Electric Rates Miscellaneous Order U

Similar documents
BC Hydro writes to provide the BCUC with its second errata to the Addendum to Assessment Report No. 6 (Addendum) filed on September 30, 2013.

PER-005 System Personnel Training

WECC Standard VAR-STD-2a-1 Automatic Voltage Regulators

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

BPA Network Open Season 2013 Cluster Study

November 13, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Standard NUC Nuclear Plant Interface Coordination

Project Laura Anderson, NERC Standards Developer August 18, 2016

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

CIP Cyber Security Incident Reporting and Response Planning

Standard FAC Assessment of Transfer Capability for the Near-term Transmission Planning Horizon

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to:

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

To ensure system protection is coordinated among operating entities.

Standard CIP 004 4a Cyber Security Personnel and Training

WECC Criterion PRC-006-WECC-CRT-3

Transmission Planning Attachment K Public Input Meeting

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to PRC System Protection Coordination

OC Approved 2/17/05 SB/DS Stability Limits for the addition of 3.26% Series Reactor

Bio Energy #1 Distribution Generator Interconnections Less than 35 kv

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Standard Development Timeline

NERC BES Kickoff Webinar. May 2, 2014

130 FERC 61,211 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

NPCC Tasks Related to NERC Blackout Recommendations Timeline

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No.

VIA ELECTRONIC FILING

ELECTRIC TRANSMISSION 301: Competitive Development and New Business Models

FUNDAMENTALS OF ELECTRICITY TRANSMISSION COURSE

MASTER RELATIONSHIP AGREEMENT FOR THE OWNERSHIP, OPERATION, AND MANAGEMENT OF THE ST. CROIX VALLEY BUSINESS INCUBATOR

Testimony On the 2016 Decommissioning Cost Estimate for Palo Verde Units 1, 2, & 3

July 1, 2006 Revision 2

April 13, 2015 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2

NPCC Tasks Related to NERC Blackout Recommendations Timeline

Public Service Commission

Managed Care Organization Hospital Access Program Hospital Participation Agreement

Appendix 5A. Organization Registration and Certification Manual. WORKING DRAFT-August 26, 2014

REQUEST FOR PROPOSALS

Justification for a Non-Competitive Procurement Process. Grant to Ross & Associates Environmental Consulting, Ltd.

5. Effective Date: See the Implementation Plan for IRO B. Requirements and Measures

Appendix 5A. Organization Registration and Certification Manual

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

Standard FAC Facility Ratings. A. Introduction

Minutes Board of Trustees

Approved Project Sponsor s Participating TO Application Process Clean-Up. Proposal and Tariff

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

ERO Enterprise Strategic and Operational Planning and 2018 Business Plan and Budget Preparation Schedule (2017 Development Year)

NOTICE OF REQUEST FOR PROPOSALS

Best Practice: Multi agency Memorandum of Understanding

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

PEAK RELIABILITY. Enhanced Curtailment Calculator Task Force (ECCTF) Charter. Enhanced Curtailment Calculator Charter Final Draftv3.

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

Meeting Minutes Operating Reliability Subcommittee February 6-7, 2018

NeoOne VPN Service Specific Terms and Conditions

WICF GOTO Focus Group Update

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

Currant Lake Telecommunication Tower

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

ADDENDUM ALLIED HEALTH PROFESSIONAL CARE COLLABORATION AND SUPERVISION

Duquesne Light Our Energy...Your Power

Application form for Commissioning Generation Facility Registration by a Market Participant. including explanatory notes

Project Phase 2 Undervoltage Load Shedding: Misoperations UVLS Standard Drafting Team. Industry Webinar February 3, 2015

COUNTY OF SANTA BARBARA

Request for Proposals and Specifications for a Community Solar Project

Chapter 2 DISCLOSURE OF ECONOMIC INTERESTS. Article 1

SunZia Southwest Transmission Project. September. Project Update for the Board of Socorro County Commissioners February 28, 2017.

Clean Technology Fund Grant Agreement

FUNDING AGREEMENT FOR SECTION 5317 NEW FREEDOM PROGRAM GRANT FUNDS

SECOND AMENDED AND RESTATED R E S E R V A T I O N P R O C E D U R E S F O R T H E R I T Z - C A R L T O N C L U B, L A K E T A H O E

AMENDMENT NO. 3 MEMORANDUM OF UNDERSTANDING NO. 36 REGARDING THE MANAGEMENT EMPLOYEES UNIT

Invitation to Submit Expression of Interest and Proposal

Long Range Transportation Plan

LIBRARY COOPERATIVE GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [Governing Body] for and on behalf of [grantee]

CITY OF COFFEYVILLE, KANSAS REQUEST FOR PROPOSALS FOR ELECTRICAL ENGINEERING, SUBSTATION MAINTENANCE, TESTING & SUPPORT SERVICES

SunZia Southwest Transmission Project. September. EUCI 2017 Western Transmission Summit SunZia Project Case Study February 27, 2017.

Request for Proposal. Mobile Application for Customer Interface. October 6 th, 2017 Procurement Contact Holly Hussey

Meeting Notes Project Phase 2 of Relay Loadability: Generation Standard Drafting Team December 11-14, 2012

Single-family Affordable Solar Homes (SASH) Program. Q Program Status Report

March 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

RECITALS. WHEREAS, on July 1, 2008, Time Warner Telecom Holdings, Inc. changed its name to TW Telecom Holdings, Inc. ( TW Telecom ); and

ADDENDUM ALLIED HEALTH PROFESSIONAL CARE COLLABORATION AND SUPERVISION

Mission Bay Master Plan File No M September 27, 1990

Global Partnership on Output-based Aid Grant Agreement

Labor Chapter ALABAMA DEPARTMENT OF LABOR ELEVATOR SAFETY RULES ADMINISTRATIVE CODE CHAPTER LICENSING AND FEES TABLE OF CONTENTS

NOW, THEREFORE, the Navy and the School District hereby agree as follows:

Appendix B-1. Feasibility Study Task Order Template

Summary of FERC Meeting Agenda

PRACTICE PARTICIPANT AGREEMENT

APPENDIX I AGENCY CONSULTATIONS

Single-family Affordable Solar Homes (SASH) Program. Semi-annual Program Status Report

Transcription:

Electric Rates Miscellaneous Order U2007-357 MADE at the City of Calgary, in the Province of Alberta, on 11th day of December 2007. ALBERTA ENERGY AND UTILITIES BOARD Sixth Amendment of Reliability Criteria Agreement Application No. 1545152 1 INTRODUCTION On November 7, 2007, the Alberta Energy and Utilities Board (the Board) received an application (the Application) from the (AESO) in which the AESO requested approval of the sixth amendment (the Sixth Amendment) to the Reliability Criteria (RC) Agreement, between the AESO and the Western Electricity Coordinating Council (WECC). The AESO noted the WECC Board of Directors had approved the Sixth Amendment on October 6, 2007. 2 DETAILS OF THE APPLICATION The AESO explained the Sixth Amendment provided for the following changes to the RC Agreement: 1. Make NERC Transmission Operators subject to the Reliability Management System (RMS) NERC System Operator Certification Criterion, 2. Clarify the language in Section III.M.3 by replacing the phrase TAE authority with TAE, 3. Add a Fifth excuse of performance to allow participation in Field Testing of new standards and criteria, 4. Replace in Attachment I Path 53 & Crossover/Yellowtail (Billings Yellowtail Crossover Phase Shifter) with Path 80 (Montana Southeast), 5. Replace Attachment II with a new Table 3 that includes additional Remedial Action Schemes, and 6. Add a clause for situations when there is a conflict with Electric Reliability Organization (ERO) Reliability Standards. The RMS criterion shall be no longer in effect and shall be unenforceable upon the effective date of the ERO Reliability Standard. The AESO also stated the WECC Board of Directors requested and approved one change in wording to page two, section e. of the Sixth Amendment, replacing the phrase Local Page 1 of 2

transmission with Bulk Power System. The approval was given with the understanding that the new requirements would become effective upon the Federal Energy Regulatory Commission s (FERC) acceptance of an amendment to the RC Agreement and approval by the applicable Canadian Regulatory Authorities. The AESO indicated that the Sixth Amendment had been discussed at several Transmission Operations Coordinating Committee (TOCC) meetings in 2006 and no changes are required to the AESO Operating Policies and Procedures. The AESO also stated that the Sixth Amendment was not expected to have any revenue requirement impacts and that no parties were expected to be impacted by the revisions. 3 BOARD FINDINGS The Board published Notice of the Application on November 15, 2007. The Board received only one intervention, from the Utility Consumer Advocate (UCA). The UCA, however, raised no objections to the Application. The Board has reviewed the Application and considers the amendments contained therein to be reasonable and in the public interest. 4 ORDER IT IS THEREFORE ORDERED THAT: (1) The Sixth Amendment to the Reliability Criteria Agreement is approved as filed (copy attached as ), effective November 1, 2007. ATTACHMENT Page 2 of 2

Page 1 of 13 SIXTH AMENDMENT TO WESTERN ELECTRICITY COORDINATING COUNCIL RELIABILITY CRITERIA AGREEMENT CANADIAN LANGUAGE VERSION This SIXTH AMENDMENT TO WESTERN ELECTRICITY COORDINATING COUNCIL RELIABILITY CRITERIA AGREEMENT CANADIAN LANGUAGE VERSION ( Amendment ) is entered into as of, 2007 among the Western Electricity Coordinating Council, Inc. ( WECC ) and Canadian member Transmission Operators ( Canadian Participating Transmission Operators ) (collectively, the Parties ). RECITALS WHEREAS, WECC and Canadian Participating Transmission Operators are parties to the Reliability Criteria Agreement dated as of August 1, 1999, as amended by the First Amendment to the Reliability Criteria Agreement dated as of July 1, 2000, by the Second Amendment to the Reliability Criteria Agreement dated as of November 1, 2000, by the Third Amendment to the Reliability Criteria Agreement dated as of May 18, 2001, by the Fourth Amendment to the Reliability Criteria Agreement dated as of August 1, 2003, and by the Fifth Amendment to the Reliability Criteria Agreement dated as of April 25, 2005 ( Agreement ); and, WHEREAS, WECC and the Canadian Participating Transmission Operators desire to amend the Agreement to incorporate by reference and implement as reliability criteria any reliability standard developed by the Electricity Reliability Organization as approved by the Federal Energy Regulatory Commission and by the applicable Canadian Regulatory Authority; and WHEREAS, on October 5, 2006, the Board of Directors of the WECC approved the changes to the Agreement set forth herein; NOW, THEREFORE, in consideration of the agreements and covenants hereinafter set forth and intending to be legally bound hereby WECC and the Canadian Participating Transmission Operators hereby agree as follows: 1. The Agreement shall be amended by: a. adding the following sentence to the definition of Control Area in Section 2:

Page 2 of 13 As used herein, the term Control Area shall have the same meaning as the term Balancing Authority Area or Balancing Authority, as applicable, as such terms are used in the NERC Standards. b. adding the following definitions in Section 2: Bulk Power System means facilities and control systems necessary for operating an interconnected electric energy transmission network (or any portion thereof), and electric energy from generating facilities needed to maintain transmission system reliability. ERO means the Electric Reliability Organization certified by FERC to develop mandatory Reliability Standards for the Bulk-Power System. Reliability Standard means any mandatory standard developed by the ERO and approved by FERC and the applicable Canadian Regulatory Authority to provide for the reliable operation of the Bulk- Power System in the applicable Province of Canada. c. adding the following new section 4.3: 4.3 Applicability of Criteria; Conflict with ERO Reliability Standards. Notwithstanding anything else in this Reliability Agreement, any reliability criterion set forth in Annex A shall be no longer in effect and shall be unenforceable upon the applicable Province of Canada effective date of an ERO Reliability Standard that establishes a standard addressing the same subject as such criterion. d. replacing the definition of NERC Standards in Annex A, Section I with the following: NERC Standards means the standards and related requirements and measures contained in the NERC Reliability Standards for the Bulk Electric System of North America, as such may be amended from time to time. e. adding the following new definition to Annex A, Section I: NERC Transmission Operator means the entity responsible for the reliability of the Bulk Power System in its jurisdiction, and that operates or directs the operations of transmission facilities in its jurisdiction.

Page 3 of 13 f. adding the following title before the first paragraph in Annex A, Section II: A. Sanctions for Non-Compliance g. adding the following to the end of the first sentence in the first paragraph in Annex A, Section II: ; provided, however, that no sanctions will be assessed for noncompliance with a criterion in Sections III, IV, and V if the Participant is sanctioned under an ERO Reliability Standard for the same action or non-action that resulted in non-compliance with such criterion in Sections III, IV, and V. h. adding the following title immediately before the paragraph that reads: The Specified Period and the Sanction Measure are as specified below for each criterion. in Annex A, Section II: B. Specified Period and Sanction Measure i. replacing the word Sanctions in the first line of the second paragraph in the newly designated Annex A, Section II.B, with the following: Unless excused pursuant to Section II.A, sanctions j. replacing Section III.B.4 to Annex A in its entirety with the following: 4. Compliance Standard A Participant identified in Section III.B.1 must meet the Disturbance Control Standard specified in Section III.B.2 following all Disturbances. Compliance with the Disturbance Control Standard ( DCS ) shall be measured on a percentage basis as set forth in BAL- 002 of the NERC Standards (subject to the 15 minute recovery period specified in Section III.B.2). k. replacing the phrase NERC Performance Subcommittee in Section III.C.2 of Annex A with NERC Operating Committee. l. replacing the phrase the NERC Performance Standard Training Document in Section III.C.4 of Annex A with BAL-001 of the NERC Standards.

Page 4 of 13 m. replacing the phrase Section B.1.1.2 of the NERC Performance Standard Training Document in Section III.D.2 of Annex A with BAL-001 of the NERC Standards. n. replacing the phrase the NERC Performance Standard Training Document in Section III.D.4 of Annex A with BAL- 001 of the NERC Standards. o. replacing Sections III.J.1 and III.J.2 to Annex A in their entirety with the following: J. Operator Certification 1. Participants Subject to Criterion This criterion applies to each Participant that is an operator of a Control Area, NERC Transmission Operator, Independent System Operator (ISO), Regional Transmission Operator (RTO), or Reliability Coordinator; provided, however, that monetary sanctions shall not be assessed against NERC Transmission Operators for non-compliance with this criterion for any incidents of non-compliance prior to January 1, 2007. 2. WECC Criterion Control Areas, NERC Transmission Operators, Independent System Operators, Regional Transmission Operators, and Reliability Coordinators that maintain control center(s) for the real-time operation and direct control of the interconnected Bulk Electric System shall continuously staff all real-time operating positions with NERC-Certified system operators. Subject to the requirements and the exceptions explained below, certification is required for those System Operators in a position to make and/or carry out decisions, without review by higher authority, that could impact interconnected system reliability. Entities requiring NERC-Certified System Operators Control Areas NERC Transmission Operators Independent System Operators Regional Transmission Operators Reliability Coordinators

Page 5 of 13 Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, and Reliability Coordinator Positions requiring NERC-Certified System Operators Positions that have the primary responsibility, either directly or through communications with others, for the real-time operation of the interconnected Bulk Electric System, or Positions that are directly responsible for complying with NERC Reliability Standards. Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, and Reliability Coordinator Personnel required to be NERC-Certified All Personnel working in the control center for Reliability Coordinators filling positions requiring NERC-Certified System Operators; System Operators who: are employed by, or on behalf of, a Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, or Reliability Coordinator, and are filling positions requiring NERC- Certified System Operators, are employed by, or on behalf of, a Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, or Reliability Coordinator, and have the primary responsibility, either directly or through communication with others, for the real-time operation of the Western Interconnection, and are employed by, or on behalf of, a Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, or Reliability Coordinator, and are directly responsible for complying with NERC Reliability Standards. System Operators on shift, employed by, or on behalf of, a Control Area, NERC Transmission Operator, Independent System Operator, Regional Transmission Operator, or Reliability Coordinator, including shift supervisors, and

Page 6 of 13 management personnel who direct the real-time actions of System Operators, filling positions requiring NERC-Certified System Operators, shall be NERC-Certified under the applicable area of responsibility (i.e., only NERC-Certified personnel for a particular type of power system may direct the real-time operation of such type of power system). Certification Requirements are not intended to apply to substation or power plant operators, or to personnel who perform switching provided that the personnel performing the switching are supervised by on-shift NERC-Certified personnel. Exception for new personnel (new trainee): Any organization, otherwise required to have NERC-Certified operators shall not permit a new System Operator or new trainee that is not NERC-Certified to hold a System Operator position. Non NERC-Certified personnel shall not be permitted to work independently in positions requiring NERC-Certified System Operators. While in training to become a NERC-Certified System Operator, an uncertified individual may work only in a non-independent position, shall not perform any duties related to operation of the Bulk Electric System unless directly overseen by a NERC- Certified System Operator on a one-on-one supervisory basis, and must be under the direct authority of a NERC-Certified System Operator at all times while on the job. NERC Standards require all individuals in the positions referenced above must be NERC-Certified. To qualify for the NERC training exception for new personnel, the person needs to be truly in training and not filling a shift position that requires a NERC-Certified System Operator. The person may only work in a non-independent position, meaning that the individual is not filling a shift position that requires a NERC-Certified System Operator and has a NERC-Certified System Operator that is filling the shift position to monitor and approve all actions of the person in training. A NERC-Certified System Operator may only supervise one trainee per shift. Period of Certification. The NERC System Operator Certification credential shall be valid for the period specified by NERC from the date of passing the certification examination.

Page 7 of 13 a) Recertification. System Operators working in the positions requiring NERC Certification shall maintain their NERC Certification. b) Lapsed Certification. If a System Operator s NERC Certification credential expires, the System Operator shall not be considered a NERC-Certified System Operator. p. replacing the phrase NERC Policy 3 in Sections III.M.1.b.1.c. and III.M.2.b.5 of Annex A with the phrase the NERC Standards. q. replacing Section III.M.2.b.1 to Annex A in its entirety with the following: 1. The LCA s authority service has either not implemented E-tag or fails to maintain an availability of greater than or equal to 99.5% of the time during a calendar month pursuant to the NERC Standards. r. replacing Section III.M.3.b.1 of Annex A in its entirety with the following: 1. The TAE s approval service has not implemented or fails to maintain an availability of greater than or equal to 99.5% of the time during a calendar month pursuant to the NERC Standards. s. deleting the phrase TAE authority each of the four times it appears in Section III.M.3.c in Annex A and inserting in place thereof TAE. t. deleting the phrase events listed in Sections VI.B(1)-(4) in Section VI.A in Annex A and inserting in place thereof events listed in Sections VI.B(1)-(5). u. adding the following new Section VI.B.5 to Annex A: 5. Participation in Field Testing Any action taken or not taken by the Participant in conjunction with the Participant s involvement in the field testing (as approved by either the WECC Operating Committee or the WECC Planning Coordination Committee) of a new reliability criterion or a revision to an existing reliability criterion where

Page 8 of 13 such action or non-action causes the Participant s noncompliance with the reliability criterion to be replaced or revised by the criterion being field tested; provided that Participant s non-compliance is the result of Participant s reasonable efforts to participate in the field testing. v. replacing ATTACHMENT I to Annex A with the attached ATTACHMENT I (Table 2) to Annex A. w. replacing ATTACHMENT II to Annex A with the attached ATTACHMENT II (Table 3) to Annex A. 2. This Amendment shall be filed with the appropriate Canadian Regulatory Authorities by each Canadian Participating Transmission Operator with a request that it be made effective on November 1, 2006, and the Amendment shall become effective for each Canadian Participating Transmission Operator on the date specified by the appropriate Canadian Regulatory Authority. 3. This Amendment may be executed in counterparts and each shall have the same force and effect as an original. IN WITNESS WHEREOF, WECC and the Canadian Participating Transmission Operators have executed this Amendment, by their duly authorized officers or agents, as applicable, as of the day and year first above written. WESTERN ELECTRICITY COORDINATING COUNCIL, INC. By: William Chamberlain Title: WECC Chair BRITISH COLUMBIA TRANSMISSION CORPORATION By: Martin Huang Title: Senior V.P., System Operations and Asset Management

Page 9 of 13 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY By: Renata Kurschner Title: Director, Generation Management INDEPENDENT SYSTEM OPERATOR, operating as ALBERTA ELECTRIC SYSTEM OPERATOR By: Title: By: Title: FORTIS B.C., INC. By: Dave Cochrane Title: Manager, System Control

ATTACHMENT I Table 2 Existing WECC Transfer Paths (BPTP) (Revised February 1, 2006) Page 10 of 13 PATH NAME* Path Number Operating Agent 1. Alberta British Columbia 1 BCTC/AESO 2. Northwest British Columbia 3 BCTC/BPA 3. West of Cascades North 4 BPA 4. West of Cascades South 5 BPA 5. West of Hatwai 6 AVA/BPA 6. Montana to Northwest 8 NWMT 7. Idaho to Northwest 14 IPC 8. South of Los Banos or Midway- Los Banos 15 CISO 9. Idaho Sierra 16 SPP 10. Borah West 17 IPC 11. Idaho Montana 18 NWMT 12. Bridger West 19 PAC 13. Path C 20 PAC 14. Southwest of Four Corners 22 APS 15. PG&E SPP 24 CISO 16. Northern Southern California 26 CISO 17. Intmntn. Power Project DC Line 27 LADWP 18. TOT 1A 30 WAPA 19. TOT 2A 31 WAPA 20. Pavant Gonder 230 Kv 32 SPP/LADWP Intermountain Gonder 230 kv 21. TOT 2B 34 PAC 22. TOT 2C 35 NEVP 23. TOT 3 36 WAPA 24. TOT 5 39 WAPA 25. SDGE CFE 45 CISO/CFE 26. West of Colorado River (WOR) 46 CISO 27. Southern New Mexico (NM1) 47 EPE 28. Northern New Mexico (NM2) 48 PNM 29. East of the Colorado River (EOR) 49 APS 30. Cholla Pinnacle Peak 50 APS 31. Southern Navajo 51 APS 32. Brownlee East 55 IPC 33. Lugo Victorville 500 kv 61 CISO/LDWP 34. Pacific DC Intertie 65 BPA/LADWP 35. COI 66 BPA/CISO 36. North of John Day cutplane 73 BPA 37. Alturas 76 SPP 38. Montana Southeast 80 NWMT 39. SCIT** CISO 40. COI/PDCI North of John Day cutplane** BPA For an explanation of terms, path numbers, and definition for the paths refer to WECC s Path Rating Catalog. ** The SCIT and COI/PDCI-North of John Day Cutplane are paths that are operated in accordance with nomograms identified in WECC s Path Rating Catalog.

ATTACHMENT II Table 3 Existing WECC Remedial Action Schemes (Revised March 1, 2006) Page 11 of 13 Path Name* Path Number RAS 1. Alberta British Columbia Path 1 Remedial actions are required to achieve the rated transfer capability. Most involve tripping tie lines for outages in the BCTC system. East to West: For high transfers, generation tripping is required north of the SOK cutplane in Alberta. 2. Northwest British Path 3 Generator and reactive tripping in the Columbia BCTC system to protect against the impact caused by various contingencies during transfers between British Columbia and the Northwest. 3. West of Hatwai Path 6 Generator dropping (Libby, Noxon, Lancaster, Dworshak); Reactor tripping (Garrison); Tripping of Miles City DC link. 4. Montana to Northwest Path 8 Tripping Colstrip by ATR (NWMT); Switching shunt reactors at Garrison 500 kv; Tripping the back-to-back DC tie at Miles City; Tripping Libby, and Noxon generation by WM- RAS (BPA). 5. Idaho to Northwest Path 14 Jim Bridger tripping for loss of Midpoint Summer Lake 500 kv line. 6. Midway-Los Banos Path 15 CDWR and PG&E pump load dropping north of Path 15. PG&E service area load dropping north of Path 15. PG&E service area generation dropping south of Path 15. 7. Idaho Sierra Path 16 Automatic load shedding is required when the Alturas line is open for loss of the Midpoint-Humbolt 345 kv line during high Sierra system imports. 8. Bridger West Path 19 Jim Bridger tripping for delayed clearing and multi-line faults; Addition of shunt capacitors at Jim Bridger, Kinport and Goshen and series capacitor bypassing at Burns. 9. IPP DC Line Path 27 IPP Contingency Arming System trips one or two IPP generating units. 10. TOT1A Path 30 Bonanza and Flaming Gorge generation is tripped for loss of the Bonanza-Mona 345 kv line to achieve rating on TOT1A. Involved Parties BCTC/AESO BCTC/BPA AVA/BPA NWMT/BPA IPC CISO SPP IPC LDWP WAPA

Page 12 of 13 11. TOT2A Path 31 For the Montrose-Hesperus 345 kv line outage with Nucla generation above 60 MW, the parallel Montrose- Nucla 115 kv line is automatically transfer tripped. 12. TOT2B Path 34 Trip Huntington generation for loss of the Huntington-Pinto + Four Corners lines when parallel lines are heavily loaded. 13. TOT5 Path 39 For an outage of the Hayden-Gore Pass 230 kv line, the lower voltage parallel path is tripped. 14. SDGE RAS Path 44 RAS used to meet reactive margin criteria for loss of both San Onofre units. 15. SDGE CFE Path 45 The purpose of the RAS is to automatically cross-trip (transfer trip) the Miguel Tijuana 230kV following the outage of Imperial Valley Miguel 500kV line. 16. Southern New Mexico Path 47 For double contingencies on the 345 kv lines defined in the path, WECC Operating Procedure EPE-1 is implemented. 17. Pacific DC Intertie Path 65 Northwest generator tripping; Series capacitor fast insertion; mechanically switched shunt capacitors 18. California Oregon Intertie Path 66 Northwest generator tripping; Chief Jo Brake insertion; Fort Rock Series Capacitor insertion; Northern California generator and pump load tripping; N. California series capacitor bypassing, shunt reactor or capacitor insertion; Initiation of NE\SE Separation Scheme at Four Corners. 19. Meridian 500/230 kv Transformers** 20. Northern-Southern California 21. PNM Import Contingency Load Shedding Scheme (ICLSS) Path 26 Path 48 Following the loss of the Meridian 500/230kV transformers, RAS is used to comply with WECC Standards under high load conditions. Remedial action required to achieve the rated transfer capability. Midway area generation tripped for loss of any two of three Midway-Vincent 500 kv lines. ICLSS is a centralized load shedding scheme for low probability events such as simultaneous outage of the Four Corners-West Mesa (FW) 345 kv and San Juan-B-A (WW) 345 kv lines, as well as any unplanned disturbance affecting voltage in the Northern New Mexico transmission system. WAPA PAC WAPA SDGE SDGE/CFE EPE BPA/LDWP BPA/CISO/APS PAC CISO PNM

22. Valley Direct Load Trip (DLT) RAS is required for the loss of the Serrano-Valley 500 kv line. About 200 MW of Valley load is tripped. Page 13 of 13 23. South of Lugo N-2 RAS RAS is required for the simultaneous double line outage of any combination of the Lugo-Mira Loma 1 (when looped), 2, and 3 500 kv lines and the Lugo-Serrano (when de-looped) 500 kv line. 24. Lower Snake RAS The RAS is required to protect for the double line outage of the Lower Monumental-Little Goose 500-kV lines. Generation is dropped at Little Goose and Lower Granite Powerhouses as well as key the WM RAS. An outage of the Little Goose Lower Granite 500 kv lines will drop generation at Lower Granite Powerhouse and key the Western 25. Palo Verde COI Mitigation Scheme 26. Palo Verde/Hassayampa RAS 27. Sierra Pacific PacifiCorp RAS Path 66 Path 76 Montana RAS. Required to provide for safe operation of the COI for the loss of two units at Palo Verde Nuclear Generating Station (PVNGS). The RAS protects the PVNGS and Palo Verde Transmission System (PVTS) for faults at Palo Verde and subsequent outage of the Palo Verde Westwing 500 kv lines. Provides protection to the PVNGS and the PVTS for faults at Palo Verde and subsequent double line outage of the Palo Verde to Westwing 500 kv lines.*** Needed for loss of the 230 kv Malin- Hilltop line when heavily loaded unless automatic reclose is successful. The scheme closes the Hilltop 345 kv line reactor if pre-outage northbound flow is greater than 150 MW. For preoutage southbound flow greater than 235 MW the Hilltop 345 kv line trips and the Hilltop 345 kv line reactors closes. SCE SCE BPA SRP SRP SPPC * For an explanation of terms, path numbers, and definition for the paths refer to WECC s Path Rating Catalog. ** The Meridian 500/230 kv transformers are not included in the Path Rating Catalog. The RAS associated with the Meridian transformers is included in Table 3 because the failure of the RAS may result in cascading. *** The Palo Verde/Hassayampa RAS is designed to prevent cascading problems throughout the WECC region. This scheme is not Path related and is not used to protect any specific WECC Path.