STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS HALRB DECEMBER 21, 2016
PROJECT SCHEDULE 1
PROJECT SCHEDULE USE PERMIT 2016 2017 2018 2019 2/2017 CERT. OF APPROP. 2/2017 DESIGN DEV. CONST. DOCS. BUILDING PERMIT CONSTRUCTION SCHOOL OPEN Fall 2017» TBDTBD Stratford Middle School - 3
PROJECT MILESTONES Concept Design approved November 2015 Schematic Design approved June 2016 Use Permit submitted: September 8, 2016 EA submitted: September 8, 2016 Water Quality Impact Assessment submitted: September 15, 2016 Certificate of Appropriateness submitted: September 22, 2016 Presenting to Commissions: (Fall/Winter 2016/2017) Resubmission of Use Permit / COA: December 21, 2016 County Board (projected): February 2017 Building Permit (projected): Fall 2017 Stratford Middle School - 4
STAKEHOLDER INVOLVEMENT 23 BLPC meetings 13 PFRC meetings 5 HALRB/DRC meetings/work sessions 2 Gallery Walks / Open Houses Additional meetings with: Community leaders Department of Parks and Recreation VDOT Arlington County School Board Members Stratford Middle School - 5
SITE DESIGN 2
SITE PLAN Stratford Middle School - 7
HISTORIC VIEWSHED Stratford Middle School - 8
VACATION LANE HISTORIC VIEWSHED Stratford Middle School - 9 OLD DOMINION
VIEW FROM OLD DOMINION Stratford Middle School - 10
HISTORIC PATH 302 STONE BOULDER WITH MARKER FOR INTERPRETATION OF HISTORIC PATHWAY. SEE CHARACTER IMAGE 1/SHEET L2-0H. TW 303.50 TW 306.50 300 SEAT WALL WITH INTERPRETIVE SIGN INTEGRATED. SEE CHARACTER IMAGE 3/SHEET L2.0H. TW 302.50 291.60 TW 306.50 298 (26) PROPOSED BIKE RACKS 97.70 TW 300.50 292 296 292 294.00 TW 304.50 95.20 95.10 TW 294.25 TW 294.25 294 TW 303.50 95.20 TW 299.50 294 296 TW 296.00 296 TW 291.17 OLD DOMINION ROAD CONCRETE RETAINING WALLS. SEE DETAIL 1/L4-1H. TW 300.50 306 304 97.70 298 300 TS 291.75 290 288 286 284 282 BS 280.75 BIOFILTER TW 289.85 T TS 285 280 ADA PATH CHANGED TO FLAGSTONE AT POINTS WHERE IT CROSSES THE HISTORIC PATH. SEE CHARACTER IMAGE 2/SHEET L2.0H. TW 306.50 TW 302.50 TW 302.50 302 SEE DETAIL 2/L4-1H. LOW WALL WITH INTEGRATED SEATING, TYP. SEE CHARACTER IMAGE 2/SHEET L2.0H. 304 TW 306.50 302 300 298 296 294 292 290 288 286 284 282 306 FIELD STONE MARKERS RECALL ORIGINAL PATH STUDENTS TOOK ON INTEGRATION DAY TO ENTER THE SCHOOL. SEE CHARACTER IMAGE 2/SHEET L2-0H. 310 308 STONE BOULDER WITH MARKER FOR INTERPRETATION OF HISTORIC PATHWAY. SEE CHARACTER IMAGE 1/SHEET L2-0H. 312 312 310 Peirce Mill, QEA Stratford Middle School - 11
HISTORIC PATH A 302 STONE BOULDER WITH MARKER FOR INTERPRETATION OF HISTORIC PATHWAY. SEE CHARACTER IMAGE 1/SHEET L2-0H. TW 303.50 TW 306.50 300 SEAT WALL WITH INTERPRETIVE SIGN INTEGRATED. SEE CHARACTER IMAGE 3/SHEET L2.0H. TW 302.50 291.60 A TW 306.50 298 (26) PROPOSED BIKE RACKS 97.70 TW 300.50 292 296 292 294.00 TW 304.50 95.20 95.10 TW 294.25 TW 294.25 294 OLD DOMINION ROAD CONCRETE RETAINING WALLS. SEE DETAIL 1/L4-1H. TW 303.50 TW 300.50 306 95.20 304 TW 299.50 97.70 294 296 298 C 300 TW 296.00 296 TS 291.75 BS 280.75 TW 291.17 290 288 286 284 282 BIOFILTER TW 289.85 T TS 285 B ADA PATH CHANGED TO FLAGSTONE AT POINTS WHERE IT CROSSES THE HISTORIC PATH. SEE CHARACTER IMAGE 2/SHEET L2.0H. B TW 306.50 TW 302.50 C TW 302.50 302 SEE DETAIL 2/L4-1H. 280 LOW WALL WITH INTEGRATED SEATING, TYP. SEE CHARACTER IMAGE 2/SHEET L2.0H. B 306 304 TW 306.50 302 300 298 296 294 292 290 288 286 284 282 FIELD STONE MARKERS RECALL ORIGINAL PATH STUDENTS TOOK ON INTEGRATION DAY TO ENTER THE SCHOOL. SEE CHARACTER IMAGE 2/SHEET L2-0H. STONE BOULDER WITH MARKER FOR INTERPRETATION OF HISTORIC PATHWAY. SEE CHARACTER IMAGE 1/SHEET L2-0H. A 310 312 308 C 312 310 Stratford Middle School - 12
VIEW FROM HISTORIC PATH Stratford Middle School - 13
BUILDING DESIGN 3
SOUTH ELEVATION Stratford Middle School - 15
VIEW FROM EAST Stratford Middle School - 16
VIEW FROM STRATFORD PARK Stratford Middle School - 17
EXTERIOR MATERIALS: BRICK Manganese ironspot brick base Artisan and smooth finishes Recalls rustic fieldstone base on existing building Precedent image: First Congregational United Church Architects: Tod Williams Billie Tsien Architects 945 G St NW Washington, DC Stratford Middle School - 18
EXTERIOR MATERIALS: COPPER Pre-patinated copper shingle Precedent images: Dormitory at Rutgers University, Livingston, NJ (top) Mixed-Use development, Hamburg, GER (right) Stratford Middle School - 19
BUILDING ENVELOPE PRE-PATINATED COPPER SHINGLE FIBER CEMENT RAINSCREEN PANEL LIGHT DIFFUSION GLAZING SUN SHADE HIGH PERFORMANCE GLAZING MANGANESE IRONSPOT BRICK Stratford Middle School - 20
BUILDING ENVELOPE HIGH R-VALUE ASSEMBLY (R-30+) METAL SHINGLE CLADDING WEATHER BARRIER NAILBASE INSULATION (WOOD SHEATHING AND 3.5 R-19 POLYISO) 6 STUD WALL WITH R-19 BATTS 1/2 GWB FIRST FLOOR MASS WALLS (R-15+) BRICK VENEER SPRAY INSULATION (R-13+) CONCRETE WALL Stratford Middle School - 21
BUILDING SECTION OPPORTUNITY FOR COMMEMORATION AT HEART OF SCHOOL FEATURE WALL Stratford Middle School - 22
RENOVATION New elevator at east end of building - increased accessibility Renovated cafeteria New teacher collaboration spaces Conversion of existing Library to Work and Family Life space Renovating select rooms to meet Neighborhood MS program needs Replacing ceiling and lighting (to LED) in core classroom as funding allows Moderate renovations to existing toilet rooms Stratford Middle School - 23
RENOVATION THIRD FLOOR FIRST FLOOR PLAN SECOND FLOOR BASEMENT CHANGE OF PROGRAM NEW ELEVATOR TOILET RENOVATION Stratford Middle School - 24
BASEMENT PLAN LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE N 20 0 40 Stratford Middle School - 26
FIRST FLOOR PLAN LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE N 20 0 40 Stratford Middle School - 27
SECOND FLOOR PLAN LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE N 20 0 40 Stratford Middle School - 28
THIRD FLOOR PLAN LIBRARY FOOD SERVICE PHYSICAL EDUCATION THEATER/ARTS MUSIC TECHNOLOGY WORK & FAMILY STUDY BUILDING SUPPORT TEACHER & STORAGE ADMIN COUNSELING/CLINIC CORE CLASSROOMS SPECIAL EDUCATION ELECTIVE CLASSROOMS CIRCULATION ENTRANCE N 20 0 40 Stratford Middle School - 29