NPCC Tasks Related to NERC Blackout Recommendations Timeline

Similar documents
NPCC Tasks Related to NERC Blackout Recommendations Timeline

Standard NUC Nuclear Plant Interface Coordination

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

VIA ELECTRONIC FILING

PER-005 System Personnel Training

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

CIP Cyber Security Incident Reporting and Response Planning

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

NORTHEAST POWER COORDINATING COUNCIL MINUTES

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

Standard Development Timeline

Vice Chair Independent Electricity System Operator Vice Chair. New York Independent System Operator Central Maine Power Company

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

Standard FAC Assessment of Transfer Capability for the Near-term Transmission Planning Horizon

Standard FAC Facility Ratings. A. Introduction

Minutes Board of Trustees

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to:

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

BC Hydro writes to provide the BCUC with its second errata to the Addendum to Assessment Report No. 6 (Addendum) filed on September 30, 2013.

Implementation Plan Set Two of Phase III & IV Reliability Standards

Re: NPCC Response to a Request for Criteria Interpretation on Regional Reliability Directory# 8 System Restoration.

Appendix 5A. Organization Registration and Certification Manual. WORKING DRAFT-August 26, 2014

130 FERC 61,211 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

April 13, 2015 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2

Day-Ahead Market and Forward Reliability Commitment Timing to Meet FERC Order on Compliance for Gas Electric Scheduling Requirements

Appendix 5A. Organization Registration and Certification Manual

Meeting Minutes Operating Reliability Subcommittee February 6-7, 2018

Pilot Project Initiative

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

Consideration of Comments

Community Health Centre Program

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Pilot Program Framework Proposal

Standard EOP System Restoration Coordination

To ensure system protection is coordinated among operating entities.

The Narragansett Electric Company d/b/a National Grid

5. Effective Date: See the Implementation Plan for IRO B. Requirements and Measures

Project Phase 2 Undervoltage Load Shedding: Misoperations UVLS Standard Drafting Team. Industry Webinar February 3, 2015

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

WECC Standard VAR-STD-2a-1 Automatic Voltage Regulators

Project Laura Anderson, NERC Standards Developer August 18, 2016

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to PRC System Protection Coordination

Comprehensive Interconnection Process Improvements

Standard CIP 004 4a Cyber Security Personnel and Training

Small and Large Generator Interconnection Procedures

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

NERC BES Kickoff Webinar. May 2, 2014

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

DER Pilot Program. Brian Yung Market Design Specialist Business Issues Committee. August 9, 2017, 10 Krey Blvd, Rensselaer, NY 12144

The Narragansett Electric Company d/b/a National Grid

OC Approved 2/17/05 SB/DS Stability Limits for the addition of 3.26% Series Reactor

FUNDAMENTALS OF ELECTRICITY TRANSMISSION COURSE

ERO Enterprise Strategic and Operational Planning and 2018 Business Plan and Budget Preparation Schedule (2017 Development Year)

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

CWE Flow-based Market Coupling Project

Business Requirements Specification

Board Report Agreed Management Actions Status Update

WICF GOTO Focus Group Update

Future Development Plan:

Meeting Notes Project Phase 2 of Relay Loadability: Generation Standard Drafting Team December 11-14, 2012

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No.

NN SS 401 NEURONEXT NETWORK STANDARD OPERATING PROCEDURE FOR SITE SELECTION AND QUALIFICATION

AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

1st Workshop Federal Grid Code

Developing an Incremental Proposal for EU gas transmission. Draft Project Plan

Duquesne Light Our Energy...Your Power

TRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015

REPORT OF THE SYSTEM RELIABILITY, PLANNING, AND SECURITY COMMITTEE

The State of Interconnection in NYS:

Report of the Auditor General to the Nova Scotia House of Assembly. December Independence Integrity Impact

PERSONNEL SECURITY CLEARANCES

Testimony of T.J. Glauthier President & CEO, Electricity Innovation Institute Affiliate of EPRI (Electric Power Research Institute)

A. General provisions and other electrical systems are specified in other Sections of Division 26.

PERFORMANCE WORK STATEMENT FOR. Sustainment/Patching Service U.S. AIR FORCE OWNED LAND MOBILE RADIO (LMR) EQUIPMENT. (ASTRO 25 Core System)

Explanatory document for the Nordic synchronous area proposal for coordination actions aiming to reduce FRCE as defined in Article 152(14) and

SMART ENERGY DISTRIBUTION SYSTEMS

March 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

Health Promotion Amendment (Amendment 173 to Annex 1)

COM Operating Personnel Communications Protocols

Child Care Program (Licensed Daycare)

BRAC 2005 Issues. Briefing to the Infrastructure Steering Group. December 12, 2003

Bio Energy #1 Distribution Generator Interconnections Less than 35 kv

Technology Consultation and Support

Cancer Prevention & Research Institute of Texas

November 13, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

McKinsey Recommendations for Code Compliance and Economic Development. Status Report. Dallas City Council Briefing April 20, 2005 DRAFT 1

Consideration of Comments Project Undervoltage Load Shedding (UVLS) & Underfrequency Load Shedding (UFLS)

REQUEST FOR PROPOSALS BIG DARBY ACCORD. Proposals Due by October 25, 2004

PEAK RELIABILITY. Enhanced Curtailment Calculator Task Force (ECCTF) Charter. Enhanced Curtailment Calculator Charter Final Draftv3.

WECC Criterion PRC-006-WECC-CRT-3

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels

OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

GAO. MILITARY PERSONNEL Considerations Related to Extending Demonstration Project on Servicemembers Employment Rights Claims

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

Transcription:

Tasks Related to Blackout Recommendations Timeline Rec. 16 Due Feb. 1 st Blackout Recommendations Issued Feb. 10th Rec. 11.a Completed July 14th Rec. 7.a Rec. 8.b Rec. 8.c Rec. 10 Rec. 12.a,b Rec. 13.a Rec. 14 Rec. 16 Due Feb. 10 th Rec. 1.a Completed March 3rd Rec. 3.a Rec. 6 Rec. 9 Completed June 30 th Rec. 4.b Due March 31 st Rec. 4.c Due by March Rec. 4.a Rec. 8.a TF Rec. 27 Due June 30 th Rec. 17 Due August 1st Regional BRRTF Assignments Due Dec. 2005 1 st Q 2004 2 nd Q 2004 3 rd Q 2004 4 th Q 2004 1 st Q 2005 2 nd Q 2005 3 rd Q 2005 4 th Q 2005 Rec. 2.c Completed March 31st Rec. 1.b Verified July 1 st Rec. 2.b BOT Guidelines Effective July 1 st Rec. 5.b Due Jan. 1st Rec. 8.a Due Jan. 31st Key Completed Ahead of Schedule On Schedule Behind Schedule PC review of BRRTF report December 7-8, 2005 November 30, 2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 1.a Complete FE/MISO/PJM Remedial Actions FE/MISO/PJM S P 15 Rec. 1.a - TFCO verified Control Areas meet identified mitigation measures. Completed - additional actions beyond what was required will continue in. TF Rec. 15 - Completed. Many operations measures have been reviewed and enhanced. 1.b Assignment of Experts to Assist FE/MISO/PJM 15 Rec. 1.b - In March 2005, FE provided the PC with an update on follow-up activities on FE s plan to address blackout recommendations related to the completion of outstanding reactive capability tests on several fossil generation units, resolution of a 50 MW margin for voltage stability study purposes and its implementation within the MISO process, and the evaluation of automatic undervoltage load shedding (UVLS) and its implementation at thirty-three locations by the summer of 2005. This update provided closure on FE s reporting to the PC on implementation plan items scheduled for completion in 2005. considers this recommendation closed. 2.a Significant Violations/ Quarterly Violations Reporting S P 17.A Rec. 2.a - No significant violations have been reported in. On August 2, 2005, the BOT approved the Compliance Performance Reporting Process developed by the Compliance and Certification Committee. 2.b Violation Corrective Actions * BOT S P 17.B * Applicable if there is a significant violation for a member. No significant violations reported in. BOT approved final "Guidelines for Reporting and Disclosure" on June 15th, to be effective July 1, 2004. On August 2, 2005, the BOT approved the Compliance Performance Reporting Process developed by the Compliance and Certification Committee. 2.c Review and Update Compliance Templates PC/OC/CTTF S P 17.D Rec. 2.c - Approved Templates incorporated into the 2004 Compliance Program. Completed. Assignments Page 1 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout 2.d Other(s) Staff ECAR Compliance Review ECAR/ S P 17.C Rec. 2.d - CMAS to review recommendations, when issued. Standards and Compliance Team report finalized on April 12, 2004; the final report has yet to be issued. CMAS met November 18-19 and completed the informal review. 3.a Readiness Audit Program S S P 18.A Rec. 3.a - Completed. All five Areas have successfully completed the Control Area questionnaires: ISO-NE, NYISO, and the IMO were successfully audited on-site by. TF Rec. 18.A - Completed. Additional audits will have participation based on schedule. Staff participated in the New Brunswick System Operator readiness audit (Sept. 12-16, 2005) and the TransEnergie audit (Oct. 24-28, 2005). 3.b Audit Criteria S S P 18.A Rec. 3.b - In progress. Staff has provided input into the development of the baseline audit criteria. and ECAR compliance staff recommended improvements to the compliance process. TF Rec. 18.A - Completed. Additional audits will have participation based on the schedule. Staff participated in the New Brunswick System Operator readiness audit (Sept. 12-16, 2005) and the TransEnergie audit (Oct. 24-28, 2005). Assignments Page 2 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 3.c Readiness Audits /FERC S S P 18.A Rec. 3.c - DOE (OETD) to take lead. Coordination with CCC and CCMC required. No TFCO support requested yet. is working with its members to identify sub-operating entities through the process of Functional Model registration. This information was provided to as per schedule. TF Rec. 18.A - Completed. Additional audits will have participation based on the schedule. Staff participated in the New Brunswick System Operator readiness audit (Sept. 12-16, 2005) and the TransEnergie audit (Oct. 24-28, 2005). 4.a Vegetation Related Outage Reporting Program S P S S S 16.A Rec. 4.a - Primary responsibility assigned to the Task Force on Coordination of Operation (TFCO) with reports to to be sent through the Compliance Monitoring & Assessment Subcommittee (CMAS). Procedures for reporting in place and in use. Documentation in place. Completed. TF Rec. 16.A - Standards to be developed through the Standards process. criteria will be modified to be consistent with the Standards. These have now been placed in the Compliance program. Action required to complete. 4.b Vegetation Related Outages Annual Report Transmission Operators S P S 16.C Rec. 4.b - Year 2004 Report was sent to 4Q 2004 - Completed. Documentation under development. TF Rec. 16.C - TFCO will continue to track the vegetation related outages on 230 kv and above but not all the ground-fault outages recommended. Assignments Page 3 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 4.c Vegetation Management Procedures Transmission Owners S P S 16.B Rec. 4.c - Next reporting due at the end of the fourth quarter; with the annual report due March 31, 2005. has included this requirement in the Version 0 reliability Standards, "Vegetation Management Program." Documentation completed. TFCO believes that the Transmission Owners have necessary plans in place and have submitted a plan. Completed. TF Rec. 16.B - The recommended reports currently are not posted on public websites. 4.d Vegetation Management Standard 16.A Rec. 4.d - A new, more comprehensive standard on vegetation management has been developed and posted for industry comment through July 31, 2005. The new standard specifies minimum clearance between vegetation and energized conductors based on IEEE engineering criteria. The proposed Transmission Vegetation Management Standards are posted for a 30-day pre-ballot review that ends December 19, 2005. 5.a Recommendations Actions Tracking Program P S S S S S S 5.A Rec. 5.a - RCC approved program and procedure July 14, 2004. The October 2005 Status Report was posted on the web site. TF Rec. 5.A -, DOE, FERC, and NRCAN continue development of a common database. Work underway to further develop 's existing database for tracking disturbances and unusual events. Completion scheduled for later in 2005. is now looking to develop a web page for the Regions to monitor requests made of them and the status of their responses. Assignments Page 4 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout 5.b Other(s) Staff Reliability Performance Monitoring 5.B Rec. 5.b - is working with the Outage Task Force to develop a database to track and report progress in implementing all applicable blackout recommendations. Monitoring function is still under development. initiated a collaborative effort with the NRC to analyze reliability performance trends. 6 Improve Operator/Reliability Coordinator Training S P 19.A Rec. 6 - All Areas verified compliance by June 30th. All training completed. Documentation to confirm completion of training in all Areas completed. Will determine if formal selfcertification is required. TF Rec. 19.A - has endorsed a program that will allow certified system operators to maintain their system operator credentials by earning continuing education hours (CEH) from approved training providers. This program would replace the current practice of requiring system operators to pass an exam once every five years. 7.a Reactive & Voltage Standards Evaluation PC S S S P 23 Rec. 7.a - The response was sent to the TIS in March 2005. The PC approved the TIS report at its March 2005 meeting - it was approved by the BOT at its May 2005 meeting; they resolved that the appropriate organizations and committees implement the report recommendations. TFCP has developed a whitepaper to address and document what was done and how should follow up was approved at the Sept. 2005 RCC meeting. TF Rec. 23 - The PC approved a TIS study schedule for conducting reliability and adequacy analyses of several load centers; the regional studies are expected to be completed by December 31, 2005. The TFCP's Voltage and Reactive Power Practices Report was approved at the Sept. 2005 RCC meeting. Assignments Page 5 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 7.b ECAR Reactive Power Review ECAR 23 Rec. 7.b - ECAR has contracted with a vendor to conduct a voltage/reactive study to help in establishing regional voltage/reactive criteria. TIS review of ECAR's responses was completed and accepted by the PC Executive Committee in mid-august and the PC in November 2004. 8.a Zone 3 Relay Review/Analysis TR-1 PC/SPCTF TF-2 PC/SPCTF with OC/TS S S S S P S 21.A Rec. 8.a - The SPCTF report was approved by the PC in July. The BOT approved the EHV Transmission System Relay Loadability Report and its recommendations on August 2, 2005. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-1,2). TF Rec. 21.A -The PC approved the SPCTF protective relaying loadability review for significant circuits between 100 kv and 200 kv at their June 2005 meeting, and directed the SPCTF to develop a "technical exception" for out-of-step special protection systems. The BOT approved the EHV Transmission System Relay Loadability Report and its recommendations on August 2, 2005. Assignments Page 6 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 8.b Evaluate UVLS TR-7 PC/TIS & SPCTF S P S S S 21.B Rec. 8.b - Each Area conducted the requested evaluation for their systems under the coordination of the SS-37 Working Group. SS-37 drafted a status report, sent to on February 10, 2005. The draft UVLS Evaluation Report was submitted for discussion at the Sept. 2005 RCC meeting. The RCC directed the report undergo a joint review by CMAS and the Task Forces; the UVLS report was approved at the Nov. 2005 RCC meeting. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-7). TF Rec. 21.B - The TIS expects a preliminary draft report and recommendations for PC comment by October 25, 2005 with a final report and recommendations for approval at the December 2005 PC meeting. 8.c Evaluate Planning Standard III TR-8 PC/IDWG with SPCTF & TIS S S P S S 21.C Rec. 8.c - TFCP developed White Paper on the merits of controlled separation was discussed at the January 2005 TFCP meeting. TFCP presented the revised White Paper to the RCC in June 2005. The RCC directed the TFCP to translate the recommendations into TFCP Work Plan items. The Work Plan was presented and approved by the RCC at their Sept. 2005 meeting. The SS-37 Working Group has completed an analysis of the feasibility of UVLS for the Region as a part of the Overall Transmission Review; the RCC approved both reports at its November 2005 meeting. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-8). Assignments Page 7 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout 9 Other(s) Staff Clarify Reliability Coordinator and Control Area Functions OC S P S 20 26.A 30.B Rec. 9 - Completed - no additional TFCO action is anticipated. reviewing how the Homeland Security Information Network can be used to help improve real-time communications among RCs and CAs. TF Rec. 20 - The RCWG had established guidelines for communication of alert and emergency states. The CO- 8 WG has reviewed this and has developed a list of emergency alert states. TFCO will review this list for concurrence. TF Rec. 26.A - same status as TF Rec. 20. TF Rec. 30.B - Planned outages are well coordinated among the Areas. The Emergency preparedness and the Hotline procedures address this. Completed. 10 Establish Guidelines for Real-Time Operating Tools TR-3 Completed. TR-5 OC/IS TR-6 OC/SD Task Force with MMWG S P S 22 Rec. 10 - The CO-10 Working Group has identified the EMS/SCADA failure review practices used by the Areas. In addition, CO-10 and TFCO have put in place practices to review and analyze at each meeting any EMS/SCADA failures. This includes the priority and time deadlines for restoring the systems to full capability. TF Rec. 22 - 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-3,5,6). CO-10 WG continues work on a document to replace the B-12 and C-17 Documents. 11.a August 14 System Restoration Evaluation PC/OC; PJM;, ECAR S P 29.A Rec. 11.a - The IRCWG's Restoration Report was approved by the RCC on July 14th. Completed. TF Rec. 29.A - The CO-11 IRCWG has completed this. The OC approved the Restoration Report recommendations from the ORS at its June 8-9, 2005 meeting. Assignments Page 8 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 11.b Blackstart & Restoration Evaluation S P 29.B Rec. 11.b - The IRCWG's (CO-11) Restoration Report on the August 14, 2003 system restoration was approved by the RCC on July 14th. TFCO waiting for the Planning Committee's acknowledgement of 's satisfactory completion of Rec. 11b. TF Rec. 29B - CO-11 report satisfies this item. The OC approved the Restoration Report recommendations from the ORS at its June 8-9, 2005 meeting. Completed. 12.a Regional Criteria for Synchronized Recording Devices TR-10 PC/IDWG with SPCTF S P S 28.B Rec. 12.a - The RCC discussed the SEDR WG report on Synchronized Event Data Reporting at its June 1, 2005 meeting. Presentation of the associated cost/benefit was given at the Sept. 2005 RCC meeting. The IDWG report was approved at the May 2005 BOT meeting; they resolved that the regional reliability councils take steps to improve the disturbance monitoring capabilities as outlined in the report. This report also addresses TF Rec. 23.A and 23.B. The draft SAR(s) pertaining to requirements for reporting disturbances and the installation of disturbance monitoring equipment were approved by the PC EC in July and were sent to SAC for development as standards. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-10). Assignments Page 9 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 12.b Dynamic Recorder Upgrade/Installation TR-10 PC/IDWG with SPCTF S P S 28.A Rec. 12.b - The RCC discussed the SEDR WG report on Synchronized Event Data Reporting at its June 1, 2005 meeting. Presentation of the associated cost/benefit was given at the Sept. 2005 RCC meeting. The IDWG report was approved at the May 2005 BOT meeting; they resolved that the regional reliability councils take steps to improve the disturbance monitoring capabilities as outlined in the report. This report also addresses TF Rec. 23.A and 23.B. The draft SAR(s) pertaining to requirements for reporting disturbances and the installation of disturbance monitoring equipment were approved by the PC EC in July and were sent to SAC for development as standards. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-10). 13.a Reevaluate System Operations Planning and Operating Criteria OC S P 30.A Rec. 13.a - 's Blackout Recommendation Review Task Force to report to the PC in September 2005 regarding this activity (TR-6). TF Rec. 30.A - agreement on the Bulk Power System (BPS) definition is needed to complete the identification of critical facilities. Areas have critical facilities lists, but they are not on a consistent basis. Within the CP-11 Working Group is addressing the Bulk Power System definition and which facilities are considered BPS. The RCC approved the Evaluation Study Plan for Document A-10 at their Sept. 2005 meeting, and reviewed a list of existing Area BPS elements and schedule for completion of testing at its November 2005 meeting. 13.b ECAR Reevaluation ECAR 15.D.1 Rec. 13. b - TIS's and RIS's reviews of ECAR's reports and responses were completed and accepted by the PC Executive Committee in mid-august 2004 and the PC in November 2005. Assignments Page 10 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 13.c Evaluation of Planning Processes PC S P 24 Rec. 13.c - The CP-9 Working Group of the TFCP has begun their review and tracking of the Resource Adequacy Standard currently being drafted by and has submitted comments through the SAR process. staff also made a presentation to the TIS outlining the planning process and the various studies and reviews performed by the Regions and its Areas. The TIS is preparing an assessment of the planning process and expects a preliminary draft report with recommendations for PC comment by October 25, 2005 with a final report and recommendations for approval at the December PC meeting. 14 Model Data Validation TR-4 PC/MMWG with TIS & OC/DFWG TR-9 PC/MMWG with TIS/SPCTF/ RIS TR-12,13 PC/MMWG with TIS S P S 24 Rec. 14 - developed a threestep plan: A Step 1 status report, including a summary of the existing model validation procedures, was sent to on February 10, 2005. TFSS is now reviewing the adequacy of the existing procedures and considering what new procedures, if any, may be needed (Step 2). However, is moving ahead with development and implementation of the "Phase III & IV" planning standards, which include model validation. Consequently, the TFSS proposes to postpone consideration of new procedures pending developments regarding related standards. 's Blackout Recommendation Review Task Force to report to the PC in December 2005 regarding this activity (TR-4,9,12,13). Assignments Page 11 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff 15 to investigate future blackouts and disturbances 14 Rec. 15 - has developed Blackout Disturbance and Response Procedures, which include requirements for the analysis of blackouts. These procedures were accepted by the board in May 2005, with the direction to obtain further input from the standing committees and other stakeholders as the procedures are refined and upgraded. TF Rec. 14 - Creation of a standing Binational ERO Oversight Group has been completed. A bilateral working group from the United States and Canada will address key issues related to electricity reliability in North America. The terms of reference were announced June 30, 2005. 16 Accelerate the standards transition. 25.B Rec. 16 - Completed - Version 0 standards adopted by Board for implementation on April 1, 2005. 17 Evaluate actions in the areas of cyber and physical security. 32.A Rec. 17 - The BOT extended the expiration date of Reliability Standard 1200, Urgent Action Cyber Security Standard, to the earlier of the effective date of the permanent cyber security standard or August 13, 2006. Assignments Page 12 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff Develop Enforceable Standards for Transmission Line Ratings PC/Ratings 27 TF Rec. 27 - Facility Rating Methodology SAR posted, with comments due by July 15, 2005; balloting completed in Nov. 2005; FAC 008-1 (Facility Ratings Methodology) and FAC 009-1 (Establish and Communicate Facility Ratings) passed, and will be forwarded to the BOT for adoption. One of the Determine Facility Ratings groups of standards (FAC-010-1 and FAC- 011-1) has been reposted for a 45- day comment period from December 1, 2005 through January 17, 2006, following a revision of the definition of Contingency. TLR Use 31 TF Rec. 31 - The BOT approved the urgent action revision to Reliability Standard IRO-006, Attachment 1, "Transmission Loading Relief Procedures - Eastern Interconnection" on June 15, 2005. At its November 15 16, 2005 meeting, the ORS decided to withdraw its standards authorization request that was intended to divide the reliability requirements from the business practices in the TLR Procedure, standard IRO-006. The subcommittee also agreed to ask NAESB to discontinue further work on its complementary business practice standard. The subcommittee believes that the TLR procedure is too complex and interwoven with reliability, tariff, and business practices to split into documents under the purview of two separate organizations. Establish and Implement Mapping Deliverables/Require ments for Disturbance Analysis (geographical maps and one-line diagrams). OC/DAWG with IDWG TR-14. should specify a standard set of system maps to be maintained and supplied for analysis of system disturbances. Maps should be regularly updated to reflect changes in system topology or generation facilities. Improvements to the Reliability Coordinator Information System include system flowgate maps. Assignments Page 13 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff Establish EMS and SCADA Time Synchronization Standards OC/Data Exchange WG with PC IDWG/SPCTF TR-15a. EMS hardware and software designs should be accommodate time stamps recorded by remote telemetry units (RTUs). Each substation should have GPS synchronization capabilities. TR-15b. All real-time data exchanged via ICCP data (volts, flow, frequency data, ACE) between operating entities should be similarly time stamped, and those time stamps should be included in all transmittals. TR-15c. Data collection should be well monitored to detect equipment failures and data quality problems. TR-15d. Standards for data retention and archiving should be established. Evaluate and Implement "Defense in Depth" System Monitoring, Control, and Protection Measures to Slow Down and Mitigate the Severity of Cascades. 16a: PC/IDWG with TIS/SPCTF 16b: OC/ORS with TS TR-16. For each of the Interconnections, a defense-indepth philosophy and integrated strategy should be developed based on the characteristics of that interconnection to limit the impacts of potential cascading outages. The Operating Reliability Subcommittee and Transmission Subcommittee are forming an operations planning task force to work on this. Review the Response of Switch-on-to-Fault Relay Functions to System Disturbances. PC/SPCTF TR-17. It is recommended that the SPCTF review the concept of switch-onto-fault logic and settings in relaying systems, and prepare a report for the Planning Committee on its merits, deficiencies, and setting requirements. Not started. Revise Industry Standards to Establish Under/Over Frequency Design Limits of Operation for Distance Relays. PC/SPCTF TR-18. Standardize a frequency floor above which relays should not trip. Such a frequency set point should be coordinated with UFLS and generator underfrequency tripping schemes. IEEE Standard C37.90 should be revised to include this limit. Not started. Assignments Page 14 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff Evaluate and Report on the Performance and Complexity of Protection and Control Schemes for Three Terminal Lines PC/SPCTF with TIS TR-19. should review and report on the advantages and disadvantages of the use of multiterminal line configurations on the EHV system, and any associated complex protection and control (sequential) schemes. Particular attention should be paid to the performance of such configurations and its protection during emergency operation conditions, including expected system swings. Not started. Establish Guidelines on High Speed Reclosing. PC/SPCTF TR-20. Not started. should review and report on the advantages and disadvantages of autoreclosing methods on the EHV system including: High speed automatic reclosing for multi-phase and single phase relay operation Synchronism check reclosing Require the Installation of Underfrequency Protection for Generators and Coordination with UFLS. PC/IDWG with SPCTF TR-21. Underfrequency relaying should be installed on all generators, coordinated with the underfrequency load shedding relays (IDWG to lead combined scope definition of TR-8 & TR-21) Inter-regional planning study may be needed. Evaluate and Implement Coordination Requirements for Generator Backup Protection Responses in Cohesive Generation Groups. PC/SPCTF with IDWG/RCWG TR-22. should evaluate these protection schemes and their settings for appropriateness including coordination of protection and controls when operating within a coherent generation weakly connected to an interconnection or in as an electrical island. Generators directly connected to the transmission system using a 51V should consider the use of an impedance relay instead. Not started. Assignments Page 15 of 16 12/5/2005

2005 November Status Report Board/US-Canadian TF Recommendations on Blackout Other(s) Staff Establish Regime for More In-Depth Analysis in Transmission Reliability Studies. OC & PC/TIS with MMWG TR-23a. should re-examine the appropriateness of the 30- minute criteria for returning to a safe operation following an outage. Not started. TR-23b., the Regions, and the ISO/RTOs should conduct a comprehensive analysis of the bulk power system for identification of severe combinations of contingencies. Not started. TR-23c., the Regions, and the ISO/RTOs should develop study regimes that determine severe combinations of contingencies. Not started. Continue "What if" Analyses, Promote Research Based on the Blackout, and Preserve Forensic Analysis Techniques. PC/TIS with MMWG/IDWG /DAWG TR-24. Evaluate significant what-if scenarios to learn how the overall system may have performed given varying system conditions or different sequence of events. Those studies should investigate the feasibility of preventative and safety net mitigation strategies. Not started. Assignments Page 16 of 16 12/5/2005