemes: Works new SSI including ESMP implementation /Infrastructure support to Rice schemes Lot 4 ( Domasi and Khwisa Irrigation schemes) 270 NCB No No Post 10 th March, 2014 07 th April, 2014 22 nd April, 2014 Bids advertised 10 th March, 2013 and to close on 07 th April, 2014. Construction period 3 W.1.6 Construction of schemes: Works new SSI including ESMP implementation /Infrastructure support to Rice schemes Lot 5 ( Lifuliza Irrigation scheme) 400 NCB No No Post 10 th March, 2014 07 th April, 2014 22 nd April, 2014 Bids advertised 10 th March, 2013 and to close on 07 th April, 2014. Construction period 3 W.1.7 Construction of schemes: Works new SSI including ESMP implementation /Infrastructure support to Rice schemes Lot 6 (Miyombo & Chonanga Irrigation schemes) 250 NCB No No Post 10 th March, 2014 07 th April, 2014 22 nd April, 2014 Bids advertised 10 th March, 2013 and to close on 07 th April, 2014. Construction period 3 W.1.8 Infrastructure support for Rice scheme efficiency (Lot 7: Kaombe Irrigation Scheme) 100 Shopping No No Post 01-April-2014 08-April-2014 08-April-2014

Ref. No Estimated Cost in Procurement Domestic Preference Yes/No Prior/Post Issuance of documents W.1.9 IFA Roads Works 303 Shopping No Yes Post 01-April 2014 07-April 2014 07-April 2014 Small procurement across all 29 districts Total Works () 3,143 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Prior Review Threshold Comment 1. Single Source (Firms) Any amount All 2. Quality and Cost based (QCBS) >= 200,000 All contracts 3 Consultants Qualification (CQ)/ <200,000 None 4 Least Cost >= 200,000 <200,000 All contracts 5. Individual Consultants >= 200,000 All contracts 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: N/A 4. Consultancy Assignments with Selection s and Time Schedule

CONSULTANCY SERVICES 1 2 3 4 5 6 7 Issuance of EOI Ref. Estimate d Cost in Selection Prior/ Post Finalise shortlist and issue RFP Expected Proposals Submission Date Complete Technical Evaluation Complete Financial Evaluation Negotiate and Award C.1.1 C.1.2 C.1.3 C.1.4 Irrigation Master plan and investment Framework Agricultural Development Strategy Irrigation Environmental studies (ESMP) Communications, Community Participation,Land Tenure and Resettlement Framework 2,134 QCBS Prior 600 QCBS Prior 400 QCBS Prior 1,650 QCBS Prior 28 - Jan-13 25 - Apr-13 23 - May-13 24 - Jun-13 03 - Juy-13 08 - Oct-13 24-Dec-13 21-March-14 22-Apr-14 25-Apr-14 05-May-14 09-May-14 06-Nov-13 22-Jan-14 07-March-14 21-March-14 28-March-14 14-Apr-14 10-March-14 01-April-14 06-May-14 13-May-14 27-May-14 06-June-14, Contract awarded to SMEC International on 08 th October, 2014 for USD2,134,998.00. Contract period 15 Shortlist re-submitted to WB on 19 th March, 2014 Technical/Financial proposed received on 07 th March, 2014. Technical evaluation finalized to seek WB No Objection by 28 t March, 2014 Poor response. Readvertised on 10 th March, 2014 and closed on 24 th March,

1 2 3 4 5 6 7 Issuance of EOI Ref. Estimate d Cost in Selection Prior/ Post Finalise shortlist and issue RFP Expected Proposals Submission Date Complete Technical Evaluation Complete Financial Evaluation Negotiate and Award C.1.5 C.1.6 C.1.7 C.1.8 C.1.09 C.1.10 Umbrella Consultant/SVIP Coordination/Implement ation Unit for the abovementioned studies Public Private Partnership Feasibilty Study Dam Safety Panel for the proposed Shire Valley Irrigation Project 300 300 Hydraulic modeling TOR 20 Hydraulic Modelling for the proposed Shire Valley Irrigation Project Legal Consultant for Ex SFPDP and New SSI Technical Assistance in Capacity Building in Irrigation System design and Construction (2 month hands-on course for Bunda/NRC graduates) 50 QCBS QCBS SS SS Prior Prior 300 QCBS Prior 160 SS Prior 50 IC 10-March-14 01-April-14 06-May-14 13-May-14 27-May-14 06-June-14, 28-March-14 01-April-14 06-May-14 13-May-14 27-May-14 06-June-14, Prior N/A 28-March-14 07-Apr-14 10-Apr-14 10-Apr-14 17-Apr-14 Prior N/A 17-March-14 20-March-14 20-March-14 24-March-14 24-March-14 18-Apr-14 09-May-14 06-June-14 13-June-14 27-Jun-14 04-July-14 12-Nov-14 12-Nov-14 6-Dec-13 10-Jan-14 20-Jan-14 21-March-14 Post 22-Aug-13 26-Sept-13 25-Oct-13 20-Nov-13 05-Dec-13 21-March-14 2014. To shortlist by 02 nd April, 2014 Poor response. Readvertised on 10 th March, 2014 and closed on 24 th March, 2014. To shortlist by 02 nd April, 2014 Draft EOI approved by WB on 25 th March, 2014. To advertise by 27 th March, 2014 whilst finalisisng TORs Finalising contract by 24 March, 2014 Finalising contract by 24 March, 2014 To initiate action after Consultant finishes preparation of TORs Contract negotiations finalized. Revised Draft contract and signed negotiation minutes re-submitted to WB on 25 th March, 2014 Identified Consultant will be available for the assignment in July, 2014

1 2 3 4 5 6 7 Issuance of EOI Ref. Estimate d Cost in Selection Prior/ Post Finalise shortlist and issue RFP Expected Proposals Submission Date Complete Technical Evaluation Complete Financial Evaluation Negotiate and Award C.1.11 C.1.12 C.1.13 Training Facilitator for Hands on Training in Irrigation Schemes Development (2 month hands-on course for Bunda/NRC graduates) Lessons and Knowledge learning Specific on-demand training and support to cooperatives and marketing/ Mgmt and Technical Assistance to FBO 150 IQCBS Post 22-Aug-13 26-Sept-13 25-Oct-13 20-Nov-13 05-Dec-13 21-March-14 155 CQS Post 200 CQS Post C.1.14 Small studies on FBOs 100 IC Post 19-Nov-13 22-Jan-14 14-Feb-14 14-Feb-14 22-Feb-14 22-Feb-14 07-March-14 24-March-14 30-Apr-14 05-May-14 01-Apr014 15-Apr-14 12-May-14 19-May-14 19-May-14 28-March-14 12-May-14. 30-May-14 Contract negations finalized with FISD.FISD whose fees were on the higher range. To sign contract by 27 th March, 2014 Combined Technical and Financial evaluation finalized. To arrange negotiations with Royal Tropical Institute of Netherlands by 03 rd April, 2014 Sshortlisting finalized 25 th March, 2014. To send RFPs to shortlisted firms by 27 th March, 2014 On need basis C.1.15 PCU and IWMU staff of IRLADP Total Consultancy Services 1,411 IC Post 7,980 N/A N/A N/A N/A N/A On going PCU. List of staff will be submitted to the. Note: ICB = International Competitive Bidding NCB = National Competitive Bidding QCBS = Quality and Cost Based Selection CQ = Selection Based on Consultants Qualifications IC = Individual Consultant LCS = Least Cost Selection

LIST OF IRLAD PROJECT STAFF AND THEIR POSITIONS No Name of Officer Title of Post C.1.31.1 Dickxie V Kampani Project Coordinator C.1.31.2 Henry Mphasa Finance Manager C.1.31.3 Time Fatch M&E Specialist C.1.31.4 Rex Tolani Social & Community Development Specialist C.1.31.5 Goli M Mwanza Procurement Specialist C.1.31.6 Joseph Chisenga Director, IWMU C.1.31.7 Crosby Mphande Project Engineer C.1.31.8 Cecilia Wanda Regional M&E Expert C.1.31.9 Joy Ndalama Regional M&E Expert C.1.31.10 Fabiano Kwaule WUA Specialist C.1.31.11 Chisomo Gunda WUA Specialist C.1.31.12 Daniel W M Chitonya WUA Specialist C.1.31.13 Charles Kanyinji IFA Coordinator C.1.31.14 Pieter A Nthenda WUA Specialist C.1.31.15 Moston Mhango Irrigation Engineer C.1.31.16 Chisomo Taulo Irrigation Engineer C.1.31.17 Samson Banda Irrigation Engineer C.1.31.18 Jeremiah Nkowani Irrigation Engineer C.1.31.19 Tony Chiputula RWH Specialist C.1.31.20 Patrick Viyazyi RWH Specialist C.1.31.21 Innocent Kabwadza Asst Accountant C.1.31.22 Gilbert Mwakalenga Asst Accountant C.1.31.23 Chimwemwe P Nyirongo Admin Assistant C.1.31.24 Leah C Dindi Admin Assistant C.1.31.25 Kazimu Kalilombe Admin Assistant C.1.31.26 Jean F Makamo Admin Assistant

C.1.31.27 Zondiwe P T Kadango Asst Accountant C.1.31.28 Joseph C N Khonje Asst Accountant C.1.31.29 Humphrey W Ngwira Asst Accountant C.1.31.30 Alfred K Mbale Asst Accountant C.1.31.31 Elizabeth Nyirenda Admin Assistant C.1.31.32 Goodwin G Njunga Asst Accountant C.1.31.33 Maurice A R Mlozoa Asst Accountant C.1.31.34 Victor Kaonga Asst Accountant C.1.31.35 George G Pikani Asst Accountant C.1.31.36 Yakobe Longwe Asst Accountant Chipiliro C.1.31.37 Ziyendammanja Asst Accountant C.1.31.38 Henry Ng'ong'ola Senior Driver C.1.31.39 Snoden Nyirenda Senior Driver C.1.31.40 Amon M K Banda Driver C.1.31.41 Helbert Chikazingwa Senior Driver C.1.31.42 Kako G Chakhaza Driver C.1.31.43 Jafali Mbewe Driver C.1.31.44 Patrick J Chiusiwa Driver C.1.31.45 David Chikayenda Driver C.1.31.46 Lucius Michongwe Driver C.1.31.47 Mathews Chipeta Driver C.1.31.48 Henry Kalonga Driver C.1.31.49 Menard Nyasulu Driver C.1.31.50 Elizabeth Teleka Driver C.1.31.51 Mabvuto Waliwali Driver C.1.31.52 Gerald Luhanga Driver C.1.31.53 Donald Chimbwanda Driver C.1.31.54 Kennedy Mandambwe Driver

C.1.31.55 Richard Tchetha Office Assistant C.1.31.56 Geoffrey K Chamhanya Office Assistant C.1.31.57 Gregory J Kufeyani Office Assistant C.1.31.58 Ceasar Mhango Office Assistant C.1.31.59 Fetson Tembenu Office Assistant C.1.31.60 Jean Jamu Office Assistant C.1.31.61 Emmanuel Chole Guard