Format for Preliminary Project Report (PPR)

Similar documents
Request for Proposal

1. MAHTAMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE ACT (MGNREGA):-

PROFORMA FOR SUBMISSION OF PROPOSAL (For F.Y: )

EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF OPELIP

NABARD Consultancy Services Private Limited (NABCONS) Corporate Social Responsibility (CSR) Policy

PROFORMA FOR SUBMISSION OF PROJECTS UNDER BIOTECHNOLOGY- BASED PROGRAMMES FOR RURAL DEVELOPMENT

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT

SCHEME OF GRANT-IN-AID FOR PROMOTION OF AYUSH INTERVENTION IN PUBLIC HEALTH INITIATIVES.

Merit Scholarship Scheme for the Wards of Project Affected Families

Corporate Social Responsibility Policy *********

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2

Guidelines / Standard Operating Procedure for implementation of Central Sector Schemes during XII Plan Period ( )

Integrated Low Cost Sanitation Scheme Revised Guidelines, 2008

Corporate Social Responsibility ( CSR ) Policy for Heinz India Pvt. Ltd

ToR FOR DEVELOPING AQUACULTURE PRODUCTION STRATEGY & THEIR IMPLEMENTATION UNDER OTELP

INVITATION FOR EXPRESSION OF INTEREST. ICAR-Central Research Institute for Dryland Agriculture,

Appendix 1. (Please read carefully the guidelines to investigators before filling this proforma)

THDC INDIA LIMITED THDCIL CSR and Sustainability Policy 2015

SCHEME OF POST-MATRIC SCHOLARSHIP FOR STUDENTS BELONGING TO THE MINORITY COMMUNITIES

Dr. Ambedkar Medical Aid Scheme (Revised 2016)

Guidelines for implementing Research Projects SCIENCE AND ENGINEERING RESEARCH COUNCIL

ON-GOING EXTERNALLY AIDED PROJECTS

A Study on Financial Assistance Programme of NEDFi:

MINUTES OF MONTHLY R. D. REVIEW MEETING WITH DM & COLLECTORS HELD ON AT 12:00 NOON.

Guidelines for Indira Gandhi NSS Awards

PROFORMA FOR SUBMISSION OF PROJECTS UNDER BIOTECHNOLOGY- BASED PROGRAMMES FOR RURAL DEVELOPMENT

SCHEME FOR INFRASTRUCTURE DEVELOPMENT PRIVATE AIDED/UNAIDED MINORITY INSTITUTES (IDMI) (ELEMENTARY SECONDARY/ SENIOR SECONDARY SCHOOLS)

MATCHING SCHEME OF ASSISTANCE TO PUBLIC LIBRARIES TOWARDS INCREASING ACCOMMODATION

GOVERNMENT OF INDIA MINISTRY OF LABOUR AND EMPLOYMENT

A. Any individual, who is having his/her own agriculture land and is undertaking own production of seed, as per requirements of seed production.

Criteria for selection and establishment of KVK and proforma for submitting proposal for the establishment of KVK by different organizations -reg.

Criteria for selection and establishment of KVK and proforma for submitting proposal for the establishment of KVK by different organizations -reg.

1. Bank linked : with bank consent only the subsidy shall be released. 2. Without Bank tie-up: 100% subsidy shall be released directly.

NABARD Consultancy Services Private Limited (An ISO 9001:2008 Company) A Wholly owned subsidiary of NABARD

SCHEME OF POST-MATRIC SCHOLARSHIP FOR STUDENTS BELONGING TO THE MINORITY COMMUNITIES.

Rural Innovation Fund FAQS

CORPORATE SOCIAL RESPONSIBILITY POLICY HI-TECH GEARS LIMITED

SCIENCE & TECHNOLOGY ENTREPRENEURSHIP DEVELOPMENT (STED) PROJECT

Board of Governors for TEQIP III Meeting of College of Engineering & Technology

University of Mumbai

Consolidated guidelines for preparation of project proposal for RMSA and proposal for preparatory activities

Pradhan Mantri Awas Yojana Housing for All (Urban) State Urban Development Agency (SUDA)

[***Kind Attention: Grantees of Repertory Grant-Instructions regarding submission of Utilization Certificate in revised format of GFR 12-A***]

Performance Evaluation Report

NATIONAL ENVIRONMENT AWARENESS CAMPAIGN. Guidelines for RRAs. Page 1 of 1

Guidelines on Gram PanchayatDevelopment Plan

Section 4 (1) (b) (viii)

FORMAT FOR SEEKING FINANCIAL ASSISTANCE FOR IN/EX-SITU CONSERVATION, VALUE ADDITION AND MARKETING COMPONENTS OF THE SCHEME PART I :- GENERAL DETAILS

Guidelines for HRD Schemes

SCHEME FOR SETTING UP OF PLASTIC PARKS

Indian Institute of Technology Guwahati

Guidelines for HRD Schemes

ENTREPRENEURS MEMORANDUM NUMBER (IN CASE OF MICRO, SMALL &MEDIUM ENTERPRISES).

REVISED SCHEME FOR EXTERNAL MARKET DEVELOPMENT ASSISTANCE

Master circular for the Start-Up Village Entrepreneurship Programme

RESPONSE TO QUERIES Request for Proposal for Empanelment of Consultants for Appraisal of Detailed Project Reports (DPRs) for Industrial Projects

MARKET ACCESS INITIATIVE (MAI) SCHEME

RFP FOR ENGAGMENT OF CHARTERED ACCOUNT

CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

Technology Business Incubator (TBI)

Udaan Guidelines. Ministry of Home Affairs

Chapter -3 RESEARCH METHODOLOGY

Product(s) Installed Capacity Existing Proposed Existing Proposed

PARLIAMENT OF INDIA (SPEAKER S RESEARCH INITIATIVE)

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

PLAN (SIMP) AND REHABILATION AND RESETTLEMENT STUDIES. Date of Submission:- 5/11/2016 up to 17:00Hrs

NATIONAL ENVIRONMENT AWARENESS CAMPAIGN

; FAX:

INNOVATIVE YOUNG BIOTECHNOLOGIST AWARD (IYBA)

Guidelines for preparation of AWP&B for the year

APPLICATION FORM FOR ENLISTMENT OF VENDORS

Ministry of Panchayati Raj. Objective/Outcome Outlay Quantifiable Deliverables

Inspector Wakf Recruitment 2015 (Exam Code : IW 15)

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

CORPORATE SOCIAL RESPONSIBILITY POLICY JUBILANT FOODWORKS LIMITED

Application Form For JAPAN s Grant Assistance for Grassroots Projects (GGP)

COPRPORATE SOCIAL RESPONSIBILTY OF GINZA INDUSTRIES LIMITED

Department of Science & Technology Terms & Conditions of the Grant

APPLICATION PROFORMA FOR SUPPORT TO SYMPOSIUM/ SEMINAR/ CONFERENCE /WORKSHOP (APPLICATION TO BE TYPED IN ARIAL FONT - 12 SIZE )

INVITATION FOR SUBMISSION OF PROPOSALS FOR

Invitation of Proposals for Empanelment of Agency for 3 rd party Inspection

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS (DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS)

National Rural Livelihoods Mission

Guidelines for the scheme on Upgradation of Existing Government Industrial Training Institutes into Model ITIs - CENTRALLY SPONSORED SCHEME

Youth for Development Programme (YFDP) under the Scheme of National Young Leaders Programme (NYLP)


कर ड़, कर ड़,

Department of Drinking Water Supply Ministry of Rural Development Government of India January 2004

INDO-ITALIAN EXECUTIVE PROGRAMME OF COOPERATION IN SCIENTIFIC & TECHNOLOGICAL COOPERATION. (Proforma for Application for Joint Research)

APPLICATION FORM FOR PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (Seven Copies to be submitted)

APPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (To be submitted in Quadruplicate)

Revised Guidelines Special Projects for Placement Linked Skill Development of Rural Youths under Aajeevika (NRLM)

Part I. Project identification and summary

INSPECTION PROFORMA FOR B.SC. NURSING

INDIAN COUNCIL OF PHILOSOPHICAL RESEARCH Darshan Bhawan, 36, Tughlakabad Institutional Area M.B Road, New Delhi

For Information, Issuance and Submission of EOI, please contact as follows:

Central Council for Research in Yoga & Naturopathy Janakpuri, New Delhi

TANZANIA FOREST FUND

THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) APPLICATION FOR

REVISED AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME

Transcription:

Integrated Watershed Management Programme Format for Preliminary Project Report (PPR) Department of Land Resources, Ministry of Rural Development, Government of India 1

Format for Preliminary Project Report I. Institutional Structures. I. A. State Level Nodal Agencies I. B. District Level Watershed Units II. Selection of Watershed Projects III. Profile of the each selected watershed project IV. Agro-climatic condition of project area. V. Demography & land distribution VI. Livelihoods VII. Expected project out comes VIII. Mandatory certificates IX. Status of on-going projects X. Abstract of projects proposed for sanction 0

I. Institutional Structures I. A. State Level Nodal Agencies (SLNAs): Table-PPR 1: Details of SLNA 1 2 3 4 5 6 State Type of SLNA # Date of Notification Date of MoU with DoLR Total no. of members of SLNA # Whether it is a Department/ Mission/ Society/ Authority/ Others (pl. specify) (contd.) Table-PPR 1: Details of SLNA (Contd..) 7 8 Chairperson CEO Name Designation # Name Designation Date of Appointment Nature of appointment $ Tenure ( of years) Contact Ph. / Fax/ E- mail # APC/ ACS/ Dev. Commissioner/ Others (pl. specify) $ Deputation/ Contract 1

Table-PPR 2: Details of functionaries in the SLNAs* 1 2 3 4 5 6 7 8 9 Total no. of persons working in the SLNA for IWMP Names & Designation Qualifi -cation Experience Work allocation Monthly remuneration (Rs.) Total budget of SLNA (Rs.) Funding expected from DoLR (Rs.) R NR R NR R Recurring; NR- Non-recurring * From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table. Table-PPR 3: Details of State Level Data Cell (SLDC) functionaries* 1 2 3 4 5 6 7 8 9 Total no. of persons working in the SLDC for IWMP Names & Designation Qualifi -cation Experience Work allocation Monthly remuneration (Rs.) Total budget of SLDC (Rs.) Funding expected from DoLR (Rs.) R NR R NR R Recurring; NR- Non-recurring * From column no. 3, totals no. of persons, from column no. 7 to 9, totals, may be indicated for the State at the end of the table. 2

I. B. District Level Watershed Units: Table-PPR 4: Details of functionaries in the DRDA Watershed Cell* 1 2 3 4 5 6 7 8 9 10 Name of Date of Total no. of persons Name Status of the signing of working for Names & Qualifi of the Chairman executing MoU with Watershed Designation -cation Experience District @ Agency# SLNA programme Work allocation Table-PPR 4: Details of functionaries in the DRDA Watershed Cell..Contd. 11 12 13 Monthly Total budget of Watershed Cell Funding expected from DoLR (Rs.) remuneration (Rs.) (Rs.) R NR R NR R Recurring; NR- Non-recurring *From column no. 2, no. of districts; from column no. 3, no. of executive agencies; from column no. 6, no. of persons working in the executive agencies of watershed programmes; from column no.7, total no. of personnel engaged in the watershed cells, from column no. 11 to 13, totals for the State may be indicated at the end of the table. #DWDU/ DRDA/Zilla Parishad (ZP)/ State Department (please specify)/ Any other (Please specify) @collector/ceo ZP/ CDO/ DDO/ PD/ Any other (please specify) 3

II. SELECTION OF WATERSHED PROJECTS Table-PPR 5: Status of District-wise area covered under the watershed programme* (MIS Table-M(SP)2) 1 2 3 4 5 Micro-watersheds covered so far Dept. of Land Resources Other Ministries/ Depts. Names of Districts Total microwatersheds in the District Area (ha.) Pre-IWMP projects (DPAP +DDP +IWDP) Area (ha.) Any other watershed project Area (ha.) Total watersheds covered Area (ha.) Net watersheds to be covered Area (ha.) *from column no.2, total no. of districts; from columns 3 to 5, the totals for the entire State may be given at the end of the table. 4

Table-PPR 6: Prioritized list of projects proposed for sanction during the financial year * 1 2 3 4 5 6 7 8 of Type of microwatersheds project Proposed project (Hilly/ proposed area Desert/ to be (ha) Others) covered Name District of the project Weightage under the criteria# Proposed cost (Rs. in lakh) i ii iii iv v vi vii viii ix x xi xii xiii Total * From column no. 2, total no. of districts, from column no. 3, total no. of projects selected for sanction, from column no. 4, total no. of micro-watersheds to be covered, from column no. 5, total project area proposed, from column no. 7, total cost proposed, may be indicated for the entire State at the end of the table. # Criteria and weightage for selection of watershed Maximum Criteria score Ranges & scores i Poverty index (% of poor to population) 10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20 % (2.5) ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3) iii Actual wages 5 Actual wages are significantly lower than minimum wages (5) Actual wages are equal to or higher than minimum wages (0) iv % of small and marginal 10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3) farmers v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0) vi vii Moisture index/ DPAP/ DDP Block Area under rain-fed agriculture 15-66.7 & below (15) DDP Block -33.3 to -66.6 (10) DPAP Block 0 to -33.2 (0) Non DPAP/ DDP Block 15 More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above 70 % (Reject) 5

viii Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0) ix Degraded land 15 High above 20 % (15) Medium 10 to 20 % (10) Low- less than 10 % of TGA (5) x Productivity potential of the land xi xii Contiguity to another watershed that has already been developed/ treated Cluster approach in the plains (more than one contiguous micro-watersheds in the project) Cluster approach in the hills (more than one contiguous micro-watersheds in the project) 15 Lands with low production & where productivity can be significantly enhanced with reasonable efforts (15) 10 Contiguous to previously treated watershed & contiguity within the microwatersheds in the project (10) 15 Above 6 micro-watersheds in cluster (15) Above 5 micro-watersheds in cluster (15) Lands with moderate production & where productivity can be enhanced with reasonable efforts (10) Contiguity within the microwatersheds in the project but non contiguous to previously treated watershed (5) 4 to 6 microwatersheds in cluster (10) 3 to 5 microwatersheds in cluster (10) Lands with high production & where productivity can be marginally enhanced with reasonable efforts (5) Neither contiguous to previously treated watershed nor contiguity within the microwatersheds in the project (0) 2 to 4 microwatersheds in cluster (5) 2 to 3 microwatersheds in cluster (5) 6

III) PROJECT WISE PROFILE OF THE SELECTED WATERSHED PROJECT Table PPR 7: Project at a Glance 1 Name of the State 2 Name & type # (Hilly/ Desert/ Others) of the project 3 Name of the District 4 Names of the Blocks 5 Names of Gram Panchayats 6 Names & Census Code of Villages covered 7 Names & Codes of the microwatersheds 8 Four major reasons for selection of watershed 9 Area of the Project (ha.) 10 Area proposed to be treated (ha.) 11 Project Cost (Rs. in Lakhs) 12 Name and Address of proposed PIA 13 Any other (please specify) 1. 4. 2. 5. 3. 6. # for definition of type please see Appendix-I 7

Table-PPR 8: Details of previously identified DPAP/ DDP areas proposed under IWMP (ha) during the financial year* 1 2 3 4 5 6 7 8 9 10 11 12 Names of Districts Name of the project proposed Name of Block(s) Type of Block (DPAP/ DDP/IWDP) Area of Block (ha) of pre- IWMP projects sanctioned in the Block Area of sanctioned projects Net area to be covered Area of the proposed project Area proposed to be covered by schemes other than DoLR Net balance area * From column no. 2, total no. of districts, from column no. 3, total no. of projects proposed, from column no. 4, total no. of blocks, from column no. 6 to 12, totals, may be indicated for the entire State at the end of the table. 8

Table-PPR 9: Land Use pattern of the project* (Area in ha) 1 2 3 4 5 6 7 8 9 Name of watersheds Names of villages Geographical Area of the village Forest Area Land under agricultural use Rainfed area Cultiva ble Wasteland Permanent pastures Noncultivable Source of data: * From column no. 2, total no. of microwatersheds, from column no. 3, total no. of villages, from column no. 4 to 9, totals, may be indicated for the project at the end of the table. 9

IV. AGRO-CLIMATIC CONDITION Briefly describe the agro-climatic condition of project area including the Agro-climatic zone of project area, soil types, rainfall, major crops, etc. Table PPR 10: Details of Agro-climatic condition* 1 2 3 4 5 6 7 8 9 Average Major soil types Name of the Names rainfall in Topography a) Name of Agro-climatic Area of the mm the Project zone covers in ha villages b) Area a)type (preceding project area in ha # 5 years Name average) Major crops b) Area in ha * From column no. 5, total no. of villages, from column no. 6, total area, from column no. 9, total no. of crops and total cropped area, may be indicated for the project at the end of the table. # Flat, undulating, moderate slope, Steep slope 10

Table-PPR 11: Details of flood and drought in the project area* 1 2 3 4 5 Periodicity Not Sl. Particulars Villages Any other Annual affected (please specify) 1 Flood of villages 2 Drought Name(s) of villages of villages Name(s) of villages * From column nos. 4 & 5, total no. of villages, category wise, for the project may be given at the end of the table. Table-PPR 12 : Details of soil erosion in the project area 1 2 3 4 5 Cause Run off Type of Area affected Average soil (mm/ loss (Tonnes/ erosion (ha) year) ha/ year) Water erosion a Sheet b Rill c Gully Sub-Total Wind erosion NA Total 11

V. DEMOGRAPHY AND LAND DISTRIBUTION Growth in population during the last three census, per capita availability of land, sex ratio, population age group in the project area, literacy level, migration, workforce available in different sectors of the economy, demography of SC, ST, BPL and landless families in the project area in the last ten years, etc. VI. LIVELIHOODS Briefly describe the existing livelihoods, raw material available, possible livelihood interventions, scope for capacity building etc. in the project area Table-PPR 13 Summary of livelihoods 1 2 3 5 6 7 Names of the villages Existing livelihood activities Possible livelihood interventions under the project Current status of migration ( of people) Main reasons for migration 12

VII. EXPECTED PROJECT OUTCOMES VII. (i). Expected employment related outcomes: Table-PPR 14: Employment generation 1 2 3 4 Names Wage employment Self employment of the of mandays of beneficiaries of beneficiaries villages SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total * From column no. 2, total no. of villages, from column no. 3 & 4, category-wise totals may be given at the end of the table for the project. Table-PPR 15: Details of migration from Project area 1 2 3 4 5 6 Sl. Names of villages of persons migrating of days per year of migration Major reason(s) for migrating Expected reduction in no. of persons migrating * From column no. 2, total no. of villages; from column no. 3, total no. of persons migrating; from column no. 4, average no. of days for annual migration; from column no. 6, total expected reduction on no. of persons migrating, for the project may be given at the end of the Table. 13

VII. (ii). Water related outcomes: Table-PPR 16: Details of average ground water table depth in the project areas (in meters) 1 2 3 4 5 6 Expected Names of Pre-Project Sources post-project villages level level Open wells Bore wells Others (specify) Source of data: Remarks 14

Table-PPR 17: Status of Drinking water* 1 2 3 4 5 Availability of drinking water Names of Quality of drinking water (no. of months in a year) the Comments villages Expected Post-project Preproject Preproject Expected Postproject * from column no. 2, total no. of villages implementing the programme, from column no. 3, average no. of months may be given at the end of the table for the entire project. VII. (iii). Crop related outcomes: Table-PPR 18- Major crops grown and their productivity in the project area 1 2 3 4 Expected post project Current status Name of the status Crop Kharif Rabi Zaid/Other season Area (ha) Productivity (kg/ ha) Area (ha) Productivity (kg/ ha) * From column no. 2, total no. of crops; from columns no. 3 & 4, total cropped area, average productivity, for the project may be given at the end of the Table. 15

VIII. MANDATORY CERTIFICATION It is certified that the State Government of will abide by the following mandatory conditions laid down by DoLR 1 The area of the proposed projects are not covered under assured irrigation 2 The area of the proposed project is not covered or overlapping with any other watershed projects sanctioned by the central govt./ state govt./ autonomous bodies & others 3 The State must sign all the mandatory MoUs before implementing the project 4 The timeframes and milestones of the projects will be followed 5 The Budget requested for must follow the criteria laid down in the Common Guidelines, 2008 6 The State must release matching State Share within 15 days from release of each installment of central funds 7 Purchase of vehicles and other equipments are not permitted and nor is construction of buildings allowed. Only purchase of computers and related software is permitted 8 Savings, if any, in each component of the project cost can be utilized only for activities in the Watershed works 9 The DWDU will have one Member exclusively responsible for monitoring 10 All works will be evaluated after each phase of completion. Fund release will depend on favourable reports received from evaluators 11 Evaluators must include only institutions and agencies and not individuals 12 The State and DRDA cell will furnish monitoring reports and periodical reports as desired by DoLR 13 Composition of the WDT must be clearly spelt out and the team Members must be fully in place at the time of signing of the MoU of contract between the PIA and DRDA Cell 14 That DRDA shall release the funds to the PIAs and the watershed committees within 15 days of receipt of the funds 15 The Watershed Committee must be a registered society under the Societies Registration Act, 1860 16 At least one of the WDT Members must be a woman 17 The Gram Sabhas of the proposed project areas have passed resolutions for people s contribution towards WDF 16

18 Resource-use agreements on the principles of equity and sustainability must be worked out among the User Groups prior to the concerned work being undertaken 19 The DPR must give detailed justification for the proposed project duration 20 No works on private lands will be repaired/ maintained from the WDF 21 The PIA will start project work within three months of the receipt of first installment by DWDU/agency or else it can come under the purview of foreclosure 22 The State will not undertake unnecessary foreclosure of the projects. In the event of foreclosure, the State will refund the amount and furnish all necessary documents as desired by DoLR. The State shall also take administrative and legal action against any defalcation, misappropriation, mis-utilization, deliberate negligence and laxity which has caused foreclosure of the project. Date: Signature of officer authorized by State Govt.* NAME OF OFFICER (IN CAPITAL LETTERS) DESIGNATION *Letter of Authority from Secretary of the concerned Department, authorizing the concerned officer to sign the above undertaking, should be enclosed with PPR. 17

IX. STATUS OF ON-GOING PROJECTS (DPAP/ DDP/ IWDP) Table- PPR 19: Details of pending UCs: Statewise* 1 2 3 4 5 6 7 8 9 10 11 Date of Submission of submission of UC UC No. District Project Instal -ment no. Financial year of release of fund Amount released (Rs. in lakh) Amount utilized (Rs.in lakhs) Due date Amount (Rs. in lakhs) Date Amount (Rs. in lakhs) Reasons for not submitting/ delayed submission of UC Pending UCs Period Amount (Rs. in lakhs) *From column 2, total no. of Districts, from column 3, total no. of projects, from column no. 6, total amount released, from column 7, total amount utilized, from column 8, total amount due, from column no. 9, total amount for which UCs submitted, from column 11, total amount of the pending UCs, may be mentioned at the end of the table for the entire State. 18

Table- PPR 20: Details of Unspent balance as on : Districtwise* 1 2 3 4 5 6 Total funds Name of Total cost released District the (Rs. in lakh) (Rs. in lakh) Project DoLR State Unspent balance (Rs. in lakhs) *From column 2, total no. of Districts, from column 3, total no. of projects, from column no.4 to 6, totals, may be mentioned at the end of the table for the entire State 19

X. ABSTRACT OF PROJECTS PROPOSED FOR SANCTION DURING FINANCIAL YEAR.. 1 Number of districts to be covered under the present proposal 2 of Watersheds projects proposed to be taken up under IWMP Hilly/Desert Others 3 Total area to be covered under proposed projects (000 ha) (a) Hilly & Desert areas # (b) Others Total 4 Total cost of the proposed Watershed projects (Rs. in lakhs) (a) Hilly & Desert areas # (c) Others Total 5 First installment required from central funds for the proposed watershed projects # For details refer Appendix-I ********************* 20

Date of meeting of PPR sanctioning Committee Decision taken by the Committee Date of receipt of Annual Action Plan Brief details of Annual Action Plan Final approval of projects/area/costs/project period Amount released as first installment and date of release File 21