Project Idea Note for the JCM Model Project

Similar documents
JCM Indonesia Application Procedures. Rini Setiawati Indonesia JCM Secretariat

The JCM Development in Indonesia and Its Evolution Towards Sustainable Low Carbon Growth Cooperation

Key Considerations on JCM Methodology Development and Project Registration in Cambodia

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

ADB Trust Fund: Japan Fund for Joint Crediting Mechanism (JFJCM)

OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015

Draft Concept of the International Conference and Training Seminar. Business Planning of Energy Efficiency and Renewable Energy Projects

Support for private sector landlords. discover why energy efficient properties make sense for everyone

GLOBAL CARBON TRUST VERIFICATION MANUAL. v Global Carbon Trust - All rights reserved

JICA s tools for promoting Private Sector Partnership

Transposition of Aviation Directive. Aviation in EU ETS Workshop 30 June 2009

International Climate Initiative and NAMA Facility

SOLAR PV TRADE MISSION INDONESIA

International Investment Case: Jordan. Res4Med 25 Nov 2014 Milan

The Green Climate Fund s. Private Sector Facility

Annex 2 GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM

CLP CLIMATE ACTION BOND

PROCUREMENT NOTICE. Project name: Small Decentralized Renewable Energy Power Generation (DREG)

Capacity Building Project for Measurement, Reporting and Verification (MRV) of Greenhouse Gas (GHG) Emission Reduction in Africa

GS REQUIREMENTS VERSION 2.2. History of the document August 2008 Launch Gold Standard Version 2.0

Utility Warehouse. Feed-In Tariff scheme. Application form

Perspectives for Financial Institutions

REQUIRED DOCUMENT FROM HIRING UNIT

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

MILLENNIUM CHALLENGE ACCOUNT - INDONESIA GREEN PROSPERITY PROJECT. Window 3A. CfP Ref : CFP/GP-W3A/001/2014 CALL FOR PROPOSAL FOR

Overview of REDD Project Cycle Richard McNally Pro Poor REDD Project Launch Pro Poor REDD, Dalat 12/01/2010

EU-Indonesia. Creating opportunities for increased trade and investment between Indonesia and the European Union November 19, Jakarta, Indonesia

The Gold Standard Methodology Approval Process Guideline for Land Use & Forests... Version 1.0 Valid since June 2015

Peer Reviewed and Innovative Carbon Offsets

Annex Template for the call for input

Climate change is an important issue in Indonesia. The country consists of thousands of islands with lowlying coastal areas liable to floods as well

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

ASSEMBLY 39TH SESSION

A new initiative to catalyze high-impact NAMAs and create a vibrant practitioner network on low-carbon development

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

DEVELOPMENT OF TOWER A AND TOWER B DHARMAIS INCC TOWARDS RECOGNIZED NATIONAL CANCER CENTER IN ASIA

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects

1. Name of Project 2. Necessity and Relevance of JBIC s Assistance

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

The What, Who and How of the Partnership for Market Readiness (PMR)

Portfolio Holder for Environment and Sustainability. Llandrindod Wells Powys LD1 6NT

II. Background Information

Utility Warehouse. Feed-In Tariff scheme. Application form

Renewable Energy Initiatives by Infrastructure Development Company Ltd. (IDCOL)

Alberta Indigenous Green Energy Development Program Guidelines

Status of the GCF portfolio: pipeline and approved projects

FREQUENTLY ASKED QUESTIONS

FEED-IN TARIFF LICENSEE TRANSFER

Shifting to hygienic and eco-friendly production in the tofu and tempe industry in Indonesia

CLIMATE CHANGE: CAPACITY BUILDING AND FINANCING

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

INTRODUCTION. Organization Description

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Status of the Fund s portfolio: pipeline and approved projects

2018 CATEGORIES HOW TO ENTER.

Title 35-A: PUBLIC UTILITIES

Sri Lanka Climate Fund Ministry of Mahaweli Development & Environment

Combined Clarification Notes I VI. published on 21 October 2016

Guidance materials on Auditing Climate Change

CLIMATE SOLVER. WWF s climate innovation platform. Climate Solver Partners

The American College & University Presidents Climate Commitment (ACUPCC)

The C40 Cities Finance Facility Information pack for cities

American Association of Port Authorities Environmental Improvement Awards

Submitted Pursuant to: Minnesota Statutes section 216C.43, subd. 12 Prepared by: Department of Commerce Division of Energy Resources

New Jersey Energy Resilience Bank

Public consultation on the Establishment of the Innovation Fund

b. Inform the Secretariat that it has commenced consultations with the NDA or, if applicable, the focal point.

Production Device Registration

Voluntary Carbon Standard

Business Development Course Programme

Directive for the Austrian JI/CDM Programme

Offsets Registry Program Manual

PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE. (Version 06) (Effective as of 15 April 2010)

Review of Currently Available Grants and Rebate Programs

GLOBAL NAMA FINANCING SUMMIT: SETTING THE STAGE FOR OUR DISCUSSIONS Copenhagen, Denmark

Operational Programme Entrepreneurship and Innovations for Competitiveness Regional Office of CzechInvest for South Moravia region

GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

GREEN PROSPERITY PROJECT WINDOW 3.B CALL FOR PROPOSALS FOR CO-FINANCING GRANTS FOR COMMERCIAL RENEWABLE ENERGY PROJECTS IN INDONESIA

MEXICO PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) ISR 02 COVERING PERIOD 10/ /2018

City Council Report 915 I Street, 1 st Floor Sacramento, CA

Industrial Development

ELENA TECHNICAL ASSISTANCE

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

SA GREEN FUND. OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013

TGIF: The Green Initiative Fund

New Solar Homes Partnership Program. Maggie Dimitrova Pacific Gas and Electric Company

The Accreditation and Verification Regulation - Quick guide on the role of the verifier and the CA

Clarifications III. Published on 8 February A) Eligible countries. B) Eligible sectors and technologies

Point Renovation Info Service, France

Residential- and Small-Scale Solar Hot Water Program Manual

LOW-CARBON INNOVATION FUND (LCIF) Program Guidelines

Republic of Uzbekistan: Samarkand Solar Power Project

ADVERTISEMENT OF PUBLIC NOTICE

Local Governments and Sustainability Survey

New Growth Strategy (Basic Policies)

Feed in Tariff Application Form

Progress of Expert Working Group on ESM (EWG)

Africa-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets. Alexander Huppertz

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

Transcription:

Project Idea Note for the JCM Model Project Document release date (08/12/2016) Title of the proposed project (should be self-explanatory and Green Laundry Room at Boarding School in Pandeglang, clearly indicate the activity leading Banten to emissions reduction) Host country The main contact for the project (for identification of the person in charge for the project in terms of communication) Republic of Indonesia Name of the contact entity (company, etc): Pundi Artha Ghani Address of the contact entity: Menara Sentraya 11 th Floor Unit A6 Jl. Iskandarsyah Raya No. 1A Kebayoran Baru 12160 Indonesia Phone. + 62 21 2788 1929 Fax. +62 21 2788 1930 Website of the contact entity: Name and position of the main contact person in the entity: Mrs. Irene Lianova (Director) E-mail of the main contact person: general@pundiartha.com Phone number of the main contact person: +62-21-2788 1929 Japanese participant[s] for the project and their roles in the project (if possible, please indicate the contact person of each entity involved in the project) Name of the entity (company, etc): Roles of the entity in the project: Website of the entity: (Name and position of the contact person in the entity: ) (E-mail of the contact person: ) (Phone number of the contact person: ) Name of the entity (company, etc): Roles of the entity in the project: Website of the entity: (Name and position of the contact person in the entity: ) (E-mail of the contact person: ) (Phone number of the contact person: ) 1

[please add other entities if necessary] Participant[s] of host country for the project and their roles in the project (if possible, please indicate the contact person of each entity involved in the project) Name of the entity (company, etc): Pundi Artha Ghani Roles of the entity in the project: Focal Point, Project Participant & the Project Owner Menara Sentraya 11 th Floor Unit A6 Jl. Iskandarsyah Raya No. 1A Kebayoran Baru 12160 Indonesia Phone. + 62 21 2788 1929 Fax. +62 21 2788 1930 Website of the entity: (Name and position of the contact person in the entity: Irene Lianova (Director) (E-mail of the contact person: general@pundiartha.com) (Phone number of the contact person: + 62 21 2788 1929) Name of the entity (consultant, etc): PT. Asia Carbon Indonesia Roles of the entity in the project: Project Consultant/ JCM Consultant 1. Assistance on feasibility study development. 2. Assistance on methodology development. 3. Assistance on project design document development. 4. Assistance on emission reduction calculation. 5. Assistance on validation and verification processes. 6. Assistance on JC registration and issuance. Menara Sentraya 11 th Floor Unit A6 Jl. Iskandarsyah Raya No. 1A Kebayoran Baru 12160 Indonesia Phone: +62 21 2788 1750 Fax: +62 21 2788 1752 Website of the entity: www.asiacarbon-indonesia.com (Name and position of the contact person in the entity: Mr. Irfan Pawennei (Director) and Mr. Saktiyo T. Nugroho (Manager) (E-mail of the contact person: general@asiacarbon-indonesia.com and saktiyo@asiacarbon-indonesia.com) (Phone number of the contact person: +62 21 2788 1750) 2

Brief summary of the project Example: Objective of the project Location of the project Scale of investment including planned source of investment Technology[ies] to be adopted for the project, and brief description of the technology[ies] Project implementation scheme, and role of each participant Current status and progress of the project The proposed JCM project aims to increase capacity of a laundry facility at the boarding school and improve energy saving by introducing high-efficiency technologies. The project is located in Pandeglang, Banten, Republic of Indonesia and managed by PT Pundi Artha Ghani. The type of key technologies as follows: Econavi-inverter-active foam washing system (newly installed or installed to replace existing the washing machine system; new methodology is developed); LED lighting (newly installed or installed to replace fluorescent lighting; methodology used: ID_AM005); and Solar PV system (newly installed or installed solar V system; new methodology is developed). The project implementation scheme can be seen in the figure 1 (please see Attachment I). Rough estimation of expected GHG emission reductions (unit: tco 2 /year) Expected schedule up to the EPC completion and the registration under the JCM Capacity building activity for the participant[s] of host country (cf. training on operation and maintenance of newly installed equipments, information sharing among stakeholders, organizing workshops, and/or study tour to Japan) The source of investment for the project activity will be obtained from equity and loan. Currently, the status of project activity is under pre-feasibility study. The project is expected to reduce a total of... tco 2 e greenhouse gas annually, among which... tco 2 e/yr by econavi-inverter-active foam washing system,... tco 2 e/yr by LED lighting and... tco 2 e/yr by solar PV system. Please refer to Attachment II. This section will be developed after engaging with the Japanese participant. 3

Please insert an image of implementation structure. SAMPLE 4

Attachment I. Project Implementation Activity Project Approval (including FS) Design Work Civil Work Equipment Supply and Installment Operation Institution in Charge 2016 2017 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2018 Note: : Project participants (PT Pundi Artha Ghani & Japanese participant) (Please note that the schedule above may deviate due to the circumstances of the project activity). 5

ATTACHMENT II. ESTIMATED SCHEDULE UNDER JCM 4 Activity EPC Work EPC Completion Proposed Methodology Development Submission of Proposed Methodology Approval of Proposed Methodology PDD Development Submission of PDD Validation Registration Institution in Charge & ACI & ACI JC, & ACI & ACI JC, & ACI TPE, & ACI JC, TPE, & ACI 2016 2017 12 1 2 3 4 5 6 7 8 9 10 11 12 Note: : Project participants (PT Pundi Artha Ghani & Japanese participant) ACI : Indonesian consultant (PT Asia Carbon Indonesia) JC : Joint Committee TPE: Third Party Entity (Please note that the schedule above may deviate due to the circumstances of the project activity). 6